Loading...
Report SEP -21 -2007 FRI 02 : 34, .CARLSON TESTING INC. FAX NO. 503.P40954 P, 02/02 d_ w n7Wbr Qpur, Salem 0( /fee 116.1 nyfrn Carlson Testing, Inc -� � "" ii5, Nl 6l Rd ul! ffyv r7ft wl,! „r .qtr eA uu ➢77ur 9.,p1, Olt D77u; I'lwue; (fu,,l ad. rJr'( 0...:00.99M-a12 Piney, 04 i.fl,. ul.ir Construction Materials Testing & Inspection ” °1 GSd n, 5 ns, <,v,.ier, ec r. i.n„ Special Inspection FINAL SUMMARY LETTER September 21, 2007 TO509634,G City of Tigard 13125 SW Hall Blvd • Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2B — Building 24 • i07y3 'SW Canterbury Lane -- Tigard, OR Permit No.: BUP2005 -00305 Dear Sir or Madam: • This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with 'The approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Steven W. each Project Manager • SW L /tm • cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible