Loading...
Report .3- (/�� • Inc. Lain 011ira Salem Office Brad °pite Carlson Testing, PJ1oSII'lfwedei o6o,rad,nn.�r T' B ene t OR 3 7702 =l1 Tigmel OR 97"3 Salem OR 97301 Bend OB 9770' Phnrm (503)6U 3160 Phone !303/_59 -1_;: Phone (541)330 91 Construction Materials Testing & Inspection :,e9 -/309 9, 1 Special Inspection FINAL SUMMARY LETTER July 13, 2007 T0509634.E City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2B — Building 22 Ap7Z 7 — 1$53:5. SW Canterbury Lane — Tigard, OR Permit No.: BUP2005 -00307 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. YZ - 7g ) .Leac Project Manager SWL/tm cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible /,'/r,0aoris - 30 MATERIALS PAGE DATE oF1 ATERIALS REV. DATE 2/6/06 TESTING & / 4 72 7 ' da"'fer -Awx INSPECTION C: \DOCUME \DANN \LOCALS-1 \TEMP \060011 RP T(2.2.06) -DOC o Environmental Services o Geotechnical Engineering o Construction Materials Testing o Special Inspections Dana Hunt Polygon Northwest Homes Project: Canterbury Woods (CT #04196, MA #04 -34) 109 E. 13th St. Inspector: Phil Jacques A WS /CJVI #91010571 Vancouver, WA 98660 Ski Harris AWS /CWI #03080431 Dan Colby A IVS /CLJ'I #00050471 Inspection Date: February 2, 2006 MTI #: 0-60011c STRUCTURAL STEEL WELDING INSPECTION REPORT On the above dates, our representative arrived at Pacific Steel Co., Middleton, ID to perform work on the referenced project as reported below. Work was in progress and performed by two welders and one welder helper for clean up, pick up and staging procedures. Weldments consisted of complete joint penetration, single /multi -pass fillet welds on continuity plates and connection plates for wide flange moment columns and beams. The in- progress work had material identification checked. All phases of work was monitored, inspected and documented with approval per AWS D1.1 and contract specifications and approved structural drawings. Note: Work was inspected without plans marked `approved'. Work is also in progress at this time, all cjp weldments on piece marks 9 and 10 has been completed and ultrasonic non - destructive testing performed. There were no relevant indications. Some fillet welds still to be completed on above mentioned items. Work inspected was in compliance with project plans, shop drawings and specifications, except as noted. If you have questions concerning this report, please call us at (541) 889 -3602. Respectfully submitted, MATERIALS TESTING & INSPECTION, INC. Reviewed by: Phil Jacques Northwest Regional Manager 110 SE 2'd Avenue, Ontario, OR 97914 541 889 -3602 Fax 541 889 -3605 E -Mail mtior @mti- id.com www.mti- id.com