Loading...
Report 11/22/06 WED 11:15 FAX 503 670 9147 CARLSON TESTING 0 002 Carlson Testing Inc. °� Ncdfm$Y_ 6303)flli rill r e �a, OR a�n3 S hten, QR.>ixP: Bard. wesno: ' PMnrc 00.9 G41 -7.`M Awe: (70A JUPPJ? Aare. 041) 3309M Construction Materials Testing & Inspection Fro "a"a"'e e� rsw1SX91309 F 641) 330-9163 • Special Inspection FINAL SUMMARY LETTER November 22, 2006 T0509633H City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Hap Watkins Re: Canterbury Place Phase 1B- Building 14 077 ' -486-73 SW Canterbury Lane- Tigard, OR Permit# Bup2005 -00302 Dear Mr. Watkins: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CA ON TEST I r( t I Steven . Leachi �J Project Manager SW Uks cc: Polygon Northwest Co- Dana Hunt CT Engineering - Todd Eaton Milbrandt Architects- Bob Weible • /a0-1)5-_ZI-03o z PAGE # 1 OF1 MATERIALS /0779 5L,-/ (44-4-4424,:3- //I REV. DATE 2/6/06 TESTING & INSPECTION C' \DOCUME -1 \DANN \LOCALS -1 \TEMP \060011RP 7(2.3 06).000 o Environmental Services o Geotechnical Engineering o Construction Materials Testing o Special Inspections Dana Hunt Polygon Northwest Homes Project: Canterbury Woods (CT #04196, MA #04 -34) 109 E. 13th St. Inspector: Phil Jacques AWS /CWI #91010571 Vancouver, WA 98660 Ski Harris AWS /CWI #03080431 Dan Colby A WS/CWI#00050471 Inspection Date: February 3, 2006 MTI #: 0-60011c STRUCTURAL STEEL WELDING INSPECTION REPORT On the above dates, our representative arrived at Pacific Steel Fabricators, Middleton, ID to perform work on the referenced project as reported below. Work was in progress and performed by two welders and one welder helper for clean up, pick up and staging procedures. Weldments consisted of complete joint penetration, single /multi -pass fillet welds on continuity plates and connection plates for wide flange moment frames. The in- progress work had material identification checked. All phases of work was monitored, inspected and documented with approval per AWS D1.1 and contract specifications and approved structural drawings. Note: Work was inspected without plans marked "approved ". Work is also in progress at this time, all cjp weldments on piece mark 11 has been completed and ultrasonic non - destructive testing performed. There were no relevant indications. Piece mark 12 is in progress and has not had ultrasonic testing performed. Some fillet welds still to be completed on above mentioned items. Work inspected was in compliance with project plans, shop drawings and specifications, except as noted. If you have questions concerning this report, please call us at (541) 889 -3602. Respectfully submitted, MATERIALS TESTING & INSPECTION, INC. Reviewed by: Phil Jacques Northwest Regional Manager 110 SE 2 " Avenue, Ontario, OR 97914 541 889 -3602 Fax 541 889 -3605 E -Mail mtior @mti- id.com www.mti - id.com