Loading...
Report 6 az�5 cry p PAGE # 1 OF1 MATERIAUU /07// REV. DATE 2/6108 ` _ TESTING & \ 00 RTS12006 REPORTS y INSPECTION O�D16001 060011 POLVOONI1 -17 -06 TO - 2-6 2 -6 0610600110PT(2.6 06).00C ❑ Environmental Services ❑ Geotechnical Engineering ❑ Construction Materials Testing ❑ Special Inspections Polygon Northwest Homes Project: Canterbury Woods (CT #04196, MA #04 -34) 109 E. 13th St. Inspector: Phil Jacques A WS/CW/ #91010571 Vancouver, WA 98660 Ski Harris AWS /CW1#03080431 Dan Colby AWS,' WI #00050471 Inspection Date: February 6, 2006 MTI #: O-60011c STRUCTURAL STEEL WELDING INSPECTION REPORT On the above dates, our representative arrived at Pacific Steel Fabricators, Middleton, ID to perform work on the referenced project as reported below. Work was in progress and performed by two welders and one welder helper for clean up, pick up and staging procedures. Weldments consisted of complete joint penetration, single /multi -pass fillet welds on continuity plates and connection plates for wide flange moment frames. The in- progress work had material identification checked. All phases of work was monitored, inspected and documented with approval per AWS D1.1 and contract specifications and approved structural drawings. Note: Work was inspected without plans marked "approved ". Upon arrival, MTI representative was informed that the 12 frames had been shipped to Portland earlier that morning. Based on discussions with MTI representatives Ski Harris and Dan Colby, the visual and non - destructive inspections were completed on frames 1 through 11. Frame 12 will be shipped back to Pacific Metal Fabricators for visual and non - destructive inspections. Work inspected was in compliance with project plans, shop drawings and specifications, except as noted. If you have questions concerning this report, please call us at (541) 889 - 3602. Respectfully submitted, MATERIALS TESTING & INSPECTION, INC. Reviewed by: Phil Jacques Northwest Regional Manager VI us at • 110 SE 2 " Avenue, Ontario, OR 97914 541 889-3602 Fax 541 889-3605 E-Mail mtior @mtiid.com www.mti4d.com 12/06/06 WED 08:15 FAX 503 670 9147 CARLSON TESTING ij011 • l MAotnK s ue. Carlson Testing, Inc. ° ° > riNIS �1 n44 Hlishat St, NE 7Yyw ffprzg �'c4enr,(.149730! Berrd. S Abm• OUP 06.1.5460 FAc s 1503) SH44252 !'home: (344 330.917) Construction Materials Pasting & Inspection ``D 664-0951 F .r5031SR9 (wN Mtt154!)5309/43 Special Inspection FINAL SUMMARY LETTER OFFICE COPY December 5, 2006 T05096331 City of Tigard Building Department 13125 SW Hall Blvd DEC 0 0 2006 Tigard, OR 97223 - 8199 CITY OF i,' ;,r ) Attn: Hap Watkins BUILDING Re: Canterbury Place Phase 1B- Building 20 / ®7// 4 frSW Canterbury Lane Tigard, OR Permit# BUP2005 -00309 Dear Mr. Watkins: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office, If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. ven W. Leach Project Manager SWUks cc: Polygon Northwest Co- Dana Hunt CT Engineering- Todd Eaton Milbrandt Architects- Bob Watkins