Loading...
Report Main OJfre Salem Office Ben! Quire e l< Carlson Testing Inc. AdiO SW l8ur_4c Pho - rclwn 5 12 63 OB Rae) #I1 gnrd. OR 972:5 Sn /rm ON 97101 Rend OR 9770' Phone. I50i4 631 -5460 /'Bone: I =Oi/ iy9 -1: i^ Phone. 1:414 330.9155 Pa, n 1503) 634 -0954 Fin 1503, 580 1309 pat 154113311 -9163 • Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER April 13, 2007 /0715 C / T0509634.N 64 Paws 00 ? -1 '7 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2C — Building 19 p 7 /S 4057-3 Canterbury Lane — Tigard, OR Permit No.: BUP2005 -00299 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are•any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. even W. Leach Project Manager SW L /tm cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible „e'J/°o7or.95- CIO 2c1q \ io 7/5 l; -e ry Ls, Polygon Northwest Company 109 East 13 st. Vancouver Washington 98660 o PY DEERE C Quality Assurance Summary Letter: Building #19 HGGH Canterbury Woods This letter is to confirm that all Polygon Northwest Quality Assurance inspections have passed in accordance with all engineering and plan specifications. Thank you / Date: 4/16/07 �I Json Bellar Quality Assurance Manager RECEDED APR 1.6 2007 CITY OF TIGARD BUILDING DIVISION