Report • Y
J Salem laia Office Office Bead OW, Carlson Testing, Inc. e439 Sir /1mr_rlm Mahon St., 6 OR Rd 911 71Krnd OR 97..3 4060 Salem, OR 97S01 Hnnl. OR 9770'
Phone (503) 68{.3460 Phone 1 -1.5_' Phone. 1541)330 91_
Construction Materials Testing & Inspection
F. 6OJl /S 0954 Pr/c 150.3, 5R9 -1109 l/6i
Special Inspection
FINAL SUMMARY LETTER
July 13, 2007
T0509634.D
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Canterbury Place Phase 2B — Building 21
10591 SW Canterbury Lane — Tigard, OR
Permit No.: BUP2005 -00308
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
/C_
Steven W. Leach
Project Manager
SWL/tm
cc: Polygon Northwest Co — Dana Hunt
CT Engineering — Todd Eaton
Milbrandt Architects — Bob Weible
3,30 Sir 1 lain OJJire Salem Office Bend Office Carlson Testing, Inc. luariker
Plume.(593)84- 40991991,99 Sr. ,VA 63d'S ON Rifer Rd ill
Tignrd, OR 9�. ?3 Salem. OR 971/11 Bend. OR 97702
Rile) /'hone /303J 6.4 -3160 Phone: /_ +03/ s79 - /?i? Phone- (541) 330-91.
Fare
1503, 6e4 -0951 F. ( , 89-1809 Fir 1311) 330 -9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
July 13, 2007
T0509634.D
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Canterbury Place Phase 2B — Building 21
jo7 /9 --1-069-1—SW Canterbury Lane — Tigard, OR
Permit No.: BUP2005 -00308
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
Project Manager
SW L /tm
cc: Polygon Northwest Co — Dana Hunt
CT Engineering — Todd Eaton
Milbrandt Architects — Bob Weible