Loading...
Report • Y J Salem laia Office Office Bead OW, Carlson Testing, Inc. e439 Sir /1mr_rlm Mahon St., 6 OR Rd 911 71Krnd OR 97..3 4060 Salem, OR 97S01 Hnnl. OR 9770' Phone (503) 68{.3460 Phone 1 -1.5_' Phone. 1541)330 91_ Construction Materials Testing & Inspection F. 6OJl /S 0954 Pr/c 150.3, 5R9 -1109 l/6i Special Inspection FINAL SUMMARY LETTER July 13, 2007 T0509634.D City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2B — Building 21 10591 SW Canterbury Lane — Tigard, OR Permit No.: BUP2005 -00308 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. /C_ Steven W. Leach Project Manager SWL/tm cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible 3,30 Sir 1 lain OJJire Salem Office Bend Office Carlson Testing, Inc. luariker Plume.(593)84- 40991991,99 Sr. ,VA 63d'S ON Rifer Rd ill Tignrd, OR 9�. ?3 Salem. OR 971/11 Bend. OR 97702 Rile) /'hone /303J 6.4 -3160 Phone: /_ +03/ s79 - /?i? Phone- (541) 330-91. Fare 1503, 6e4 -0951 F. ( , 89-1809 Fir 1311) 330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER July 13, 2007 T0509634.D City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2B — Building 21 jo7 /9 --1-069-1—SW Canterbury Lane — Tigard, OR Permit No.: BUP2005 -00308 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Steven W. Leach Project Manager SW L /tm cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible