Report • Mahn Office Salem Opine Bend Ogirr
Carlson Testing, Inc. 5-130 SI
0031,_,4 -3 -1060160100, St NE Q +o.: oa allel Rd r,
7 7 OH 97223
Ph Phone OR3158 9. 1. ;3 6302 019 tle Plume / =03/ 68; 360 Phone (5031:F Phnrlc. (40 t30 -915
(5631684 -09il l ac (031589_1309 Fay 85-111330.9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
July 13, 2007
T0509634. F
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Canterbury Place Phase 2B — Building 23
(a 735 _1068-7--SW Canterbury Lane — Tigard, OR
Permit No.: BUP2005 -00306
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
Project Manager
SW L /tm
cc: Polygon Northwest Co — Dana Hunt
CT Engineering — Todd Eaton
Milbrandt Architects — Bob Weible
,ass - 5 �p/,`
4 PAGE # 1 OF1
MATERIALS �d7� �� � ��C�y(
,—, .4;4( ` REV. DATE 2/16/06
TESTING &
INSPECTION C. \DOCUME-1 \DANN \LOCALS \ TEMP \060011 RP
T(2 9 06) (2)'Doc
o Environmental Services o Geotechnical Engineering o Construction Materials Testing o Special Inspections
Dana Hunt
Polygon Northwest Homes Project: Canterbury Woods (CT #04196, MA #04 -34)
109 E. 13th St. Inspector: Phil Jacques AWS /Cwr #91010571
Vancouver, WA 98660 Ski Harris AWS /Cw1#03080431
Dan Colby AWS/CWI#00050471
Inspection Date: February 9, 2006
MTI #: 0-60011c
STRUCTURAL STEEL WELDING INSPECTION REPORT
On the above dates, our representative arrived at Pacific Steel Co., Middleton, ID to perform work on the
referenced project as reported below. Work was in progress and completed, performed by two welders and one
welder helper for clean up, pick up and staging procedures. Weldments consisted of complete joint penetration,
single /multi -pass fillet welds on continuity plates and connection plates for wide flange moment columns and
beams.
The in- progress and completed work had material identification checked. All phases of work was monitored,
inspected and documented with approval per AWS D1.1 and contract specifications and approved structural
drawings.
Note: Work was inspected without plans marked `approved'. CJP weldments on piece marks 12, 13 and 14 has
been completed and ultrasonic non destructive testing performed. There were no relevant indications.
If you have questions concerning this report, please call us at (541) 889 -3602.
Respectfully submitted,
MATERIALS TESTING & INSPECTION, INC.
)C
Reviewed by: Phil Jacques
Northwest Regional Manager
110 SE 2'd Avenue, Ontario, OR 97914 541 889 -3602 Fax 541 889 -3605
E -Mail mtior @mti- id.com www.mti- id.com