Loading...
Correspondence ,), /�uvore1ym ` liiglV�i'�I 4 x, September 28, 2005 _.' CITY OF TIGARD Canterbury Place LLC OREGON Dana Hunt 109E 13 St. Vancouver, WA 98660 RE: TWO STORY 4 PLEX CONDOMINIUMS - BUILDING # 22 PLAN VIEW – F1,E1,E1,F1 Building Permit: BUP2005 -00307 Construction Type: VN - Sprinklered Occupancy Type: RI Area: 2 Story+ Basement, 7,324 Sq Ft Tenant Name: Canterbury Crest Address: 167,2 7-49635 Canterbury Lane The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved. The above permit is approved for construction subject to the following conditions CONDITIONS 1. Special inspection is required for Structural Welding, Concrete and reinforcement placement, High- strength bolting and Special moment - resting steel frame etc.. The special inspection agency shall furnish inspection reports to the Engineer of Record, CT Engineering, the General contractor, and the City of Tigard Building Division (attn. Hap Watkins). All discrepancies shall be brought to the attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, is in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC 2. The City of Tigard, Building Division, is requiring Structural Observations per section 1709 Oregon Structural Specialty Code (OSSC). The owner shall employ a registered design professional to perform structural observations as defined in Section 1702, OSSC. The structural observations shall take place after the framing of each floor level prior to the installation of floor joist or roof trusses above the structural framing. Deficiencies shall be reported in writing to the owner and to the City of Tigard, Building Division, attention Hap Watkins. FYI The structural observations do not waive the framing inspection required by code. 3. Shear -wall Sheathing and Gypsum Sheathing shall be attached and inspected in stairwells prior to the construction of stairs or landings. 4. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. Sec. 2406. Some of these locations are as follows: 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 a. Glazing in ingress and means of egress doors. b: Glazing in storm doors. c. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. 5. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Deferred items; * *Fire Sprinklers * *Truss Design * *Fire- Stopping Details American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfull Va Henze , Senior Plans Examiner UU�aZ�S ' 47z3c9 7 X07 7 .suJ c 6.7 1. WO Polygon Northwest Company 109 East 13st. Vancouver Washington 98660 Quality Assurance Summary Letter: Building #22 Canterbury Woods Lt< I d ''. This letter is to confirm that all Polygon Northwest Quality Assurance inspections have passed in accordance with all engineering and plan specifications. • Thank you • P -0 C4 Da te: v` Jason Bellar Quality Assurance Manager • RE cE ; v Eo JUL 31 2001 C11 Y ( 1 Forivk. BUILDING DIVISION