Correspondence February 4, 2008
Stephen & Florence Woodcock
11300 SW 108 Ave.
Tigard, OR 97223
RE: RESIDENTIAL ALTERATION
Project Information
Building Permit: MST2008 -00007 Construction Type: VB
Address: 11300 SW 108 Ave. Occupancy Type: R -3
Area: 0 Stories: 1
The plan review was performed under the 2005 Oregon Residential Specialty Code (ORSC). The
review of the submitted plans will be completed when the following information is provided.
1. Please provide a drawn or written detail on ground clearance and protection from
decay of new wall in -fill (old garage door) Per R319.1 Item 5.
2. Insulation summary on plans is not compliant to prescriptive code requirements,
please provide summary of Energy Code compliance, see Energy Code packet.
3. Please submit verification that existing furnace and water heater are not of
combustion fuel, i.e., gas, oil, or solid fuel. If combustion appliance exists they need
to comply with combustion air requirements Per G2407.1 See sections and diagrams.
4. I am available for a consultation meeting to clarify any questions you may have.
When responding, provide an itemized letter stating in what way each issue has been
addressed in the revision.
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of
Tigard in tracking and processing the documents.
Respectfully,
Brandon Shaw
Plans Examiner
BrandonS @tigard - or.gov
Phone: 503.718.2425
Fax: 503.624.3681
Stephen & Florence Woodcock
;:. ` 11300 SW 108t Avenue
. ‘s:`, Tigard, OR 97223
February 20, 2008
Attention: Brandon Shaw, Plans Examiner
E a o 4 ' °
RE: RESIDENTIAL ALTERATION � y
Project Information
Building Permit: MST2008 -00007 Construction Type: VB
Address: 11300 SW 108 Avenue Occupancy Type: R -3
Area: 0 Stories: 1
In response to the letter we received (copy enclosed) we have made the following
revisions to our plans.
1. We will install metal flashing to the front of garage/ renovated area extending 6"
vertical from concrete.
2. We will blow 12" of additional insulation throughout the whole attic cavity.
3. We have cut a ventilation hole in the garage ceiling measuring 36" x24" to comply
with combustion specifications.
Please let us know if there is anything else we need to do to come into compliance.
Thank you,
;:''' ;, ) . \ ,"/ , ,,./ ,:
/16 daga
Misty Woodcock
(on behalf of Stephen and Florence Woodcock)