Loading...
Correspondence City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 April 2, 2008 . � Gertz Construction Company Inc. n ' 06 4.75 19200 SW 46 Ave. i\? 1 , r T I G 6 C ®5. Tualatin OR, 97062 -8770 RE: Lot # 1 Project Information • Building Permit: MST2008 -00015 Construction Type: VB Address: 13778 SW Halcyon Terrace Occupancy Type: R -3 Area: 2574 Sq. Ft. Stories: 2 The plan review was performed under the 2005 Oregon Residential Specialty Code. The review of the submitted plans will be completed when the following information is provided. Please provide two revised copies showing crawl and attic access locations or a letter detailing intended location, so we can red line them on the plans. Supply a detail with the ledger board (deck /porch) attachment and please include the / hangers for the joists. "<'-- Provide beam calculations for deck /porch beams ((2)5 1 /8 "X 12 "GLB). Beam NB -2 calculated with only a 600# concentrated load at 1.5' but beam NB -2A has reactions of 1323 #. Beams M -2 &3 that support NB -2 should be revised with additional loading. Please revise footing s under said beams with regards to added loads, submit two copies. 5. When responding, provide an itemized letter stating in what way each issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 • This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. • BUILDING DIVISION TIGARD TRANSMITTAL LETTER !? r TO: / .i /(-u ,v �L AT . DATE RECEIVED: DEPT: BUILDING DIVISION EGA \ FROM: �' .e KJ L- APR 3 20 :a COMPANY: 6 .e;,t� 0 . der /4-c___ \ his - - '® PHONE: ,5 • ? L - 3 3 Pb • L ilk', RE: `3 7) $ A- i , -c t,t,..,., A 5r , ZCC B - o cc/ s - . (Site Address) (Permit/Case Number) (Project name or sub 'vision name and lot number) . ATTACHED ARE THE FOLLOWING'ITEMS: Copies: ,Descri :ption :` : . ` . : Copies,:. ,.:Des' scription: : . Additional set(s) of plans. 3 xZ- Revisions: Cross section(s) and details. Wall bracing and /or lateral analysis. Floor /roof framing. Basement and retaining walls. ry2.- Beam calculations. Engineer's calculations. Other (explain): • REMARKS: / r , 1 -..t1 A cr � lr.�� axe /v C�,✓s 4: s 9 Q� . • . F OR OFFICE US E ONLY : Routed to Permit Technician: Date: Initials: Fees Due: n Yes I I No Fee Description: Amount Due: $ . - $ $ . .. $ Special Instructions: Reprint Permit (per PE): I I Yes n No I I Done Applicant Notified: Date: . Initials: • l \Building \Forms \Transmittal Letter- Revisions.doc 4/4/07 Brandon Shaw From: Brandon Shaw Sent: Thursday, April 10, 2008 7:58 AM To: 'Ken Gertz' Subject: Lot # 1 I'm proccessing the paperwork that was submitted the other day and reviewing Lot # 1 (MST2008-00015) . I still do not have the revise information that was requested. Item 1- Crawl space to be under stairs? Attic access in the master closet? 2,3, & 4 are the inportant items that need to be addressed. Site plans for all Lots have been received ant routed to others - planning, arborist, engineering. Brandon Shaw Plans Examiner Tigard OR, 97223 503 - 718 -2425 1 Brandon Shaw From: Ken Gertz [Ken @Gertzco.com] Sent: Thursday, April 10, 2008 8:44 AM To: Brandon Shaw Subject: Re: Lot # 1 Attachments: Lot 1 Edgewood PLan Corrections.pdf Here ya go. I did not bother to check the footings under the 2 beams as the loading only changed about #100 each and they were already over designed. Let me know if you need anything else. KG Brandon Shaw wrote: > If you could, please and thank you. > Brandon Shaw > Plans Examiner > Tigard OR, 97223 > 503 - 718 -2425 > Original Message > From: Ken Gertz [mailto:Ken @Gertzco.com] > Sent: Thursday, April 10, 2008 8:12 AM > To: Brandon Shaw > Subject: Re: Lot # 1 > Brandon, > It should all be in the packet I turned in at the front desk Tuesday. > There was a whole stack of all the items for all the jobs. I wanted > to be sure you had everything that has come back to me. Maybe it is > stuck in another of my files? > If you don't have them , I can PDF them and shoot them to you. > KG > Brandon Shaw wrote: » I'm proccessing the paperwork that was submitted the other day and » reviewing Lot # 1 (MST2008- 00015) . I still do not have the revise » information that was requested. » Item 1- Crawl space to be under stairs? Attic access in the master closet? » 2,3, & 4 are the inportant items that need to be addressed. » Site plans for all Lots have been received ant routed to » others- planning, arborist, engineering. » Brandon Shaw 1