Loading...
Correspondence Ae9 S'S -- .),> .Tien/ C April 28, 2005 U — al ha COMMUNITY DEVELOPMENT Mr. Robbin Lee Lee Land Homes 28 Becket Street Lake Oswego, OR 97035 Re: Residence @ Lot 4, Bretton Woods Development Tigard, OR -- Permit # MST2004 -00257 Dear Mr. Lee: Further to your request, we met you at the site to observe the as -built conditions. The city inspector wrote a correction worksheet regarding some non - compliance framing items (copy enclosed for reference). The intent of this letter is confirmation of our discussions in an effort to correct the non - compliant items. We have notified the engineer of record to inform him that we have been retained to assist in this way. It is our intent to review the approved permit drawings and recommend how best to accommodate the existing and approved design as submitted. We will not revise the design in any way, but merely complete the intent of the structural load path - included in the approved drawings. As noted in the correction worksheet, items of correction are needed at shear walls 8, 9, 26, 29, and 30. We have prepared the enclosed SK type drawings to show our recommendations for remedial work. We trust this information is adequate for your needs at this time. Please feel free to contact our office if you have any questions or if we can be of additional service. E Very truly yours, . aJCTU/q ALPHA COMMUNITY DEVELOPMENT ��0 PROpe` ■') v‘ GIN EF cS'j W 12'320 O� ° OREG Steven J. Entenman, PE, SE t'` "F ,A��Y1 Principal � � N J. ENS EXPIRES: I - 51 or • Encl. Plaza West, Suite 230, 9600 SW Oak, Portland, Oregon 97223 [T] 503 - 452 -8003 [F] 503- 452 -8043 ii June 24, 2005 -alpha COMMUNITY DEVELOPMENT Mr. Robbin Lee Lee Land Homes 28 Becket Street � ��� � (� Lake Oswego, OR 97035 JUN 2 7 2005 Re: Residence @ Lot 4, Bretton Woods Development CITYOFT1CAR® Tigard, OR -- Permit # MST2004 -00257 BUILDING DIVISION Dear Mr. Lee: Further to your request, we have reviewed the shear wall configuration along the rear wall of the shop area. It is our understanding that a window was installed, nearly centered in the rear wall. This window interrupts a braced panel. The following information and comment includes our recommendations to accommodate this additional window opening within the lateral load resisting system. Please refer the enclosed SK -1 sketch showing the as -built conditions regarding the rear wall of the shop area. Also included are our recommendations as to the remedial work we are recommending for the braced wall line. We trust this information is adequate for your needs at this time. Please feel free to contact our office if you have any questions or if we can be of additional service. Very truly yours,, ALPHA COMMUNITY DEVELOPMENT A ` , t4 GIN� 12,320 y,\ RJR GON Steven J. Entenman, PE, SE`s, 1 15 ,. � Pr '8/ J. E14C Y.P1RES. 12-Q, , Encl. Plaza West, Suite 230, 9600 SW Oak, Portland, Oregon 97223 [T] 503-452-8003 [F] 503- 452 -8043