FINAL SUMMARY LETTER
November 7, 2007 -� a
T0705129 1
NOV 14 2007
City of Tigard
13125 SW Hall Blvd CH Y or' 1 .ItARD FILE COPY
Tigard, OR 97223 -8199 DIVISION
DI
BUILDING
Attn: Building Department 1 V .7 �IZ�1
Re: Paul Schatz Furniture — Tenant Improvement (Project #56535)
6600 SW Bonita Road — Tigard, OR
Permit.: BUP2007 -00280
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
Structural Steel
Structural Masonry
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
f
Steven W. Leach
Project Manager
SWL /eah
cc: R & H Construction — Kelly Pyrch
T M Rippey Consulting Engineers — Ralph Turnbaugh
Mildren Design Group — M Ryan Wing
Paul Schatz Furniture