Loading...
Plans CITY OF TIGARD BUILDING INSPECTION DIVISION MST a ZGUG - 0 2/ 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 �� BUP Date Requested f AM PM BLD Location i f eND .5 w 19,49 l(•1i'l,/ / Suite MEC Contact Person Ph 4'O -57 7 4) PLM Contractor Ph SWR BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam • Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler 1 �lJi/ Fire Alarm Susp'd Ceiling d / '' - - Roof / Misc: h� v Final P4S ART FAIL LOMB t.G.' Post & Beam Under Slab Top 0 - ain Drains Final � id PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Date g' /U —Gtr Inspector �,� Ext Other _ Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.