Loading...
Report ocp. I I. LVVV IV...Vnivi ivu. V./) I I. 1 . le its In!tihectintl. In fi, . Real -World Geotechnical Solutions Investigation • Design • Construction support September 11, 2006 /07 - anal Project No. 05 -9263 Attention: Andy Thomas /70710 lee /Lf,V Venture Properties 4230 Galewood Street, Ste. 100 Lake Oswego, Oregon 97035 Fax No. (503) 387 -7617 • RE: FOUNDATION EXCAVATION LOTS 16 AND 17 DAKOTA GLEN TIGARD, OREGON On September 8, 2006, GeoPacific engineer, Jim Imbrie, was on site to observe foundation excavation for lots 16 and 17. Subgrade predominantly consists of stiff native silt soil; however the front of Lot 16 exposed a little drain rock from an old septic line. The concrete pipe had been crushed during excavation and only a few inches of drain rock remained. The old drain line does not appear to pose a problem for foundation support. The observed subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. No deck footing, patio, or other appurtenant structure subgrades were observed. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No warranty is herein expressed or implied. This report was prepared for Venture Properties only and should not be relied upon by third parties without consulting GeoPacific. If you have any questions, please call. • Please call If you have any questions. Sincerely, GeoPacific Engineering, Inc. � \y *F' 0NGNE ;ES,\ip� c 1474 / ORES* James D. Imbrie, P.E., C. . v 23. �9�k• e`o• 3 . Geotechnical Engineer '�fS D. IM® 1� b � P. . 7312 SW Durham Road Tel (503) 5984445 Portland, Oregon 97224 Fax (503) 5984705