Loading...
Plans CITY OF TIGARD BUILDING INSPECTION DIVISION MST _CiUs S 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 UP Date Requested 7 AM V PM BLD Location /3 .2,36 54, 6m- L6/9 -r 7) Suite MEC Contact Person Ph 3 - 07 -3 7 PLM Contractor Ph SWR �UILDING Tenant/Owner ELC Retaining Wall ELR Foundati Access: FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing ' % // ,p144- ,ce'foSio Al 'NroL (4-I.7 ) Insulation Drywall Nailing f� 5,'4c / �c Firewall Fire Sprinkler 46 S, /w .L/ Fire Alarm Susp'd Ceiling cf) Roof Misc: F' • - PART FAIL `• "SING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Date 7- e e Inspector Ext Other Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.