Specifications a r OFFICE COPY CONSULTING ENGINEERS • � CS A ENGINEERING EXCELLENCE R EC E V L D I � b � O0 a- M5 JUN 2Z 2004 "1 CITY OF TIGARD BUILDING DIVISION STORM DRAINAGE CALCULATIONS FOR "BEVELAND OFFICE BUILDING" CITY OF TIGARD, OREGON City of Tigard Approved Plans By/3 S0 Date 9'— 2 y .7/37 5 IN fEPce-A.Jo 0 ._ „0 , 0 (,, or A• ,,, OREGON , ter; � � c'.9 FOR ZIMMLER DEVELOPMENT, LLC 7165 SE FIR LOOP, SUI'1`.b 100 TIGARD, OR 97223 CSA JOB# 04 -299 June 16, 2004 321 S.W. 4th, 4th Floor • Portland, Oregon 97204 (503) 228 -3848 E -mail: csa @integraonline.com FAX (503) 228 -0475 PURPOSE: This report analyzes the surface water runoff from the proposed 0.83 AC commercial development "BEVLAND OFFICE BUILDINGS ". This report includes hydrology calculations to determine water quality storm requirements and detention system sizing as well as the peak stormwater runoff quantities for hydraulic calculations to determine the capacity for the proposed storm drainage facilities. SITE DESCRIPTION: The site is located at 7155 & 7115 SW Bevland St., in Tigard, Oregon. The proposed site area is has approximately 0.62 acres of pervious and 0.21 acres of impervious area existing. The site slopes downward approximately 2 -5% in the westerly direction. The lot currently contains two single - family home sites. The existing site drains via sheet flow to the northwest into the storm drainage -way located along the northern portion of the property. DESIGN PARAMETERS: The SCS Type IA rainfall distribution, 24 -hour storm duration method for runoff parameters and the Santa Barbara Urban Hydrograph (SBUH) method are being used to extract the peak runoff rates. The Soil Survey of Washington County, August 2002, published by the Soil Conservation Service, was used to determine the soil type. The site is comprised of various soil types; 1, Aloha silt loam, within hydrologic group "C" and 45B, Woodburn, 3 to 7 % slopes, within hydrologic group "C ". Hydrologic group "C" was utilized throughout the development. The rainfall intensities were provided by Clean Water Services as follows: Event Water Quality 2 -year 10- year 25 -year 100 -year Intensity 0.36" 2.50" 3.45" 3.90" 4.50" Duration 4 hrs 24 hrs 24 hrs 24 hrs 24 hrs For the developed site, a curve number (CN) of 86 for pervious surfaces and a CN of 98 for impervious surfaces was used. The undeveloped time of concentration for the site was determined to be 12.9' and the developed time of concentration was determined to be less than 5 minutes, therefore a time of concentration for the developed site of 5 minutes was used as a minimum for calculations. SITE DESIGN: The proposed additional impervious area is approximately 0.34 AC. The proposed stormwater water quality will be provided by a Stormwater Management's StormFilter Manhole located at the connection point to the public facility within the driveway area. All of the storm water conveyance system and the detention system were designed per Clean Water Services standards for a 25 -year storm event. The entire storm sewer system will be private with the property owner responsible for all maintenance. WATER QUALITY DESIGN: The site is designed utilizing a Stormwater Management proprietary system to provide the required treatment. This resulted in the following design criteria: ® Pre- developed Runoff =0.03 cfs (SCS Type 1A) ® Post- developed Runoff= 0.11 cfs (SCS Type 1A) • Water Quality Flow = 0.08 cf. (Post - Pre) ® Number of Cartridges = 3 (WQF x 449/15) A sumped water quality /flow restriction manhole is provided immediately upstream from the water quality facility. CFA Consulting Engineers CLE 08:35 16- Jun -04 Project 04 -299 BEVLAND OFFICE BUILDING RUNOFF by the SANTA BARBARA URBAN HYDROGRAPH PRE DEVELOPED FLOWS 2 -year, 24 -hour rainfall = 2.50" flow type description coeff. distance fall slope T/C 1 overland sheet short grass,lawns n =0.15 100.0 2.0' 2.00% 11.1' 2 shallow concentrated short grass, lawns K =11 170.0 3.4' 2.00% 1.8' total Time of Concentration = 12.9' storm hyetograph: SCS TypelA return period = 1 year storm duration = 4 hr. total rainfall = 0.36 in. pervious area = 0.62 A CN = 86 Gp C:landscp,good cond. impervious area = 0.21 A CN = 98 total site area = 0.83 A hydrograph file: j:\ civil \_proje -1 \04- 299 \storm \wq- pre.hyd peak flow = 0.03 cfs @ 1.39 hr. runoff volume = 147 cu.ft. CFA Consulting Engineers CLE 09:14 16- Jun -04 Project 04 - 299 BEVLAND OFFICE BUILDING RUNOFF by the SANTA BARBARA URBAN HYDROGRAPH POST DEVELOPED FLOWS total Time of Concentration = 5.0' storm hyetograph: SCS TypelA return period = 1 year storm duration = 4 hr. total rainfall = 0.36 in. pervious area = 0.13 A CN = 86 Gp C:landscp,good cond. impervious area = 0.55 A CN = 98 total site area = 0.68 A hydrograph file: j:\civil\_proje-1\04-299\storm\wg peak flow = 0.11 cfs @ 1.33 hr. runoff volume = 388 cu.ft. • STORMWATER CALCULATION DATA FOR ON -SITE SYSTEM DESIGN CFA Consulting Engineers CLE 14:01 16- Jun -04 Project 04 -299 BEVLAND OFFICE BUILDING GRAVIY PIPE FLOW (Chezy- Manning) OUTLET PIPE 2" diameter = 12.0" slope = 0.2% material: ABS, PVC Manning's n = 0.011 depth of flow = 41.00% wetted perimeter = 1.39' area = 0.30 s.f. hydraulic radius = 0.22' velocity = 2.14 fps flow = 0.65 cfs STORMWATER CALCULATION DATA FOR DETENTION SYSTEM DESIGN CFA Consulting Engineers CLE 08:34. 16- Jun -04 Project 04 -299 BEVLAND OFFICE BUILDING RUNOFF by the SANTA BARBARA URBAN HYDROGRAPH PRE DEVELOPED FLOWS 2 -year, 24 -hour rainfall = 2.50" flow type description coeff. distance fall slope TIC 1 overland sheet short grass,lawns n =0.15 100.0 2.0' 2.00% 11.1' 2 shallow concentrated short grass, lawns K =11 170.0 3.4' 2.00% 1.8' total Time of Concentration = 12.9' storm hyetograph: SCS TypelA return period = 25 years storm duration = 24 hr. total rainfall = 3.90 in. pervious area = 0.62 A CN = 86 Gp C:landscp,good cond. impervious area = 0.21 A CN = 98 total site area = 0.83 A hydrograph file: j: \civil \_proje -1 \04- 299 \storm \25yr - pre.hyd peak flow = 0.55 cfs @ 8.00 hr. runoff volume = 8,319 cu.ft. CFA Consulting Engineers CLE 09:13 16- Jun -04 Project 04 - 299 BEVLAND OFFICE BUILDING RUNOFF by the SANTA BARBARA URBAN HYDROGRAPH POST DEVELOPED FLOWS total Time of Concentration = 5.0' storm hyetograph: SCS TypelA return period = 25 years storm duration = 24 hr. total rainfall = 3.90 in. pervious area = 0.13 A CN = 86 Gp C:landscp,good cond. impervious area = 0.55 A CN = 98 total site area = 0.68 A hydrograph file: j:\ civil \_proje ' 1\04 - 299 \storm \25yr - pos.hyd peak flow = 0.65 cfs @ 7.83 hr. runoff volume = 8,477 cu.ft. CFA Consulting Engineers CLE 09:42 16- Jun -04 Project 04 -299 BEVLAND OFFICE BUILDING RUNOFF by the SANTA BARBARA URBAN HYDROGRAPH BYPASS POST DEVELOPED FLOWS total Time of Concentration = 5.0' storm hyetograph: SCS TypelA return period = 25 years storm duration = 24 hr. total rainfall = 3.90 in. pervious area = 0.15 A CN = 90 Gp C:landscp,fair cond. impervious area = 0.00 A CN = 98 total site area = 0.15 A hydrograph file: j:\ civil \proje =1 \04 - 299 \storm \25yr- byp.hyd peak flow = 0.12 cfs @ 7.83 hr. runoff volume = 1,538 cu.ft. CFA Consulting Engineers CLE 09:45 16- Jun -04 Project 04 -299 BEVLAND OFFICE BUILDING DETENTION ROUTING DETENTION TUBE flow (cfs) 0.8 0.6 0.4 0.2 0.0 0 5 10 15 20 25 30 time (hr) DETENTION TUBE (stage - volume calculated) diameter = 2.00'; length = 95.70'; slope = 0.19%; invert = 231.81'MSL STAGE VOLUME 231.8 0 232.2 33 232.5 88 232.9 150 233.3 213 233.6 268 234.0 301 OUTLET TYPE ELEVATION SIZE circ. orifice 231.8 dia.(in) = 3.75 inflow hydrograph: j: \civil \_proje =1\04- 299 \storm \25yr - pos.hyd outflow hydrograph: j:\civil\_proje-1\04-299\storm\25yr-det.hyd peaks: inflow = 0.65 cfs @ 7.83 hr. outflow = 0.43 cfs @ 8.33 hr. stage: 1.67 ft. volume: 245 c.f.