Permit L ii 9 /66 .: I 0.6)).A.LcirsOLsy "7//5-' -7t-, " 7 ii 7 lff ,CTSj
"- P - 6.4h
M BUILDING PERMIT'
T' OF T I C� R D PERMIT #: BUP2004 -00296
>_�,, \ DEVELOPMENT SERVICES DATE ISSUED: 11/2:2004
- :°=fit. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171
SITE ADDRESS: 07117 SW BEVELAND RD PARCEL: 2S101A6 02201
SUBDIVISION: BEVELAND ZONING: MUE
BLOCK: LOT: 2 -3 JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: NEW FIRST: 3,230 sf N: NR S: NR E: 1 HR W: NR
TYPE OF USE: COhr1 SECOND: 2,818 sf PROJECT OPENINGS?
TYPE OF CONST: 5N : sf N: N S: N E: N W: N
OCCUPANCY GRP: B TOTAL AREA: 6,048 sf ROOF CONST: C FIRE RET?
OCCUPANCY LOAD: 60 BASEMENT: sf AREA SEP. RATED:
STOR: 2 HT: 30 ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: 50 psf LEFT: 13 ft RGHT: 10 ft FIR SPKL: N SMOK DET:N
DWELLING UNITS: FRNT: 10 ft REAR: 99 ft FIR ALRM : N HNDICP ACC:Y
BEDRMS: BATHS: IMP SURFACE: PRO CORR: N PARKING:
VALUE: $ 351,743.00
Remarks: New office building. TIF has been deferred until prior to occupancy.
Owner: Contractor:
ZIMMLER DEVELOPMENT LLC S I GRACE LLC
7165 SW FIR LP SUITE 100 PO BOX 230698
PO BOX 230698 PORTLAND, OR 97 28 1 -0 69 8
Pho
TInD, OR 503=59 8 -3440
Phone: 503 - 598 -3440
Reg #: LIC 156355
FEES REQUIRED INSPECTIONS
Description Date Amount Ersn Cntrl 681 -4444 Masonry Insp
rBUPPL`j Pin Rv 6122/2004 $1,119.30 Mechanical Permit Require Framing Insp
Electrical Permit Required Roof nailng Insp
[FLS] FLS Pin Rv 6/22/2004 $688.80 Plumbing Permit Required Insulation Insp
[BUILD] Permit Fee 11/2/2004 $1,722.00 Foot/Found Insp Shear Wall Insp
[TAX] 8% State Surcharl 11/2/2004 $137.76 Slab Insp Gyp Board lisp
(additional fees not listed here) Masonry Insp Susp Ceilng Insp i
- Masonry Insp Bolts in concrete final repo
Total $6,736.66 Masonry lnsp Structural welding final rep;
- — Masonry lnsp _ Final Inspection J
Sli
This pelm:t is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes CN
and all other applicable law. All work will be done in accordance with approved plans. This permit will e,cpire if work is c\)
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon Iww
requires you to fellow t7e rules adopted by the Oregon Utility Notification Center. Those rules are sat forth in OAR
952 -001 -0010 through OAR 952 -001 -0100. You may obtain a copy of these rules or direct questions to OUNC by l
calling (503) 246 -6699 or 1- 800 - 332 -2344. '19
C)
Issued By:
Perm Mee
Signature: 1
Call 639 -4175 by 7 p.m. for an inspection the next business day
— . •,�� .
B - building Permit _ ELC - Electrical Permit
r - \I Inspection Description Date Passed By / Inspection Description Date Passed By
Footing /Setback ,
_ __ Underground cover
Foundation walls Wall cover
Footing drain Ceiling cover
Waterproof bsmt walls _ Electrical rough -in _
Slab Electrical service _
Crawl drain Electrical final
Underfloor insulation — -
Post/beam structural
_
— — —
Shear walls /anchors ELR - Restricted Ener • y Permit
Roof nailing ,f Inspection Description Date Passed By
Firewall Low voltage
_ _
Tilt -up panel Electrical final
Masonry /Reinforcement — —
Framing — —
MFG structure set -up MEC - Mechanical Permit
_ Jnsulation
Drywall nailing - 4 Inspection Description Date Passed By
Suspended ceiling — Post/beam mechanical
Engineered soils Gas line
Welding Lab Final — Mechanical rough -in
_Concrete Lab Final Fire damper_:_
_ Bolting Lab Final .Duct work _ — --
Structural observation Smoke detector
Fireproofing Lab Final Mechanical final
Final inspection - — PLM - Plumbing Permit
BUP — Fire Protection System Permit Inspection Description Date Passed By
Plumbing underslab
Ai Inspection Description Date Passed By
_ Sprinkler underfloor /slab Crawl drain
' Sprinkler rough -in _ Post/beam plumbing
Sprinkler final Plumbing top out
Fire alarm final _ RP /backflow preventer
_ Rain drain
_ Storm drain
_ Water service
SIT - Site Permit Sanitary sewer _
AI Inspection Description Date Passed By Culvert/catch basin _ _
Footings Pump /fill septic tank
Foundation walls Plumbing final
Sprinkler supply lines — — — —
Sprinkler underfloor /slab �— —
Catch basin /Manhole _ SWR - Sewer Permit
Engineered soils
- 4 Inspection Description r—
Date Passed By
Engineering acceptance _Sanitary sewer
Final inspection _ • Final inspection
Inspection Record - BUP, PLM, SWR, ELC, ELR, MEC, SIT Permits
is \dsts \forms \InspRecordBUP.doc 0.1 /17/01
A • ` CITY OF TIGARD BUILDING PERMIT
PERMIT #: BUP2004 -00296
DEVELOPMENT SERVICES DATE ISSUED: 11/2/2004
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 PARCEL: 2S101A6 02201
SITE ADDRESS: .4174-1 SW BEVELAND RD
SUBDIVISION: BEVELAND 7//7 ZONING: MUE
BLOCK: LOT: 2 -3 JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: NEW FIRST: 3,230 sf N: NR S: NR E: 1HR W: NR
TYPE OF USE: COM SECOND: 2,818 sf PROJECT OPENINGS?
TYPE OF CONST: 5N : sf N: N S: N E: N W: N
OCCUPANCY GRP: B TOTAL AREA: 6,048 sf ROOF CONST: C FIRE RET?
OCCUPANCY LOAD: 60 BASEMENT: sf AREA SEP. RATED:
STOR: 2 HT: 30 ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: 50 psf LEFT: 13 ft RGHT: 10 ft FIR SPKL: N SMOK DET:N
DWELLING UNITS: FRNT: 10 ft REAR: 99 ft FIR ALRM : N HNDICP ACC:Y
BEDRMS: BATHS: IMP SURFACE: PRO CORR: N PARKING:
VALUE: $ 351,743.00
Remarks: New office building.
Owner: Contractor:
• ZIMMLER DEVELOPMENT LLC S I GRACE LLC
7165 SW FIR LP SUITE 100 PO BOX 230698
PO BOX 23069882 PORTLAND, OR 97 28 1 -0 69 8
_ . __. TIGARD t OR 50 -3440
Phone: 503 - 598 -3440
Reg #: LIC 156355
FEES REQUIRED INSPECTIONS
Description Date Amount Ersn Cntrl 681 -4444 Gyp Board Insp
[BUPPLN] Pln Rv 6/22/2004 $1,119.30 Mechanical Permit Require Susp Ceilng lnsp
[FLS] FLS Pln Rv 6/22/2004 $688.80 Electrical Permit Required Bolts in concrete final repo
Plumbing Permit Required Structural welding final rep
[BUILD] Permit Fee 11/2/2004 $1,722.00 Foot/Found Insp Final Inspection
[TAX] 8% State Surchari 11 /2/2004 $137.76 Slab Insp
(additional fees not listed here) Framing lnsp
Roof nailng Insp
Total $6,736.66 Insulation Insp
Shear Wall Insp
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these rules or direct questions to OUNC by
calling (503) 246 -6699 or 1- 800 - 332 -2344.
Issued By: - _/
Perm it tee
Signature: /
ignau �- -�.,�/
Call 639 -4175 by 7 p.m. for an inspection the next business day
/ iv p 1L 115 v �±t�
Building Permit Applhcati011><1�4 `_•'s FOR OFFICE USE ONLY i J� , 'Tt ' `7''' 4e
City of Tigard J�yiv �n� Received
DateB / ��6� T perm No.: • /
� � - ��i
�
13125 SW Hall Blvd., Tigard, OR 97.223 T . �F��G (�
` `r Q iSI Plan Review
Phone: 503.639.4171 Fax: 503:598�.14 D V 'Ni� A Date/13 : 0 ' —Z 3 -U ,, S Other Permit:
Inspection Line: 503.639.4173'w td _ IN" � r.!' I� Date ReadyBy: lu ' . ® See Attached Checklist for
Internet: www.ci.tigard.or.us Notified/Method: - Supplemental Information
2 �. -0400
'?::ss:: »''�`� m " :: - . R ;, ,;,., ..hl ,,,,, , S : - - , <" �v •: �;; y am
YP.E:; z WURKw_, a � >� ��, � 'RE .C7 .AN FA MILYD 41 _ �,
,: ....� =T.: �wy����� ...- �e��, . ._�. _? <.„ ��' -` -v "- Q ., _ WELll�i -:
® New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
❑ Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
w - -F;'t `r':' ::•;t. sa ;:.-�;: �••° • -fix: .�..s'a'?;,rs; -.z: - ;,`� - • :e.�:,,w. W
l = . „4: : e y n ; =;.: 5 work indicated on this application.
„,0 , -i.1, r. z ,,, ; BY', COl -t W ,,' t, on.
��� e „�.��,':.: a.� ,, ..= �;�. .� s� 3 -: «,, f� ;...:.:: � INK :�r. �.:: _�_ ;�.. _ _.. ,.'4:-.'“0:00 `��
❑ 1- and 2- family dwelling ® Commercial/industrial Valuation: $
❑ Accessory building El Multi- family Number of bedrooms:
❑ Master builder 0 Other: Number of bathrooms:
K S�;r= �.:�?;: ,,. = �.: aT "N ��'" ,- . ^:�- ;.�^>�+:i,�:..:e.�'�.>.r 1 "F'.a..: � .:�Mk"c�:.i �?.:�
>OJ4B� =Sl`I =lf4 INFOR14IA 'IOJV'` •- ;> „ n floors:
- ': ,„ ,-AND` LOCATION ; ,: " '0" Total number of
�iA::.:"�'�i� =.�;�.�= "':�; dam"' t.. �.. �: �'.. 'ik. °:F�;:�:;�.�"':: r� - �� ��, _ .. .. " 'a'•, �'�
Job site address: 4 5 Beveland - 7 / f 7 New dwelling area: square feet
City /State/ZIP: Tigard, Oregon 97223 Garage /carport area: square feet
4 Suite/bldg. /apt. no.: Project name: 7155 Beveland Buildings Covered porch area: square feet
Cross street/directions to job site: Just east along Beveland of the intersection of Beveland
and 72 " Ave Deck area: square feet
Other structure area: square feet
UTREUllA7'A�.`COM RGIAL TJ,, GHECKLISx =
Subdivision: Permit fees* are based on the value of the work performed..
Lot no.: 2201 P
Indicate the value (rounded to the nearest dollar) of all
Tax map /parcel no.: 2S101AB, lot 2201 equipment, materials, labor, overhead, and the profit for the
C' ;- ..- - V , W wor m tcated on this application.
� = k ' d'
'f x:�
- .�... L _ A.;•u> .x�� = � = r ���<' .. � " ,...._.... fi=x. �� .:.... :.......
s a.<,s �,� �, ... =..` .�.. Valuation: $$351,743.00
Construct site improvements and new building including all civil, landscape,
architectural, and structural. Mechanical, plumbing, and electrical by spearate permit. Existing building area: square feet
1\ New building area: 6,048 square feet
:r <::;r:....,:. •::x s° : , ;x * Number of stories: 2
V -, I'ROPEItTX > WNER =�' > ., a,_ ,�,
» ; ®. , _�;Org_�.: ,. 2 . `:� i,,c1 ' . TENAN I :;
�o Type of construction: VN
Occupancy groups:
=- -. ->3�. �R`.�� -,: 'Ate � i s => a.
Nam Zimmler Development, L.L.C.
Address: 7165 S.W. Fir Loop, Suite 100 /P.O. Box 230698
Existing:
City / StatelZIP: Tigard, Oregon 97223/Portland, Oregon 97281 -0698
New: B
Phone: (503)598-3440 Fax: (503)598-3450
'"-= i ;3 `�2�Y' -�� t.I,� VA`AIiL'J " t-..: x �5�3 =c,-�'E[ -. �
®:_APPI IC s ' t. I C O N. ACT. MI contractors and subcontractors are required to be :: d .:: . , �
„
r- ..:__ :_ .... -E . :. , -,,,: = w� r ev , ,E ,: >;.f-
Business name: Mildren Design Group, P.C. licensed with the Oregon Construction Contractors Board
`'1 Contact name: Jack Kriz under ORS 701 and may be required to be licensed in the
jurisdiction in which work is being performed. If the
Address: 7650 S.W. Beveland, Suite 120 applicant is exempt from licensing, the following reasons
Aili City /State/ZIP: Tigard, Oregon 97223 apply'
Phone: (503) 244 -0552 Fax: : (502) 244-0417
- E -mail: jack @mdgpc.com
.F CT,OR 1. a -•a
,
Business name: SI Grace L.L.0 t : Z ;a; 13 1�1 -0 I'EI, * F, ' ": a 1
sz2, Address: 7165 S.W. Fir Loop, Suite 100 /P.O. Box 230698 Please refer to fee schedule.
City /State/ZIP: Tigard, Oregon 97223/Portland, Oregon 97281 -0698 Fees due upon application $1,808.10
Phone: (503) 598 -3440 Fax: (503) 598 -3450 Amount received
CCB lie.: 142119— J 5-76 3 .-S Date received:
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
" Fee methodology set by Tri- County Building Industry
Print name: 74....„,, )4„ Date: A. Lt. Or Service Board.
i:\Building \Permits \BUP- PermilApp.d 12/03 440- 4613T(I1 /02/COM/WEB)
•
b Y;
PERMIT 'NO. " 4 T Zcoci o30 Zi6(/- ((y /Q
•
EROSION CONTROL INSP - C - -TION REPORT
DATE S h:(16
INSPECTOR f cg
CIeari V Vater Services OWNERIPERMITEE / rn i1c)° , t)(c✓
Ou;r commitment is clear. SUBDIVISION LOT
•
i SITE ADDRESS 7117
' PRO!
• FINAL INSPECTION
THIS SITE MEETS- THE POST - CONSTRUCTION •
ROSION CONTROL REQUIREMENTS SET
FORTH IN-CLEAN WATER SERVICES
RESOLUTION AND ORDER
•
NOTE: IF POST — CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING
EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION,
THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE
OR PERMANENT GROUND COVER IS ESTABLISHED. {
A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE - '
FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES
THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL.
OTHER ! •
THANK YOU FOR YOUR COOPERATION!
INSP CT
PHONE 7-51 9
CITY OF TIGARD
BUILDING DIVISION PERMIT #: gteal .-09 z=i4c
13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED:
Phone: (503) 639 -4171 A p�piul ,
Inspection Requests (24 Hrs.): (503) 639 -4175
INSPECTION WORKSHEET FOR DATE: 1 -64V( ,,�-- TIME: PAGE:
SITE ADDRESS: 7 t t 7 tom . - ` -t'sw CLASS OF WORK:
SUBDIVISION: LOT #: TYPE OF USE:
PROJECT NAME:
DESCRIPTION:
OWNER: • PHONE #:
CONTRACTOR: .-:::::( ' PHONE #:
Inspection Request Scheduled For: Date: Pour Time:
Code # Inspection Description Confirm # Contact # Message
1 Corrections /Comments /Instructions: .
1
■
(„.....7 tk_e,u___ i f4k
t)
PASS n PARTIAL APPROVAL ❑ CANCEL _ NO ACCESS
n FAIL ' CALL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED
ti kW Inspector: Date: 2 1 55 Phone #: (503) 718-
-. [,,.eid.
CITY OF TIGARD . ,.
BUILDING DIVISION PERMIT #: BUP2004 -00296
13125 SW Hall Blvd., Tigard, OR 97223 ` DATE ISSUED: 11/2/2004
Phone: (503) 639 -4171 � iiIIA
Inspection Requests (24 Hrs.): (503) 639 -4175
INSPECTION WORKSHEET FOR DATE: 5/26/2005 TIME: 7 :27AM PAGE: 58
SITE ADDRESS: 07117 SW BEVELAND RD CLASS OF WORK:
SUBDIVISION: BEVELAND LOT #: 2 -3 TYPE OF USE:
PROJECT NAME: ANDRUS
DESCRIPTION: New 6,048 square foot Office Building. TIF Deferred
OWNER: ZIMMLER DEVELOPMENT LLC, PHONE #: 503-598-3440
CONTRACTOR: S I GRACE LLC PHONE #: 503 -598 -3440
Inspection Request Scheduled For: Date: 5/26/2005 Pour Time:
Code # Inspection Description Confirm # Contact # Message
299 Final inspection 007750°01 503-969-2953 N
Corrections /Comments /Instructions: 120-62
1)
A 0 S' 41
Gt)`oF'1- l ,
L Z� d —o ( v - ) — , 'wkil oL-?V
L 'A - 20 0 6- 0 0 - 2A 0 - ( 1)- ..t_c -w o-r ■z__-) - A M 1. Gll
, n, o iI, X0 -as 1 9 (p C - c - --) - ��ti'N L,
l❑ ' ( -moo - 0 0 cq 4 c T.) - ■i N Pc,L€ y
11 k 131"e Uo Lc - 00 - . 9 tip C.MAsit-e--.e-) - Akti23 -
❑LLC, 200 y - ov c1 P C, etc icir-ce) - : til - g
s 1 T 7.cyo.t4 - co U 20 L1.,; - IN 6 — Q , .
Z - 6--vx v\ c -- e ' � r - �O I,_ /moo
CL,.-.r -0 - 5 v `mss — C lf)
Li � ri ems( .S7y� 4 (sL e - k-.‹ J ` e_�' .' / 4-) i Wks'
s
Pt ■ (k, cA - (1)i e f? & . ,
t o. L 1,96-4-7,- ,.., A,.. \ u 0 ./1/4...:, eL(
') -=TA 4 44- \_-v,.' rztl< Lt_r Vf2_ & 'D i
❑ / P S S P AP ROYAL CANCEL ❑ NO ACCESS
p ❑ CALL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED
Inspector: . VL _ Date: S/ 6 7°K---Phone #: (503) 718-
CITY OF TIGARD
BUILDING" DIVISION PERMIT #: c ,206 — D6 2- Gj,6
13125 SW Hall Blvd., Tigard, OR 97223 D ATE ISSUED:
Phone: (503) 639- 4171a�
Inspection Requests (24 Hrs.): (503) 639 -4175 111.
INSPECTION WORKSHEET FOR DATE: 3 - 0 TIME: PAGE:
SITE ADDRESS: 7 I ( C CLASS OF WORK:
SUBDIVISION: LOT #: TYPE OF USE:
PROJECT NAME:
DESCRIPTION:
OWNER: � ��� PHONE #:
CONTRACTOR: PHONE #:
Inspection Request Scheduled For: Date: Pour Time:
Code # Inspection Description Confirm # Contact # Message
Corrections /Comments/ Instructions:
•
k I Pik LO
L�...
•
❑ PASS 7PARTIALPPROVAL CANCEL n NO ACCESS
❑ FAI CALL FOR INSPECTION n ADDITIONAL FEES ASSESSED
Inspector: ( '1 `r Date: crw Phone #: (503) 718-
CITY OF TIGARD 24 -Hour
i8 11L'Di}NG Inspection Line: (503) 639 -4175 MST
INSPECTION QIVISION Business Line: (503) 639 -4171
BUP
Received Date Requested — 2 AM PM aDD - oo. 4
Location 7/1 �e_f R Suite MEC
Contact Person r Ph ( ) ' (off .'9 5 PLM
Contractor Ph ( ) SWR
BUILDIN Tenant/Owner ELC
Footing
Foundation ELC
A ccess:,
Ftg Drain ' ELR
Crawl Drain
Slab Inspection Notes SIT
Post & Beam
Shear Anchors r/�,� e f 1 � k IC
Ext Sheath/Shear V _� �-
Int Sheath/Shear ct a
Framing _
W
Insulation ( N L ����y� J �5S(` ���
Drywall Nailing ✓ .l` - Ai.- `
Firewall .
Fire Sprinkler - -
Fire Alarm - t " ' ;'
Susp'd Ceiling �1� _ ����nC� �r� . �, 1\--7--r- _C ill '�
Roof �' r (k I. . ' . " -
Other: �F �r�
Finall � �� vim` �w A- -tom i
f
PASS PART) FAIL
PLUMB sz b• : ! r im SILESIA-0C-- / Amy 2 „ !�()
Post & Beam � a, <<
Under Slab �' �% " u
Rough -In
Water Service
Sanitary Sewer
Rain Drains - =
Catch Basin / Manhole ill '- i / '
Storm Drain �.
Shower Pan M' fp f- 1"
Other:
Final
PASS PART FAIL
MECHANICAL , :_ 1 I `r/� ' I / _
Post•& Beam I r -` -! V 411111101VW 7- r'
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hail, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please call f r reinspect • n RE: _- 0 Unable to inspect - no access
Fire Supply Line
ADA ' cJ
_
Approach/Sidewalk Date Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the job site. •
PASS PART FAIL
CITY OF TIGARD 24 -Hour
' BUILDING Inspection trine: (503) 639 -4175 MST
INSPECTItA�'.[yIVISION Business Line: (503) 639 -4171
BUP,govq 7c,
Received Date Requested / — .2 0 AM PM BUP
Location Suite MEC
Contact Person C-6 _ - y'- Ph ( ) 9'6 9 - t - PLM
Contractor Ph ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Access:
Ftg Drain �p��. A ELR
Crawl Drain =� \VV't
Slab Inspection Notes:. 640 SIT
Post & Beam
Shaar Anchors q j
xt Sheath/Shear � Vt /./ 71)a-e—Z7
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall `L • 14 /- -_ /1.1 /` '_
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
F al /
•AS) PART FAIL
PLU . . BING
-.st & Beam
Under Slab J /a
Rough -In / IfililIVElitr/WII Water Service f W I ,
Sanitary Sewer
• Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan -
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm.
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE _ U Please c- for reinspec on RE: i Unable to inspect – no access
Fire Supply Line / r C
ADA
Approach/Sidewalk Date Insp Wr Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL
CITY OF TIGARD 24 -Hour
SUI IL?IIsG Inspection Line: (503) 639 -4175 MST
INSPECTI'ON Business Line: (503) 639 -4171 v OD
BUP �
Received Date Requested /' // AM PM BUP
Location 7 1 r 5 ' ' 10 , Suite MEC
Contact Person Ph ( ) PLM
Contractor Ph ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam in Q `
Shear nc ors t,
Ext Sheat ear
dSheath/Shear 1
Framing 4
Insulation
Drywall Nailing ( t� Anti
Firewall V) is I _
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof p
kf �' l
Other:
Final r ,
PASS PART FAIL . - -
PLUMB
Post & Beam II
Under Slab l R"r ` e- (S/(! 3 r`-s1 l ts
Rough -In . ,
Water Service � � �; - - . way
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm' Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final •
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
Final Reinspection fee of $ require s, , _ • re next inspectio7 Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please 'all for re' spection RE: . El Unable to inspect — no access
Fire Supply Line 4,1/1"
ADA
Approach/Sidewalk Da$ ` Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL •
BUP2004 -00296
7117 BEVELAND
• 5/26/05 Rick failed
• 5/26 Letter Of Completion processed by ? ??
• Whom ever processed: NO LETTER OF COMPLETION
ACTIVITY WAS ADDED TO CASE
• 6/28/05 looked for approved final inspection. NO APPROVED
FINAL INSPECTION FOUND IN THE FILE
• 6127105 Final inspection approved by Dan
• 6/27 Letter Of Completion ok'd by Sue, signed by Hap
• 6/28 Letter Of Completion mailed
BUP2004 -00594
7117 BEVELAND #100
• 5/26/05 30 Day Temporary CIO issued
6/28/05 Sue ok'd CIO's for suite 100 and 200