Loading...
Report • Zvi °aoo do 9cv Field Soil Inspection Summary ., 6 3o SW 47ZA-NrA' Sr Page 1 of 1 Field Soil Inspection Summary REG E Project: Atlanta St. Office Building UV 2 5 7-* Job number: OR 03 -8272 Y 0 TIGrap Project address: Atlanta street 68th & Parkway GO i j S lON @ number: BU1�p�NG Permit type: Daily Reports 5/8/03: GeoPacific Engineering Geologist, Paul A. Crenna, visited the project site to observe removal of old pool at northwest corner of site. All pool concrete debris has been removed and 5 to 8 foot deep excavation is complete. Subgrade consists of stiff, navtive clayey silt soil that is suitable for support or engineered backfill. 5/9/03: GeoPacific Engineering Geologist, Pau]. A. Crenna, visited the project site to observe compaction of backfill in swimming pool excavation at northwest corner of site. Observed compaction of two 8 inch lifts with IR self - porpelled 4 foot diameter drum. Roller comapation fill at +3 is compacted to a firm, unyielding state. Fill consists of 3/4 " -0 reject from Tigard Sand & Gravel. Go back to the task select page for Atlanta St. Office Building Go back to the project select page http://192.168.0.1/geopacific/office/viewsoil_field report.pl 8/24/2004