Loading...
Report 08/25/2004 15:25 5036989442 BUTLER CONSULTINGINC PAGE 02 it 75 .u) 409N 13454 SE 126th Avenue Butler Clackamas, Oregon 97015 Consulting Inc. (503) 698- 9442 Fax ENGINEERING FIELD DIRECTIVE To: Buena Vista Homes Project: Durham Oaks — BVH Plan 1605 Attn: Mike Davis Address: Lot 20, Tigard, Oregon, From Mark Butler BCI Job No: 142 - 1103 -06 Date: August 25, 2004 Subject: Hole cut in joist This Engineering Field Directive is issued Buena Vista Homes for the single family residence being constructed on Lot 20 at the Durham Oaks subdivision in Tigard, Oregon regarding a hole cut in a floor joist. The 3'Jz" diameter hole was cut in one of the 11W RFPI -20 floor joists about 4" from the hanger at the end approximately as located on the attached framing plan. The joist in question is continuous across the width of the house bearing on the interior garage wall. The end of the beam with the hole is very lightly loaded. The hole should not violate the structural integrity of the floor framing. The joist with the hole is acceptable. Please do not hesitate to call if you have any questions. Respectfully Submitted, ,sAk P R OFe GI N F /0, BUTLER CONSULTING, INC. AN 4 1,.- K. Mark E. Butler, P.E., S.E. President e ft - E. EXPIRES: 1 2- 31 -2OCK 08/25/2004 15 :25 5036989442 BUTLER COhtSULTItlGIhtG PAGE 03 • ■ B utler Sheet 14 Job No. 142-1003_06 Project BVH Plan 1605 Date 11/17/03 C o salting, I nc . CIient Buena Vista Homes Subject 2nd Fl Frain PIan By MEB l er 7 l r � p,,q . ( C SC .�t�f llnii �� . ■ 4x12 F #2 — > �arAril� :.r ..... rir..' 4x10 DFifl I, 1 I t r 1 1 1 1 1 1 1 1 1 t Trit HDR. allo II I l II ,I H I I I H H 1 I l ! I I 1 I 1 1 , 1 1,, �/ �� 1 f 1 I (((( 1111 A �I l l : „ .' a @ i fi /C I I I FLOOR JOIST r r 1 I I III I C 1e i' I 1 1 1 1 MYt C S 1 I i 8 I .a":11......, isip. :.xit/o rat: 1 i r e 4x6 POST wl _ _ _ I � ECCQ46 CAP & ± - —ADD S}s x 11 4 LSL— 1 - - r Ix t) MIL ifTT16 @ FTC P - EATh - SHEAR W AIL C OVE - I 1--jH6 EA EPA -�- -- „ a ;. i1 _ - - T - 4_t7 — , 4x12F #z - - _ fez x 1 —SLCQ RIM 4 , v all x9.i LSL 2ND FLOOR FRAMING PLAN JLL -19 -20044 t = 52 TREE !CARE [It I M I TEL 50o 635 1549 P. 0e,193 /vISTdzaOvf - eao50 i ARBORIST SPORT Nature of the Report: 38" D.B.H. Douglas Fir, Pseudotsuga menu s!i Address of the Report; Lot 20 Durham Oaks Subdivision Tigard, OR Date of the Report: June 22, 2004 Report Submitted To. . • Harris- McMOnagle PH: 503- 639-3453 Attn: Jay Harris FX: 503- 639 -123 12555 SW Hall Blvd. Tigard, OR 97223 • met with Jay at the site on June 22, 2004 to review the tree of concern, a 38" D.B.H. Douglas Fir in very poor condition having been topped approximately 10 years ago and a dogleg 22' up from an early break, At issue is the need to build a house on the lot and the requirement to install the homes foundation approximately 8' away from the trunk. • An air - spaded trench has been dug to determine roots extending into the house footprint. T understand Walter Knapp is involved with this project as well as the City of Tigard% Arborist Matt Stein. I have been asked to provide an opinion as to how to install a foundation on this site. We have had very good success with engineered bridged foundations designed to roots. By doing large ng o I be lieve the tree will remain standing unless it fails during a r r storm event (which any tree Could). • Residential and Commercial Spraying • Fertilizing Pruning andscape Installation • Landscape Maintenance • Consultation � ' MEMBER: National Arborist Association • International Society o Arboriculture • Oregon Association of Nurserymen Oregon Golf Course Superintendents' AsSOCiatien • Oregon Landscape Contractors Association Obate Licensed Tree Service #62635 • landscape Contractor #8659 • Chemical Appiloatlon #000231 • insured P.O. Box 1566 - Lake Oswego, OR 97056.503- 635.3165 • Vancouver 3604 737 -2646 • FAX 503 -635 -15 Visit our website at www.treeoarelamiscapes.com S 07/21/2004 19:48 5036989442 BUTLER CONSULTINGINC PAGE 02 44 ADD #4 VERT. w/ STD HOOK EA SIDE OF OPENING ADD (2) #4 (1) #4 @ TOP MUD SILL ACROSS OPENING OF STEM WALL FINISH GRADE 1.111111111MIIIIILWMall //- . . • " • - 3" - ' . • ......, 4 ' , • ;Z • • - • 01 ' • • , • Y EXIST. 8" 0 TREE ROOT TO REMAIN TYP. 8x16" STRIP FOOTING w/ 8" PROVIDE MIN. 4" CLEAR ALL SIDES , THICK MONOPOUR STEM WALL , . • 1 BRIDGE FOOTING OVER TREE ROOT SK1 3/4" 1 • PROP s it e , 44 4 4) 14855 REV 0=0km BY Date DURHAM OAKS OREGON Butler LOT 20, BVH PLAN 1605 • 4 4z. 4 , Consultin , Inc. TIGARD, OREGON . f ir it E. ei■S\' 13454 SE 126th Avenue BRIDGE FOOTING OVER TREE ROOT Clackama, Oregon 97015 EXPIRES: 12-11-203r I (503) 698-2357 Job No 142-1103-06 Date 7/21/04 Sheet (503) 698-9442 Client Buena Vista' Homes By MEB SK1