Loading...
Permit v CITY OF TIGARD 1 BUILDING PERMIT 11 COMMUNITY DEVELOPMENT "� Permit #: BUP2011 00017 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 08/12/2011 Parcel: 2S101AB00100 Jurisdiction: Tigard Site address: 12023 SW 70TH AVE Project: Red Rock Center, Phase II Subdivision: Lot: 0 Project Description: New office building. 8/17/11, reprinted to correct project description. Contractor: ONEILL INTERNATIONAL INC Owner: FRY, DOUGLAS 16731 GREENBRIAR RD 23077 SW NEWLAND RD LAKE OSWEGO, OR 97034 WILSONVILLE, OR 97070 PHONE: 503 - 635 -6181 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - COM - New Construction 08/12/2011 $4,621.43 Class of Work: ALT 12% State Surcharge - Building 08/12/2011 $554.57 Dwelling Units: 0 Plan Review 01/25/2011 $2,423.15 Stories: 1 Height: 0 ft Plan Review- Fire Life Safety 01/25/2011 $1,491.17 Bedrooms: 0 Bathrooms: 0 Plan Review 08/12/2011 $580.78 Value: $948,421 Plan Review - Fire Life Safety 08/12/2011 $357.40 DC Provision Review, COM New - Bldg 08/12/2011 $128.00 DC Provision Review, COM New - Ping 08/12/2011 $128.00 Floor Areas: DC Provision Review, COM New - LRP 08/12/2011 $38.00 Total Area: 11115 Info Process /Archiving - Lg Sheet (over 08/12/2011 $44.00 11x17) Accessory Struct: 0 Info Process /Archiving - Sm Sheet (up to 08/12/2011 $177.00 Basement: 0 11x17) Carport: 0 Erosion Control 08/12/2011 $256.00 Covered Porch: 0 Erosion Plan Review CWS 08/12/2011 $83.20 Deck: 0 Erosion Plan Review COT 08/12/2011 $83.20 Tig -Tual School CET - Non Residential 08/12/2011 $5,890.95 Garage: 0 Park - Commercial and Industrial 08/12/2011 $10,464.00 Mezzanine: 0 Metro Const. Excise Tax - Commercial 08/12/2011 $1,138.10 Use Total $28,458.95 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: 1 Geo Tech report required prior to issuance Fire Alarm: Yes Protected Corridors: No 2 Ersn Cntrl 681 -4444 Smoke Detectors: No Manual Pull Stations: No Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTE N: •r -•• law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001 -0 10 through OAR 9 '- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued y: , / 4 �/ Permittee Signatur - rf ! ` CC-- Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT 1111 11- COMMU DEVELOPMENT Perm #: BUP2011 -00017 T[GARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 08/12/2011 Parcel: 2S 101 AB00100 Jurisdiction: Tigard Site address: 12023 SW 70TH AVE Project: Red Rock Center, Phase II • Subdivision: Lot: 0 Project Description: New office space. Contractor: ONEILL INTERNATIONAL INC Owner: FRY, DOUGLAS 16731 GREENBRIAR RD 23077 SW NEWLAND RD LAKE OSWEGO, OR 97034 WILSONVILLE, OR 97070 • PHONE: 503 - 635 -6181 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - COM - New Construction 08/12/2011 $4,621.43 Class of Work: ALT 12% State Surcharge - Building 08/12/2011 $554.57 Dwelling Units: 0 Plan Review 01/25/2011 $2,423.15 Stories: 1 Height: 0 ft Plan Review - Fire Life Safety 01/25/2011 $1,491.17 Bedrooms: 0 Bathrooms: , 0 Plan Review 08/12/2011 $580.78 Value: $948,421 +. Plan Review - Fire Life Safety 08/12/2011 $357.40 DC Provision Review, COM New - Bldg 08/12/2011 $128.00 DC Provision Review, COM New- Ping 08/12/2011 $128.00 Floor Areas: DC Provision Review, COM New - LRP 08/12/2011 $38.00 Total Area: 11115 Info Process /Archiving - Lg Sheet (over 08/12/2011 $44.00 11x17) Accessory Struct: 0 Info Process /Archiving - Sm Sheet (up to 08/12/2011 $177.00 Basement: 0 11x17) Carport: 0 Erosion Control 08/12/2011 $256.00 Covered Porch: 0 Erosion Plan Review CWS 08/12/2011 $83.20 Deck: 0 Erosion Plan Review COT 08/12/2011 $83.20 Tig -Tual School CET - Non Residential 08/12/2011 $5,890.95 Garage: 0 Park - Commercial and Industrial 08/12/2011 $10,464.00 Mezzanine: 0 Metro Const. Excise - fax - Commercial 08/12/2011 $1,138.10 Use Total $28,458.95 • Required: Required Items and Reports (Conditions) 1 Geo Tech report required prior Fire Sprinkler: Yes Parapet: to issuance Fire Alarm: Yes Protected Corridors: No 2 Ersn Cntrl 681 -4444 Smoke Detectors: No Manual Pull Stations: No Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set orth in OAR 952- 001 -0010 through OAR 952 - 001 -0090. You may obtain a co. • . .'rest questions to OUNC by •- lin• 503.232.1987 or 1.800.332.2344. / Issued By: �� � � /' �= • ermitteeSignature: / • Call 50 45 ■ 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application . o'mm e rcl l , F C ESE ONLY _ • FOR OFFIC 'U City of � {� ' R C T igard r , Date /B ved I Permit No.: 1 I i II_ 0 i 1312 SW Hall Blvd., Tigard, OR 97223 7 all ' eview ` 1 k Other Permit: � 'J Date /B : A'I� II 00I Phone: 503.639.4171 Fax: 503.598.1960 t TIGARD' Inspection Line: 503.639.4175 ,P \V Dat : y: Juris: 0 See Page 2 for a r, y . , Internet: www.tigard- or.gov d. Supplemental Information x._,:„� . �, ::: - -� ,: -..., � - � -: _ : ..; - . : = � �e _ � ,� s� -. ,ss � -, nom. �_ ; �: � °., .� �Nohfied St le - '.' .;. ;T YP E O E W O ' K , , ' , „,,, [JIRED D AT ,, : A'N 2 r 3 DWI ' = ' :a ---- � �.,.:.r r- ,� ;;..<, .: , "x,.= .�:aw,irr�e�.': ". �:,,..a, ,. $4 »,� °?�° „wx .. � ,7,�AM �r�' New construction ❑Demolition v Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the ms -i _e indicated on this p .._ e - CATEGQRY , CONST RUCTION: work application. ❑ 1- and 2- family dwelling gCommercial /industrial . Valuation: $ ❑ Accessory building ❑ Multi - family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: • - . ` '' b , A TZ OB SIT iN ORM?►TION AND I; OCe1'PION _, a Total number of floors: t Job site address: : �j, / 76 & New dwelling area: square feet City/State /ZIP: /tea 3 �/ ` i2 Garage /carport area: square feet l Suite/bldg. /apt. no.: Project name: i ��e " " Covered porch area: square feet TIN Cross street/directions to job site: '72n�G(I 00 Cjni ✓a�� �f{�/ /y l�� � i � �1� ;g Deck area: square feet t,�► y C1' °� Other structure area: square feet R EQUIRED. DATA: COltill\ii'RCIAE USE ^CHECKC ISTz Subdivision: . • Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all d and the profit for th a rtr the equipment, ma t erials labor, abor overh e p DESC CPTTON° =0F `WORK e work indicated this 1? t �/� & i /1 I Valuation: $ ' '46 A--2.e.72- (/V Existing building area: square feet New building area: I I (1 ,5- square feet = � R o,u OSVNER EIVANT Number of stories: Name: Type of construction: �E Address: - Occupancy groups: e , C i t y / S t a t e / Z I I P : * i 11/140 Existing: Phone: ( / • • 37 Fax: ( ) New: ; ! CONTACT PERSON y .-= .: , E NOTICE > � :' _ . - � �, -� , : ����u. _ - m�-� te: -,. Business name: 1 � l O/ ,9 AAA - ��� .� - All contractors and subcontractors are required to be Contact name: /� /1 licensed with the Oregon Construction Contractors Board N ` under ORS 701 and may be required to be licensed in the Address: 14- 7 .) I jurisdiction in which work is being performed. If the City/State /ZIP: art a 6 � , 97214 applicant is exempt from licensing, the following reasons `� apply: Phone: (/03 t om �7� l 77 Fax: : ( ,� n Z3 I p 3z7 E-mail: fl 1A) I.Uv L ? 11p ic.�v [ / B UY in - . A ._ F , ki _ ry CONTRAG dit,„ s . .e_ .. , y Business name: e (( l VI V fLGI D , g 3 ' BUTGD;ING - Address: I toil a (1-1 ran aV r — 1-4) (P %as �ejer to jee`sched di C.. _�,m ,1+ i D Structural plan review fee (or deposit): 02 h �3 ' . , 5 — City/State /ZIP: ) 1 — ( ) FLS plan review fee (if applicable): 1 A f 2 Phone: ( 63 r . + • v Fax: I 1 CCB lie.: . 7.7 iJ / Total fees due upon application: 3 j /i , ( . )� • Amount received: • Authorized signature: / T his permit application expires if a permit is not obtained n / <. within 180 days after it has been accepted as complete. I, Print name: R , ,,,,) r � L t/ R Date: //2,. 37/7 * Fee methodology set by Tri- County Building Industry Service Board. • I: \Building \Pennits \BUP- COMPermitApp.doc 10/01/09 440- 4613T(l1 /02 /COM /WEB) � "O a-9, I l 1 �:.. Building Division Accessibility: Barrier Removal Improvement Plan TI GARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ • (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ • . (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: - $ TOTAL (shall equal line [2] of Valuation Computation): $ I: \Building \Permits \BUP -COM PermitApp.doc 06/25/08 Building Division _ , Plan Submittal Requirements TIGARD Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number • B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. • F. ' Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Budding \Permits \BUP -COM PermitApp.doc 06/25/08 Building Division Plan Submittal Requirement Matrix TIGARD Commercial & Multi - Family - New, Additions or Alterations _Te of�Sbmxttal ##�ofPlans� () n�ludespnew, a dditions anted alterations } Required at Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 2 (must include location of all accessible parking) Plumbing (site utilities) 2 • Building 2 Fire Protection. System 2 • Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 • Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue) • I: \Building \Permits \BUP -COM PerrnitApp.doc 06/25/08 April 12 2011 City of Tigard 8 Current Planning Division r s Attention: Gary Pagenstecher Permit Center Building ' c, 13125 SW Hall Blvd. I\ / Tigard, OR 97223 RE: Permit Revision Comments for Red Rock Center. Dear Mr. Pagenstecher; We are in receipt of your email dated March 15 2011. Andy from Pace Engineers also met with Mike and Gus to review the drawings and below is a synopsis of the additional information needed from their review. We are also in receipt of the Dan Nelson's email dated March 17 2011. Here are our responses to the plan review comments: m c a) E E >, E o z b U Issue 1 , Condition #3..If the project is to be constructed in phases, the applicant must submit an overall phasing plan and a detailed plan for each phase to the Current Planning Division for review and approval. Each phase must show the limits of construction �- and appropriate transition throughout the site and demonstrate consistency with all of the applicable planning standards and conditions of approval. City Comment: The overall phasing plan is good. The detailed phasing plan for Phase ll is missing although the information may be scattered about the plan sets. For example C3.2 shows the limits of construction and parking is accounted for on another sheet. Tree removal is less clear as to which trees are proposed for removal with Phase II as distinct from other phases. Response: We have split the drawings into 3 sets; Phase Ha On -site, Phase lib Building A Shell and Phase IIc Off Site. Each set has the information and construction details for each phase. We have clarified the areas of work in each of the bid packs. It you want an overview of the areas of work in each of the bid packs see the Overall Plan on A1.0 of each of the bid packs. 2 Conditio Prior to issuance of site permits for each phase, the applicant shall su mit a specific development schedule indicating the approximate dates of construction activity, including demolition, tree protection installation, removal, ground breaking, grading, public improvements and building construction of each phase. Response: Please see attached schedule. v L1. t 3 L Condition #5. Prior to issuance of site permits for each phase, the applicant shall • apply for Tree Removal Perraap for trees proposed for removal during the respective phases. An erosion control plan shall be submitted with each phase that shows erosion control measures for the trees identified for removal of each phase. City's Comment: See notes on LD1.0 to be more specific on what is happening with Phase 11 as distinct from other phases. Erosion control in C3.2 is ok.( Note about Lt scope in phase is noted on A2.0; Question regarding the tree mitigation on LD1.0) Response: In the original drawings the scope lines were different between dPP � Ob. Civil, Architectural and Landscape. We have split the drawings into 3 sets; pi ell Phase Ha On -site, Phase Ilb Building A Shell and Phase Ilc Off Site. Each set has the information and construction details for each phase. We have clarified 0 the areas of work in each of the bid packs. It you want an overview of the bid packs see the Overall Plan on A1.0 of each of the bid packs. 4 - Condition #6 Prior to issuance of site permits for each phase, the applicant shall su ' , k re . - _ : _ - - . , s' I I - I es wi eac • . ` - • . « t , . . , . T . . I I . . ' - 1!- - S ._ .- ..' . remo . . Q_ -.. w _ - ' , f` J City's Comment: Engineered planting soil locations ok on LD3.1. However, refer to y N ta ,. comments on LD3.2 for revised details. ' r Response: The details have been modified to reflect the changes written in the City's set. Please see drawings Phase Ila On Site LD3.2 and Phase lic Off Site for changes. 5 Condition #7 Prior to issuance of any building permits, the applicant shall submit a ai copy or a recorded rec- iprocal access and maintenance easement to ensure access , 0 . and maintenance rights are recorded with the approved partition map. Response: Building A is a single building that does not need reciprocal .� access and maintenance easements when built alone. When we build the Q ° other buildings on the site then we will address this condition durin th rift, ill m ..tit on plat,.,.. 6 L., Condition #8 Prior to issuance of any building permits, the applicant shall submit ro satisfactory legal evidence to establish the proposed joint parking use in the form of e p deeds, leases or contracts. If a joint use agreement is subsequently terminated, or if to ,,,e the uses change, the requirements of this title thereafter apply to each separately. t 0°1 , Response: Building A is a single building that does not need joint parking ` agreements when built alone. When we build the other buildings on the site then we will address this condition duriaa t ie minor partitinn plat. t' . f t t. 7 i Condition #9 Prior to issuance of any building permits, the applicant shall submit al detail drawings show appropriate railings for grade separated areas in the parking lot to prevent accidents. (Note also on A2.1 of the plans) R ponce: The note in the drawing asks if there needs to be a railing at the Su 1 1 , north ide of the east driveway adjacent to the parking lot. There is not an a facent sidewalk to this drop therefore this location does not need a railing. 8 L, Condition #11 Prior to issuance of any building permits, the applicant shall submit co evidence that supports provisions of a single loading space is sufficient to serve buildings A and B in the proposed configuration, or provide two loading spaces. City's Comment: Condition asks for evidence that supports one loading space. The ra statement provided is your rationale. Please provide letters from your prospective tenants and delivery companies that support a single space. Response: Please find attached letters from Building A tenants. 9 L ., Condition #12 Prior to issuance of any building permits, the applicant shall submit a as revised site plan showing the clear visions areas, consistent with visual clearance requirements. Response: The clear vision areas do not apply to this area because of the zero lot lines. We have provided a site distance diagram on sheets C14 and C15 of the Phase lIC Off site bid package. 10 Condition #13 Prior to issuance of any building permits, the applicant shall submit a as revised Landscape Plan demonstrating compliance with the Level D buffer • standards to include hedges on the southern property lines abutting the existing & a residences. 0° - DV ?' ary's Comment: The condition requires a revised landscape plan showing required AO � ` g/ k J` hedges prior to any building permits. Screening of Phase II, Building A will be Dr X® . f required with Phase 11 development. Response: Brian met with Gary on this issue. Gary said if we can provide photos looking south that show the native material screening the residence, he could relent on the hedge requirement until Building C is built. Please see attached photographs. 11 Condition #14 Prior to issuance of any building permits, the applicant shall submit as detailed plans that show all service areas, including air conditioners and gas meters are screened from view. 061 Response: All HVAC equipment is roof mounted and fully screened by parapets — see 1/A5.0 from the Phase lib Shell package. The gas meter is now shown on the A2.1 of the Phase Ila On Site work package — see detail 9/A2.4 of the Phase Ha On Site work package for screen detail. 12 Condition #15 Prior to issuance of any building permits, the applicant shall submit a • written sig n- oflfrom the waste hauler (Pride Disposal) demonstrating that the otei proposed waste collection system location and design is compatible. Response: Please see the attached letter. Pride Disposal wanted the dumpster to move north approximately 15'. Site drawings in all phases have been updated for their requirements. They also requested we remove the cover on the dumpster enclosure. See drawing sheet A2.4 of the Phase II On Site drawings for enclosure changes. 13 >, Condition #24 Prior to site work, the applicant shall submitted a cash assurance as (letter of credit or cash deposit) of the equivalent value of the mitigation required (476 caliper inches of proposed mitigation tree planting x $125 /caliper inch = $59,500). Any trees successfully planted and maintained in accordance with the approved Tree Mitigation Plan and TDC 18.790.060.D, will be credited against the assurance two years after all of the trees are planted. After the trees are planted, the project arborist shall submit a letter to the City Arborist to certify that all of the mitigation trees were properly planted per the approved Tree Mitigation plan in order to the set starting point of the two year tree establishment period. After the two year establishment period, the applicant shall provide a re- inventory of the mitigation tress conducted by a certified arborist in order to document mitigation tree survival, and compliance with the approved Tree Mitigation Plan. The remaining value of caliper inches not successfully mitigated shall be paid as a fee in lieu of planting from the original cash assurance. Failure to plant and provide documentation of the mitigation tree planting by the project arborist within 6 months of certificate of • occupancy issuance shall result in the forfeiture of the cash assurance to the City's tree fund. Re - se: Please see LD 1.0 on the P se Ha On -site and LD1.0 on thee c Off site packages for tree mitigation. Brian Keicher will write a check for t e mitigation under this phase. ' Via/ 7 14 >, Condition #25 Prior to the site work, the applicant shall install fencing as directed by the project arborist to protect the trees to be retained. The applicant shall allow access by the City Arborist for the purpose of monitoring and inspection of the tree x n..a� protection to verify that the tree protection measures are performing adequately. _ °1 ' to follow the plan, or maintain tree protection fencing in the designated locations shall be grounds for immediate suspension of work on the site until ' remediation measures and /or civil citations can be processed. Gary's Comment: When tree protection is installed, Project Arborist shall notify City ± Arborist in writing and call for inspection. Response: When tree protection is installed, Project Arborist shall notify the City Arborist in writing and call for inspection. 15 Condition #55 Prior to issuance of building permits and any Certificate of pancy for each phase, the applicant shall provide a revised site plan and design details for the required bicycle parking (19 spaces), demonstrating that the applicable location, access and design requirements are met. Response: Building A will require five parking spaces. The original drawings 10 only included four spaces. One more bicycle bar has been added to all site drawing sets. Please see drawing sheet A2.3 of the Phase Ila On Site package for details. 16 , Condition156 erior to issuance of any Certificates of Occupancy for Phase 2, the applicant shall provide the following information to establish joint a s_ess_ -1) c o p' Satisfactory legal evidence presented in the form of deeds easement, leases or contracts to establish the joint use; and 2) copies of the deeds, easements, leases or contracts are placed on permanent file with the City. Response: Building A is a single building that does not need a joint access when built alone. When we build the other buildings on the site then we will cla address this condition during the minor partition plat. (deetaaa96, be Abdrj2 / ' 17 , b.- Drawing Notes on A2.0: need narrative on how this meets planning conditions and standards for parking, etc. Response: Please see the drawing sheet A2.1 of the Phase Ila On Site package. The scope line represents the total area we are affecting by construction. The scope line includes areas like rough grading, construction parking and the construction area. This drawing. has been updated to show the limits of construction for this phase. We have also provided temporary c ¢p curbs to finish the site. g� 18 , ,drawing Notes on A2.0: work within Track A to be completed in Phase I including e� retaining wall? (note is pointing to the first retaining wall on the east side of the wetlands) Response: In Phase Ha On- Site we have included p portion of the first retaining wall adjacent to the Wetland to delineate the edge. Phase I Wetlands is already permitted. 19 Y City wants the new legal name of the developer: Name, Address, Phone. Response: Brian /Andy has already submitted. C3 2 20 Y City wants to see a composite plan of trees, signs, street lights and stripping to make sure there are no conflicts. This can be shown on the Signage & Striping plan. The city arborist wants _a detail of the street tree installation on my set of -- . p �`@ es ponse: See drawing sheet C4 on the Phase Ilc Off Site Package. 21 Y City wants an additional sheet for the 1200 -CN permit plan set of the entire site and showing the phasing. They also want to designate a parking area for the construction workers and state that no parking will be allowed on SW Dartmouth and SW 72 Response: Comments resolved in new 1200 -CN drawings. 22 Y Installation of a water meter will require the removal of an entire concrete panel and dowel in the new panel. City will not allow saw cutting a small area. City will allow a double service and sleeve under SW 70' so we can irrigate the east side. That will eliminate the removal of a 2 street panel. Response: Please see drawing C5 of the Phase Ilc Off site drawings. 23 Y Verify the actual location of the street lights and show a detail of the street lights and - installation. Response: See drawing sheet C4 on the Phase Ilc Off Site Package. 24 a Provide a copy of the focal point plans in the Off Site bid pack. Response: Architectural and Landscape separated the off site work from the on site work. Please see the new Phase Ilc Off site package for these details. 25 N Y Highlight the detention system, water quality manhole and the downstream piping on the On -Site Plans to be approved by engineering. This has to be approved and inspected by the engineering department. It is outside the jurisdiction of the building department. Response: See drawing sheet C5.0 of the Phase Ila Onsite package. 26 0 - The next submittal will require a Suite Plan with approved street address. Response: Please see attached street address plan. 27 a) I have to prepare a memo to ALL utility companies as listed with One Call of the proposed improvements to SW 72 and DW Dartmouth. I must attach these memos with my next plan submittal. Response: There is a site meeting on Thursday to discuss the underground PGE requirement. Once discrepancy is resolved then we will resolve this condition. 28 c Provide mechanical, lighting and insulation energy forms found at p XOregon.gov /energy. Response: Please see attached forms. 29 c Please provide details of stucco system to be used. p Response: Please see attached stucco system details. 30 c Please provide manufactures instructions for installation of stone veneer. o Response: Please see attached stone veneer installation instructions. 31 c Please provide ceiling plan showing all ceiling grid and installations required by the as state. Response: No ceiling acoustical tile grid system is specified in the shell of the building. The T.I. drawing will include any acoustical tile /grid and appropriate details. 32 c Label all straps on plans showing types of straps. as Response: Please see attached Addendum. 33 c Key Notes on page S2.1 are calling for mostly LSL's and page S1.1 is stating that either manufactured or solid sawn may be used. Please clarify. Response: Please see attached Addendum. 34 When five or more parking spaces are designated accessible, any space that is designated "van accessible" shall be reserved for wheelchair users. Response: The site drawings for Building A are located in the Phase Ha On- site bid pack. For this phase of work we are showing 5 ADA parking spaces. Sheet i /A2.3 shows that we are providing 2 parking spaces with van accessibility (parking spaces share 1 aisle). Detail 6/A2.3 shows detail for the accessible parking sign with van accessibility sign. 35 c Please show nailing of multiple members that are put together to create columns. Response: Please see attached Addendum. If you should have any further questions, please feel free to call me. Thank you, 1 11 1 . 0) 4 / 1 1 / I IA Jon Anderson, AIA, NCARB Principal Anderson Dabrowski Architects, LLC CC: AD file