Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Specifications
M EC2007-00181 HEMCON 10575 SW CASCADE AVE 130 City of Tigard, Oregon ® 13125 SW Hall Blvd. . Tigard, OR 97223 ** • al ,, • March 5, 2007 x RE: HEMCON MECHANICAL Project Information Building Permit: MEC2007-00181 Construction Type: VN Tenant Name: Hemcon Occupancy Type: Fl Address: 10575 SW Cascade Ave. Occupant Load: 16 Area: 5812 Sq. Ft. Stories: 1 The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2004 edition;and the State of Oregon Fire Code (OFC) 2004 edition. The submitted plans are approved subject to the following. Ductwork shall be supported in accordance with Sheet Metal&Air Conditioning Contractors National Association, Inc. (SMACNA) Each appliance shall be provided with a shutoff valve separate from the appliance. The shutoff valve shall be located in the same room and within six feet of the appliance served.Access shall be provided to the shutoff valve. C409.5 OMSC Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC Permanent equipment supported by the structure, 400 lbs and over,shall have their attachments designed in accordance with the Building Code. 301.16 OMSC Appliances serving different areas of a building other than where they are installed shall be permanently marked in an approved manner that uniquely identifies the appliance and the area it serves. 304.10 OMSC Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. 306.1 OMSC Manufacturer's installation instructions shall be available on the jobsite at the time of inspection. 304.1 OMSC Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke Phone: 503.639.4171 0 Fax: 503.684.7297 0 www.tigard-or.gov 0 TTY Relay: 503.684.2772 detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. 606.2, 606.4& 606.4.1 OMSC Suspended-type unit heaters shall be supported by non-combustible elements that are designed and constructed to accommodate the weight and dynamic loads and shall be sway braced. 920.2 OMSC Appliances installed on roofs or elevated structures exceeding 16 feet in height shall be provided with a permanent means of access grade or floor level. 306.5 OMSC Guards shall be provided where appliances are located within 10 feet of the roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor,roof or grade below.The guard shall be 42 inches above the elevated surface with an intermediate rail so as not to allow the passage of a sphere, 21 inches in diameter. 304.9 1) Provide details of all attachments for all mechanical equipment taking into consideration of the requirement for engineering on any unit weighing over 400lb. 2) Provide gas line drawings showing size of gas line and BTU's of equipment. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite.The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard,Letter of Transmittal.The letter of transmittal assists the City of Tigard in tracking and processing the documents. Res.ectfull T 10111 . elson, t Senior Plans Examiner m F- �"`* r?x°-`l ask. ..�.r: - �r.w.r ..�.-.w.r ,7 ,��.L. Part Ncrr►ber. s 4 f 1�: 11f �c ro Nt etl Unit Hold-Down Brackets for Trane and FORM NO. 3263-1P DATE: 101 03 American Standard t MH-VOY-HOLD I sue�lrm TO YC D, TC D, WC D 121 C-301 C 7 al cri COMPANY: CfAWN BY:X .HARM JOB NAME cri m EQt31Ph1ENT:. , co cn NOTES' _.. Lo 2111 E --;4:,�• -t' ,.•3 o.; Manufactured 18 1s`'' ,° • gaga i¢edsteel -1,,A1-7A-,:ii:;° ' • i:•~ t.��S.Y,,.';`,, rte4T • Package (fIC(Udeseight f83 t�ald-duwrlbrackets 4 p`�'2•:f .zr�-�� ably- (84)#10 x 11r Tek screws e 'I - . - ~' � per bracket :. A's Unit base rail Ste? 3i.-�r i.- Attach to curb J (4)#10 x 1t2" .• •Tek screws - o ''= , Attach to unit(4 ea.) _- f #10 x 112"Tek screws •.KY; ..r.,,,5, [ Q 4 P D� •ooi curb a 6" �'� tty of Tigard Apo 0,1,4 et Plans 6 El , la Date ok- o*---( T T-' 7 G) M ' - m TH18 POCIA ENT ISTNEPROPERTYCFFACRDMEn.CORPQRAI1CN AND iSOEE fERED UPCN THE£032 RESS cetiornoN 7)-AAT THE 00NT El4T3WILL NOT$ECISCL GSM CAUSEDV1ATFi CUT MICRO I ETL'S1"!R{TTENCONSENT N 1,11CRCieETt.OCR,PORATTai•303511.51iACEb NO AVENUE,SUiT E3Oa•INCFA?14FOL19,IN.46'228•i$C -8 624822•••MICRCII Ell WEST-2029 1111418THsr.•SPARKS,NV86'431•1-800-8644662 LEGEND & SYMBOL LIST ANNOTATION SYMBOLS 1"”uWM INSTRUMENTATION SYMBOLS TYPICAL PIPE ' 4%.::: PIPING SYMBOLS VALVE SYMBOLS LINE CLASS DESIGNATION Q KEYED NOTE a BALL (BA-X) woo EQUIPMENT LIST ITEM NUMBER UTI ITY PIPE AT' L AIR VENT, AUTOMATIC (SsP-X) EXAMPLE: L� POINT OF NEW CONNECTION FIELD MOUNTED INSTRUMENT AIR VENT, MANUAL (SSP—X) ��,--THREEWAY BALL (BA-X) K E L ?� ELEVATION N2 iET, KEE OR KET ARROWS INDICATE FLOW PATTERN JOINT OR SERVICE. A = WELDED ANCHOR B = THREADED 0, CENTER LINE HPDIR/5 RDW OR KET - FLANGED RIGHT ANGLE BELLOWS VALVE (SP-X) PLATE PANEL MOUNTED INSTRUMENT (BACK} CDA IEC, KEE OR KET 1.1 ANCHOR, WALL C = SOLDERED--g-- BASKET STRAINER (STR-X) ---�$H BUTTERFLY (BF-X) D = BRAZED ---- --- EQUIPMENT ACCESS CLEARANCE IW IEC - BELLOWS (VAC-X) E = COMPRESSION NORTH ARROW CWR/S JEP - �J Z 0 - H°H BUTTERFLY VALVE W/OPERATOR (BF-X} F = HUB PANEL MOUNTED INSTRUMENT (FRONT) En BLIND FLANGE --�.,i— SWING CHECK CK-X G = FUSEAL PWD QCH, J 0 K U { ) = —►— FLOW ARROW (FOR LIQUID LINES ONLY) -.- -.., ..-C.O. CLEAN-OUT —<o— BALL CHECK (CK-X) H - SOLVENT CEMENT LPCR ADA REVISION TRIANGLE PANEL MOUNTED INSTRUMENT (FRONT)�--� - DOUBLE CONTAINMENT PIPING -11— CIRCUIT SETTER, BALANCING VALVE (SP-X) I - SEAL WELD o ® J JACKETED REVISION NUMBER W/ ILLUMINATION LPCS KET 0 C DROP AT END —1:11--- CYROGENIC VALVE (SP—X) K = NO COPPER r--1 ,a DETAIL NUMBER DIR/S ZEZ OR R t o D— DROP AT MID 6a DIAPHRAGM VALVE (DA-X) L = SLOWDOWN ; ' DETAIL SYMBOL SHARED INSTRUMENT DW IEC ---p---- FILTER (SSP-X) M FLANGED L--J DRAWING NUMBER WHERE DETAIL APPEARS DHW IEC xi, _ D i —�-- FLEX HOSE (SSP-X) i EXCESS FLOW VALVE N = COAXIAL ELEVATION LETTER {. --1-I-- FLEXIBLE CONNECTION I><1 GATE VALVE (GA-X) 0 = FM APPROVED 0 ELEVATION SYMBOL MOTOR CONTROL CENTER MOUNTED DEVICE SAN 2AH `\ P - VICTAULIC N (GA-X) ELEVATION LETTER OR REMOTE PANELFLEXIBLE HOSE -- GATE VALVE, ANGLE Q V IEC ��a� GATE VALVE FLANGED (GL-X) STEAM ADA M N. JfjORI FLOW METER, ROTAMETER (FI-X) R = UL APPROVED No ELEVATION SYMBOL --- GATE VALVE, FLANGED ANGLE (GL-X) _ FACILITY MANAGMENT SYSTEM (FMS) �m- Yu --4 �- S - STEAM DRAWING NUMBER WHERE ELEVATION APPEARS SCS ADA A W W mt GRAVITY FLOW DRAINAGE PIPING WITH GLOBE VALVE (GL-X) T - ELECTRONICS SHARED CONTROL & DATA AQUISTITION ;_ Zpp� : N I... SECTION LETTER -� CHWR S IEC GLOBE VALVE, ANGLE (GL-X) = SYSTEM FUNCTION / p AIR GAP ° U CONTAINMENT SECTION CUT SYMBOL _ , , _ CD KEA HEAT TRACED DOUBLE CONTAINMENT PIPING GLOBE VALVE, FLANGED {GL-X) V NO HUB r4- - -- GLOBE VALVE, FLANGED ANGLE (GL-X) W FUSION WELDED SECTION LETTER PROGRAMMABLE LOGIC CONTROLLER FUNCTION HWC KET ----- -- HEAT TRACED PIPE (PRIMARY) X = ORBITAL WELDED �' SECTION CUT SYMBOL ,4, N r� )--x--- HOSE END (SSP-X) l' THREEWAY GLOBE {FL W Y = SHRINKABLE SLEEVE DRAWING NUMBER WHERE SECTION APPEARS (ARROWS INDICATE FLOW PATTERN) = _ N\ HOUSE VACUUM PORT SCHEMATIC (HV-X) Z = TUBING _ DEVICE TYPE FROM SCHEDULE PROGRAMMABLE LOGIC CONTROLLER HOUSE VACUUM PORT PLAN (HV-X) BELLOWS SEAL GLOBE (GL-X) 1 = TRI-CMP CON. HVAC AIR DICE CALLOUT INPUT/OUTPUT FLOW (CFM)�: HOU --4TF-- NEEDLE (GL-X) �, -IP INSTRUMENT PORT ---obi— PLUG (PL-X) MATERIAL RATED Le _ AIR HANDLER ID � � •� ---0-- ECCENTRIC PLUG (PL.-X) PR ESSURE (PSIG): A = ATM AIR HANDLER CALLOUT ,0� PILOT LIGHT •------ {- LINE BLIND B = 50 , cA-0 FLOAT (SP-X) = CAPACITY (TONS) u m 11: MASS FLOW METER W/BATCH TOTALIZER --� FLOW CONTROL, VENTURI (SSP-X) C = 100 �3 VALVE TYPE W D - 125 VALVE ID INSTRUMENTATION LINE LEGEND U� . ----�' HOSE BIBS (HB-X) E - 150 ,--- --_, NON-CONNECTING LINES �' VALVE NUMBER Z •°- oi QUICK OPEN (SP-X) F = 300 - PROCESS INSTRUMENT SENSING LINE — v +,+---- ORIFICE PLATE (PRESSURE REDUCING) (SSP-X) G = 600 MISCELLANIOUS ABBREVIATIONS AND ACRONYMS // NSTRUMENT PNEUMATIC SIGNAL PADDLE WHEEL FLOW METER (FI-X) O PRESSURE REGULATING VALVE, BODY FED (PRV-X) H = 900 ABBREVIATION MEANING ----D--- NSTRUMENT ELECTRICAL SIGNAL (DISCRETE) Z N it �, PIPE BRANCH, BOTTOM I 15 _ w 5 a `�' � - ATINVALVE BODY FED A ANALOG SIGNAL ---A--- N5TRUMENT ELECTRICAL SIGNAL ANALOG)---- PIPE BRANCH, TEE (PRV-X) J _ 175 AC AIR TO CLOSE -----Q--- NSTRUMENT ELECTRICAL SIGNAL DATA) Z v E•m PIPE BRANCH, TOP K -- A ?JJM OVED LOOR ---PF--- N5TRUMENT ELECTRICAL SIGNAL PULSED FREQUENCY U-. I ' PRESSURE REGULATING VALVE, LINE FED (PRV-X) L = V AHU AIR HANDLING UNIT FREQUENCY) c E------- PIPE CAP PRESSURE RELIEF (PSV-X) AO AIR TO OPEN x x NSTRUMENT CAPILLARY TUBING U� a g. PIPE EXISTING AVG AVERAGE I_ L L NSTRUMENT HYDRAULIC SIGNAL ir o) 0 E's PIPE GUIDE SERVICE IDENTIFICATION = BDD BACK DRAFT' DAMPER ti ti ELECTROMAGNETIC SIGNAL OR LIGHT BEAM i PIPE MATERIAL. A = A-53F A-53B BLK, STEEL, � PIPE PLUG SYMBOL SERVICE / B.O.80 BOTTOM OF UNDERGROUND LINE � • A134, AWWA C200 BOD BOTTOM OF DUCT -0-0-0- SOFTWARE LINK SIGNAL • B = A-53F GALV/A-53B BLK, BOP BOTTOM OF PIPE U� a.� —0 PIPE UP CD CONDENSATE DRAINS _ _ 4 8 /S 8bN8RWAE --u- 1T T T E (PTU-X) R RETUR N SUPPLY / SINGLE LINE DUCTWORK ACTUATOR SYMBOLS5 PI 4 TUBE Bi. S DEIONIZED WATERUR SUPPLY C = — — BLK, CFM CUBIC FEET PER MINUTE/ 5 F1 G STEEL CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED CEILING SUPPLY DIFFUSER E ELECTRIC PRESSURE GAUGE (PI-X) DOMESTIC HOT WATER r CONSTANT AIR VOLUME I � I (PI-X) DW DOMESTIC WATER D = A-106B SCH 40/A-53B, CEILING SUPPLY DIFFUSER WITH FLEX DUCT PRESSURE GAUGE WITH ISOLATOR STEEL DEMO �-- (DIAPHRAGM SEAL) FW FIRE PROTECTION WATER DIRECT-ACTING Z1--3 CEILING EXHAUST OR DUCTED RETURN AIR P PNEUMATIC • 1■cp, FD FIRE SPRINKLER DRAIN E = A-106B SCH 80/A-53B, . .•,%: •, - (PI-X) / TC WASTE AND VENT ►� GRAVITY DAMPER .;PRESSURE GAUGE WITH COCK IW INDUSTRIAL WATER STEEL E EXISTING P s PNEUMATIC WITH SOLENT, ' • LPCS LOW PRESSURE CLEAN STEAM F = A-106B/A-53B ALL SCH ' FFU �� •• • ;.�.; - PI PRESSURE INDICATING DEVICE (DIGITAL} (PI-X) NG NATURAL GAS / ENERGIZE TO CLOSE $ - SIDEWALL SUPPLY AIR REGISTER 80, STEEL EL. ELEVATION I P Z PNEUMATIC WITH POSIT IC :iIR•'t�•: PRESSURE INDICATOR TRANSDUCER N2 NITROGEN G = A-333, STEEL EO ENERGIZE TO OPEN s---I--a- SIDEWALL EXHAUST OR RETURN AIR T k - (PI-X) C DA CLEAN DRY AIR I = COPPER S SUPP Y I .s' (DIGITAL) PWD PRO CESS WASTE DRAIN = CO E E ERRE L L SQUARE ELBOW WITH TURNING VANES r SOLENOID ,EV VALVE n _ T' PT PRESSURE TRANSDUCER (PI-X) SAN SANITARY SEWER DRAIN J - 304L, STAINLESS ESD EMERGENCY SHUTDOWN RADIUS ELBOW SV SANITARY VENT K = 316L, STAINLESS E VALVE 9 C''� TEMPERATURE TRANSMITTER (TT-X} V VENT L = FRP F H EXHAUST s i> s DUCT TRANSITION THREE-WAY ACTUATED L UDI UTILITY DEIONIZED WATER M = POLYETHYLENE frXILosED Q PNEUMATIC ROOM THERMOSTAT M o . lo- w LEVEL SENSOR (LS-X) HPDI HIGH P RITY DEIONIZED WATER N = POLYPROPYLENE FD FIRE DAMPER ELECTRIC ROOM THERMOSTAT TWO-WAY ACTUATED VALVE v I— ri. \-.J STEAM STEAM EXISTING BOILER _ PR S URE CONDENSATE RETURN 0 _ PVC, SCH 40 FFU FAN FILTER UNIT Q ROOM HUMIDISTAT --® I- O LEVEL ALARM (LA-X} LPCR LOW M CONDENSATE P - PVC, SCH 80 FL FAIL LOCKED OR LAST PH PHOTOHELIC 0 Z HIGH, H-HIGH, M-MID, SHW CLEAN HOT WATER Q = CPVC FO FAIL OPEN Mc MAGNEHELIC W(HH-HIGH C GPM GALLONS PER MINUTE L-LOW, LL-LOW LOW) R = PVDF sQ SMOKE DETECTOR < N ,� �K S - TFE LINED GV GRAVITY DAMPER O 0 pH INDICATING TRANSMITTER {pH-X} T = FEP LINED HG INCHES OF MERCURY + 1' 1 BLAST GATE DAMPER a ( ° m- U = PVDF LINED HH HAND HOLE Q� MECHANICAL DAMPER � Z � u 1 (;) A NALYTICAL TRANSMITTER (AT-X) V = DUCTILE IRON HS HYDRAULIC SUPPLY ER v 0 o &� f TF°P3 FIRE DAMPER (VERTICAL) w N PROCESS LINES HEAT TRACED PULSATION DAMPENER, WATER HAMMER W = CRYOGENIC IA INTAKE AIR - -- (PD-X) X = POLYPROPYLENE LINED MA MAKE-UP AIR F G ARRESTOR - �--� FIRE DAMPER {HORIZONTAL) o o � ak --- -_ (Qc-X) NEW PROCESS LINE Y - SARAN LINED (N HAND VOLUME DAMPER (BU1TERFLY)QUICK DISCONNECT COUPLING Z — PVC TUBING N NORMALLY CLOSED / i REDUCER, CONCENTRIC EXISTING PROCESS LINE = NO NORMALLY OPEN SMOKE DAMPER _ :9- 17-: 4 1 POLYBUTYLENE � t� ':�'.' �A►�► - ._ �-- REDUCER, ECCENTRIC SLOPES SLOPED LINE 2 = ABS OA, OSA OUTSIDE AIR F 1 ° SMOKE CONTROL DAMPER It ,,� ; z -.. OC OCCUPIED ° 0 SAMPLE VALVE (SP-X) PIPE SPEC. CHANGE 3 = CAST IRONt� W `�Z SANITARY SAMPLE VALVE SP-X PP1 II HP1 4 = CARBON STEEL TUBING OFCI OWNER FURNISHED, CONTRACTOR INSTALLED i�.Folir„ o _� C ) DU U o , �� STERILIZATION PORT � ' 5 - CLAY P PNEUMATIC SIGNAL CTWORK SYMBOLS , �, �� � .2 �P - PPH POUNDS PER HOUR � /� �,� - , %�� ,i.,�� ,� � �� SIGHT GLASS SSP-X N T SHEET REFERENCE SYMBOL FOR LINE 6 _ RUBBER HOSE PSI POUNDS PER SQUARE INCH 12x9 -RECTANGULAR DUCT, WIDTH x DEPTH (INCHES) W ( ) DRAWING N0. ENTERING OR LEAVING A P&ID 7 = CONCRETE PSIA POUNDS PER S UA E IN 24s -__ z �, .. 8 = 304 PSIG POUNDS PER SQUARE QR INCH ABSOLUTE �' AROUND DUCT �,, ! ,� �„ o sg SLOPE IN DIRECTION SHOWN INCH GAUGE ►., - ��Ihliiii�i�i�m. FLEXIBLE DUCT _ �Q -- STATIC MIXER (SSP—X) LINE IDENTIFICATION 9 = PFA QC RELOCATED FLEXIBLE CONNECTION a ° .CR) - a 8§ ie g -- STRAINER (STR-X) PIPELINE INDICATION FOR PIPING SYSTEMS INDICATED HA RETURN AIR ®N SUPPLY DUCT I W n Z I IA ON DESIGN DRAWINGS SHALL BE INDICATED THUS: ECG U I P M E NT SYM B O LS RPBP REDUCED PRESSURE BACKFLOW PREVENTER ®,r' EXHAUST OR RETURN DUCT m o EX SWITCH, FLOW (SSP-X) R&D RESEARCH AND DEVELOPEMENT CROSS SECTION THROUGH ROUND DUCT -- - � RH ECURATURE �5WITCH, TEMPERATURE (SSP-X) (1) LINE SIZE SERVICE IDENTIFIER (3) CIRCULATING PUMP CENTRIFUGAL PUMP D RDECTECTOR�.. STANDARD RADIUS ELBOW �t z -, 0 --- TEMPERATURE AND PRESSURE FITTING (SSP-X) " RTU ROOF TOP UNIT m = Q ° 0 2 -CHWS-JET S SA SUPPLY AIR IE5 y TEMPERATURE GAUGE (TI-X) SD SMOKE DETECTOR LONG RADIUS ELBOW - z 1■.` METERING PUMP W THERMOMETER (TI-X) LINE CLASS ) I SUBMERSIBLE PUMP SCFM STANDARD CUBIC FEET PER MINUTE SQUARE ELBOW W/TURNING VANES WCO WASTE CLEAN OUT N 1 ---4E---- THERMOMETER WELL (SSP-X) DIAPHRAM PUMP SP SET-POINT _ © j 25 DIRECTION OF FLOW SQ.RT. SQUARE ROOT ED RADIUS ELBOW W/TURNING VANES , d ES -3 TUBE COUPLING VACUUM PUMP TP TRAP > z° #NE SI - A NUMBER FOLLOWED BY INCH MARKS TC THERMOCOUPLE - CELN IFFUSERS (ARROWS DENOTE FLOW PATTERN)--®all UNION (1) L SIZE LI 3 I , (") INDICATES THE PIPE SIZE AS MEASURED IN INCHES. BLOWER , TLT TOILET CEILING EXHAUST REGISTER OR RETURN AI "` � 6 _ g' -��— UNION, FLANGED '� �� T.O. TOP OF � � � U AIR GRILLE ._ �, ��r LIQUID RING PUMP SIDEWALL SUPPLY REGISTER `„ (2) LINE CLASS - AN ALPHA CHARACTER REFERRING TO DRUM PUMP VARIABLE AIR VOLUME II � TRI CLOVER CONNECTION �� WG WATER GAUGE - SIDEWALL EXHAUST REGISTER OR RETURN 1— ce a .� THE SPECS. (LISTED IN LINE CLASS DESIGNATION). AIR GRILLE/REGISTER M EXHAUST FAN (P&ID) WH WATER HEATER a PR CAD ALE. - VACUUM GAUGE W/COCK (PI-X) _ ULTISTAGE W WATER SUPPLY = BLAST GATE DAMPER ,`�� .D 4f�� 07006-110-0 ---01VENTURI EDUCTOR (ssP-X) {3} SERVICE IDENTIFIER ALPHA CHARACTER FLUID I.D.1D CENTRIFUGAL PUMP H T P S D SHUT DOWN DOUBLE LINE DAMPER '4 ' '4 %ABBREVIATION FOR THE COMMODITY . ..� Ex AUS FAN ( LAN) 0 UNOCCUPIED -- - +� STEAM TRAP (TP-X) HANDLED BY THE PIPELINE (LISTED IN SERVICE INDEX) VTR VENT TO ROOF •E_ FIRE DAMPER (VERTICAL) JJ__ sash ' eg' El i L...._ +_ FIRE DAMPER (HORIZONTAL) REG HAND/VOLUME DAMPER (BUTTERFLY) , cY�3, o Jk SMOKE DAMPER 'O/1 N E. cie SMOKE CONTROL DAMPER 't 1 Expires 12/31/2007 I oate. n,,,, .S_ rn i . L z I) , k r, lk k � m ,t 0 0 0 Q 9 o o Q Q o - - o : ' ijjfj 111 ■ ■ o 13 ' �, /►' ° � — Z ® I I —I 1 I � 0. _ __ __ P _ - - - — - - i„.____„,______, P /IVA KVIIIIII.A I I _//I_ _ s [�I t!11 Ids ° ° c // / ! l li�� 111 MD [I1 o II,� (I II � Fit- // ��FFICE OF - O t.OFFICE OFFICE OFFICE �I j (1051 1106) 11071 1108( .9- j) v I I / ∎ oNQED I HemCon o..... I / / cA �© w 0 _ �0 __ '' q EYPLAN __ _-_-aTI_ 0 I — „,in 0 _ r- -- "I - -i 1— -� —q- � !� _ .: _ CORRIDOR r r - 14) i) ; ei I I I I1 o2AI I I ,r, ,.- ;"` {�,:�; Ill Iii 1 um II' - II' (it - A fr-r . tzt) G ENERAL N OTES Alk i / CONF CE ROOM OFFICE 111, OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE •FFI E a.•-, ` I +K �� 204 1 12051 12061 12071 12081 I1091 II 12101 al % 111111.1111 III . r J STAFF i��rr oillis�I A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2 0 R II ,,. ,� COPIER PRINTER ROOf�i I� � � �► �► p► � I1 a31 tai � i!) I -:\ \ _.-- I .� T `����"' KEYED NOTES LOBBY ' °ar u� - �� I � — ,. .. .. I I — � 201 � CORRIDOR CORRIDOR COORIQOR L � 202A 1202A1 (102 — '� • Ri _ I— _ _ --'-- -_ I I I I 1 —.� _ • -I.I-_ 1 1 DEMO AIR COMPRESSORS, AIR DRYERS, AND WET TANK. rn L 1 - TELE/DATA MEN S _ - EL - -_r-= 1 j - RELOCATE TO ROOM 345. 13 m s� ELECTRICAL i . (2171 TLT �(��l NSF. _ , - '- Z �U �. ..i I__._. 212 V MEN'S TLT W 14, • �. � z • 12231 . .� sss�T ;IF.; �j ,,�„ 1 1 ir' �. 2 DEMO CHEMICAL CABINET. SAVE FOR RELOCATION. W �-...._.� (1131 � � �,`E` I EERING & m � - Irm - _ --._'__ _'_--- .<- _ �. ,I I�F 1�,CILITIES WORK AREA � to � Li- CORRIDOR C .I c �, laril CORR@OR• I- - � LU CH ROOM ACCOUNTING STA F (1111 11121 TIN c W 202B : / P•i l i 'DOCUMENT CONTROL CORRIDOR F 3 DEMO CHILLER. SAVE FOR RELOCATION. R--- �*-1 - T ' I. a'''�/ I -- -;� -_I 216 I 202C 215 I 214 I I I I _ _ --�)- ilikoa b 3 • .� 7ir ( 4 DEMO BIKE LOCKERS. SAVE FOR RELOCATION. 0 _._.�- CONF. ROOM L�- I di G > ! � ` - -( 2�. �11'"ail �`2(E) J L 219 - `. 11,4,0 • - MEN'S TLT IN ENS TL- r.2II' � _ MEN S TL (�� 5 DEMO ACID STORAGE CABINETS. PROVIDE TO OWNER Z 2221 - `� _ - hn " - - _ WOMEN S TLT 114 ..�tf1•.� _ - - - ucr�r 1— 1 1 � � , FOR DISPOSITION.T k =i-: _ ill Z Iup Ni a ICiiirhi III -�� �~1 =-- = o _�,_�� =o ° ill T ;" � :..� E= � — -�L _ _1 L_-1- -1 !' �� : ��! Ie'�,� -� 1.' 1]'�■ -1 ��� "�'�""I kifil.A1 ���! 6 DEMO EXHAUST SNORKEL. SAVE FOR RELOCATION TO L�,� �' ' �/ ! , J J '- J !: r�uo>•ur�Krpi�.�r I '�'tl 1111111611 Illlllllll T.S .i � ..►1 11 11_11 , . — _ ROOM 301. a i w� LYOPHILIZER --E-�n���c-e-�+- - -I I -- LYO'' �" � Q II°1111 (3341 -•--.__- III�Y�illll 0 N 13071 ( -' COMpRESS� S to `"`� i , , IIIIIIIIII �� LYOPHILIZER ROOM 1 _El Mil° Ii II© II© Hill' 11,;,1i11, ) 0 u 1311A1 7 DEMO N2 DEWER RACK AND MANIFOLD. PROVIDE MANIFOLD ig .- g i§.il- ; ��� u�.11lt �,� „�,r,. c ,v,� N I � ,) ,aMP I I TO OWNER FOR DISPOSITION. es � fill /.:.i2/'' H f,,II 0 j f'•, � II '111 TIDE `..*.� •� •� I - _~ Y _ i .. . yy '7!l ,. . 1111111 - - �■ (. - - - - - G m _ °-a, v ,,�, _;,�� 1111_J111111 GOWNING ROO 0 i � ,. ■;,:I ... rc,iciL .�='.� �i�' 11E1111 LABWARE s it �s 1sx�Ir �■ r�.� ..rr1�f'.. ; -I I ._ � � �_ bild 1111 s TORAGE �© �° o� � �•,•,�„ y I I 8 DEMO DI SYSTEM AFTER NEW SYSTEM IS IN OPERATION. s as I! BREAK ROOM ( sKEK.vESS sHa�ES sHELY6 � IIiI 13321 � � � � N � �l ��! � �L _-- ( ��)' )'�°��� '� - _ PROVIDE EQUIPMENT TO OWNER FOR DISPOSITION.1224 ilil� 11 L ---1 LYOPHILI• R li ; � l�l�l� ' � i,�� :ic5ii � ;! � W W1 1 ililllilll 11'III__ �, WI I 1111111111 CORRIDOR 13081 � ;rdiIti. '■■' 7 ;7 , 11.IIIL I 1 1 #2 LOADING ■���._._ �!J�� 111111011 � •-300 ' I II°1111 CLEAN �” • i�; ._ 9 DEMO BOILER, FEED TANK, FEED PUMP, AND CHEMICAL PUMP. ' 1` WORKBENCH WORBBFNCH WORKBENCH 1111111111. 1 t nni: ..� .ter 1 �►y `:l — _\ x -- °--�- -•� .. IlllllIllri paw_w 1 s1� w� II — - - LYOPHILIZ:R ..W. T wilw■■x L PRODUCT' i 1 i- Jl ` COMPRESSORS O - - !I — I T eleJ1 _ SAVE CHEMICAL PUMP FOR RELOCATION. PROVIDE OTHER 1- � - IN COMING L- L I II ® ---'8 � EQUIPMENT TO OWNER FOR DISPOSITION. . . 1 13021 PRODUCT'•N ROOM ��. - H00D CART K HOOD 3 ►+'K MANUFACTURING/QC ' Q� I IF ' L po,, R ROOM I. • ,al :' , El ca o , �, -� -� �- [- -1 �_ �T II 10 DEMO MOLD SINK AND ASSOCIATED PIPING. `�" I _ CORRID�' 13311 ' PRODUCT 1 o s ttl I ` w VFD I • 1. '1••,�� i it; ` OUT GOING L_ I J E o CAP PIPE IN WALL. DHW AND DW TO BE USED N NEW ROOM. (338) o� 13031 � K� �1 � 51--"Arr). � � • •:. - MIL All. AL ..ci la,. I RESEARCH & DEVELOPMENT R & D t I ° a EY " rii 11 DEMO ACID WASTE NEUTRALIZATION SYSTEM. DISCHARGE } +�gI .a I I LABWARE « Di ■ : MOLD CLEANING 13 PH METER TO BE USED IN UPSIZED 2" PIPE. �+ WORKBENCH K+►in cLE ■ ■ _ �,�C BICLES �� �WViiV ALIQUOT '� BMO 13091 �w�• ' STORAGE 000 0 1' I C�28 I 13041 fl I SPONGE BACK OVENGE I 12 DEMO N2 TANK AND PIPING BACK TO VALVE. DROP REMAINS. o ■ ■ oC�o o K 0 CLEAN NOW M . §OA rz._ I ■ ■ —1 U -) • II PASS STORAGE ,� �,�11§ lj IIIIE'° ' ORRIDOR I �' � M' WALK IN /�'� I ` o ) 13 DEMO LAB SUPPLIES RACKS AND RELOCATE TO RM 3 2. L !II f'�}VEN A/L4 13381 COOLER V cjii--.71i � �i - (3051 I '� °"" T SPONGE PRESS II IIIlIIIIIHhIIH E:�:: MEI 14 DEMO PALLET RACKS AND RELOCATE TO RM 341. ■�, r JI Li- -1 , I j > z°_"" CORRIDOR CORRIDOR ' mid 111111111111111111•11■111111• MININIMMINIMMIL jj �:�,_._._.:�-��:'.'' (300) (3001 ,,, ,,,�, Li 4 15 DEMO WASH SINK FOR REPLACEMENT. W t° \\ '1'° EQUIPMENT Q ktel p I'`• 5 A 0 TRANSFER "� 323 _ / ► - ,,� 16 DEMO LAB WARE WASHER AND RELOCATE TO RM 334. Z 1 1 INCOMING SUPPLIES MATERIALS MANAGEMENT _ STORAGE D i, 1 c•t K II ]t 13211 OUTGOING SHIPMENTS El 1313 G• r ' '= w �E.,, T� �. '!!a GOWN 1 I I I I I I L WORK.. j 1 ' 13241 ii P I TOR KKK M T01 N 2 J 13221 Kl � ' a x r cr G _ i r . _ H *;A d' 41 roil t PACKAGING -- - ��Mri*"7� i .�'7` war► 4 ■II rIi' . it I i�.7 r _ © F- SPONGE , � �jw I _ ___ - - WT ti I iie,"^:' . 8■ me a_l -7 S> 0:11 I 1318 V x r STORAGE RFA J .-� - --' - .. 4 I 6 Al _ I _. . I - r�ir�.�ii " ■ (316 I i I Z _._j L_ I 1EI1 QUA TY CO TROL Es' � � x x r 1 _ - z a el CIP 1- �7 cP-t 13201 ��i UQUOTING ® R ass snot ' I �41� q� !11 o sP+ 0 1 ORRIDOF spwE ' `"' i BYO �� ;! 1319) it �'x0' >rxk 1 i .. �'.`'� li® ® �i r� U E I GENERAL 40 1 1 r/ 1300) - ■i - :��� - �il4 �. > rK rr,1.., 1 I DI-T-1 337 - o DC t t ELECT. ROO PUMPS ��,��j !!■� g3 I M o: ,HAN KCAL ROOM Dl T t ( 1 Ill twME �x� r x r 't�'►s�ri�, FR �,: fr -I j„ rx�' 13151 �: � - w �I 1335) I P : ) A r , r try. I SEP ( �'!II__---•4. FT. OPHILIZER) Z 1 I I i s� � I � I F o C3 E"- �� REF I - PRODUCT 7 l a:r Sae I - Z a J 0 1 STORAGE ROOM Z I w No I _ ________ g TELECM ROOM I ► + d v_ ■1 1317j 1 "'� ,�,� - x II— -CO ....41v:_ _- _:°=J- , �` �- !n +� �� Kra~ . _ . -. , - a `IT - - - - - �,I ''fir CHILLER p a0 _pa ____ ___ ___I � �51 L J I I I I I E � aI- O c) • A 0 �� I, Aliiiir41// Nimmo MIK 1111111111 C DA Ll.. E Lij m ° ig k'' Ao, b a. e 0 % . et 5 5 MW C7 iii' 1 039 .W /fieI I I I I I I I w ? ., .i,.4 ........,Adr. IfI�►i C., Q J H e w 1 r , W .. = V O O d g. J I /I o 5i-4s A _ A J = c�2 a • 0 I I I I I I I I I x d N k F 0z M CAD FILE: t.1 �a PROT 07006-L00-1 34 I I I I I I I I I I S cIN.� 4 iE 8 4! . 9PE'�` RI x. 1 MANUFACTURING EQUIPMENT LAYOUT -- DEMO v�REGO o Yi3,2 Q`J ,i MD0.1 SCALE: 3/32"=1'-0" h' 'NE. G 101.'° -c,,,, ill Expires 12/31/2007 F), 8 r (t ® o s ® o ," kt-, o) kr 0 0 0 0 0 0 0 0 0 © r 0 4N _.19Pr pr ! 1 1 I I - • 0 0 1 "Adir - O 8 ® 0 4 ®— L_ _ -o L_ _X" A/1041erArej 0 z rr, r rr or A, . ._ , Ai A A I I ® E ® _ _ _ _ _ _ _ _ _ _ _ _ _ -- // II __-_ I 1 0 o Q--&- cn I 0 ME - .// j 1 // g OFFICE OFFICE OFFICE OICE ®/ fFHCE 10$I 1109) _ E ® o// i/ 1 I I 1 `� _, 1 HemCon .) m //// cn 4111 _____— KEY PLAN N �,--— _ — — LOBBY _ - \ \ ��%' 1101) o rn p / ( I I ( I I ( CORRIDOR I M h o �- 1102A( 1 _ I- 0 0 CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E �J v v a 12031 12041 12051 12061 1207) 12081 1 09 12101 w w 0 to cn j - E NERAL NOTES A MINISTRATIVE STAFF -� I I \ I 1 ( OFFICE OFFICE I 11041 I CONFERENCE ROOM I 1 11111 11101 I A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. I _ Pr) N �� - LOBBY - - B SEE PARTIAL MECHANICAL PLANS FOR DIMENSIONING y tr 201 CORRIDOR CORRIDOR AND DETAILS. 0. I2O2A1 1202A1 COORIDOR 1102B1 1 4 ___,/ 1 _______ ..... ___ _ ELECT. 7 L .-. MEN S * 4i L9 wv) ELECTRICAL I TLT o F`' 112A V s ® CONF. ROOM 12121 MEN'S TLT .■► W 220 1 I 11131_ ENGINEERING KEYED N O T E S E L A:' CORRIDO'� I CORRIDOR FACILITIE1i 21 RK REA t!) w �*2026 R. & D. P. D. Q. A. DOCUMENT CONTROL CORRIDOR LU CH ROOM .. Olio° 11111 I „ g rla 1 ___ /218 / 21s 2o2c 21s I `'� ' ' 1 I 1 PROVIDE TWO 2" PVC PIPE BETWEEN ROOMS 301 & 306. .7 0 1Q - o �'� I �� I 011- I _ 1 THROUGH WALL AT HT. 24" ABOVE FF. COORDINATE WITH OWNER= Z ' �- -L—._ —.r SERVER ROO 1 I 1 WH-1 &2(E) -- OWNER. SEE DETAIL ON A5.6. i ® ��� iQ 219 I I ENS TL' a Z ti .r MEN'S LT 4 EN'S TL ttil I I moil__� WOMEN'S TLT 0 11141 -.••''"".., -•r — 2 CONSULT OWNER ON FINAL TANK LOCATION. U.I '� ca r �� �L� 0 Ng 0 L Ili - 3 INSTALL LYOPHILIZER '---.ww,.. _______ - LEI- _ -- ���� _ #3 REFER TO HULL PID'S FOR -� 1 sink sk,k ° ,—.,���, _ _ ' El 4it �..,. , � ,' �' ������ CONNECTION DETAILS. INSTALL VENTS FOR RELIEF VALVES o LYOPHILIZER LYOPHILIZER #1 LYOPHIUZER AND VACUUM PUMPS LIKE LOPHILIZER j1 & #2. ° 1 III� � girl► Q r� . '� #1 LOADING f LYOPHILIZER ROOM I c�raan.. reran 2 I I I I O I # D ifirl∎ 1311 AI I I i I RESEARCH & DEVELOPMENT C WORK AREA PROS C. ° ■■ m 329 = ARE j 1 1 30� A5.6 a ...�rlr�.. - 'C 7 rig GENERAL PURPOSE 1_1IClan molds �i = i > 5)■ S °sma II CORRIDOR 40111110 LYOPHILI• R 1 _ 11111�1I► 1_I i% 'WA i :i: ''' W m. �■- (3081 a!,'"--!— ! n�::� I■■I rrl r (' �,ru r!,■•� irrr.,, l�/- ail 11,�I,1� 1r-�� 1 ` #2 LOADING _ _ LYOPHILIZER #2 - LYOPHILIZER �■ _ II - PRODUCT - • I� _ ® - I - - _ - COMPRESSORS - - - F IN COMING PRODUCT! N ROOM 36 LYOPHILIZER ROOM ■ • REIM PRODUCT � ,❑ VFD • • CORRIDOR I { I 0•o 1 (311 BI :..•�.OUT GOING ■■ ■■••■ ■ 13381 iG �'Lt� Dirty molds 3031 _ I I O El E/ El H(� o� I LY 't� II r �� E El � � TRANSFER 13091 !� -- LYOPFIILIZER #3 � � � •■ RESEARCH & DEVELOPMENT Tabw #3 LOADING LAB ® © IABWARE n ROOM �' II�li1' M� L RO R 13271 CLEANING GOWN MO 13096) `�' u,■r.�� M' I a ■.■�■L;,,,i;• E ROOM — "' 1 I 13281 I ( ---_t_.;-.""..;..71-::_::- M Q M SPONGE BACEk SPONGE �U�� �, '_.."' 'A Imo`,„= ► x 1304) , QC WORK eMan OVEN oao I N !t rol O AREA ---0----0 GOW 9 M c E N U a 4 - 13311 - - - - - II ;�• ■ CORRIDOR WALK IN 309A �� SIP '�'> - EW" � VEN A L 13381 COOLER w; o PHILIZER R00 DI O c� i / 3051 h- ---jr► - �.,z 13401 1 !El1 E °�` SPONGE PRESS 1 ® ) __ _ srss 1 1111111111111111111111 ( CORRIDOR ( CORRIDOR ( ( [no Tabl. a« o -; �_� - = ,,,, �z =1:="""""""""""':=1 I , - o 0 13001 (3001 - �� � Tabs. iiIIIHhIIIIiuill \J EQUIPMENT °0rt ('�-�, TRANSFER l"'°� i I Q (3231 V ' ;'•r i`' D It R & D .�. STORAGE _ u.. . . _�_ � `.. ► Q O W ' 13211 • • • o ® � . �'� U O a. CLEANROOM GOWN 1 I 1--I RACK I RACK I -, l ' _1 W W6•13261 o (3241 GEL WIP FACILTIES C t3 0 I 8 JANITOR Pals — ELECT. ROOM 339 O p 1 12 GOWN 2 13221 "� ' • c a a 1315A1 ►�[-T]► E In Q �.g • II 13251 ' .tr. ” 0 O II WIP I - 1 ■, - -- ----____ it _A-r-� daTiz► Z •- p ..�._.__ SPONGE WIP -- • ■-'+fit ► - r �_�■�.. ��: 1 -- -I 13181 I I a . . I ■� ,t 0....)►___- p 4ZE > _ ' �� • CP-1 II♦ QUA ITY CO TROL PACKAGING A filri,) iiiiiM ■' `� ; I— ..M o LYO CIP SP-10 1320 13161 � ■■� _ a 9 dig ";--5 GENERAL USE f )► , -v �■ r.,....r �' Dl-�-t 337 _ PACKAGING WIP "- ELECT. ROOM flr��i � "vI.M a .• ..r I 1 •nrls ■�ii �' ,�r��'M�I HA I335L ROOM l4 1 r, 13151ff l►,; UTILITY D �i� •� w - 1345) Z SEP � •• �N ---- a. FT, LYOPHILIZER) - 1 © �-1 REF �� I a O le I- NON CONFORMING/QUARANTINE WIP 0 TELECOM ROOM (4•41,... I . y = w N� © p p 13171 : • o V gg +I9 __ 01 SYSTEM_IIT- __T-_-- �� � • .-•••••••■••••■■.•••••••.... --L._ _ r- .40.1.41* ii. B zi- NON-CONFORMING SALES I I I UP 1 1 C4€ CHILLER ` J -I 2 O& MKTG R&D I C- U _ h icE STORM E STORAGE CHITOSAN STORAG ..ilb) 1345) (3441 343 CDA '�` Q W co l J go, Mg. kik " x 14.1 — E t, cr 1 QUARANTINE I I 0 o N a 11'' STORAGE I v ,Q p 1 1 J C7 LAB STORAGE I 4J SIIOR�6E - O • �,. z A - - - - - _ 13421- - - - I D - - - - - - - - O S1fS'tDl t� I J Z�y a r a D • 0 f � � �, W I I o X N S SHIPPING ~ 0 gz, ...-.7. MATERIALS & STORAGE P�1U� 07006-M0-1 CAD FILE: MANAGEMENT 13411 -- -__. 4‘.9 IN ' 1 �� N I IN RAwNG I I 1 I I � � � ��'' �� li o (SI CI.11PLIGNT \ , i t 7'gBE I f a. 1 MANUFACTURING EQUIPMENT LAYOUT GREGO ` — MO.1 SCALE: 3/32"=1'-0" ' " N E. OR% .°v iii . v Expires 12/31/2007 g 1:9obs\07006 Hemcon Facility Expansion\Dwgs\07006-MD0-2.dwg,3/1/2007 5:18:41 PM,pbrenner,Evergreen Engineering L._ e1 I • ' :) >. > = I -1 --I I (.0 P1 1- 1-11 1'1 < 0 .----, in -4- K X - m — I = c ,-,a — C) I I ,......- - tz) u) ......_0 K L 75" • r(r-•1) „_-1 ...- S r- r' 1 -m m 1 . • 1 coi Issi -......, i , 00 _..., > II- Z - • 1 - Z > z I 1 rri •0 K C i I) m 1 Z ......i r-- > 1 11111 c 1 1 1 ....._ 1 L ),.. = 1 (A 0 1 rri -In rri Fri 0 -ti • C R ....., -0 .-- .----, : m ---)' K DH-1 ..,„ -1-1 x - ml .0 z 7n I z td ...1 ' -- t --I c) = ' D 1 -Ti 'bp 11-1 :7) :7-, (-) R° . N -11 , r,..) . --Ti 1 0 0 ,............................ i 1 ''' s E\ I I O O 0 II I -11 i I a) Ihammissumumassummossait. I I I I I I I I I I _LI I I I 0 0 0 0 .....a. 0 0 ® 0 0.0 II ri M -ri ren 11111 (1) CD >, M -< 2 z - iii I r-s M K 7-R 171 E., 1> 0 u M Es -L xl co 0 •-< M 30 -I I eo — 0 -1-1 > I IIII u.) z --1 _ J 0 r-- 1 1 = --1 m ..4 c) 0 Li ill 0 K -.......3/4 1 e z co —I c") z F"'" in 0 ] --‹ 0 m Ci") y21 _i_i Ill 4=, _ -o m 23 I = cf) c M I E2 - --(11---- , — ,,ITitt w - - i &xi ...._ > 0 ?c) Lk. I III Cor) -0 1 o cn 0 . 11 > ' c) v) M CD ® ® o > M t---- Niom 1 ---1 G) -4( 3 , 1.. ,%1■111 I 0 lagi I —1 : , CJ W AN . rri C) ....– N'iloww■I ,..,,..., ii ())> fj* -,... •I• -. - 0 (43 177 .1"-\*-1 0 ece; z -‹ m 0, F3. r.n 1: L 1 r ct .R--.) 0 ov, m 4 4"'", 8 11, .1 (/,(■Th*. 1* 1:1 rrl CO > -1 0 (i) = M q 0 N ell) d,,,,t 1 14"11 >z I 1 III I---- . / 9 0 0 8 0 SO €f) 0 9 gig TITLE: LYOPHILIZER #3 & FACILITY EXPANSION Hem C "5 : CASCADE AVE, SUITE 130 .".. 1 m MECHANICAL CUENT: on • . . EVERGREEN ENGINEERING =r- 10575 SW Urn . c,•• MEZZANINE EQUIPMENT LAYOUT - DEMO 1 LOCATION: TIGARD OREGON 97226 '• • •.. % % • Engineering and Construction Services r., i .. _Ia. . . . REV. DWG. #MD0.2 JOB # CLIENT REF. # Drs. DWN. CHI( APPD. •••.. . . • • "i:Iv•'-07006 SCALE: .1" ais.;•.•: • a HILLSBORO EUGENE SHEET OF 3116" ,... 1.-0" DATE; DATE: DATE: :" 7431 NW Evergreen Platy, Suite 210 _Hillsboro, OR 9712444r Conote7r7ft,FWena4,10)R 97402 t 0 ASL SEC 03/02/07 ISSUED FOR CONSTRUCTION . • 1N e, THIRD ANGLE THIS DRAWING. INCLUDING ENGINEERING. DESIGN AND PERTINENT SPEaFICATION. IS INTENDED SOLELY FOR THE PROJECT STA'TEL" IN THE `:ITLE BLOCK. IT MAY \\ ...1 (503) 439-8777 FAX. (503) 439-8767 PROJECTION NOT BE SUITABLE OR SAFE FOR OTHER PROJECTS. OTHER USE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF 7/ERGREEM ENGINEERING, LLC IS PROHIBITED. '.. REV. BY APPD. DATE: DESCRIPTION ..•••••••-4.............,• J11■116.1 ■ 4 -1:\Jot,J\07006 Hemcon F-acility Expansion\Dwgs\07006-M0-2.dwg,3/1/2007 5:18:49 PM,pbrenner,Evergreen Engineering ___ ______ —EL— --1---- ___.1 I I ❑ ❑ ❑ ❑ Co " Y : I 73 > CD > C s Z I —' i a �. 00 III ❑ ❑ ❑ ❑ 12'-0" — — — 0 — — — - r — r— — — — — — r — — CC) ❑ — ❑ ❑ ❑ Ph I c .0 r-, : x Iv Ph N ❑ I ❑ 0 ❑ ❑ to c7 K ��' L ?� r- rrl ir.1 N 1 04 N — — — — — E — — - , — -- — — 43 — — - 00 I! - E .. _ ❑ ( ❑ ) n ❑ P 0 c I _O K z 0 — o_ — ❑ — ` — — ❑ ❑ _ —❑ , ,:, , - o . C • ❑ ❑ ' 0 ❑ — — — •_, ,,, co I I _ 1 i rr, a, rri C A la � m I _1 - DH-1D O N ti► 1 3'-7 9/16 1 c]' -p cD I 7fr A V >. rr, .- n — n I N) I __S.P.I I M -X) ET—. n El- :: I 8'-3 7/8n ❑ ,`' 0 lo ` ❑ I 0 ❑ - t Ph V) r- I I I z ❑ r 0 C ) C rn O I ( i ---I 1 1 I - Q - I - ° - .--_ - - - - - - - - - - I I 0 0 0 0 . CD a G ) o ® 0 0a9 0 m • e cn m m 0 — 1111 �, m ; Z — I o 73 _I- I I — K z ] F.i_ °X --i 11 - I 111 rn 73 K Pi Z W kt ° M EMI !kik n mcD I ] o ..7., G., i. � T ,,, --‹ 3`' m m Ca) Ii...mmIII 0 , ,,,,<-1:„ _ rO I I 1.-- 0 II.ro s �c 11's.� rry 1 j z 3`� a� © ra I O 0 -cti : et R-) O N '"'°° 'a' ° z II O ° &Asi. `'`�b �'#' N 0 0 0 0 0 0 t O � TITLE:ILYOPHILIZER #3 & FACILITY EXPANSION 11111111 CUENT: 05 5o SW CASCADE AVE, SUITE 130 EVERGREEN ENGINEERING ° MEZZANINE EQUIPMENT LAYOUT • LOCATION: TIGARD OREGON 97226 ••• • r• Engineering and Construction Services• REV. DWG. i M 0"2 JOB # CLIENT REF. # DES. DWlN. RAN CHK. APPD.S. CROFT •.• :��..•.r 4 ASL SEC 1 3/02/0 ISSUED FOR CONSTRUCTION 07006 SCALE: : • "•"■: r ' HILLSBORO EUGENE SHEET OF 3 16' . 1`-0' DATE:01/22/07 DATE: :r" 743 NW(Everer , Pkwy, sins 210 Hnasboro. oR 97 24 860 Cor�e�st. Euq�e. oa 97402 3 SEC SEC 10/31/0 AS-BUILT 1 THIRD ANGLE THIS DRAWING, INCLUDING ENGINEERING, DESIGN AND PERTINENT SPECIFICATION, IS INTENDED SOLELY FOR THE PROJECT STATED IN THE TITLE BLOCK. IT MAY (503) 44:39-8777 FAX (503} 439-8767 (541} 484-4771 FI►X: (541) 484-6769 *�. . \1 PROJE • OT :i _ 1 :. •J- .a •,: 111.a- iii Zit .ii. II a- • THE I.: .1 ,111.,•., .Gunn •:+....,2. .F aiia:h-32 A a`" a- ■ :ia•. :AuP►. REV. E,. APPD. DATE. DESCRIPTION j , GENERAL NOTES A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z 0 P et -" tom. - ,.....5 ..- « 5'�. ...- .f -r. i?"T�r, r. o--....--.. :?` ... H ... - "Tt•r•� .. � 43'alM. N P''*••S r T. �� r N 1 •r • e •: •�L•L2 o2.2 11 J War �r.`l) War l r:�.i i'.i iL) ! Y!-) a r Y O ` . "S i i" ■ "•T r. i ^S 1: i. -,. ' `' r. tI r Ise r v `�' I 1 r uI 10 WIMP=.. YlY.IYrOF ri! CO���.iY .�. i_ 11 IIIIII l� ��ll.�l� CI -��_ .�._ L' � C � �� I. �' R >R TS• .��. r.�.. �. 1.,. i.�,. 1... r. ,. f, 1. t. 1. 1. 1. i. !f. I. ((. 11. II. ';III REM Wash Sink #3 300 Hand Wash Sink to 0. rations Area 2 0.5 1 2 0.5 1 III MIMI MUM Water Fountain 300 1 0.5 0.5 Exhaust Snorlde 301 OFCI Nederman Arm 600 cfm Exhaust Provided by EF-1 - _ 600 1 60th GM Cabinet 301 OFCI 50 cfm Exhaust Provided by EF-1 111 et - _ 50 1 50 0 J N Gel Formulation Mixer #1 301 OFCI - - - "� o N Gel Formulation Mixer 2 301 _ OFCI w m . 5 0.5 2.5 4 0.5 2 _ � I MEI N Gel Formulation Tank 1 301 OFCI 300 cfm Exhaust Provided by EF-1 300 1 300 0.2 0.8 c 8 N Gel Formulation Tank #2 301 OFCI 300 cfm Exhaust Provided by EF-1 5 0.5 2.5 4 0.5 2 - 10 0.5 5 300 1 -- 0.2 �0.8 9 N Gel •um• CDA dtiven dia•hra•m 301 OFCI _ _10 N Powder Die• nein• Hood 301 CFCI 600 cfm Exhaust Provided by EF-1 _ r_____.� 600 1 600 11 R Scale #1 301 OWNER Relocated to rm 301 was (Scale at Gel Mix Table 11)12 R Scale 2 301 OWNER Relocated to rm 301 was (Scale at Gel Mix Table #1) �-13 R Bag Holder/Filter Unit j1 306 OWNER - IIININ 14 D Bo Holder Filter Unit 2 306 _ OWNER IIIIIIIIIII III In g 15 E Bandage Trimmer 306 Altman Browning _ _ _ 16 E Banda•e Trimmer 306 Altman Browning _ _ _ _ 17 v _ 150 1 150 Chitoflex Cutter 306 Eubanks 1 18 Conditioning Oven j1 306 _ 19 Conditionin Oven 2 306 150 1 150 20 Dreesin • • Softener 306 Claude Machining Gel Roller Con - •r 1 306 _ _ 21 E r . M D Gel Roller Con or 2 306 _OWNER - - - III= WM v 2 N Mold lift 1 306 OWNER Unidex - , IL; 2. N Mold lift 2 306 _ OWNER Unidex 5 lV Pouch Printer 306 OWNER i.v. E Pouch Sealer 1-u 308 mat h 2 0.7 1.4 41 0.7 28.7 _ N Es- 27 E Pouch Sealer 1-up 308 Gramatech 2 0.7 1.4 41 0.7 28.7 _ - ® Z 26 E Pouch Sealer 1-up 306 Gramatech 2 0.7 1.4 41 0.7 28,7 r r ■Q 29 E Pouch Sealer 1-u• 306 - III 30 Pouch Sealer 1-u• 306 Gramatech 2 0.7 1.4 41 0.7 28.7 Q W u. =mai Pouch Sealer 1-up 306 OWNER _ - h Sealer 1-u• 306 OWNER _ _ _ � C � Pouc See Q 33 E Pouch Sealer 2-up 306 Gramatech g ai 34 E Pouch Sealer 2-up 306 Gramatech 1 �- V °� 35 E Prose #1 306 Altman Browning 2 0.7 1.4 _ _ . 300 1 300 1111 MIN L N 36 E Press 2 306 �_ Altman Browning 2 0.7 1.4 300 1 300 � .�.,, 37 D Scale 4 306 OWNER Removed N 38 E Gel Dispenser Pump 307 Flexicon - S C ~ Os Q 39 E Gel Dispenser Pump 308 Mexican 40 N Gel Dispenser Pump 309 OWNER Flexicon - _ _ - - - h 41 N PI Conditionin, Oven 309 OFCI 150 cfm Exhaust Provided by EF-1150 1 150 101 309 OWNER _ .� gm 42 N PI Dressing Trimmer p 43 N PI Gel manufacturing system 309 OWNER 44 N PI Production Press 309 OFCI 300 cfm Exhaust Provided by EF-1 _ 300 1 300 NM II 0) & N" 4 N - PI Sealer 309 QgiNER 2 0.7 , 11111111111111111 O ' 46 N - PI Sealer 309 OWNER 2 0.7 1.4 . _ 47 N - Powder Dispensing Hood 309 CFCI 400 cfm Exhaust Provided by EF-1 • 48 R Scale #3 309 OWNER Relocated to rm 309 for loading lyo 3 _ _ , C 49 D Nitrogen Storage Receiver #1 316 CONTRACT 80 gal storage steel tank 50 N Box Printer 318 OWNER Packaging 51 E Label Printer 318 - , EMI ILI El .'N' 52 D Fume Hood #1 319 OWNER Removed IIMIIIIIM �IIIIIIIIIII 53 D Scale #6 319 OWNER Removed _ 1.1. .F. 54 D Scale 17 319 OWNER Removed S _ 55 E Circulating water bath 320 Precision 56 E Environmental Control Chamber 320 _ _ 1 0.5 0.5 , M 57 E Low Temperature Incubator 320 58 E Moisture Analyzer 320 Arizona Instruments ' R ri•' ator 1 320 Fisher Scientific _ • , • •59 E � - is rr . : `r 60 E 1111 Refrigerator #2 320 Fisher Scientific - _ S • ': .•I W •. E SAWS III 320 M 2 0.5 1 _ _ _ 0.5 1 r E Scale 320 Arizona Instruments � E Seal Burst Tester 320 2 0.5 1 2 0.5 1 0.5 0 64 E r Wash Sink 4 320 QC Room _ - _ � • KM E Wash Sink #5 320 QC Room _ _ _ _ _ 2 _ 0.5 1 2 0.5 _ 1 0.5 1 66 E Wash Sink 6 320 QC Room _ 2 0.5 1 2 0.5 1 2 0.5 I 67 11111 M. Incubator 321 - PI § _ Incubator 321 __ - - . 69 E 1111 Wash Sink #7 322 Janitor Mop Sink , - 2 0.5 , 1 2 0.5 1 11 0.5 _ % 6 aqo 70 E Tester 326 Instron W 71 E Tensile Tester 327 r o z_ 72 E SAWS IV 328 M _ _ _ 2 _ 0.5 1 _ _ 0.5 IA IlEall N - Dryer ( blower and steam coil) 333 OFCI 30 1 30 - Mold lift 3 333 OWNER Unidex W z-4.ex CO Pa IN1111 11' II - Mold lift 4 333 OWNER Unidex _ _ _ . N li wN 0 76 N - Mold washer 1 333 OFCI 1000 cfm Exhaust Provided by EF-6 3 4 1 4 6 , 1 6 300 1 300 1000 1 1000 3 1 p I� 5 A g in D IIIIIII Wash Sink 1 333 CONTRACT Demo and Re.lace - 2 0.5 1 ` 2 0.5 , 1 2 0.5 _ 1 U � d E Wash Sink 1 333 CFCI Lab Ware Washing G �' 7S ; Wash Sink #2 333 CONTRACT Mold washing relocated from 309 to lab services 2 1 2 2 0.5 1 2 0.5 1 _ _ U Z -'8O s D Boiler Feed Tank 334 CONTRACT Chemline Removed _ _ . _ 06 81 e„, N CP-2 Condensate Pum• 334 CFCI Bell & Gossett - ITT WCD-12-20-BMA 32 - N WH-3 Hot Water Heater 334 CFCI Rinnal -EU-V3237FFU-US NG Circulatin• Hot Water -m 237 1 237 ' c In 0 3 N WH-4 Hot Water Heater 334 CFCI Rinnai #REU-V3237FFU-US NG Circulating Hot Water System _ _ 237 1 237 U rte., v= 84 D Hot Water Heater 2 334 CONTRACT Removed _- - � m p t�.0 85 R Lab Ware Washer 1 334 CONTRACT Bulkhead in room 334 2 0.5 1 2 1 2 20 1 20 - • 11111111111 MI NM I 1.- i- ch.E 86 D Steam Boiler 1 (NG) 334 CONTRACT Removed _ _ -®� Z RN . . ,87 E CP-1 Condensate Pump 335 Bell & Gossett - ITT WCD-12-20-BMA WM E DI-R&D DI Water System (R&D) 335 Grundfoe CRN1-3 _ 5 1 5 -��1 W a'111111111111 89 E HX-01 Heat Exchanger 335 Bell & Gossett 316 SS CHXS-336-2L + _ 15 0.2 3 90 E HPDI HPDI System (R&D) 335 Grundfos CRN3-6, 316 POLISHED - co J a fl) V 91 E - Lyophilizer R&D. 335 SPI - 5 1 _ 5 a 5 1 5 _ 3 0.5 1.5 _ • EMm 1100 1 1100 0.3 4.5 , 92 E - Lyophilizer R&D - CIP Skid 335 SPI - 2 1 2 _ _ 200 0 0.2 6 w ;1 93 E - L►�ophilizer R&D - Refrigeration Skid 335 SPI _ 14 1 14 w Z cm ce Finish Thompson AV4 - - 1111.1.1- _ z v %o 94 E SP-1 Sump Pump 335 rm pe _ W U w 95 E SP-2 Sump Pump 335 Finish Thompson AV4 96 N Conductivity Meter 339 CFCI Sigent (GF) Waste Neutralization System V 97 N Conductiv Meter 339 _ CFCI SI•ent G Waste Neutralization S em x 98 N Neutralization dosing pump 339 CFCI LMI Waste Neutralization System X N W (0 OM N Neutralization dosing pump 339 CFCI LMI Waste Neutralization System 0 100 N PWD-1 Waste Treatment Pump 1 339 CFCI Grundfos 1000 Gal Tank Loop 20 0.7 3 bi0 ; © . g. MLaz il5 r ceg til W F L5 ce sk J LI„:;K? � A Lu Fs 0 . J .' mi. Z g 0 T, m 1 g8 3 S iN in .. © N n co VI N. Iii F"'CAD FILE: M ‘0.,,t rnOF p 07006-NO-3 S GINe !' rte, �' 48 9 P' ti ea.eg r. . •,-EG �c•AG0,13, J c � GQ` ENE•' lQ1I ` , Expires 12/31/2007 I L. Z al te 0 0 0 cn S. 0 n 4' . , , 7 GENERAL NOTES (CONT.) SYSTEMS EQUIPMENT LIST FROM DWG MO.3 A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. z 0 P a. 5: T- Chad Tatar Water star -r Cold ,.,, got Steam ., �, SFMm sikbaust, ,.,, , __rite Treat 0 W .! S0� AL H 1. # .. .1 __ $L) gates t %Lbw 1 1_.Y.J t-_4 O NMI di Rely‘li ID DINCNIPTION ��,,.�__�'`` ION 11��'10Bit < «: r 1.. � !i,.Jf�1 .: .: r Dam �� Val TS 5 r` "•5 �, S ^S T -, , , ,...1 , ',"1 ,' ^n i, , 'T1 i �" ^S �, . 1., t�� � 1 / tom,` i� ■,' /�� ` ` t�,� (sped t�,�� 'Y` tY / ` f� f /��� /��i0 tY iii l t!�.1 iA�.l �s ) ia�1� 4�..r<l ��W �et:r') �� SiY�.l �L / � �� �� ) Si��� {i[�4i �g m km) ��m� Woe) Goal i. 1. I i, +i, .' 1 .. 'I. .' .,,:. --� () iiPfa} ice) (mg fm) wan) n D�O�D - _ FCi Grundfos 1900 Gal Tank Loop _ _ N 101 N PWD-2 Waste Treatment Pump�2 339 C 102 E - De enotion Oven R&D 340 Despatch - _ z P�fO9 85 1 85 0 0 3 N Walk in Cooler 343 CFCI Bush Refrigeration Includes Evaporator/Condensor _ _ C) 104 R Jr A Compressor #1 345 CONTRACT Powerex SED1007 29.4 SCFM 345 Powerex SED1007 29.4 SCFM - - __ ce 105 R Air Compressor #2 106 N Air Compressor #3 345 OFCI Powerex SED1007 29.4 SCFM w En Powerex SED1007 29.4 SCFM � � _ _ _ _ cn 107 N Air Compressor #4 345 CFCI aware 108 N Boiler Feed Tank 345 -OFCI Bryan HFS-150-60-100-D s./2 Q 109 R Compressed Mr Dryer #4 345 CONTRACT Airtek TW-55 Regenerative Dessicant Dryer Dewpoint -40F 8.25 1 8.25 1 6 \. 110 D Compressed Mr Dryer #2 345 CONTRACT Airtek 1W-40 Regenerative Dessicant Dryer Dewpoint -40F 6 _ �_ _ o co p 1 i 11 N Compressed Air Dryer #2 345 OFCI Airtek 1W-75 in 80 gal storage steel tank _ _ - _ r i r 112 N Compressed Air Storage Receiver #1 345 CFCI 113 E Cooling Water Pump #1 345 Bell & Gossett 48C 600 gpm, 80 ft 1DH, VFD Bell&Gossett Powersav Type 8-3 _ _ 0 0 Cooling Water Pump 12 345 Bell & Gossett 48C 600 gpm, 80 ft TDH, VFD Bell&Gossett Powersav Type B-3 , _ _ 114 E 9 P # 48C 600 m 80 ft TDH VFD Bslld&Gossett Powersav Type B-3 w N 115 N Cooling Water Pump #3 345 CFO Bell & Gossett 4S gpm, , 116 E Cooling water separator 345 Griswold CSS-300 Cooling tower Griswold Separator 100 gpm 2 1/2" piping - M 117 N EF-7 Exhaust Fan #7 345 CFCI Greenheck - SE1-18-434-C8 Shed Exhaust -With Wall Enclosure _ 118 N - Steam Boiler 345 CFCI Bryan _ _ _ 2500 0.8 2000 3.4 0.2 0.68 ' - M -J- 119 N - Steam Boiler Burner 345 � CFCI Weishaupt WM-G10/2 2-A/ZM r _ - 120 N UH-1 _ Unit Heater 345 CFCs Trans #1 PND003ADF100007 Shed Freeze Protection Heater _ _ 30 0.1 3 121 E DH-1 Dehumidifier #1 401 Bry-Afro Lyophilizer Loading Area RH 25X 18.9 18.9 , M N 122 E WH-1 Hot Water Heater 401 Rinnai #REU-V3237FFU-US NG Circulating Hot Water System _ 237 1 237 i t� 123 E WH-2 _ Hot Water Heater 401 Rinnai #REU-V3237FFU-US NG Circulating Hot Water System _ 237 1 237 .,, 401 CFO Trans New cleanroom HVAC _ _ 17 0.8 13.6 7.5 1 7.5 N m °+.�4 N , MAU-3 � Makeup Airhandling Unit #3 .1 125 E 6 RAH-3 Recirculating Air Handler #3 401 Trans Production Room Cooling 6 ton fon coil 61.8 61.8 i 14 0.5 7 Air Handler 7 401 CFCI Trans New cleanroom HVAC _ M w 13 126 N RAH-7 Recirculating Ai # 6 0.8 4.8 M 127 D Steam Boiler 2 (Electric) 401 CONTRACT Removed r i (Electric) 401 CONTRACT Removed ..---, -- 7 o 128 D Steam Boiler 3 (EI ) 4 .,i 129 E MAU-1 Makeup Aifiandling Unit #1 402 Trans Production Room 2000 cfm Makeup r Unit - 1 10 130 E RAH-1 Recirculating Air Handler #1 402 Trans Production Room Cooling 6 ton fan coil 67 72 _ _ , 17 0.5 , 8.5 _ M •- 131 E RAH-2 Recirculating Air Handler #2 402 Trans Production Room Cooling 6 ton fan coil 67 72 17 , 0.5 8.5 _ M � � W � I 132 E RAH-4 Recirculating Air Handler #4 402 Trans Cooling Storage room 305 5.65 6.26 _ 2 _ 1 2 _ �- M I O 4 133 N RAH-8 Recirculating Air Handler #8 402 CFCI Trans On Mezzanine to service RM 301 1 1 , 1 - ally 134 _ E - Freezer 403 VWR - _ -,- 135 , E SIP-1 _ Lyophilizer R&D - SIP Skid 403 - - _ 5 0.5 2.5 1 0.5 0.5 _ 500 0.7 _ 350 450 1 450 _ 1 0.2 0.2• L 136 E MAU-2 Makeup Airhandling Unit 12 403 Trans M-Series, Size 03 80 113 17.3 0.8 , 13.84 _ 7.5 1 7.5 M Z N•137 N R&D Lyo cooling tower loop pump #1 403 CFCI Grundfos _ _ _ _ C m 138 N R&D Lyo cooling tower loop pump #2 403 CFCI Grundfos _ Recirculating Air Handler 5 403 Trans 1A-Series, Size 21 47 - _ 6 0.8 4.8 _ 0 139 E _RAH-5 g # M 0 ^ra GI 140 E _RAH-6 Recirculating Mr Handler #6 403 Trane M-Series, Size 21 r - - 141 E - Test Chamber 403 Lunaire STABIU1Y/SHELF UFE TEST CHAMBER 1 Lunaire STABIU1Y SHELF UFE TEST CHAMBER - c = 142 E - Test Chamber 403 / 143 E _ - Facility Toilet and Lavatory Cold Water Use + r 90 0.45 40.5 5.2 _, 1 5.2 0 0" 144 E - Facility Toilet and Lavatory Hot Water Use 15 1 15 2 1 2 145 E Water Fountain 102B 1 0.5 0.5 •� 146 E Lyophilizer #1 311A Hull 23 0.5 11.5 14 0.5 7 258 0.8 206.4 4 0.5 2 310 0.5 155 600 0.5 300 _ 147 D SP-3 Sump Pump 311A CONTRACT Husky 1040 _ 15 0.3 4.5 _ _ _ 11 m d• 148 N SP-3 Sump Pump 311A CFO Finish Thompson AV4 y li• 149 N SP-4 Sump Pump 311A CFO Finish Thompson AV4 q_ Powered by yo 11 d W 150 E Yokagawa recorder 311A _ _ , _ Ii1 151 E Compressed Air Storage Receiver #2 311B 120 go! storage steel tank, may relocate to mez. _ _ 152 E Conductivity Meter 311B Sigent (GF) Waste Neutralization System Final PH Monitoring_ _ _ - _ 4- I• 153 E DI-PROD DI Water System (Production) 3118 12 gpm polishing/distribution (Production and Cleaning) o 0.5 0 III. . , , 154 E Dosing pump 1 3118 cooling tower cleaning solution _ :1. Dosing pump 2 311 B 155 E g p p cooling tower cleaning solution 3 311 B cooling tower cleaning solution 156 � E Dosing pump A 157 E Lyophilizer #2 311B Hull , .b 7 _ _ _ ■ 158 E Yokagawa recorder 3118 Powered by lyo .. .. .■• 159 N Clean Steam Generator 311C OFCI 3.1 1 3.1 1000 0.8 800 1 0.5 0.5 • 160 N CP-3 Condensate Pump 311C CFCI Bell de Gossett - I1T WCD-12-20-BMA - i ."-e' ...�■■■ 161 N DI Water Skid 311C OFCI Siemens 45 gpm distribution _ r Lyophilizer 3 311 C CFCI Hull _ r■■■ 162 N # 26 0.5 13 23 0.5 11.5 ■■■■ 600 0.8 480 600 0.5 300 _____ �. 63 _ 163 N Lyophilizer #3 CIP 311C OFCI Hull 25 0.5 12.5 _ 20 0.2 . 4 _ 20 0.2 4 200 0.8 160 _ 30 0.; 9 184 N RO Water Skid 311C CFCI Siemens 5 gpm RO makeup 6 1 6 _ 2 - ,,>-i 165 N _ SP-5 Sump Pump 311C CFCI Finish Thompson AV4 _ 166 N SP-6 Sump Pump 311C CFCI Finish Thompson AV4 x 167 N _ Yokagawa recorder _ 311C OFCI t,e) R... 0 L 168 E FFU Fan Filter Unit Manuf Huntaire Series 300 Rooms 301, 302, 303, 304, 306, 307, 308. 3098 Total 4 7Z 169 N FFU Fan Filter Unit Manuf CFO Huntaire Series 300 Rooms 309A & 3098 Total #36 _ _• 170 R CH-2 22 Ton Chiller Outside CONTRACT Carrier 30RA022, 46 gpm pump _ _ a 171 E CH-1 35 Ton Chiller Outside Carrier Cleanroom HVAC Cooling Water, 80 gpm pump M 1 - _ WZ 172 E _ Cooling Tower #1 & 2 Outside Evapco 900 gpm 95F in 8OF out, 8' SS pipe to pumps 675000 , 10.8 _ 0.5 5.4 -173 E Heat Trace Outside Cooling_Tower Pipe Heat Trace - Leased tank system, installed by vendor _ _ W _g 174 N Nitrogen Bulk Tank Outside OWNER - `q N x � b 175 176 E AHU-1 AHU #1 Roof Trans North Manufacturing Area 18 ton HVAC unit 270 0.5 135 _ _ _ La f x < <g. _ 177 N AHU-11 AHU #11 Roof CFCI Trans Server Room 1.5 ton HVAC unit, cooling only _ _ - O, 178 E AHU-2 AHU #2 Roof Trans North Office Area 6 ton HVAC unit, Use same electrical feeder. _ 150 , 0.5 . 75 . En z 8 grT,- 179 E AHU-3 AHU #3 Roof Trans Central Office Area 7.5 ton HVIC unit 200 0.5 100 _ - - _ < t9 N 4. 130 = wo 181 E AHU-4 AHU #4 Roof Trans Control Manufacturing Area 18 ton HVAC unit 270 0.5 135 N 0 18282 E AHU-5 AHU #5 Roof Trone South Manufacturing Area 10 tonHVAC unit 200 0.5 100 fo U)r. 0 • ° g 183 E AHU-6 AHU #6 Roof Lennox South Manufacturing Area 10 tonHVAC unit _ 200 0.5 _ 100 134 E AHU-7 AHU #7 Roof Trans South Office Area 4 ton HVAC unit 120 0.5 60 m p C9 0� 185 E .AHU-8 AHU #8 Roof Lennox South Office Area 3 ton HVAC unit 75 0.5 37.5 _ _ E- 186 E AHU-10 AHU#10 Roof Trans XO office space unit z 187 N AHU-9 AHU#9 Roof CFCI Trone New Warehouse expansion HVAC _ , 200 0.5 100_ .188 E EF-1 Exhaust Fan 11 Roof Greenback Production Exhaust Fan. 4250 cfm , . isz‘i g 6 ii Ei 189 D EF-2 Exhaust Fan 12 Roof CONTRACT Greenheck Lyophilizer Room Exhuaet Fan, 200 cfm _ , 190 N EF-2 Exhaust Fan #2 Roof CFCI Greenheck 500 cfm Lyo #1 room exhaust fan 0 Cube 161XP-15.W 1940 cfm ' -* 191 E EF-3 Exhaust Fan #3 Roof Greenback /VFD - 192 N EF-4 Exhaust Fan 14 Roof CFCI Greenheck _ 500 cfm Lyo #3 room exhaust fan _ _ _ W Er 193 N EF-5 Exhaust Fan #5 Roof CFCI Greenheck 500 cfm Lyo #2 room exhaust fan , , _ •y . k Lab Services Exhaust _ -.,_ O J z ig 194 N EF-6 Exhaust Fan #8 Roof CFCI - Greenheck - 195 E GD-1 Gravity Damper Roof Gresnheck Lyophilizer Room #2 Gravity Camper Air Intake _ Z 0 W % _ `�, Z W U 196 N GD-4 Gravity Damper Roof CFO Greenheck Lyophilizer Room #3 Gravity Damper Mr Intake ...___ �„ Greenheck Lyophilizer Room #1 Gravity Damper Air Intake X U ! 197 N GD-5 Gravity Damper Roof CFO r LY4P 198 N GD-6 Gravity Damper Roof CFO Creenheck MAU-3 Gravity Damper Mr Intake _ W V 199 N Walk in Cooler Condsnsor Roof CFCI Bush Refrigeration Z O o- Totals 187.25 92.95 220 145.8 5703 4088.6 128.3 87.4 805 837.8 43.1 20.1 77.2 41.06 111 51 54 47 2250 1880 1870 1240 7185 825 52.2 61x1 22.2 U U o L4! 2 5 a3 ig K) i6 CZ FE FE W N t,) � c _ NI' la W Z C3 � �J d O I a 6 W a V=1 . Vf L�i C m 2 r o 0 CAD FILE: s ' ‘.%‘.11 PROF 07006-MO-4 '''''t'' ' r-v- ,8i9Pe:. f"'" gi 0 'G o°` a'EGO o ty73, ' \IS is 111 I al 4 L Expires 12/31/2007 i./ u as r ',1-x .S CJ . , GENERAL NOTES CONTROLLER CONTROLLER MP 503_1 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT MP 580-2 / A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET CHW-AL-1 IN #1 CHILLED WATER CHILLER ALARM DRY CONTACT NA NO CONTACT IN #1 POINT USED BY MAU-2 A0.2. z 0 PCW-AL-1 IN #2 PROCESS COOLING WATER PUMP ALARM DRY CONTACT NA NO CONTACT IN #2 POINT USED BY MAU-2 o PCW-LA-1 IN #3 PC WATER TOWER #1 LEVEL ALARM DRY CONTACT NA NO CONTACT IN #3 POINT USED BY MAU-2 0 # # KEYED NOTES PCW-LA-2 IN #4 PC WATER TOWER #2 LEVEL ALARM DRY CONTACT NA NO CONTACT IN #4 POINT USED BY MAU-2 IN #5 _SPARE 1 DEMO CONTROL POINT FROM I/O TO DEVICE. POINT NO g IN #6 POINT USED BY MAU-2 LONGER USED. 0 IW-PI-03 IN #7 R&D INDUSTRIAL WATER SUPPLY PRESSURE VERIS PGO6AM 0-75 PSIG 4-20MA 2 DEVICE RELOCATED. WIRE TO BE RUN BETWEEN I/O AND rz o i.,.. r ONTROLLER P 503 2 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT PWD-LSH-02 IN #8 R&D WASTE WATER SUMP HIGH LEVEL ALARM FLOWLINE 3105 NA NO CONTACT DEVICE. - � Lf CS-('E 1 IN #1 Lyon !I #1 STEAM BOILER PRESSURE VERIS PGO6AM 0 75 PSIG 4 20M�A N2_ VERIS PG07AM 0-100 PSIG 4-20MA AL-01 IN #9 R&D NITROGEN PRESSURE ALARM _ 3 POINT TO BE DEMOED AFTER NEW DI SYSTEM IS 1 -LPCS-PI-2 IN #2 Lyon I #2 STEAM BOILER PRESSURE VERIS PGO6AM 0 75 PSIG 4 2 A IN #10 POINT USED BY MAU-2 OPERATIONAL AND READY FOR SWITCHOVER FOR cl ..q pn EXH-PI-1 IN #3 EXHAUST SYSTEM STATIC PRESSURE VERIS PXPLX02S 0-10"WC 4-20MA IN #11 POINT USED BY MAU-2 PRODUCTION. 0 2 PWD-LSHH-1 #4 WASTE TREATMENT SUMP HIGH LEVEL ALARM FLOWLINE 3105 NA NO CONTACT - IN #12 POINT USED BY MAU-2 - - -- LS HH-1 IN # W N Q CONTROLLER INPUT o OUTPUT MP 581 POINT DESCRIPTION DEVICE RANGE / CONTROLLER POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT � � PCW-TI-1 IN #1 PROCES COOLING WATER SUPPLY TEMP VERIS TIGC1 DQ (-58F) TO 266F 10K TYPE 2 MP 580-3 - / m - IN #2 PROCESS COOLING WATER SUPPLY PRESSURE VERIS PG05AM 0-50 PSIG 4-20MA 326-HI-01 IN #1 R&D CLEANROOM ROOM 326 HUMIDITY VERIS HD2NMST 0-100 RH 4-20MA ii PCW-PI 1 # � — # (,� � j CHW-TI-1 IN #3 CHILLED WATER SUPPLY TEMP VERIS TIGC1 DO (-58F) TO 266F 10K TYPE 2 326-TI-01 IN 2 R&D CLEANROOM ROOM 326 TEMPERATURE VERIS HD2NMST (-58F TO 266E 10K TYPE 2 Z •- CHW-TI-2 IN #4 CHILLED WATER RETURN TEMP VERIS TIGC1 DO (-58F) TO 266E 10K TYPE 2 IE m W ii- CHW-PI-1 IN #5 CHILLED WATER SUPPLY PRESSURE VERIS PG06AM 0-75 PSIG 4-20MA IN #3 POINT USED BY RAH-5 � WATER SUPPLY PRESSURE VERIS PG06AM 0-75 PSIG 4-20MA z o Si IW-PI 1 IN #6 INDUSTRIAL VER S CHW-AL-02 IN #4 R&D AIR COOLED CHILLER ALARM DRY CONTACT NA NO CONTACT Z :_ §, 0 OFA-PI-1 IN #7 OIL FREE AIR PRESSURE VERIS PGO8AM 0-250 PSIG 4-2OMA CHW-PI-02 IN #5 R&D CHILLED WATER RETURN PRESSURE VERIS PGO6AM 0-75 PSIG 4-2OMA Ia 3 2 N2-PI-1 IN #8 NITROGEN PRESSURE VERIS PG07AM 0-100 PSIG 4-20MA IN #6 POINT USED BY RAH-5 Z L. - IN #9 SPARE - - - CHW-TI-03 IN #7 R&D CHILLED WATER RETURN TEMPERATURE VERIS TIGC1 DQ (-58F) TO 266F 1 OK TYPE 2 v CHW-TI-04 IN #8 R&D CHILLED WATER SUPPLY TEMPERATURE VERIS TIGC1 DO (-58F) TO 266F 10K TYPE 2 Z A DI--AT-1 IN #10 DI WATER MAKE UP CONDUCTIVITY MYRON L 753 II 0-20 MEGAOHM 4-20MA DI-AIT-05 IN #9 R&D DI WATER POLISHED RESISTIVITY MYRON L 753 II 0-20 MEGAOHM 4-20MA 1 7 (3) METER METER 0) g " _ .L DI-AT-2 IN #11 DI WATER POLISHED CONDUCTIVITY MYRON L 753 II 0-20 MEGAOHM 4-20MA IN #10 POINT USED BY RAH-5 i g � METER IN #11 POINT USED BY RAH-5 ` � UV UNIT NA NO CONTACT SD-02 IN #12 SMOKE DETECTOR FOR RAH-5 > „ C D1-AL-1 IN #12 DI WATER UV METER OUT ALARM SD 02 NA NO CONTACT 5.1 W 1 n r • r `■ CONTROLLER POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT _ MP 580-1 _ ter CONTROLLER r■■ ■■•�■• • 01A-A-AL 1 IN #1 OIL FREE AIR DEWPOINT MONITOR ALARM AIRTEK TW 55 NA NO CONTACT MP 5$0-4 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT ■ `. .r' ` 1 � ■ DRYER ■■■■ .� HPDI-AL-02 IN #1 HPDI WATER UV LAMP OUT ALARM UV UNIT NA NO CONTACT 308-HUM-1 IN #2 LYOPHILIZER LOADING ROOMS 307 & 308 VERIS HT2NRSO 0-100 RH 0-10 V HPDI-AIT-07 IN #2 HPDI WATER RESISTIVITY METER/ALARM MYRON L 753 II 0-20 MEGAOHM 4-20MA c HUMIDITY IN #3 POINT USED BY RAH-6 IN #3 IN #3 POINT USED BY MAU-1 PWD-TI-01 IN #4 R&D WASTE WATER SUMP TEMPERATURE VERIS TIGC1 DO (-58F) TO 266F 1 OK TYPE 2 a 0 I 306-HUM-1 IN #4 CLEANROOM ROOM 306 HUMIDITY VERIS HWL2XSX 0-100 RH 4-20 MA _ _ HONEYWELL 2500 -5"-O" WC W % A # EXH-PI-04 04 IN #5 EXHAUST SYSTEM STATIC PRESSURE 4-20MA L IN #5 IN #5 POINT USED BY MAU-1 IN #6 POINT USED BY RAH-6 D an k_ IN #6 IN #6 POINT USED BY MAU-1 a -LAH-01 IN #7 HPDI WATER CIR. TANK LEVEL HIGH ALARM FLOWLINE LUO7 NA NO CONTACT W„. co I IN #7 IN #7 POINT USED BY MAU-1 W N HPDI-LVLL-01 IN #8 HPDI WATER CIR. TANK LEVEL LOW ALARM FLOWLINE LUO7 NA NO CONTACT °a a 4.1 306-PI-1 IN #8 CLEANROOM ROOM 306 DIFF. STATIC PRESS. VERIS PXPLXO1S 0-1” WC 4-20 MA HVAC-PI-04 IN #9 R&D CLEANROOM ROOM 326 DIFF. HONEYWELL 2500 0-0.5" WC 4-20 MA � z 4, IN #9 IN #9 SPARE STATIC PRESS. �,� IN #10 IN #10 POINT USED BY MAU-1 IN #10 POINT USED BY RAH-6 ' (5) n 1 a IN #11 IN #11 POINT USED BY MAU 1 - IN #11 POINT USED BY RAH-6 E ; a 0 IN #12 IN #12 SPARE SD-03 IN #12 SMOKE DETECTOR FOR RAH 6 NA NO CONTACT BO #2 BO #2 DI WATER CONDUCTIVITY ALARM LIGHT IN GRAINEGER PWD-TA-01 BO #2 R&D WASTE SUMP HIGH TEMP GRAINEGER e # o os HORN STROBE RM 306 #3WU58-6 / #3WU58-6 d o • 5 LL: Pi Z 8 N 1! MP POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT a o 6 MP 503-3 x W 8° PWD-PH-01 IN #1 WASTE WATER DISCHARGE pH MYRON L 723 II 0-14 PH 4-20MA W ° METER _, o C3 �° RIS TIGC 1 DO (-58F) TO 266F 1 OK TYPE 2 a o h 5 D-TT-01 IN #2 WASTE WATER DISCHARGE TEMPERATURE VE � Z U O G �w IN #3 IN #3 SPARE - - - W W Z -LSH-02 IN # WASTE WATER TREATMENT TANK I IIGI I FLOWLINE 3105 NA NO CONTACT Its -3 LEVEL ALARM NE J p i 1 1 CONTROLLER SCHEDULE DEMO o J Z a a MO.5 SCALE: NONE 4 .. et (T) 1: 6- L'' 0 c° Pk- N ,.__.-. CAD FILE: ,`0��� Of 07006-MD0-5 0 il Q 7.8 9PE I 9 i 0 t a •-EGO g LP �PA3,2 J II [ pres12I31I2OO7 i 0 1 CONTROLLER CONTROLLER MP 503-1 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT MP 580-2 / GEN E RA L NOTES CHW-AL-1 IN #1 CHILLED WATER CHILLER ALARM DRY CONTACT NA NO CONTACT IN #1 POINT USED BY MAU-2 PCW-AL-1 IN #2 PROCESS COOLING WATER PUMP ALARM DRY CONTACT NA NO CONTACT IN #2 POINT USED BY MAU-2 A 580 CONTROLLERS LOCATED IN CORRESPONDING AIR HANDLING EQUIPMENT. PURCHASE WITH EQUIPMENT. PCW-LA-1 IN #3 PC WATER TOWER #1 LEVEL ALARM DRY CONTACT NA NO CONTACT IN #3 POINT USED BY MAU-2 #4 POINT USED BY MAU-2 B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z IN PCW-LA-2 IN #4 PC WATER TOWER #2 LEVEL ALARM DRY CONTACT NA NO CONTACT _ _ 0 CL IN #5 SPARE Z N IN #6 POINT USED BY vIAU-2 POINT DESCRIPTION v ° CONTROLLER DEVICE RANGE 1NPUT OUTPUT MP 503-2 / IW-PI-03 I N #7 R&D INDUSTRIAL WATER SUPPLY PRESSURE VERIS PG06AM 0-75 PSIG 4-20MA - - - - PWD-LSH-02 R&D WASTE WATER SUMP HIGH LEVEL ALARN KEYED NOTES IN #1 PWD LSH 02 I N #8 FLOWL N E 3105 NA NO CONTACT IN #2 - - - - N2-AL-01 IN #9 R&D NITROGEN PRESSURE ALARM VERIS PG07AM 0-100 PSIG 4-20MA 1 DEVICE IS CHANGED BUT WIRE AND POINT DON'T CHANGE. EF1 -PI-1 IN #3 EF-1 EXHAUST SYSTEM STATIC PRESSURE VERIS PXPLX02S 0-10"WC 4-20MA IN #10 POINT USED BY v4AU-2 0 m 0 #4 PWD-LSH-02 IN PWD SUMP 02 HIGH LEVEL ALARM FLOWLINE LU75 NA NO CONTACT IN #11 POINT USED BY MAU-2 2 LOCATE THE NEW MP581 IN ROOM 339 NEAR THE WASTE a # — _ _ TREATMENT SYSTEM. N o _ - IN #12 POINT USED BY MAU-2 - - - `- N Gf CONTROLLER 3 MP580 COMES WITH MAU-3. Co 8 MP 581 -1 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT 0 PCW-TI-1 IN #1 PROCES COOLING WATER SUPPLY TEMP VERIS TIGC1 DO (-58F) TO 266F 10K TYPE 2 N N Q ma- CONTROLLER PCW-P -1 IN #2 PROCESS COOL NG WATER SUPPLY PRESSURE VERIS PG05AM _ 0-50 PSIG 4-2OMA MP 580-3 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT CHW-TI-1 IN #3 CHILLED WATER SUPPLY TEMP VERIS TIGC1 DO (-58F) TO 266E 10K TYPE 2 --' Ug 326-HI-01 IN #1 R&D CLEANROOM ROOv 326 HUMIDITY VERIS HD2NMST _ 0-100 R-I 4-20MA CHW-TI-2 IN #4 C-ILLED WATER RETURN TEMP VERIS TIGC1 DO (-58F) TO 266E 10K TYPE 2 326-TI-01 IN #2 R&D CLEANROOM ROOM 326 TEMPERATURE VERIS HD2NMST (-58F) TO 266E 10K TYPE 2 M N CHW-PI-1 IN #5 CHILLED WATER SUPPLY PRESSURE VERIS PG06AM 0-75 PSIG 4-20vA IW-PI-1 IN #6 INDUSTRIAL WATER SUPPLY PRESSURE VERIS PG06AM 0-75 PSIG 4-20MA POINT USED BY RAH-5 IT # IN #3 OFA-PI-1 IN #7 OIL FREE AIR PRESSURE VERIS PG08AM 0-250 PSIG 4-20MA _ _ _ DRY CONTACT NA �' # C W AL 02 IN #4 - R&D AIR COOLED C-ILLER ALARM NO CONTACT o N2-P1-1 IN #8 NITROGEN PRESSURE VERIS PG07AM 0-100 PSIG 4-20MA CHW-PI-02 IN #5 R&D CHILLED WATER RETURN PRESSURE VERIS PG06AM 0-75 PSIG 4-20MA Z '- . 0 IN #9 SIEMENS NA NO CONTACT ri m Ll 0� uj DI-AL-02 # DI WATER SYSTEM GENERAL ALARM I N #6 POINT USED BY RAH-5 CHW-TI-03 IN #7 R&D CHILLED WATER RETURN TEMPERATURE VERIS TIGC1 DO (-58F) TO 266F 1 OK TYPE 2 � o gi . IN #10 CHW-TI-04 IN 8 R&D CHILLED WATER SUPPLY TEMPERATURE VERIS TIGC1 DO -58F TO 266F 10K TYPE 2 Z � DI-AIT-05 IN #9 R&D DI WATER POLISHED RESISTIVITY MYRON L 753 II 0-20 MEGAO-IM 4-20MA 0 0 s A IN #11 IVETER Ili iii w IN #10 POINT USED BY RA--5 vt- IN #12 IN #11 POINT USED BY RAH-5 la I? _; IS 0 SD-02 IN #12 SMOKE DETECTOR FOR RAH-5 NA NO CONTACT (E cn o N.. CONTROLLER LI 1 0 MP 580-1 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT a (0 = p 1 0-10" WC EXHAUST SYSTEM STATIC PRESSURE VERIS PXPLX02S 0-10WC 4-20MA EF2-PI-2 IN � CONTROLLER > Ti, ".. 308-HUM-1 IN #2 LYOPHILIZER LOADING ROOMS 307 & 308 VERIS HT2NRSO 0100 RH 0-10 V N P 580 -4 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT ILI L G 00 S -- HPDI-AL-02 N #1 HPDI WATER UV LAMP OUT ALARM UV UNIT NA NO CONTACT HUMIDITY :?-- HPDI-AIT-07 IN #2 HPDI WATER RESISTIVITY METER/ALARM MYRON L 753 II 0-20 MEGAOHM 4-20MA IN #3 IN #3 POINT USED BY MAU-1 IN #3 POINT USED BY RAH-6 • _ HWL2XSX 0-100 RH 4-20 MA — # — � � -a;;;-,...� 306-HUM-1 IN #4 CLEANROOM ROOM 306 HUMIDITY VERIS - - PWD TI 01 IN #4 R&D WASTE WATER SUMP TEMPERATURE VERIS TIGC1 DO (-58F) TO 266E 10K TYPE 2 •• •�"- EF-3 • IN #5 IN #5 POINT USED BY MAU-1 EF3-PI-04 IN #5 EF 3 EXHAUST SYSTEM STATIC PRESSURE -ONEYWELL 2500 -5"-0" WC 4-20MA .•..■ IN #6 IN #6 POINT USED BY MAU-1 _ — — - IN #6 POINT USED BY RAH-6 IN 7 IN #7 POINT USED BY MAU-1 # . # - „ HPDI-LAH-01 IN #7 HPDI WATER CIR. TANK LEVEL HIGH ALARM FLOWLINE LUO7 NA NO CONTACT 1 306-PI-1 IN #8 CLEANROON ROOM 306 DIFF. STATIC PRESS. VERIS PXPLX0IS 0-1 WC 4-20 MA HPDI-LVLL-01 IN #8 HPDI WATER CIR. TANK LEVEL LOW ALARM FLOWLINE LUO7 NA NO CONTACT c •6 i IN #9 IN #9 SPARE HONEYWELL 2500 0-0.5" WC 4-20 M ° 0 - HVAC-PI-04 IN #9 R&D CLEANROOM ROOM 326 DIFF. C 4 20 MA �- � � `� IN #10 IN #10 POINT USED BY vAU-1 LIJ STATIC PRESS. • IN #11 IN #11 POINT USED BY MAU-1 IN 10 POINT USED BY RAH-6 (I)_ MAU1-TI-01 IN #12 MAU-1 DUCT TEMPERATURE VERIS TDDDRO (-58F) TO 266E 1OK TYPE 2 IN #11 POINT USED BY RAH-6 W Z= QN �_ BO #2 BO #2 DI WATER CONDUCTIVITY ALARM LIGHT IN GRAINEGER SD-03 SMOKE DETECTOR FOR RA--6 W N = 0 06 IN #12 NA NO CONTACT � N. 0 � ��- RM 306 #3wu58-6 PWD-TA-01 BO #2 R&D WASTE SUMP HIGH TEMP GRAINEGER 0 z W HORN STROBE #3WU58-6 " W a.6 / #3WU58 6 0 1 CONTROLLER POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT IvP 503-3 0 in fi E g - WASTE WATER DISCHARGE pH GF 8750 0-14 PH 4-20MA _a Zcp PWD-PH-01 IN #1 WAS E p CONTROLLER METER MP 580-5 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT z e3' o a5 PWD-TT-01 IN 2 WASTE WATER DISCHARGE TEMPERATURE GF 8750 METER (-58F) TO 266E 4-20MA IN #1 POINT USED BY MAU-3 8.. "Z ° IN #3 IN #3 SPARE - - - IN #2 POINT USED BY MAU-3 ;73 _9 g 2 sa—s 1.1k S IN #4 _ IN #3 POINT USED BY MAU-3 o IN #4 POINT USED BY MAU-3 z o W a� 309-HUM-1 IN #5 CLEANROOM ROOM 309 HUMIDITY VERIS HWL2XSX 0-100 RH 4-20 MA .< o 45 IN #6 POINT USED BY MAU-3 W co IR CONTROLLER =_ o oo MP 581 -2 POINT DESCRIPTION DEVICE RANGE INPUT/OUTPUT 309-PI-1 IN #7 CLEANROOM ROOM 309 DIFF. STATIC PRESS. VERIS PXPLX01 S 0-1 " WC 4-20 MA • J = O o PWD-LSH-03 IN #8 PWD SUMP 3 HIGH LEVEL ALARM FLOWLINE LU75 NA NO CONTACT a N o 1. CDA-AL-1 IN #1 OIL FREE AIR DEWPOINT MONITOR ALARM AIRTEK TW 75 NA NO CONTACT _ 5.:.0, g i CDA-AL-2 IN #2 OIL FREE AIR DEWPOINT MONITOR ALARM AIRTEK TW-55 NA NO CONTACT - IN #9 - - . - a L r, = W J# *1 W J at HPS-AL-1 IN #3 STEAM BOILER GENERAL ALARM BRYAN NA NO CONTACT IN #10 POINT USED BY MAU-3 L =x IN #11 POINT USED BY MAU-3 W o P PWD-LSLL-04 IN #4 NEUTRALIZATION TANK01 LOW LEVEL ALARM FLOWLINE LU75 NA NO CONTACT _ — NO CONTACT IN #12 POINT USED BY MAU-3 N U L('? �, Z 5 ,ri PWD LSHH-04 IN #5 NEUTRALIZATION TANK01 HIGH LEVEL ALARM FLOWLINE LU75 NA Ci ° 25 PWD-LSLL-05 IN #6 NEUTRALIZATION TANK02 LOW LEVEL ALARM FLOWLINE LU75 NA NO CONTACT o m I Z L 5 PWD-LSHH-05 IN #7 NEUTRALIZATION TANK02 HIGH LEVEL ALARM FLOWLINE LU75 NA NO CONTACT J W gi PWD-LS-06 IN #8 NEUTRALIZATION CHEM LOW LEVEL ALARM RYAN HERCO NA NO CONTACT ��,J *� L - P h- IN #9 - - - yW P� CAD FILE: r IN : —E -____ ;1' - IN - - -' w o6 IN #12 - - - 7' sp N a *�EG 1 CONTROLLER SCHEDULE , vt -E ,�o 6 MO.5 SCALE: NONE ��yF . G�J p NE c6i ;> o Expires 12/31/2007 I . � .. E I .n 0 T it 0 0 0 ® 1 ir, pit, a) s. o o o Co ® © ® ® O © _ EE, ■ A ,40111111111 0— PP)21112p1r e 0 • 10 9 8 4 ® E 1/040 z _, . 0 L ' O _ /i H _ ® 0 r- - -L o __� : I I I I cr / J— -� E L _ P I' I I i — o o w ANL,I I ( I /\ ( 2 E 150 — — I A E — — _ O U D // I © I (231) I I O-- / E - ._�— -___ , / —r �— 1 // 1 -10 i ' 1 1 I -. — ® o 1 X �� \ 12" A 14 14 ::::okNy3 �// \ Y A = I 231 C324> I 278 I ( �T O 459 205 _ H e m C a n 0 m 0 i- __l- \/ \\- f�� 1 KEY PLAN/*/ - ---- / \ �` / \ 14 O O I.L Z 3 ,s 299 r� r- �- I �11 I I I IMF f2-1- 1-1- 16 — — —1- - I (459) < 1 4 14" ___ ? - `, 1 12 GENERAL NOTES . _. .., -// I �©► 12 I, I firik I 12" 1 _ I ® w r�® cQ Ak ® U V�' �E 2 /© © �>i( AHU-7 r ® E ( © onui�'2 cn uWi a 0 — `` ( �/ ' „ � Y (262) law 2 .��� ZONE , . — ■► 12" �� A USE EXISTING DUCT WHERE POSSIBLE. 10 3LS 4 r I E 'm® (24) , 1 O„ \ (3164, `� ir 14 ,� 1 . - ► 16 © B REU RS AND RETURN GRILLS IN-, " � -� 14 \ r _, --I AIL I ® firk kH;_ 5E DEMO D DIFFUSE a �, .1\/ I, \ I E I -� 14 -0--;,�- 1 .,; E AL \ I-L- I I I ROOM 112. SAVE UNUSED, DEMO D GRILLS AND ONE? � i , Silii p t , ® i I I _*1_ �,. _ DIFFUSERS FOR USE IN THE MANUFACTURING AREA. �. ,,,.... © ( : L: © U-2 - 243 _ .�o E ; �/ ►1 I I 1 I f - HVAC. m ® I I C USE LOW PRESSURE, GALVANIZED DUCT FOR ALL 111 _ 1 O" _, E 11 .-1,....--- —- - ZONE 3 F - ® -(- I-- - 7 D INSULATE ALL SUPPLY AND RETURN AIR DUCT. de) ' I I 20" �.► 6" Z00 3 ► `� I to m © cn __!E I — E / l\ N N Q 12 3 35 \235 N N Q111 !; _ „ to E rT- L :t-8 - _ » E USE SMACNA APPROVED SEISMIC RESTRAINTS FOR ALL iiii •- �,�►, .- 290 �' ►/ ,i DUCT. m 00 i■_ rig iiriwr4 or . `i ii .1:,.. ,m _ = _ _ 1 _I �_ r 0 ., " ® ,�� � � �� F HVAC LAYOUT IS DIAGRAMMATIC. EXACT LAYOUT TO BE c li 1 .� I I I 12 .... i 1 p I ( 2) I I 2 IO -__ ___ 1 I I _ 310 • ' ' DETERMINED BY CONTRACTOR. Z •- �, C]I 411 4 18 p I AM ©► I �M I jrI:O - F-2 w Vii► NV • U �- el.a'!V R R E ''� m► m ® I • I , o _ G TO BOTTOM OF DUCT. L �, �- E ' (,, I 133 _ 14 E �► _ DUCT HEIGHT TO BE 14' AFF 0 B - ,�1377 "s- 1 !IT An: *—I IllarA'" 1401 I TEE, ill i�� �'�'' - m ® I 4 Cfl 1 65� H MAXIMUM LENGTH OF FLEX DUCT TO BE 5'. o °°iliti n AFI ,40 219 .., .. . ----,_4_ — A ..... 7 1 ®� E " I r U 8^Imml __ I PROVIDE DAMPERS AT EACH SUPPLY POINT. -v l� c ri A 1 tr li - It 16. y AC PLAN J WHERE DUCT SIZE IS NOT SHOWN, IT IS THE SAME SIZE a ° M1 .0 SCALE: 3/32"=1 ' AS NECK SIZE OF DIFFUSER OR RETURN GRILL. LI .c, g 1§- K INSTALL SMOKE DETECTION IN RETURN AIR DUCTS WITH CC 0 n A FLOW GREATER THAN 2000 CFM. .E2) 1 6 411) 1 4110 L BALANCE SYSTEM TO ACHIEVE REQUIRED AIR FLOWS AND U� w 4 OSA VENTILATION., i 0- --� M FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. \ E8©II i `` • ■ ■ r`■- �/ 1 12x8 . . ■ 10x8 • \ ' ■ \ 0 0 14x12 . x x ez o N 6.00 co M ° 14I 13 I >s ? <"' <� / 8x6 • 12x10 12x10 ► -8x6 — w KEYED NOTES 9. I �` I I � a�I�� � W z� N N �, �, N 1 PROVIDE NEW ZONE THERMOSTAT. CONNECT TO VERITRAC. 20x12 — — Fl---26x14 ► 20x12 ► 14x12 1 2 MATCH UNIT CURB SIZE FOR DUCT DROP FROM UNIT BASE o g g 34x22 «� E TO INTERIOR OF BUILDING. DROP 8' INTO SPACE. PROVIDE v °' P r V �� 1 ��a- A 14" SUPPLY AND RETURN DUCT TO REGISTERS. PROVIDE :It' 6 .ci. 0 I <00 I PROGRAMMABLE THERMOSTAT. _ c W� 34x2 , '- 0 3 PROVIDE NEW VERITRAC DAMPER FOR NEW ZONE 3 ^ 2g v. TO EXTENDED LUNCHROOM AREA. a ,Y = I- `—' G t �!I r- AK 10 . • 1 H _ I —b H -MI /1 � L — ► i►1 _ --- Z `' .. Q Eii EvA Lcl-OA-1.3 A-,.e0 GENERAL 'URPOSE lca RD :A-3.4 W Ce 24x12 20x10 i. " 00 ° —D I r 12 I-- z I- y o N O 00 ' 4 0 W 0 I \ _ J■ ► x X � 14x� w z 1 < ! p c:18 A-� A-,.2 II ►I — 0 6 1 .2 ,UV � � x QZQ p ig N A wa = o 1 6 1 .2 v .-, .� \ 3c I I I _ W 0 =E N EL o —i O I = E r"-` O a. "� n L J .w Z N *a cs, ... N per NH o F- cr °z N P`'1 2 NORTH OFFICE HVAC PLAN �0.,- ,���(,� of M 1 .0 SCALE: 3/32"=1 ' 4-4 G I N,�� /�� z 7-889PE� oW a v •R GO Gt ' 2 O J__ Ttt N , J N E. CP ,c , Exprres 12/31/2007 ei E U3. to 8 d OUTSIDE AIR SCHEDULE OUTSIDE AIR SCHEDULE ROOM DESCRIPTION EGRESS VENTILATION OCCUPANT OCCUPANT AREA VENTILATION VENTILATION ROOM DESCRIPTION FLOOR VENTILATION OCCUPANT OCCUPANT AREA VENTILATION VENTILATION GENERAL NOTES OCCUPANT OCCUPANT VENTILATION VENTILATION VENTILATION REQUIRED PROVIDED AREA OCCUPANT VENTILATION VENTILATION VENTILATION REQUIRED PROVIDED LOAD LOAD (CFM/ OCC.) CFM (CFM/SF U.N.O.) (CFM) (CFM) (SQFT) LOAD (CFM/ OCC.) CFM (CFM/SF U.N.O.) (CFM) (CFM) A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. 101 LOBBY 4 2 15 30 - 30 30 300 CORRIDOR - - - - - - - 102A CORRIDOR - - - - - - . - 301 PRODUCTION ROOM 238 1 15 15 - 15 45 Z 0 - - - - - - 302 OUT GOING (EQUIPMENT) 56 1 15 15 - 15 15 _ 1028 CORRIDOR ( V 103 COPIER PRINTER ROOM 2 1 20 20 - 20 20 303 IN COMING (EQUIPMENT) 56 1 15 15 - 15 15 0 o 104 ADMINISTRATIVE STAFF 8 8 20 160 - 160 160 304 GOWN ROOM 104 - - - .05 5 10 D 105 OFFICE 3 2 20 40 - 40 40 305 WALK IN COOLER 104 - - - .05 5 10 z 106 OFFICE 3 2 20 40 - 40 40 306 PRODUCTION ROOM 3126 8 15 120 - 120 300 8 107 OFFICE 3 2 20 40 - 40 40 307 LYOPHILIZER OUT #1 283 e 1 15 15 - 15 25 0 108 OFFICE 3 2 20 40 - _ 40 40 308 LYOPHILIZER OUT #2 293 1 15 15 - 15 25 W --109 OFFICE 4 2 20 40 - 40 40 309 LYOPHILIZER OUT 871 - - - .05 44 500 u) I 11 CONFERENCE ROOM 32 16 20 320 - 320 _ 320 309A GOWN ROOM 97 - _ - - .05 5 10 N ' 0 111 CORRIDOR - - - - - - - 3098 TRANSFER ROOM 63 - _ - - .05 4 10 © g 112 ENGR AND FACILITIES WORK AREA 7 4 20 80 - 80 80 311A LYOPHILIZER ROOM #1 955 - - - .05 48 500 0 112_ MEN'S TLT - - - _ - 50/FIXTURE X 2 100 200 3118 LYOPHILIZER ROOM #2 �{ 955 - - - .05 48 500 _ o a [1I2AELECT. - - - - - - - 311C LYOPHILIZER ROOM #3 963 - - - .05 49 500 "' a 113 WOMEN'S TLT - - - - 50/FIXTURE X 2 100 200 339 FACILITIES _ 864 - - - .05 43 100 201 LOBBY 3 2 15 30 - 30 - 316 PACKAGING 1226 - - - .05 62 62 202A CORRIDOR - - - - - - - 315 ELECTRICAL ROOM _ - - - - 202B CORRIDOR - - - - - - - 315A ELECTRICAL ROOM - - - - - - - ° 0 2020 CORRIDOR - - - - - - - 318 WIP 623 - - - .05 32 32 N0, 202D CORRIDOR - - - - - - - 320 QC LAB 876 - - - .05 60 60 gi 203 CONFERENCE ROOM 22 11 20 220 - 220 220 321 STORAGE 74 - - - .05 4 10 a m 5-.7., 204 OFFICE 3 2 20 40 - 40 40 322 JANITOR - - - - - - - Z i , 14: 0 OFFICE 3 2 20 40 - 40 40 327 R&D 380 - - - .05 19 30 2 5 m `` 206 OFFICE 3 2 20 40 - 40 40 328 R&D LABWARE CLEANING 127 - - - . .05 7 20 W c w li 207 OFFICE 3 2 20 _ 40 - 40 40 329 R&D GENERAL USE 1121 - - - .05 57 100 40 - 40 40 331 MANUFACTURING QC 428 - - - Z o s 208 OFFICE 3 2 20 _ _ _ Q .05 22 200 3 209 OFFICE 3 2 20 40 - 40 40 333 LAB SERVICES 1108 - - - .05 56 300 .L. N, - 40 40 334 MECH ROOM 383 - - - Z g h 210 OFFICE 3 2 20 40 0 0 .05 20 20 � o W 211 OFFICE 4 2 20 40 40 40 335 LYO MECH ROOM 552 3 20 60 - - 60 Z 0 5^ 212 MEN'S TLT - - - - 50/FIXTURE X 2 100 200 337 GENERAL USE 294 - - - 0.05 15 53 LLI -o iT 213 WOMEN'S TLT - - - - 50/FIXTURE X 2 100 200 338 CORRIDOR 189 - - - 0.05 10 38 Iv II el 215 LUNCH ROOM 66 33 20 660 - 660 660 339 CORRIDOR 112 - - - 0.05 6 22 1.6 cm & 216 DOCUMENT CONTROL 3 2 20 40 - 40 40 - - "- - _ - - 403 MEZZANINE 1170 2 _ 20 60 80 M f.... _1 0 217 TELE/DATA - - 341 SHIPPING&RECEIVING 5385 - - - 0.05 270 270 P : _ E E 218 R&D/P.D./Q.A. 7 6 20 120 - 120 120 219 CONFERENCE ROOM 2 2 20 40 - 40 40 W Lc 220 CONFERENCE ROOM 2 2 20 40 - 40 40 1 221 WOMEN'S TLT - - - - 50/FIXTURE X 2 100 200 L2._22_ MEN'S TLT - - - - 50/FIXTURE X 2 100 200 1- .1.". s a w -1.1.... ■■ i i w ■ w i 1 i . ea..i w• EXHAUST FAN NUMBER e RTU NUMBER go® AIR FLOW CFM , MARK NUMBER SIZE (TONS) e MARK NUMBER Q AIR FLOW CFM o . §1 [---- ROOFTOP UNIT SCHEDULE e._ AIR DEVICE SCHEDULE EXHAUST EQUIP . SCHEDULE AIR DEVICE SCHEDULE Z RTU MANUFACTURER SIZE ECONOMIZER ECONOMIZER W■ NO. MODEL NO. (TONS) MODEL NO. MARK MANUFACTURER FACE NECK '� N � EQUIP. MANUFACTURER REMARKS �,, - MARK MANUFACTURER FACE NECK (E) TRANS 17.5 INSTALLED REMARKS N0. MODEL N0. ECK REMARKS o rN,, 5 A �r. ID MODEL N0. '° YHC210A4RHA-DOOOC2B 1 A306-C N0. MODEL N0. SIZE SIZE SIZE SIZE a a HUNTAIR �„ Z q ( ? )- GREENHECK E TRANE 6 - INSTALLED ' PRICE PDN 24x24 8 SERIES 300 24x48 22x22 FILTER 99.99% HEPA PRODUCTION EXHAUST FAN o { ) 8 w SWB-2-16-50-CW-TH YHC072A4RHA-D000C281 A30fi-C � a� W GREENHECK LYHOPHILIZER ROOM 311A EXHAUST FAN �, - z PRICE PDN 24x24 10 TITUS PAR 24x48 22x46 o �� _ E TRANE 7.5 INSTALLED E o v �' TCBRU-1-9-4 O �� HUNTAIR 22x22 BOTTOM REPLACEMENT v In ca A l GREENHECK YHC092A4RHA-D000C2B1A306-C s TITUS 350RL - TRANSFER GRILL SERIES 300 24x48 FILTER 99.99% HEPA i ii a �_c0 LYOPHILIZER RM 311 B GRAVITY DAMPER e 12x8 c s low 12 x 12 FHI Lam. (E) TRANE 17.5 - INSTALLED - 21 FACE ADJUSTABLE _ i= ( ) e TITUS PAR 24x24 22x22 c®_ GREENHECK MAU-1 INTAKE YHC210A4RHA-D000C2B1A306-C e TITUS 300RS 8 X 6 - DAMPER 20 x 20 FHI Z. _ ■ TITUS TMRA CONICAL 6" Z ••W D- GREENHECK (E) TRANS 10 - INSTALLED s TITUS 300RS 18x14 - o g i z; MAU-2 INTAKE YHC 120A4RHA-D000C2B 1 A306-C E 'E 20 X 20 FHI 24 TITUS TMRA CONICAL 12" z (ET- GREENHECK EF-3 R&D EXHAUST FAN LEE,/ (E) LENNOX 10 PSD11-135 NOT e TITUS 350RL 24x24 24 2s TITUS TMRA " w - CUBE-161 XP-15 GCS11-1353-330A-1 G INSTALLED _ e US MRA CONICAL 14 �� GREENHECK LYOPHILIZER RM 311C GRAVITY DAMPER - ' TITUS 300RS 24x14 - ° W -v mini 12 x 12 FHI o (E) TRANE 4 INSTALLED z -I o cc- GREENHECK LYOPHILIZER RM 311B GRAVITY DAMPER YHC048A4RHA-D200C2B1A306-B $ TITUS 300RS 30x12 - ° W x W 12 x 12 FHI = a E LENNOX 3 REMD10M-65 NOT W = il ®4 GREENHECK LYHOPHILIZER ROOM 311C EXHAUST FAN GCS10-413-75 1 G INSTALLED e TITUS 300RS 12x8 12 u) TCBRU-1-9-4 .� Z . (N) TRANE 10 - INSTALLED ,o TITUS 350RL 30x30 30 a W o g e GREENHECK LYHOPHILIZER ROOM 311B EXHAUST FAN YHC12OA4RHA-DOOOC281A30fi-C �- Z a o TCBRU-1-9-4 a� GREENHECK LAB SERVICES EXHAUST FAN ...Tm? (E) TRANE 18 - INSTALLED " TITUS T-SLOT S 24x7 10 10" OVAL M W W Z��_ TCBRU-1-16-15 SFHF204L 46. -3 ig cD- GREENHECK 'Z TITUS T-SLOT R 24x7 10" 10" OVAL ,� v iNu- F 20 X 20 FHI MAU-3 INTAKE zi (N) TRANE 1.5 - NONE - . 4TCC3018A100A 13 � a ©PRICE PDDR 24x24 8 = _ • ; v �, EF- GREENHECK UTILITY SHED EXHAUST FAN 5 SE1-18-434-C8 m w ‘-... Rg 14 PRICE PDDR 24x24 10 o - ,f, 15 PRICE PDDR o cn g 24x24 12 W *R R 8 ,E.-3, PRICE PDDR 24x24 14 0 % CAD FILE: Q 0.11 PROf 07006-M1-OA 1 44 +G I N.4.4. "*' ii -±,,,,s 1 MECHANICAL EQUIPMENT SCHEDULES ' 789PE'� l fiW c M 1.OA SCALE: NONE `REGO U rill,A 13,2 J ../ Expires 12/31/2007 z 0 1 T ® ® , . . ® . . ® O O Q O O O O O O 6 4 0 _„„„, — ....._ • • 1 0 9 8 - (10) „ ” { III I I I_ I 1_ 43 ! LM. _ .. --- � \� �/\� l�c=��/ 4.4—j-,•� *', i. ••.. • �..__-- �' V V V QZONEJ2 L%'1'I N � I IL�.'I I 1 r � 20 I �6 � ,, , , ��.�� _ �j' _ L Y ITV H r Mr 0 r — _ — 61 T _ �, ' u L_ rA, ,% orAPJA _ ® z yr- r— EC , 73.41zER II N ® ,= • '= Q - / I I © Ea- 1 � � � ' #1 LOADING � LYOPHILI,r;,; ROOM � — U AEI ._I ' I I I I taw I I o o W A- RE 'CH & DEVELOPMENT 'I—1 a 1 ` J ;—,-� �— — �oPR. __ II v - I N • /I� o— — WORK AREA, ar m \ 1 AVAi1 �1I " u-1 GD- LYOPHILIZER �) _ A-a.4 12-�Hio'NE 3 �i��� CORRI R 13081 (� �,. o 1 1 �� 1 1 �� �r I 13001 � �" 1 ( I #2 LOADING 'A 3 — 1 N x x �y_2 dN H 1'1'1 �✓ O I I I PRODUCT t _ (n �'1 ♦ . _-- . IN COMING U T 1 -� ':, V ( ` - — cn" 4� I 302 PROD C ! N RO I 1 , I I -_- � / P �A N ,t 1 1 KEY +O 3 6 � — � YOPHILIZE'� ROOM � _ _ o -14x12 , s�1 ,� IN © ---� OM ` _ _I N ® 1 ZONE i4e 1 CORRI 1+R 1/ PRODUCT `OUT GOING 1 I -,Q I o 1 x 33 �,. �. — _ r I M GENERAL NOTES x W ci RE :CH & DEVELO�M . , WAER) " - w-� ''' 1° ''r l' S k1_ _m N m A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. 13271 I C)EANING� Q — —I — — 0 *3D" ,— \ 1 I �,• » 4 I I © 1 ( 4 v� 4 r, 0 _____/ ,. Fk XI Eli ''1%MA - I Alagri fORRI IN = Ar Ati — r R OVEN A/L �� • 11 �w �a�.,' , ti.°;,� ,-: " KEYED NOTES — Xr- 5 1340 -- - ---� a �,.,1•.�.:_`.�. � 1305 a �.i ■,�i 24 � d 1 =1 I N 1 1 � 1 . 1 7 1JP7 � . // OR; i#R CORRIDOR 1 -- -, j •, —' loin .� 1 MOVE GRILLS AS SHOWN IN NEW LAYOUT. (9 t s- :�_� 0 13001 6" � D r — - - 1 7 v EQUIPMENT Q t3 Z TRANSFER WI L a 2 DEMO DUCT BACK TO WALL PENETRATION. z SI - ell I CLEANROOM GOWN 1 I 1-9- 1P1Pr#-- I I 1 3 DEMO GRILL_ IN WALL. DUCT TO PENETRATE WALL I& iiiii v) w ii _1325) 13241 Q IN NEW LAYOUT. o—I L. J 1 WA 4 Z • I 1 JANITOR GOWN 2 13221 "• '�0 4 DEMO GRILLS BACK TO TAP IN MAIN. SAVE GRILLS. 0 S s,, 13251 \`'\ 14" Q 16" rAA.1.0y$04110 � 1 " Z ►:'� 2i �'° - 5 DEMO DUCT AND GRILLS BACK TO 24" DUCT. SAVE GRILLS. U c 5,..., QUALI ANTROL V 5n o " 6" !1 // 1 6 DEMO GRILL AND 12 DUCT BACK TO MAIN, Z „o m O 12 — .► 1 10" C ERAL E '/ ' 2 _' `, " — ELECT. ROOM ° D Q�''ANICAL ROOM 13371 � 16_ ____ � ,. � •/ 7 DEMO THERMOSTAT. III 13351 — ♦ �,�• t..�.,.���.� (3151 � (24 SQ. FT. LYOPHILIZER) sw C I { I I I I I 8 DEMO SLOT GRILLS IN ROOMS 307 AND 308. L ;1') IP — — — _ . Q� _, :T \ Q w ' JIMIew - . 1 1 r B u W II 1 I I I 1 I I I 1 1 :1 ° a 1 . ... ■ ■ r..:.-. •. A.:- I I I I I I I I . ,...:::-.%::..: ... , •::•:•.: } CA-N\f-T P — — — — — — — — — — — — — — — — — _ — _ Q9 c_ OUTSIDE AIR SCHEDULE 1 MANUFACTURING HVAC PLAN — DEMO . .. di -- MD1.1 SCALE: 3/32"=1'-0" L.., g m y ° ROOM DESCRIPTION FLOOR VENTILATION OCCUPANT OCCUPANT AREA VENTILATION VENTILATION AREA OCCUPANT VENTILATION VENTILATION VENTILATION REQUIRED PROVIDED v) La LOAD (CFM/ OCC.) UBC CFM (CFM/SF U.N.O.) (CFM) (CFM) e MARK NUMBER(SQFT) AIR FLOW CFM c 300 CORRIDOR - - - - -- — — W N = 0 w�= 301 GOWNING ROOM 238 1 15 15 - 15 45 AIR DEVICE SCHEDULE . z 302 OUT GOING (EQUIPMENT) 56 1 15 15 - 15 15 < o �.3 303 IN COMING (EQUIPMENT) 56 1 15 15 - 15 15 ° o ° ,- .05 5 10 c `i' • 0 h 304 ALIQUOT STORAGE 104 - - . MARK MANUFACTURER FACE NECK 8 in 2 I a t§ 305 WALK IN COOLER 104 - - - .05 5 10 m o NO MODEL NO SIZE SIZE REMARKS 306 PRODUCTION ROOM 3126 8 15 120 -- 120 625 . x , 17= 307 LYOPHILIZER OUT 283 1 15 15 - 15 25 ' PRICE PDN 24x24 8 . o ..I �s 308 LYOPHILIZER OUT 293 1 15 15 - 15 25 8 8 ' Me 2 U S ig R - 309 MOLD CLEANING ROOM 453 - - - .05 23 90 - PRICE PDN 24x24 10 x - - - .05 5 10 3 - W ix II 317 PRODUCT STORAGE 97 e TITUS 350RL 12xg TRANSFER GRILL z ae PRODUCTION SUBTOTAL 233 870 O ° 6.... ex 311A LYOPHILIZER ROOM 955 - - - .05 48 100 4 (EXISTING) - - RECONNECTING z o N4 - - - .05 48 100 s X I 311 B LYOPHILIZER ROOM 9 5 TITUS 300RS 18x 14 - W z to it5 312 FINISHED GOODS/MAT'L SHELVING 3695 - - - .05 185 185 ? 5 o ao JQa. 0 � . -_313 MATERIALS MANAGEMENT _ TITUS 350RL 24x24 24 U a 0 314 SHIPPING 7 L6 Q > o o W TITUS 300RS 24x14 -- - - ad z = 316 STORAGE AREA 1226 .05 62 62 U La.1 CD dB ci 315 ELECTRICAL ROOM - - - - - - - se TITUS 300RS 30x12 - flg 318 LABELING AND BOXING 623 - - - .05 32 32 - - - N Z� W ~ su. - - J C �-" 2 li5 TITUS 30QRS 12x8 12 �, F 319 ALIQUOTING - - - _ - _ o 320 QC LAB 876 - - - .05 60 60 Q TITUS 350RL 30x30 30 ° 321 STORAGE A 322 JANITOR - - - - - - - " TITUS T-SLOT S 24x7 10" 10" OVAL 323 GENERAL USE 3974 - - - .05 200 200 0 % Lsi TITUS T-SLOT R 24x7 10" 10" OVAL M 327 R&D G. ?O611 328 R&D LABWARE CLEANING 13 PRICE PDDR 24x24 8 ,�� ' P OF 07 �� �IN� /0 a L_ o....329 CLEAN ROOM 14 .•889PE�o ,,,-- . ( LI'FOYER PRICE PDDR 24x24 10 331 MANUFACTURING QC 800 15 -- is PRICE PDDR 24x24 12 .Y �� REGO 333 CLEANING AREA 383 - - - .05 20 20 _ 332 STORAGE 383 - - - .05 20 20 is PRICE PDDR 24x24 14 /VN E• 0' ti . NON-PRODUCTION SUBTOTAL 975 975 - 1r: -Expires 12/312007 i t. R. c .s. C 9 0 s .m...3(... ....._ 1 - 6 �� ® 0 ,t ® 1, ® 4. ® 0 0 0 0 0 ? 0 0 0 5 4 0 _ _ — o• ,, V 11 0 1.1 o� 10 9 8 ry I III I I I - .V�J - _ -- _ -■► r; V90/ Il 5, ' A T ZONE 2 3'$ ( ii 4 .� �,. I - � .1JI�� ■ . I I I , , , ( O„r mium/ 1 ���' 1 � 450 ( ��) ► - 1 � ' \I EN � =''�/ O ' � , /�' u ii:: b '• Mr 0 � 438 �,\,---- '� lb MECH LYOPHILIZER N pro � � O ° r `1 13341 0 13071 I I —) { I 1 ArzorrAr, A 4 380 1 LOADING LYOPHILI ROOM 0 acil RE„'CH & DEVELOPMENT , N I + u_ aPR. - — • v en (� o-- O A.;�, AREA � Q(14366) T l:/ Q Ow1H-3 -� - — — c•um 327 I ” 4105-.1 C327> . ®HUM \ L 1 ° © // GD- LYOPHILIZER - 8 : U ® i 12' �.l ¢ONE 3 ` /- O RI II . _. �� 110 13081 � © h 00 AHU6 — I L I- I — 1 I � 269 -� I 1 #2 LOADING 1 0 All. (3.,840) II ill �,RAH-2 AHU5 t0 aHU=sI HemCon W m -IX 1 ® PRODUCT HUM — — 10 ri , fi. N N I IN COMING p 1 r' ,I 2 2 4 13021 PRODUCTI N ROOM 1I1 I KEYPLAN ro_ !...^� 30 I C32s> 3 l — 2 YOPHILIZE� ROOM o .. io E 4� I ylrR X mm 21 K269) PRODUCT I -� 0 • I - �?� :r / OUT GOING �H-1 O r o o o CI ® - • _- o GENERAL NOTES U 0 0 RE ,:CH & DEVELOPM ., I- _ Aik LE I) LEI a —'` w": 1 e" ;� ���, ���=,WAR 4�► pi hI 94" N � � , © j�� � ,� CLEANING A USE EXISTING DUCT WHERE POSSIBLE. . � ► 10 ■ �, ■ 13281 0 r;. — — r ►t� ' r► 2 L I I SOD 1a' v m �, /. t 15 B USE LOW PRESSURE, GALVANIZED DUCT FOR ALL HVAC. rag 21 ..11---- I © 656 I — AH U 4 — --- - - - .. I — .— - AHU1 2 larli-!► • 17. - - - ' - - C INSULATE ALL SUPPLY AND RETURN AIR DUCT. * M a CORRIDOR I cy WALK IN . : _=tl 26"® ® COOLER 1 : 6 0 OVEN A/L _ ��.,�,_ 13051 0►:,fi 24" - $R D USE SMACNA APPROVED SEISMIC RESTRAINTS FOR ALL DUCT. NF. 13401 _ __ - 24 I �- �■_ -=I F1 CORRIDOR (ARARRIDO 1 N �� � 1 u I L. a ' I ti �—''�i i ' •'� C_ 437 13001 " ► - 16" s" LOO I I I I I I I 1 I I1-H I ' E HVAC LAYOUT IS DIAGRAMMATIC. EXACT LAYOUT TO BE U 2 g� EQUIPMENT 328 ice\ 2 6 �o DETERMINED BY CONTRACTOR. Z .� e TRANSFER GD- 36s X • m X R & D -�. ----� ® �! i - - , . "T.- 12 ® ICU F DUCT HEIGHT TO BE 14' AFF UNO. V) ti de-, CLEAN ROOM GOWN 1 ¢ 113211 ■/ 19 I 14 I I - 1326 1324 _ fir , • .��` `'�' lii c ti 1 — 1- �� G MAXIMUM LENGTH OF FLEX DUCT TO BE 5'. ,o J'�1�%'aR Aa 4.... I ZONE 2 '- MY •a-7N_ o . t.; 3 GOWN 2 13221 • 542 ( , m 40 " �0 N " BCD IS' '4 I, H PROVIDE DAMPERS AT EACH SUPPLY POINT. U i ■ 13251 � 14 Q � 1 � .----J � � � -t- __ d �� I WHERE DUCT SIZE IS NOT SHOWN, IT IS THE SAME SIZE AS c O .- o�. ©�_ ��rNTROL �,,� " © NECK SIZE OF DIFFUSER OR RETURN GRILL. Z U ©I\ _12 6 C) o •- °° (EFME-3C)IANICAL 1 p" ERAL �E 1 •= ( I ELECT. ROOM ° J INSTALL SMOKE DETECTION IN RETURN AIR DUCTS WITH FLOW o ii ROOM / (337(400) 1 GREATER THAN 2000 CFM.335 —[ L A ■ x ( 1 13351 (24 SO. FT. LYOPHILI I -) A►- I © - 1 ® Nv 175 [ ® 271 © ' I I I K BALANCE SYSTEM TO ACHIEVE REQUIRED AIR FLOWS AND 1� .E s §,§ " 7 VI7 - I a OSA VENTILATION. - TELECOM ROOM � tD = ._[ (3171 -- ---- -----__--------- _ ___-____-- ---__--- -__-- ______ _ C- I _ - - - - - L SEE DWG M1 .3 FOR PRODUCTION HVAC DETAILS. > 'vrn 16 0 g p I B I I I I '-I, I I I I M FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. w_ m .5: -----+ • .o ° ° r Al An ;i r 127 'CT I 1 I I I I I ._•An 0 4 • ■. •. . --lc r.....,• A 1 0 ► _ I I — A KEYEDNOTES a f } . r N f. 1 1 4"0 A 0 118" ,su o_lI1 4"p acv I I I 1 RELOCATED AHU-5 THERMOSTAT. " C_ .6 M o a el S ,�,, N 2 INSTALL RUSKIN FSDR25 SMOKE/FIRE DAMPERS IN DUCT N N I- m m - PENETRATI '.-�' 113:17 PENETRATIONS. ua wz 0 1 I 1 3 REGISTERS IN THIS AREA ARE RELOCATED WITH NEW > N ?_ _ GRID LAYOUT. a g z An 0 m o o) a ° ate. •. —1 11117 I I I 4 NEW TRANE VERITRAC ZONE THERMOSTAT. a z W I I 1 vW Ni ; ■ - - - - - - - 5 PROVIDE BYPASS DAMPER FOR 20"X20,� BYPASS DUCT. = a w� 6 PROVIDE 20" 'DIAMETER DUCT THROUGH WALL FOR TRANSFER o o g a Eg �° AIR AT 16'. INSTALL FIRE DAMPER IN DUCT. W c . . _ •- i o gl 1 1 I 1 7 KEEP DUCT TIGHT TO CEILING AS POSSIBLE. RECESS o e3 UP BETWEEN TRUSS AND JOISTS. CONFIRM LAYOUT W/ OWNER. g i= ..M s — Lc1 PI g iii 8 32X18 SA DUCT DOWN 'Z 9 32X18 RA DUCT DOWN 10 WITH 32X18 GRILL. z gN o ax 10 NEW ZONE IN THIS AREA. PROVIDE MOTORIZED VER�TRAC z �' DAMPER FOR A NEW ZONE ON TRANE SYSTEM. a z ° 8g w Ii5 11 RELOCATE MOTORIZED DAMPER FOR ZONE PAST CONNECTION }- o © POINT TO ZONE 1. Ja = o ci • 1 MANUFACTURING HVAC PLAN � z � oo w t, 12 REUSED GRILLS FROM DEMO OF DUCT. _ z 0 M 1 .1 SCALE; 3/32 =1 -0 V P- 2 U., ,, w Ce = b1 hl Z I w5 i a. ›..0 ei 1 " 0. w i� o i N "may o 6.l Om u� O N O CAD FILE: a RP,����,� f � 07006-M1-1 �S ��I N,�� ��� ii T 7,889P �w a ;:- 'REGIN ( 1 " ��)t,, 13, �0 J a h'E1V E. c' . C Expires 12/31/2007 g 0 a N • 1 ' �, krt ,r 1 ,D al kr. o o O p o o O O O o 11 $VVV ■ I III I I " • 0 • F o Ll _ 9 8 C-4)- O 1O z o I !trf;jhII , o P o P Pr o - o I I I I I 1 U 0 N HemCon ° 1 . W N KEYPLAN h 0 , W Ilik../ M O 0 war a KEYED NOTES/ N J .. - = A FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. hi ® � T, o � 1 - j kali o KEYED NOTES 0 1 DEMO ROOF AND DOWN IN ROOM BELOW. Z w ENT TO OWNER. cc m 5'` I W (4 F L'. — — — J 2 DEMO EF-2. FA TO BE REPLACED BY LARGER FAN IN SAME U� c Lt 3 0 N 0 �,.,. - - - PLACE. Z 1; t9 g s ,.... I I = L�� N A•! O O la ME& X MI 1211"1" "Pr'- ' X Z . - i ... . 2.1 4. fill ui -2 I 0 --` 0. m - I X a iii EXHAUST FAN NUMBER a .E 1 0 - cc 0 1 . SIZE (CFM) • m = 0 _ > .6) 16 11 EXHAUST EQUIP . SCHEDULE ▪ W 1v',. n_ 7.--- - AHU= ■ r .• `■ 10 EQUIP. MANUFACTURER REMARKS • • • •X -: GO A111I1M 1W 4 i .. IX -9.-- - '° r ,_, _ _ ID MODEL NO • .�'�=`= x GREENHECK PRODUCTION EXHAUST FAN •• ' • SWB-2-16-50-CW-TH ' ' •' _ - Aw' i • T _ �• GD- GREENHECK LYOPHILIZER MECH RM GRAVITY DAMPER - 12x12FHI o Si co- GREENHECK a 0 9N 1_— - 20 x 20 FHI MAU--1 INTAKE W w. . --.- - - -a _ _ _ _ w- _ - ::d_: ;® - - - - - _ _ _ _ ca- GREENHECK MAU-2 INTAKE t* f; '<< ' ,,-„� ;�;-�,,� rT GREENHECK W z _ rs _ _ EF-3 R&D EXHAUST FAN < N Y 0 0 Leg CI■1 5 A g - RTU NUMBER 0 °' U Z GD- SIZE (TONS) v 0 i LI: [11 lew W c Q �,g, VtAF2 i Sri ..'. . '''""T. .” ■••■•••■•■•••••••■•■1■•00ININOMMMIN■••■•■•••••■•■••■INOMM N.M■ 1 i ? 1• TTi-c'� N 0 n Z Lii v E-- o Z � (7 0 W w C I a W x a rj La 5 B k p J z o 4 — — — — — — — ! I I I I I { ,,. N 8 a O` < m I- o , x z g i W X Ix a o alls 4 W cx 0 zg W W �� N N Li.J W I I I 1 I I I I I a o of4 O 2 24 a J � N i. A A - _ - - - - - - - — - - - - - - - - ® N Na I -1 I I I I I I 0 z , H � �6 ,, CAD FILE:4,`�C�,�'D OF��� o�oos-MDR-z 9 c O 7 "389 0 9 çr Fa 1 MECHANICAL ROOF EQUIPMENT PLAN — DEMO ,„ a ►REGCIN tp vG �. MD1.2 SCALE: 3/32"=1'-O" y'3' ,�• N E• L 4. Expi res 12/31/2007 I 9 .0 1:Viobs\07006 Hemcon Facility Expansion\Dwgs\07006-M1-2.dwg,3/1/2007 5:20:35 PM,pbrenner,Evergreen Engineering 1 i 0 0 I I I ni I I I ni I I I ni I I I ____, . It I 11 I 0)I I k ................ .0 H Cal --1-- 0 I I 1><1 I><1 , 8 1><I I 0 H f 9 I 4s. I I •. I I 1 _-L., I H _ 0. I. f . I >-<1 ><1 _. __, H c i., . • -yr iv 2EE > IP ;; n 77:1 oil■ -[4 (A o ......,. ..._ Lzi Ca.1 __L_ - czi I N. GI•II- .10' ,, \ • ..0 •1 0 ___. CI 11111111111MM 1*F-;: \ ® Iii c") ><1 ,-,..i ,.. >-<1 I>< , , st9-1 ili . . , r o — t ?- co; : ,..__J M 44 • 11 0 0 IIII■ -1. m I_I::::; c:.z:::1 I ( I r-1-1 (r- r2ki- ,.... 0 , •i .0 ( , y i I H [IY -13 I >n< >< I>< K \ m Z . .......1 1 - 14 , A l• 00 —a I- > Z 1 ____ 11 o H I I I lill 1° '1 >< 14 G /' 0 • 0 0 A' ..-... ,. wr.i ,..„5. 121 Fmr] ---f I co , —a- CD 11)4,0 ,, • OD .. i h 11;::" • Gl,„, I , :,... I --------1-- :t.. ,„ E. 231 EN , ...p.., 0 I I c <> ohilloo-Al r ---, 1 >:< 0, KA F:3 a _A I_ ..i. ..1 I. I • • I/0 IV › › . . > ED 0 GO 0 0 0 0 1\3 -....1 01 CP -IN. C.P.1 I■.) —h )). C) 0 e 0 060 0 Ph P1 111 es Z M M Z X -2. -t3 z ....< -71 rn rri rn c rn z I ;3?"■ - - = ?-,-; 71 , 71 m m G.) M (-) us C) 00XX m < MO M El --L _ _ 0 0 .??.... ..= m X) ___I 1 '-"' -6' M 0 0 0 4 cn ct r_-: > l'IL -\- --1 0 0 0 r— lag Z 00M > c") m 0 S.111111% €4,. .....„ kiNthrik 1 _, 0 .. f,., MN - S = • > M M z Z 11 M X ,1/411 u) 0 A( u) --I -1 L Nii. 1A111 71 k 4S.\■,.. , \'■ , =1-- (I) 2 x 0 7.1 1 0 Iht.. SKNImiNW c) z o 73 * 5'4 111M11., 11 h'W sli > 0 > o 73 0 r-- = ...• ■ 1 kvt•,„AN'V. ° (/) , z 2 in CD r'' c..) c) 0 ‹ 3 • I.. ,.. e_N %.7.0'. IIII NS'kk . -- . rn ,i 1 ' s Re•,) r- m 0 ii,„MinkihNii e 5' 1,„ , i, •■,r., ill X (1) 0 1. . M 0 i-r, r-- I I . , -:_ 0 co co M > 1%) 0 -0 iv, C:Zo )> r, 00 Z C—TTI 41,;• "Nist CD Z I ,-, v .2. i,-) ...,/ 0 "•.1 /15 . 1111111111111P A‘ 0 0 0 e ® 0® ep ® N V• 0 0 TITLE: LYOPHILIZER #3 & FACILITY EXPANSION I- : ---'\ I'm MECHANICAL CLIENT: HemCon • • • EVERGREEN ENGINEERING 7 F. ROOF EQUIPMENT PLAN 10575 SW CASCADE AVE, SUITE 130 . .. .• • LOCATION: TIGARD OREGON 97226 •... M. Ma Engineering and Construction Services REV. DWG. #Ni 1 .2 JOB # CLIENT REF. # DEs. •••.• • •a • DWN. CHK. APPD. .•":Si.'"l'i■a 3 ASL SEC 03/02/07 ISSUED FOR CONSTRUCTION 07006 SCALE: I. •••j•"•: • HILLSBORO EUGENE SHEET OF 3/32%0*-0" DATE: DATE: DATE :%I. • 7431 NW Evergreen Pkwy, Suite 210 Hillsboro, OR 9712444110 Congzrrrt,gestAltr 97402 2 ABH SEC 07/19/06 AS—BUILT co) g THIRD AALNE -2,7 BDrACITG. INCLoURDING ENFTR4EMEG0 DESIGN AND OPKIER1NELIET OSFPEAFICADR.TIAON, IS INTENDED SOLELY FOR THEOFPROJECT STATE., INNEETIVitE67tizeiliOCK. iff MAY } (503) 439-8777 FAX: (503) 439-8767 i REV. &: APPD. DATE: DESCRIPTION , , ,IMMIM•F, ‘1•••••■••■ ' \ ' ' r ® ® ,t � 1 0 1, 0 ® ® ® Q ® ® 0 0 0 0 0 — — 0 9 8 6 ©.. , I III I I I - I- -1111/4111/_ w p r 40 i ........7.-b----- ---- ,_ _ � ' ' mill �c � " DIA U" soo � - �� � - O Z ___ !MEN .:j T L i �� 7:00 II -4';'. I I 700 01 I / �� ° P 111 I I WOMEN S TLT ■ ...tit►. R __ o o IMIDL pp E 213 —ri-J- II (� E 2 _ �� ji; — 22====2;1-1 ii====21 6 Parali 0 () 7 Nall 01 I I ., 57 11/ = - '� �: P ED-307-1 6 ( @ o AA■' - • , � I pLifIR 43 04 05 0 � � �/ '�I ... n °Li., / m 02 560 03 .0 J H I'1'1 C O III or prir 06 07 ► 55 PL •i mil , P,��;►r ,° KEY PLAN'qill .. , ,dib.....08 o � �� 1 LOADIN 4111� I / AWAT404 ,� -- _IA P ipl►.�► ►�� ►. 09 10 ►t 11 ►�I 12 ►t 13 TO IIECK GENERAL NOTES . d- ui � Q AgiruitAilrA ' ►�I 14 [A1A6007111 4 PL A FFU S ARE NUMBERED AND THE TYPICAL EQUIPMENT TAG �' '' '� 18 -, ji 58 T ��I Al 1I , � rd ►, ►�1 O !�� 01 ►, 02 ASSOCIATED WITH THE NUMBER IS• [��1Z '3�'�15 � .� 16 17 �r�i,. Jri.,. QRA �..'�.. _ -• WHERE RM# IS THE ROOM AND IS THE FFU NUMBER. ,NI • 70 ��-� ►�1 19 20 �.� III ��.. -! M B FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. lir ' 4 r A sr-"Anil 1 1, 21 1 Iv LYO HILIZE �� gm ► Ian 3 0 '� 1' lo ED-308-1 0 m a� 11 0� _'`\ / I �I ►, 59 it �I_ 1li24{� 25 26 , ,� ..�_ KEYED NOTES\tom/ _ � ,►.-' ` r _ -- ( V - ■���■ W 4 27 28 29 _- 1, ■ ; 1 -® 13 PL ► - _ 1 DEMO FFU'S AND RETURN GRILLS IN CEILING. SAVE FOR j c 4 VII �M - __ _ WA — f1.., FAN — __ ,4 M�! 1` 04 �'t REUSE, PROVIDE EXTRAS TO OWNER. Z .f- §. `1 i - - - - - - - i ►•► - 300 ,CF 2 0 g ,I 10 � 2 DEMO DUCT. REFER TO M 1 .3 FOR DUCT TO REMAIN. -F Liz IIII 1.1 1 -gig _ _ 3 DEMO 10"/8" DUCT FROM MAIN ON MEZZANINE. c°v i;P% 111 PM- I 111111 a- 0 ,_,_.__, '-� DEMO VAV AND CONTROLS. -v w �` - I RAH 1 (T ■Ii �//�.�, -/' ,gpArrifirdir, o �� _ 0 i ► I 33 34 I Mr / / 4 DEMO RETURN GRILL AND MOVE TO NEW LOCATION IN ROOM.p,rqui. 31 .i ► 32 ,a ►_ r �► AVM , % c o, .- prti . PORN � , F R REUSE. L�i�i� r I 5 DEMO THERMOSTAT. SAVE 0 wirmvii trig 36 37 38 / PrM1 Orr m 11,1 c librp.,.: 39 W4O MO SLOT DIFFUSER. > o,-- --- N O = .. . .F.S.,,k_ 1.. EMI abb . 41 42 NPR /-4111 21 STORAGE I I • .1 t pi ;���I � 44 111111197KOFINMIPM0m#111�_t 01 _.., ..r�i�_ ���� 1 L r■ -addilbE hdlitil"Pl. 46 PA I V.W.N. / J/arm._. ,i ri ■ rr ■ r ►tI1 48 ■. _ 49 NM 'l •� -� - eo MARK NUMBER ,■ .:r ': `— :: — .�/J � ■• » . �. foriN ,� ■ AIR FLOW CFM , ■ • 'WALK I N 50 ►Ai 51 , �— � rrrrr.0 C D D LE R x � :rill:� � -•ter,•- �.�I AHU-5 O o•0 52 g3 ►, 54 ►�I 55 I I AIR DEVICE SCHEDULE 305 _ ► _ 05 _ !I indij 56 o .0 IR I i , � 11 II MARK MANUFACTURER FACE NECK REMARKS '= ra;-ry/- I I I N0. MODEL N0. SIZE SIZE t UED— 'il 4 l 0, ., 17 HUNTAIR 24x48 22x22 BOTTOM REPLACEMENT ' to 111 w TZ ��-� SERIES 300 FILTER 99.97% H a La N ew Ara F4! jf'�rl °a 5 MATERIAL cn Z O3 INCOMING SUPPLIES I t AHU O ! ._. I OUTGOING SHIPM TS •,a► -- U W WI Ail Atli!r�� .r i I EN 1 .� ' AV 21 TITUS PAR 24x24 22x22 FACE ADJUSTABLE o o DAMPER ) �, "-V moo i' TORAGE AREA 24 .III ..11% PRICE PDDR 24x24 8 ..m illrAlglirrfr i� I 31fi 1 Ii:i pu E..3 PRICE PDN " :3 ° —0 24x24 8" zZ 3 TI G I ! I i I fl I U ELECT. ROOM x z Ld I i I 31 5 I I W co II 0 0 lini41111� UC) w � � 141." < 8 q §i PR ' DU T 4 w w Z U Ii I 'R . E ROB I I � � wo E. U TELECOM ROOM w o ic6 N I 1� � 317 o o CL � �o — , , _ — - — — 1��.1_ _ — — — — - - — — — �.. a. -4 �r� I 1 ( I B RI I i ea ge Ft) 184 Ln L1_ w , N 1-- , M CAD FILE: ,1 1:0 PROt 07006-MD1-3 GINZ4, 1O�, 16 S 74� 9PE � � , ... 1 MECHANICAL PRODUCTION REFLECTED CEILING PLAN DEMO .'EG 171>� 041041,13,1e G� 13, MD1.3 SCALE: 3/16"=1 '-0" N EN E• Ge• f I Expires 12/31/2007 I E 0 0 - 0 g 0 N - 0 SPIPP- 0° •I I I I I i8 1 ri 1111,4111/4/1" I A. 0 'LI _ ry I /A 2 0 Ad A _ . , or/ Ado ® z ® 1 1 or de:A E -&- I Awe Ill ®l ° z 0 w 0 I 111 • 9 8 0 6 0 " 1 64 0 oce LI- I- I I iu m) .r 1 Je :i - r N ---e .'!1-4it HernCon .... . marl n 1 1 . .1: ' I :--- Ile tini" DIA U ILIIAMMIL 4 I. • II I I 1 ...::i.....*:• 1 III . ____,,i- = ') ,t I I (71070) 4 600 42 KEY PLAN "I" 01 ■4 -....„ '....r... ci Arl I i .1.. I . . s.-3- III II,, AHU-3 111. DINE 2 glilifigg rokailt:. - - ...1 • I 0 '1,141‘• .':.• Alt 7:'7-.7*••.:.•_:•• --*- 0 3 PL I priLiri 02 .411li... GENERAL NOTES ty, m c•.. _ MIIC` IEEE=AFPWA 0 A FFU'S ARE NUMBERED AND THE TYPICAL EQUIPMENT TAG - IBA ill 4, -.I4iiwpr- . ASSOCIATED WITH THE NUMBER IS: ItaINMZEI gill" 0..Ali 1 _■11116111%._ I tim 57 I EE= UV F181E4 PL I , WHERE RM# IS THE ROOM AND # IS THE FFU NUMBER. iiiii - -1111 pILIPI 02 gra 03 04 poem 05 p,.,,no ft _._......i., ,44 pr., ..4101111101■■ 55560pL ...d.A.E....111 Am liry 03 Ina MAIM B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. re .0 11.11 r Ku hog 06 07 log 1 NI -111_,,AP0 °4111M11 . .., R 1 '44 Nom - =NI En I I ,, i 1.7 2 5, . ........ ---,-.IA UP willikilliPall 08 TO 'ECK i w E LAI h- _ AA 11 1111 Awn 09 10 MI 11 IltitL 12 MINI 13 1111WhiliPtill IIII 111:ablIPP11114 KEYED NOTES .... 0 La IL 0 d LIE 1=7 ' - I II 4 PL .......immilimil . W c li PL A. 1 ,7041m 18 Kau ci. Loyd.,1 02 all 4 ■ 1 CAP THIS END OF DUCT wig Illingilli,5 , , lial 16 ",......, 1111211111 0. 71-111 01 49--40... 42 19 g NI 2 ADJUST DAMPERS FOR PRESSURIZATION CONTROL .. 40,1 rk 1.16111 19 11Wil 20 pw, 111 NMI Z 15 A 1 Br " P ,,A 21 I mill _____mi 1 3 EXHAUST DROP THROUGH DECK TO POWDER HOOD. lil 5 ti 1,24 L.----:---j •imi orriMIIIIIIIIIIIIprAl ,iii. ab ' 3 .4_141.... -411 Illb.- I MI 1111 Emu ri= 03 111111 4 EXHAUST DROP THROUGH DECK TO HEAT PRESS. Z go, W 2 li W 0 72 OM, lindibil 24 25 01111161111Libl"Ill 26 18 Iridawitirlizal . II 59 Emiai Es gli ill -MEM low 27 28 29 Ea I ErisluirliiMINIIIIIIIIL..... AHU-6 a lai 1 it _ • immulfri oi al la="11,01 Esslismo niqui 11:-..-4 milliasm,iw 041.31 i - - -gust,amititrIVErs. _V --A111 Iii 111111111P7 ill lipm. NE willih,„ '1111111r, F.,..,..N.-i 'Rill -1111 ril vim nwim hi, pimir=liiimmirt ----07 w 15 11 ridillitell. illi■ iii ;NI i glikiAtik.,---4, 91.,,,,„. imulommonomeiral 31 -"gillPr- Itill„._. 32 14 ' DIA_UPo Emma 02 03 poi ,...„„........,........ 10.1.061 33 *MI 34 111111111017771EMII rig OL111141111....„■41141111■4111Piti,,j11 04 . .•. . .. . .■;.:::: . ..:.... .:....-: _.• ,....• _,01........„._- A _AI r .,I.- _AI r .,I.- -..1 r.••■■b. I • A 111111 -MilIVIIIIIIMIIMMINKIMMIIIIIMEIMILLE111111°1 02 irdura °5 1011 I • • .......• mb,- glortoN 02 PIIIIIIIIIIIIIIPrlitl 9 FM 4°MEM r-7 alial Mil I 3‘"'12 P 06 -"MN $ N W INN MI Nab I UM "EA-p 410111- 41 42 PIPPIN .401111161...,, ... 111161b.. 11-1111•19111/1111111111.11111411111.11 161 IIIINCEN NiiiiriLailidelni I 0 6 52ii P4) * • In Ak- 115611MITI 01 Mil 43 ,4 .1111 46 1.21 44 Illitilinall1110 (170 911 (11 ..." I - ILL' ___.? . PAini 45 . pl ' hIllwili 48 ..golol"ills. - ll Ilr- ,../•■■■■ - . I• lF1] 47 112 3moi.hinowq Nimii i.„,.. mi.._ i ,..,....„ Lai 50 112151 1 Ciii 'l a limo 9 Ami 13 Foif•Air e 0 . 0 a I C4 g W W us C■1 .s•Z IN.111:1 IIIIII■■ II LAI..I 0 0 II a. 4C(1) OZ 8 ,,‘Lii 3 gm 54 . 0 52 drib IIIPtill iffill . Imr ik,i 4 -1•10- 15 1,4 Ilidir, N.A., 0 c. W c,1 W C4 .- I Iliall.1111-41 *WW1 56 a I illidiniallilla 6 IiMil 017444 c R % = 17- 0 ° in: A (2. ce 4 -4 deb.... ...dab 1.... Ilin 111=1111.:., • E int At '3 1111111111.1%iiiihil 1 I Hum II am ...11.1 0 yr 0 1111111111111114111111111111111111111111 11111E5111111111111111111111111111111=1111111111111111 111111111111111111 IIIIIIIIIIIIIIIIIIIIIIII■1111•INIPINUIIIII I 1 1111.1.1111.1111.1.11.1 PiTCZ 18 l omo 19 20 11"11111111"111 II IE. linirall 11111 11111.1 th) . ,dirk, ,4111*._ _Alibi, -7-- _..dillib.._ if 1112 ................., ...... ... NI Ito All ....111M 96 o 7 p . , w. 1. 111 IMil. 23 COMM 24 11"11 25 ("4 pion-4 pro ..„,- g gi 1.01 0 .1 0 u) q. i2 . 111 IIIIII.IIIIIIIIrllkllIlIllIlIlkd I )* 1 Ill ..._ ,dit..- -.dit■h... I IA: RI it' 1.... .60z 8 ! ■A . . M11111111.0 - 'Ili ,............., % 104111111P% 4 immilirli ii, . , 4=1=1111 28 0■11111■111 .■ .1g 29 30 pplo- A 311117411 32 iimil ma _.,..., 111 4. 4 I : 1,6„ uniimigidgergiielatili --:_-. ' .2=-__- -' -.:..--_--_..... ' __-_._ IMERIMEME■i■ Cpmu....5 x w 2,., CO il i i W - 0-0 0 r-- 0 2 7it il i X A c.) c) . I.8.1 La 0 I 5 311k r i li 0 pr.) 05 mujix I-2Z 1 ° 1 MECHANICAL PRODUCTION REFLECTED CEILING PLAN = E • 6 A i M1.3 SCALE: 3/16"=1'.-0" o CL v". g 0 te M 1 i >.• 12 J 04 cl. E' 6 bi 3 i le, . . ..- ,,-... 6.1 0 iiw a- l-- %%4-IL oi -.7 t8r. -`"''' A 'REGO § tP veic ,st Y13,2. ) ,!. L Expires12/31/2007 -I- 1'1 ig 2 0 -0 El — N ® aim EMI 1 1 I I 13 i--" 1 Pir r 000LIII li 0 0 ® L _ A ' p 0 1........ IIA 141! o ProlIVAP' AP —— E ® 1 • ---4— 1 0 a- 9 8 0 6 0 . —NI IN o e z cn 0 ,..... p ca c., 0 H 0 . 0 1 , D N 1.13 — f KEY PLAN v) ' r■ 1 IIP \ , 0 , r— _ 0 0 4 -, r ta 6 ' 1 I 1= .. ...,...._:::". KEYED NOTES II - WH-1 & 2 reffi011 1 DEMO DUCT FROM MAIN TO PENETRATION THROUGH __ _ ----'') _ __J El---___ rag __ I AmPJ _____ I n U A / -04 0 A,4 I I.4 22x22" HOUSING DECK. PATCH DECK AIR TIGHT. 2 DEMO DUCT FROM MAIN TO STORAGE ROOM. 0 I, DEMO CONTINUED ON DRAWING MD1 .3. 11 , ,-, - - ______11 W/ 14"0 DOWN 04 _ ___I ILI : g, _ _ — w 6 6 3 DEMO FILTER HOUSING AND DUCT TO FFU BELOW IN Z .2 " . I TIGHT T LYO ROOM. SEAL PENETRATION IN DECK AIR TIGHT ri t .... ..0 160 O 0 .7 STRUCTURE ABOVE 7 PLATFORM AND REPLACE PLYWOOD SECTION. . w Cf) PENETRATION W c La. ttr: . 4 ‹1',1 ( 1 .4 1000 CFM Z .2: 8,..... ■ .:4 1 sz- 6" REGENERATION LI g .:g ■ INLET FROM Z IT; . ■ 8"0 , ( ROOF GOOSE ECK III F, Iria • 110 CFM , 1 ,...bG Ca . . 40 11' a 0 yi)10(2 D .....iiiwaii-iii.ir- • : l :1 ION ° • 4 TAP INTO 18x20 I'- . orm B ROOF •VENT 1 -, 11111 il i, II NEAR PLATFORM , 1 W 0 el 1‘ , FA 6 ' 6" P EN ETRAT-6N II co) R e4- ■ 40,4 g As 1,9 .c,... . 0 = 1000 .,,,:to 40"x30" DOWN IØ 1 ._'---- I 0 2"x22" HOUSING W THROUGH DECK NN, _ mil 1 vy/ 14"0 DOWN > .,,..13) ,„1 "0"0 ' 1 1 40"x30" DOWN THROUGH PLATFORM \ I V 4 LI tr, id t PLATFORM MI 16"0 TIGHT TO PENETRATION 20"x20' I STRUCTURE ABOVE a THROUGH ROOF = 1- 1 I . . • .. . ...„.:::: '' '' 16 - •.• 211• •2 2 TO ROOF TOP 14 14" - - 0 •• • .il GREEN HECK LOUVER MAU-1 0 "4 :,0 CFM 580 CFM ct A 1 400 CFM •• ....• ,....a.. I.. .1 , RAH-1 ‘, RAH-2 .........,• ,..140 2 2•••••1 7 ..-, ,„6„li''''' ) V.,,.. ........_ 24"ø Cx",) ", > 1-1-1 i 1 i-- \<..Y --I EL 1 . . . . zc >v1 i <, i 0 240 Ne v 14-ft 114< >‘ ,-; ig 8'' L El Se 18O CFM / If 18'' Err air-" 1400 CFM W110 500 CFM 750 CFM Lca ..... /( 8 0 14" TYPICAL -°\- 14" DOW - 0 .6 K 940 CFM 0;110111110F PLATFORM .... t 11.1 - PENETRATION 1..., a (-------7/ 18"0 ,... Pro0 16"0 W/ DAMPER .. D 0 L.7._ 6 HIC-1 14" DROP a I .....:,-0 011 940 CFM OA > < to .4z5 c4 li 0 VT,. o 1 TO RAH-2 I 00 8" g" . Li a'T H 110 CFM 010 (,) Z 4 •=1 0010 0 0 i'L:: 1 I 1 c g guj 8 it) ca i i eg i rici zt /11p ____ _ _ . — — ___ — _ ____ _ ____ 0 18" DOWN / t •• 0 1 % • - fa / .------- THROUGH PLATFORM RA--4 [M7 / 6 6 . c 1E4 1 x 'AND CEILING BELOW ..„_....... TWO PLACES Li:. 11 0 - z 0 x me 0 wm tO - _ 11 I r .1 , A . , . L n 5 • a. co IR — - o 0 I —J AC 0 ei - 0 0 IcI" "4 r8 4 u_ Z < m — 1 PLATFORM PLAN DEMO ...c ... 0 mi .. = - 0 I MD1 .4 SCALE: 3/16"=1'-O" c...) c..) L...1 ..c ") x > 0 ..s. zist = M . wir z aE 1 N o N, F .11 lL .-: 1.... "1 . tCL cl 1-4 ci. • ...., i CL. A a. g LI a .f..`") .La 0 (O &1j i 10- 0 in -...r, -- '1 CAD FILE: ,,, ss.w. G " ;70064101-4 AO IP110/._ lia I ?..... ‘41 ° 71389P, . ..-° .1/ ow 1 A i 6- 01 v IR_EGo ,1/4 ',3 0 4y13,2SP \IC 111 1 u.., <i1E-N E. 01' , . Lip) _ . 1-- Expires12/31/2007 . . V) 411•11•111110•16, ,,.-.... .A..,,,,..--,.,,....,,,,,,,, . • ,. .. . , .,.... :_....,.,.:,,,,,....,.. ,1,-- ..,,.., = 0 e:' - h. -?-1 .0 .). 1.1 .6. os , 0 0 0 0 0 0 0 0 0 0 0 0 o o II — / \ 0 o iii i 1 ± _ ..... I rj 0 0 L - ...1 Pr ....3. por Tin z . . 0 115111211r AwAli 0 -1 j I Ill ® 0.. EE I C.) Z u) .4..._ 0 w 0 9 8 0 6 ® ' --___ . 0 0 orr - E) : HemCon Li. F- _..i CI 14.1 in a 1 1 KEY PLAN 0 Q IN. ir) -.---i--- 0 1-7 -1 C-.L' ---. N,IF 0 0 ... al GENERAL NOTES 014-1 or-% 3 6 - 1 E:c (-- __. 1 8 8 cii cn cn < A SUPPORT RAH-7, RAH-8, AND MAU-3 12" ABOVE , ) . i - --, , -, - _ _ WH-1 & 2 DECK WITH UNISTRUT FRAME. PROVIDE GALVINIZED DRIP PAN UNDER COMPLETE UNIT. • — . . N.)10 ---- • - - . . " • -----"/1 .....i I n B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. ,H _ .... ,,,• , _11 ii _J. 0 2 g, - - -- I 411 Z .° - 1 16"0 TIGHT TO STRUCTURE Alio PLATFORM w PENETRATION I KEYED NOTES ) 1 SEAL DECK WITH PROFILE FOAM GASKET BETWEEN .- W nc uj li rfr 1000 CFM DECK AND METAL COLLAR AROUND DUCT. CAULK IN PLACE. Z zr- - /- I srv,--- 6" REGENERATION a 4.g. ,- ,... INLET FROM Z t gi , 1 8"0 ROOF GOOSE\IECK IA c F. J 110 CFM =i H 3 // ,...6; o o -...- - 6" REGENERATION Z 1 . 02 TAP INTO 18"x20" HMI )1111 ijial;:za_H1-1-3 I Lr'''fr----- EXHAUST TO li _ = NEAR PLATFORM I I I B ROOF VENT' I • Ill U 0 - ?_§ 1 ZOE. 16" 6"----------'---- 6„ PENETRATDN CE o) 0 ei RAH-8 PLATFORM 19 c i 0. .c 9 '” C PENETRATION CC me 1 p 1 000 low !Ai •E (Dir 40"x30" DOWN I lit V W 1.5 la THROUGH PLATFORM 1 = I./ 16"0 TIGHT TO STRUCTURE AB. PLATFORM PENETRATION , :t.. 20"x20' I I I „, ...... ...... --'- THROUGH ROOF i TO ROOF TOP / 14", 14'' 16" Li _ 20")(20! DOWN _ . .ii.:::: . • . • •. • i ,--- El r 1400 CFM •. •• .1. . .. GREEN NEC< LO VER II MAU-1 80 CFM 580 CFM / (- THROUGH PLATFORM / .-• 11.II 111.. 11.... RAH-1 \\ RAH-2 - --F Aia•• = r<2'C 1>\ (TN 24"0 (<,->\ 14"0 . "a a a ,t V ....., 111.1- t<i>\ 24"0 f'x'■ ("< IRt! '( V \,, )/ .....J \ > ./ ‘( V -0- ,( ..v 1) 1 I .,_ .• ,p.. .Adi ' dr N E . I 1 14'' 14" 441111r1 gd 500 CFIV 750 CFM III 1 0 Ix E Ail A 180 CFV1ppo,,, 1400 CFM , IMMO Allikir 0 14" , TYPICAL M111,111111 11111111111741111111111/4 MAMA il If V , ■7 2 . . cn PLATFORM 940 CFM -' 1 20"x20' * g 0 - PENETRATION I w = 1- !, / / 18"0 ----- 16"0 \V DAv PER THROUGH ROOF ..... „ „ TO ROOF r ... L HW-C 1 14" DROP r GREEN H:CK LO VER v) a r! _ LL. ---,I-(i ...P .---) 940 CFIv OA > 44 14) Csi li 0 0 w o TO RAH-2 124 - I Ci 1%•• c) ° ti " II 110 CFM I :2 6 ) IF MAU-3 rx Let' N a ,„ ci I a r2 , I (.) -- E iri < dE — ri ---- --DOWN - M c v c., L.I.) - - (111 a) o 0 x ,..- I= - 1 I 6 'ail ,\--, RA-I-4 ,\ THROUGH PLATFORM 1 16" g -s-- i x IAND CEILING BELOW PLATFORM a 9 I 0 TWO PLACES PENETRATION 6* LL: P g ig z g`03) 0 I.- ....______/ ....._ II II II II I- .(7) In I' (...Z a o _____ _......- 1 1111 --> 0 .A I L'I L x La ..1 ...1 1=44 CS It :3 '4Z 41 CD ' C.) c.) a. 41. r'' RAH-7 a z . 0 5 I. c.) = (1267) < 0 mg . . __s? . I I 1----- I I sts z >44 ' .c. w° x ixf5 'g PO x lik Z M5 , 9 0 —d-- uic I D. = 0 a a I Lu I , 0 25 fr- 3 I . 20"x20" DOWN 6 ili 15 %- c) 0 • () . THROUGH PLATFORM ---, = in c, el o cn hi --- 07 , 6— -4 CAD FILE: 6 9 PROT 00M1 -,.. ct GIIV'e,4* e* s 1 PLATFORM PLAN 0 VE -. 14143/4: iv ,rip /0 00'. M1.4 SCALE: 3/16"=1'-O" b REGl t tf) v& oc. z1/4 i iir 4,4, tri3, Ak ..-.. \.E.,.. 1-, 2 . L Expires 12/31/2007 8 IIIMINIMINNIM - - 0 = 8 Ti 5 -,,, x _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - GENERALNOTES FMS _ _ _ r - - - ROOM POSITION ROOM r- - - - -i r i 7 r - - - -1 1 DIFF. PRESS. CONTROL HUMIDITY TI r� 1/11P '� �HI r I (---ii-- A VIM r M DENOTES ROOM NUMBER. SEE DWG A0.1. (PN r I (ki �T� UNIT UNIT �.�I. i�i 3 ROOM UNIT �TI� UNIT Q 01 STATUS X01/ / STATUS STATUS ,/ r � r� HUMIDITY �0 UNIT - -� STATUS , B FOR / CONSTRUCTION PHASING Z L �I� �I� � I UNIT i iE ROOM ROOM �r M ROOM SEE STATUS TEMP TEMP I TEMP I TEMP I 1 I I I v o PANEL i I I I I I 1)/1 i I I KEYED COTES 1 I 1 1 I ► I I I I o l ll W l � T T 1 DEMO VAV AND DUCTING BACK TO MAIN. o D l T l T w m I I I MG i I I I I 1 2 DEMO EXHAUST DUCT AND DAMPERS TO a _ 1 1 10 I I I I I 1 ROOMS 307 AND 308. o 0 I I I I I I I I 1 . L __ --t-- - - - -I•—--I - - - IN G- - - , - - - _I '- - I - - - - --I - - I - - - - - - - - - - - - - - H - - 3 DEMO VAV CONTROL FROM TRANS TRACER SYSTEM. ° ° MG i I o o < 4 04 Q `� < Q �C Q i " ! "5EGENERATION AIR cn cn a I ° 1 OA TO ROOF I I o� I � HWC-1 r -- 0 J- ''3 �' I 43' DB OUT 20 E CAPACITY m 0 t 1 1 I — HEATING 500 CFM 300 CFM MIN 0 �. �, 0 1000 CFM ESTIMATED w Eit,_..1 Q _ L 2000 CFM MAX 1- J o I DH 1 _ _ _ _ _ -, OA r,--_ G:0 0 •_i, , d -r t I 42 MAX DEWPOINT �-r i 22 GRAINS H2O PER LB DRY AIR MAX MAU-1 ...r `T' • I)' `- `� `- 10 CFM M G s /)1 2000 CFM MG 06 I �. MG �. N W g§:. 15 CFM 06 I � 5 �\ 07 5 ► .. 08 m Z _�. 0 05 9 I 915 CFM �j _ .., `� `� `�— `� Z .`—' = �- 0 t I I IC%%1 �`.� Z. ZZ I I 2 I I 0 ' � m ".) ■ L.. I I `.... 110 CFM �, 8 �, p -1 0 p I EXHAUST PI EXHAUST 'O I Fry' I I 2 I MIN 0 CFM ° cp s I MIN 0 CFM IA 1 I I MAX 1200 CFM Z .` � 0 it MAX 1500 CFM `�"' J- w ( I- RAH-1 E.-. l.350 M W I RAH-2 I I I RAH 3 RAH-4-4 3250 CFM I 3250 CFM ,/ Q 1 1 L_20000FM Q4 1 1800 CFM m .41/1/ -----4` 0 ,....,' ..._. ---0.- 0 1 p g r I --� 0 lu' o = A, I ACTIVATED FILTER A I r ► f ,�9yrJv �� ,, ,�0A , 1 1 I I I I I Q Q3 I � CARBON _ t, i V h `, i 1 ►, • f F�► T.4 WC MAX /MG SD SQ SD SD .�01 I 02 03 1 1 T _ IS5A%!Diii ::y ::: ii: 1 I 1 ESTIMATED , , I ESTI MATED . •I 100 CFM MAX 110 CFM , �, • ` 10 CFM 1 1/1 vil LEAKAGE • LEAKAGE 171 A A ri;A:0 r A io:dtV % 1 V 1 diA . • _ A lir'SW: >40 ° ...J 1 1 I �_ PLENUM 1 I PLENUM 2 11 I c I I I t:2 g 0 La FFU FFU FFU FFU FFU FFU FFU FFU FFU ' FFU v) >a M z zZS I 99.97 FILTER 99.97 FILTER 99.97 FILTER - 99.97 FILTER 99.97 FILTER 99.97 FILTER 99.97 FILTER 99.97 FILTER 99.97 FILTER 99.97 FILTER a Y 8403 H Q) 0 RAH-2 � �� v, Z W GO CORRIDOR L....1� �...� 30% RH MAX ( F \ �....' E J , 35 TO 46 O a P RAH-1 2 RAH-3 � c� W E. 300 S 2, 50� RH MAX 63°±4°, +.03" WG Q RAH 3 LO ® 301 302 303 304 309 306 317 307 308 305 3 g LO +0.05" 02 �� 63°±4°, +.05 - god +0.03" °v o d 1 fti) x in 4C La 0 0 ie 1 PRODUCTION HVAC SYSTEM SCHEMATIC DEMO D1 . SCALE: NONE g o ••W tt�� U 9 Q gz(7, EQUIPMENT SCHEDULE Z W � 1,1. O o ii- �x Z U a % TAG MEG NOTES g ti ° g MODEL W = _ 16 BRY-DRY MINIPAC DEHUMIDIFIER, 208V/3P/6HZ, 12KW, 175 POUNDS J O 4. DH-1 MP-350 11 .7 POUNDS/HOUR H2O REMOVAL 0 ". 8 o 'dzt�`'- m O HUNT AIR FAN FILTER UNIT, 99.99% HEPA FILTERS, BRUSHLESS DC MOTOR, 227V/1 P/60HZ ''- •Kt cn 8 c FFU SERIES 300 ON' BOARD ADJUSTABLE SPEED CONTROL, GASKET SEALING '� 6 Cf5 I TRANE MAKE-UP AIR HANDLING UNIT, 30% FILTERS. 95% FILTERS, MODULATING MIXING BOX W/ACTUATOR a W MAU-1 / = z� MCCB006 DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTRL BOARD, 2000 CFM, EAT 90/67, LAT 43/42.8, 1 .5" WG ESP, 8 ROW COIL, 3 HP MOTOR N Z 5� Y TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .5" WG ESP, 3HP MOTOR = ° o o RAH-1 BCHC09OG2 3250 CFM, 6 ROW HIGH CAPACITY COIL, EAT 67/55.6, LAT 48/46.8 0 g g6 TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .5" WG ESP, 3HP MOTOR -' 0 , Z RAH-2 BCHC09OG2 3250 CFM, 6 ROW HIGH CAPACITY COIL, EAT 67/55.6, LAT 48/46.8 .. T o W 3N W RAH-3 TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0" WG ESP, 1 HP MOTOR N yi- BCH072G2 2000 CFM, 6 ROW HIGH CAPACITY COIL, EAT 74/54, LAT 45.6/41 .9 . M AT: o7oos-MO i-s i RAH-4 TRANE RECIRCULATING AIR HANDLING UNIT, 30% 2 FILTERS, DELUXE 3 WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0 WGESP, 3/4HP MOTOR , i % BCH072G2 _ 1800 CFM, 6 ROW HIGH CAPACITY COIL, EAT 46/44, LAT 43/42.4 _ 4889P��' � g ct/ Tk \ v4: t c„ r,„ O°` 0 4 1f Expires 12/31/2007 E o h O 2 ' _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - GENERAL NOTES FMS ' I ROOM POSITION ROOM - - - - 1 1- - - _ -1 r- - - - -I I--- - - - -1 DIFF. PRESS. CONT ROL HUMIDITY i i . . i I ' A t 'Ill DENOTES ROOM NUMBER. SEE DWG A0.1. Pr ( r - /!H1 (T1 ( - UNIT (T� UNIT r r-rf ROOM (HI ( rTI1 UNIT rail ME UNIT B FOR DEMOLITION I CONSTRUCTION PHASING SEE 01 STATUS QD 1/ STATUS �01�/ 'STATUS HUMIDITY �02 UNIT STATUS NM H A0.2. 0 SHEET ROOM j ROOM ROOM ROOM P a. I I TEMP I STATUS ► TEMP TEMP 0 _ _I_.- _ TEMP _ I _ _ _ - - - - - - - - - - - - I - - I - - - - - - - - - - - - - - - o W I I I I I I I F-- o - -�--- .- - -4---- --I--- - - - - - - - - - - - - - -I PANEL 1 I I I I I I I I ° 1 1 I I I I I I o KEYED NOTES ., . . I I MG I I I I I I I , el I I 10 I I I I I I I 1 ROOM 306 PRESSURE REFERENCED TO COORIDOR. I n- -- -- - -� . - - - - - - - -I--- I - - - -� - - ' 2 REFERENCE PRESSURE ROOM 300. 1110i o Q M0G < <t < < < < < 3 SMOKE DETECTOR IN COMMON RETURN I BY RA--1 AND RAH-2. o I REGENERATION AIR lit N) o I HWC-1 TT OA TO ROOF 4 DRAIN CONDENSATE BY GRAVITY TO NEAREST o I J- 20 F TEMP "ISE 10 4 DRAIN. �' P) 'Cr)) 43' DB OUT HEATING CAP` CITY 01 LYOP-ILIZER COLLECTION 0 2500 C • 5 DRAIN CONDENSATE TO mum 300 CFM MIN PIT. � 1000 CFM ESTIMATED w W__I €€ DH-1 _ _ _ _ _ L 2000 CFM MAX J I-a �, �, FILTER BOX WIT-1 (4) VILEDON CARBOPLEAT N� OA � � • .- J, J� FILTERS 24x24 . g `I 42' MAX DEWPOINT -is 22 GRAINS H2O PER LB DRY AIR MAX �,� MAU-1 `T' v I `r `� ` . _ 10 CFM MG 7 CONNECT COIL CONTROL VALVE TO DHW SYSTEM. Z °0 LEI // 2000 CFM I ! 08 _ n 5 5 w 915 CFM 06 I 07 8 DUCT TWO FFUS IN ROOM 309B TO PLENUM w -�. 4 05 I 915 CFM ¶ ¶ 0 T o IN COORIDOR FROM ROOM 306. U W k 0 0 0 M I --I I I 11 10 CFM I PRESSURE U o li - !Z • L I I o I 9 PROVIDE NEW VERIS PXPLNO1S Z o r,� I ,,� SENSOR ON OUTSIDE WALL IN COORIDOR 300. - t r� EXHAUST I I ,� RETURN GRILL IN CEILING WITH DAMPER. a i MIN J- J- w Z ° w , MAX 1500 CFM w , w J - . w 10 PROVIDE NEW DUCT TEMPERATURE SENSOR AND c m -o a --� • o -`' •�� �o t INSTALL IN DUCT DOWNSTREAM OF HWC-1. �° I A v • � , T �0 E0 SENSOR VERIS TDDDRO. CONNECT TO FMS. Z 350 CFM ~ I I -� UJ c li RAH-1 I RAH-2 • A I I C I RAH-3 RAH-4 U1 a F.;3250 CFM I I 3250 CFM j j 0 1 2000 CFM ®4 E 1800 CFM Ix co o "Fe (1- - - I --.. 0 ______,.. 0 0 ---0. 0 0 ( I 6 I (- ---5 �- -� ° w I . oT _ _ --J I I c ar I I I ACTIVATED FILTER I I 1� �- I > 'as 5 I I � I ,.. I 3 3 I I CARBON 10 CFM MIN 1 I W w W 0 of Q SD d SD SD < .4" WC MAX Alel 100 CFM MAX SD `� SD 1 01 02 03 04 I 05 „ ( ,,,._�v < I 09 LEAKAGE I I • 1 10 CFM MIN I I ESTIMATED ESTIMATED ••,•• I ESTIMATED I `- :11::.; :r -1 50 CFM ESTIMATED 1 1 1 10 CFM �` 10 CFM , ,�;_ r 330 CFM I 100 CFM MAX LEAKAGE I LEAKAGE ..:•■.r;.:_ I LEAKAGE 1 L - - - -�• Y. -- - - - � - -4 �- - 4 �-- - - - -.-- - - - � A I .. .. • ; . ■�■ rrrrr■ T i :• . L _ - _ -� -5 (5- - - - - -5 5- - -5 5- - -S (3- -a- - - -1 a V T V ( I il PLENUM 1 C... . 12" PLENUM 2 1 tl J- W FF FFU FFU FFU FFU FFU FFU FFU FFU FFU FFU H I z I 99.99 FILTER 99.99 FILTER 99.99 FILTER • 99.99 FILTER 99.99 FILTE' 99.99 FILTER 99.99 FILTER 99.99 FILTER 99.99 FILTER 99.99 FILTER N ,� 0 0 99.99 TER 99 9 H T BRA 2 Q3 %a �CORRIDOR �.... ' >+.05 WG RH MAX PT 35 TO 46 ° � 300 S PT 1 G +0 ,,304 RH-1 63 ±4 , +.03" WG RAH-3 50% RH MAX 03 307 x 302 303 3 3098 308 305 t„ o. --S 4 �S Fp 8 cl o9 .. 8; o os A 0 .. 6 Pk --1-MANUFACTURING HVAC SYSTEM P & ID1 Pi M1 .5 `` SCALE: NONE Z �� 0 p Z W z 41 La ,6 5" U W EQUIPMENT SCHEDULE W 1. W Zw . � o 1o. MEG � � � 0 TAG MODEL NOTES a _ o el U U V � � m BRY-DRY MINIPAC DEHUMIDIFIER, 208V/3P/6HZ, 12KW, 175 POUNDS `` _ _ ° igi DH-1 MP 350 11 .7 POUNDS HOUR H2O REMOVAL "1 Lij 3 Itg HUNT AIR FAN FILTER UNIT, 99.99% HEPA FILTERS, BRUSHLESS DC MOTOR, 227V/1 P/60HZ m Z FFU 1 SERIES 300 ON BOARD ADJUSTABLE SPEED CONTROL, GASKET SEALING Lai a Fo 0 F TRANE MAKE-UP AIR HANDLING UNIT, 30% FILTERS. 95% FILTERS, MODULATING MIXING BOX W/ACTUATOR = z . o z MAU-1 MCCB006 DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTRL BOARD, 2000 CFM, EAT 90/67, LAT 43/42.8, 1 .5" WG ESP, 8 ROW COIL, 3 HP MOTOR ..>7., z , Z TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .5 WG ESP, 3HP MOTOR 3 = g c`'. RAH-1 BCHC090G2 3250 CFM, 6 ROW HIGH CAPACITY COIL, EAT 67/55.6, LAT 48/46.8 •• `� � RAH-2 TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2 FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .5 WG ESP, 3HP MOTOR w �� M BCHC090G2 3250 CFM, 6 ROW HIGH CAPACITY COIL, EAT 67/55.6, LAT 48/46.8 �Q PROF�' CAD s�M: TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0" WG ESP, 1 HP MOTOR -p,..z` Girr,� �4>4.RAH-3 F 6 ROW HIGH CAPACITY COIL, EAT 74 54 LAT 45.6/41 .9 \V�' 48 9 E 11.l BCH072G2 2000 CFM, / o TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0 WGESP, 3/4HP MOTOR r,,c, R ef AH-4 BCH072G2 1800 CFM, 6 ROW HIGH CAPACITY COIL, EAT 46/44, LAT 43/42.4 ORE 1 N FyL 320 � U ib Y , Q I E_ Expires 12/3112007 0 I. I. 0 r _ _ _ _ _ _ _ _ _ _ _ _ FMS POSITION 1- - - GENERAL NOTES CONTROL 1 a r -'-' UNIT i (HiRooM (TI� UNIT ()i 1 STATUS 111. Q J ,/ STATUS K01/ , A trill DENOTES ROOM NUMBER. SEE DWG A0.1. I I ROOM I I TEMP I B ALL DUCTING TO BE LOW PRESSURE GALVANIZED z _ I _ _ I _ - - - --I-- - — — — — — — — — — — — - - - - - - - 1- - - - - - I I I SPIRAL WOUND OR SHEET METAL FOR 2 WC ° STATIC PRESSURE. EC _ —I—_ - _ -—I--- - - - -—I- - - - - - - - - - - - - - - - - - - - �- - - - - - a w PANEL I I I C FOR DEMOLITION / CONSTRUCTION PHASING SEE ..9_ ° I I VFD ) I 4 I , SHEET A0.2. 0 I I rP rip-c ° 1 I I K012. ' KEYED NOTES I I I X01 W -r'1 I I I I I 1 VERIS INDUSTRIES HUMIDITY SENSOR HWL2NSX N - -I - - - - - - - - - I - - - - - - - - - _ - I _ _ -I h -- MG Q MG < I I 2 REFERENCE PRESSURE ROOM 306. il .q I 01 02 ' VERIS INDUSTRIES PRESSURE SENSOR PXPLNO1S S .. I I rN 1 ,Q A B ° Q > I a_ 3 SMOKE DETECTOR SHUTS DOWN BOTH RAH-7 W a. J, 1 = MG AND MAU-3. M % � J 03 �.x .. J J 4 DRAIN CONDENSATE BY GRAVITY TO / E o o 55 F ROOM 311C SUMP.N. 750 CFM - 11 OA• / i FULL 00 CFM = I 6 W 5 PROVIDE GALVANIZED DRAIN PAN UNDER UL UNIT AREA. SET UNIT ON 12" TALL STEEL FRAME. ce 0. MAU-3 6 I g 1E-1/// 1400 CFM J v, i • ® I o Z .2 LL'i a ri b ' _ a EXHAUST 450 CFM �J m :34 N RAH 7 I wx w 2000 CFM ®3., A W C s w O O (o L. SD Z X X 13 ,....g ,.'°1' R E-U R N AIR Z 15 A 0 CFM - 500 CFM - w o U :^ III• (0 i wx � -D r6 b I N 11,1 O ° i < ESTIMATED ' LE co o " 245 CFM LI .� 1 P- I LEAKAGE ii m d I L — A 7 .a W W It% t 400 _.__ -�— 400 400 �, ,, 14" 14" • 8" _--.--- 400 :1 CFM —8" 14 8 CFM CFM 8 I CFM (--C° w(° w° w w • L__ 4_ (O `° w t° w(O ■■ e rr 1 1 '1 ■ ■ PLENUM PLENUM .`. • . ,..::::::-......,..: ■■.a■a •300 CFM 300 CFM 200 CFM (EACH) (EACH) (EACH) 0 I --) r --) r .-. r --) r M c, m In La D FFU FFU FFU FFU FFU jt1 w W (-- 99.99 FILTER 99.99 FILTER M r J., 99.99 FILTER 99.99 FILTER 99.99 FILTER M a N Ni B H A T o z W�.��'i I PT GOWN 0 PT 0 o a° �2 L_ 50% RH MAX 16 02 PRODUCTION `...,._.'., +0.04"WC 309A �,,. .,.... ,,,,' 01 " 309 64'±2'�..,- c v, o { I L _ 1 +0.085 WC 1 o to o 1 1 t2 i 11/3 6 _ .- p §' PRODUCTION ROOM 309 HVAC SYSTEM P & ID 0 0 i= di! 0 v J SCALE: NONE " g* G w 0 Y N z L a- z �tAl Z m 05° W U W �y X � pi W N � EQUIPMENT SCHEDULE Ja 0 TAG MFG NOTES 'ci- c., x .40. ci?) e a o o MODEL as U M . HUNTAIR FAN FILTER UNIT, 99.99% HEPA FILTERS, BRUSHLESS DC MOTOR, 227V/1 P/60HZ M 6 2 FFU 4k $ P SERIES 300 GASKET SEALING, ROOM SIDE REPLACEABLE FILTERS, MODBUS CONTROL SYSTEM OPTION W ix -g 1 - TRANE MAKE-UP AIR HANDLING UNIT, MERV 7 FILTERS AND 99.97% FILTERS, MODULATING MIXING BOX W/ACTUATOR, DELUXE 3-WAY CONTROL VALVES, o ,`tn 05 W MAU 3 _ . o Z ti MCCB003 TRANE TRACE CONTROL BOARD, 1400 CFM, EAT 90/67, LAT 45/44.9(CC), 2.5" WG ESP, 3 COILS, 3 HP MOTOR, VFD a TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0" WG ESP, 1 HP MOTOR o °o Z RAH-7 Z E i BCH072G2 2000 CFM, 6 ROW HIGH CAPACITY COIL, EAT 74/54, LAT 45.6/41 .9 °- 3 3g s a M CAD FlLE: a 4 igtt PROF� �10os-M,-5► $sGIN . '4 ii ;1: '� 7 8 9 P E �'' (0, 0 o • E. cie Expires 12/31/2007 Q Vmow.�,& I a a c `. 1- FMSr _ _ _ i _ _ _ _ - _ _ _ _ - _ _ - _ _ _ - _ _ _ _ , _ ,_ _ - _ _ _ _ - - - -- - - BEN ERAL COTES I r- A t' ill DENOTES ROOM NUMBER. SEE DWG A0.1. UNIT L J K E STATUS , B FOR DEMOLITION / CONSTRUCTION PHASING SEE Z ROOM SHEET A0.2. 0 TEMP tx z 0 - - - - - - - - - - - - - _ - - - - -- - - - - - - - . - - - z w O PANEL I 1 U KEYED NOTES L.,... W ' 1 BELIMO 0--10V ACTUATOR ON ROUND DAMPER. N 2 REFERENCE PRESSURE COORIDOR 300 W/ EXISTING VERIS INDUSTRIES PRESSURE SENSOR PXPLNOIS d • 3 PROVIDE GALVANIZED. DRAIN PAN UNDER FULL W ci UNIT AREA. SET UNIT ON 12" TALL STEEL FRAME. C d 4 DRAIN CONDENSATE BY GRAVITY TO ale g DRAIN LINE TO COORIDOR 300 FLOOR DRAIN. 5 INTAKE AIR FROM PLATFORM AREA ABOVE ROOM 301. N1 BUILDING AIR ® gI ci MIN 0 CFM LI m MG MAX 800 .CFM Z 2 0 01 i• El W n- - W u, cn gF o � Z _ 1 0 I SD-301 -1 L ,-" 2 A �■ J a Z h N r 0E- 14" ° EXHAUST 0 _ z v MIN 200 CFM MAX 1800 CFM W 2 RAH-8 Id a - • 800 CFM iE a, & Ny 4 •CL. y§ tE m � = _ E > •5 i! iii W ..FI w w d- I d- M h Ii i■r 10" 4 g •i 2 r PLENUM a Ld % A L� CA VI LAI ill SUPPLY GRILL SUPPLY GRILL RETURN GRILL a N • 0 05 . a o gg TRANSFER AIR a o 400 CFM 400 CFM it"' FROM COORIDOR 300 0-600 CFM PT < W MIN 0 CFM GEL PRODUCTION 0 3 0 MAX 800 CFM �----- 301 02 i 8 6 = 1- .= 0 8% i ROOM 301 HVAC SYSTEM P & I D t..15 T - 10. 0 .� c to SCALE: NONE " z W ct 6§1 Z �� O w %U- Z 0 _ O a °kg o 0 x a'LI ti EQUIPMENT SCHEDULE 0 o - -.1-1 < r 0 TAG MFG NOTES 13 0 m o MODEL > .°.� s RAH-7 C. TRANE RECIRCULATING AIR-HANDLING UNIT, 30% 2" FILTERS, DELUXE 3-WAY CONTROL VALVES, TRANE TRACE CONTROL BOARD, 1 .0" WG ESP, 1/2HP MOTOR F5 BCH024G2 800 CFM, 6 ROW HIGH CAPACITY COIL, EAT 74/54, LAT 45.6/41 .9 0 W N m m ti 4 . J O 'II ti z5 t = ,„O l I i8 a 1_1 I 15:).�o �v, '- c4 ,- °:4 z CAD FILE: �418 PROF 07006'21 -5B -1/41: ,,,..4.4., li , ®cc:` GINz `t 8IP:// F-,-,-, I i lij, REGO t� vG � t Y13,2 J f FA e WI 5 ti G� LL I Expiresl2/31/2007 0 z h 9 N d I' S i i ,z; ' S' ,t' Q1 C 0 0 0 0 0 0 4 0 0 0 © Mil ®■, R/V -rib . ,,.... III I I �„ 0 trj 0 . 0 • '� F°r? 1 8 6 C5) 4 POrArd _ /.� E z 0 I I —I r Ar, "'/ A I I I a ® Ir ° _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - - 1 a- P - I I I I I - I I I _ _ 1 0 0 / / . 0 u_N .--- -.----- HemCon W I I ! I I I I I cn KEYPLAN h 0 411111 __ O ZONE73 ` Q p p u j _11 D— I 0 Po GENERAL NOTES I I I I I I I I I N Q ci / _� a AHU-7 • \, o N'N'F71 ZONE A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. J \ _s_i I I I I COPIER PRINTER ROOM I 0 0 AHU-2 ZONE 1® ----- �A U-2 ZONE 2 RNU-3 ZONE , 1103, KEYED NOTES .r .ate ,,, \ AHU-3 1 DEMO EXHAUST DUCT BACK TO 12" MAIN AND CAP. U m o� ZONE 3 CI- - 2 DEMO EXHAUST DUCT TO ROOM 307 AND 302 BACK TO--...7.j 0 • o�E 3 ® U-8 ABOVE DECK. SEAL DECK WITH MATCHING DECK PATCH. °' � cn _ 11.1 W 11.1 El l = Z o -� � t; ACCOUNTING STA F me 3j1io I I � I I 214 � I I { ! g \\�-y- CONE. ROOM 4 ID 219 O , -1 e —TY- r,cDe_11 --)__ ..--- 11) \__. n � AHU-3 ®ZONE 2 r. a __.I 1 .. MI 11.1 = T** LABWARE - b ...1 Wig (� f a CLEANING AREA V A"'/ 1333/ (E-F.--)-1 LYOPHILIZER GOWNING ROOM 13071 L9 •L g 1.4 4 13011 lo - #1 LOADING m ,_, tE 12" I 12' I I ! 11,1 c = o.�■0 ___ _ I C _ > •i I! • LABWARE GOWNING ROOM v ®F2AH-3 ' —301 Ct� w L II BREAK ROOM STORAGE 1 I HUM I 33 2 LYOPHILIZER L � �G L?i‘,..(2241 AHU-1 I ( r A-3.4 ZONE 3 r #2 'LOADING .. a I YO RAH- �" I I i • ■■ `s• Ii 1 I LID AHU-6 • • ■ ••• PRODUCT . HUM © ��ti•OUT GOING _ — — — — — ' /) .. .. .•• 13021 PRODUCT N ROOM L_ ■_. .•r•.• MANUFACTURING/QC i r 3 6 •■ WORK AREA 13311 ■ ::•• '! ZONE 4 I 1 l PRODUCT I I RAH 1 .� I ! I 11 MARK NUMBER ''• IN COMING a (e EXHAUST AIR FLOW CFM 1( - • 303 Ain _�,�, ' 1 i MOLD CLEANING i © © AL OT ® MOLD(COLE�ANING 4Ql O 1309 C i ST61RlJOUI GE EXHAUST SCHEDULE �, ! I � I I �oz� I I m cii, I � � m� W/ _ PASS E= �-►-0- - -B - - �, _ I _ 1_ _ _ .. _ _ _ THRU_ _ _ _ _ _ _ — EQUIPMENT FLOW ° CHITOSAN m ■CT)gill STORAGE to. Ito DESCRIPTION (CFM) REMARKS a A. I- - �_'�' I r'- ._..r 1 I I I reirrinvASIA A CID STORAGE CABINETS/ 20 5 CFM EACH +� h F 0 -- d i r r�rs n 0 p u I', N so INV raFrACHITOSAN HOOD A 300 ' < o a AM 0 k 1 ACCEPTED FINISHED Atha d / W o MI I INCOMING SUPPLIES MATERIALS MANAGEMENT GOODS & ACCEPTED D $•_ , OUTGOING SHIPMENTS (3131 RAW MATERIALS SHELVING FL" EXHAUST DRUM 100 r cn O I--;— I I 1 13141 1 1312 I .` ° in ° I r � 6.�I ALIQUOTING ROOM 200 TIT5JS PAR � o �, a e 74(3' ..-- „��; / EXHAUSTS / . DAMPER / _ o Q'1 PACKAGING � ��� SNORKEL 300. � o °��., /J 13181 STORAGE AREA __� _ �,'. , w ..`1�-I -� I ��� /ilk I 131 s1 I I ! m CONDITIONING OVEN #1Ar 150 _ . M 000° 1 NNIP m Mk ,, m CONDITIONING OVEN #2 150 W ot Alor L o m SNORKEL 304 z J?. No ri," r' ( v ,Q U N I —I I PRODUCT I I I 13. �� _ l � STORAGE ROOM w O z �:� 13171 2 to 11111111 - -- -----____--�--, `op, _ _ � m. PRESS '1 300 � � ° °o °� B r:7 I i I 1 I I I m PRESS #2 300 a a a o oW # _ °6 C 0 AEA JANITOR ROOM 50 a C orri 41- Art , A. /Fa Lrl La 0 1 P W 1 1 ► I I ► I ► I Farr:, ra ..1i St ►.i '�/I i�V:1l _ Wilillir t ` -Pr r r 7 4 i . lapp741,sairir A-Aarm EL § 0 2 llg mearica 1„ 2, ,,. dI AdarAdrinitar" (.4AVrAdyfie >- __I qk -i w. A - - - - - - _ _ _ _ _ _ - - - - - - - _ - _ A o L.Y.1 h W °m g I I I I i -0 DJ-- M ge___Of o7oas�MO2-o t.� ®� —n- �, 4' w '889PE l ''' 9 V; I(.L a. 1 MECHANICAL EXHAUST PLAN -- DEMO �, v •'REGO 0 § M D2.0 SCALE: 3/32"=r-0" 4,4h► GQ' L,i) el, Expires 12131/2007 ....Ii ��._ .- : :, :m .... . S O r a ig 9 L 0 0 s 0 it, 1 ,T, ik ' 0 0 0 ® 0 0 0 ® 0 0-- L _ — 7 0 MN Pilyirill 0 nr r Fryir „ed 1 1 1 i -01, r--I vAl/ 'A: ArrAlrelE cso • • • 10 9 8 6 4 P4Aø1 _11!l I Pr //. a. Fe- 6-- _ _ _ _ _ - - _ _ • - U O W II 0 P 0 1 v ° „,:;-- ,........ ,.......E ..___, __J._ I I I 1 I I /// - 1 I I _ // / I @ 0 o // OFFICE OFFICE OFFICE OFFICE 0 , / 11051 11061 11071 fFF]CE 1081 11091 W 5 HemCon 1 I I I I 1 I I KEY PLAN n co // • . � W -, -.-- / 0 n < LOBBY - ►n o 0 _ // �, �.-. ' __-------------- � 11011 � �- - i� CORRIDOR GENERAL COTES o 1 1 I I I 1102A1 I _--_-- I a -'' / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E _ A ALL DUCTING EXCEPT AS NOTED TO BE GALVANIZED DUCTING 4 0 �' 4 12051 206 207 208 12091 12101 -5" .� v [2031 (20 1 I ► I I I I J DESIGNED FOR -5 WC. W ; ' 1 cnrt�O ` � \ A MINISTRATIVE STAFF I � \ j 104 B ALL DUCTING TO BE SUPPORTED PER SMACNA GUIDELINES M 1 OFFICE OF ICE I I I I CONFERENCE ROOM Nt. 0 11111 h 111x1 I MAIN DUCT TO BE SUPPORTED ON PIPE HANGER BRACKET. _ _ _ WHERE POSSIBLE. -� - Imo' ., h LOBBY u CORRIDOR CORRIDOR C PROV PITS OF USE. °'Ri IDE DAMPER AT ALL 0 N v, 1 201 COORIDOR IS 202A 202A 102B 1 _ _ _ 1 _ D SEE M2.1, M2.1A, AND M2.2 FOR EXHAUST SCHEMATICS. Z U W I: T0• ELECTRICAL MEN S ELECT. Z '�j 0 oasr. i W u' 12231 CONF. ROOM (2121 MEN'S TLT �� 112A •Fp E FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. UJ v) W tE 220 T -) (1131 ENGINEERING & W C li I_ - _ FACILITIES WORK AREA O CORRIDOR -I. CORRIDOR Z •— _ i - 2028 R. & D. / P. D. / Q. A. DOCUMENT CONTROL CORRIDOR LU CH ROOM I 11111 (112) +- � I` 121$I 1 216 1 120X1 215 1 I ( ( 1 ""' V Q• rr ° A KEYED NOTES ..>, I _ n _.� Y Z vs MEN'S TLT EN'S TL SERVER BROOM I I 11-- _ MEN'S TL C 4 a• 12221 41 ]a 221 1 NEW EXHAUST FAN FOR LYOPHILIZER MEGH ROOM. v sA.Icain-JI WOMEN'S TLT � 11141 - Z '� _ f , „_,_„ m� 6 I _ _ ! _ _ I _ d� _ I _ 2 NEW GRAVITY DAMPER FOR LYOPHILIZER MECHANICAL ROOM. _ E., ill FDA - ��, v [4 '17:7 ri 2' 'I ►�j `I 3 NEW LAB SERVICES EXHAUST FAN. L� rn ?I _ MECH 13341 I �f�� O LYO13071 ER ' .0 a I§ e� " J•J•I7'� - ,(LOADING LYOPHILIZER ROOM 4 DUCT UNDER PLATFORM BETWEEN DECK AND CEILING. m `IL w 311A m = `� ' 0 RESEARCH & DEVELOPMENT I U m -�1 0 I I I 12 I I ! _ 1 ( I '� _ — l _ GEL 6ROD► *N _ 5 DROP TO MOLD WASHER. o, WORK AREA D 1 1 v� 13291 s.J 3o A V ') U El GENERAL PURPOSE = 9 1 i 6 DROPS IN LYO ROOMS. SEE M2.1 A. I 12241 ® LAB SERVICES 11 so LYOPHILIZER 13331 CORRIDOR 13081 ® , MARK NUMBER I I I 13x0) , I #2 LOADING I ,--� �°° EXHAUST AIR FLOW CFM PRODUCT ::r IN COMING — -- _ GD-1� _ - 13021 PRODUCT N ROOM r • 3 6 • r r..•••EXHAUST SCHEDUL ,' .:r-: LYOPHILIZER ROOM , ,______. ill_............11 311B • . ..••• CORRIDOR I I OUT GOING I I -� I tit I _ —' - 13381 - 1303 K:)14LYOPHILIZER 1D-RESEARCH & DEVELOPMENT T RER • #3 LOAING '`' REMARKS LABWARE us 0 vi DESCRIPTION (CFM) _ 3 CLEANING - GOWN (13.) S 300 309B }1 328 ROOM MN 1 ACID STORAGE CABINET 50 m QC WORK I (304J I I 1 s i s I °d v Q W AREA GOWN a �p _ _ _ Roos _ tj:.....L._. _ _ _ m DISPENSING HOOD 6001=(1.. I 1 OP LXH QP �J" 13311 — [t — — — — CORRIDOR I WALK IN 1309A1 4�n0 H OVEN A/L 13381 COOLR o LYOPHI311C ROOM 4i zZ 13051 13110) m GEL TANKS 300 a 4o ,n� N ia,, 13401 UD 8„ 12„ Q - " Y k�` 8"4, EXH 1 i I CORRIDOR 1 CORRIDOR --I 1 n ,� I r ) U •,i — ° ^ czi •�-- _ _ 1 13001 13001 - , ,. 1111111111f H m ALIQUOTING 600 .4 0)EQUIPMENT . . 1Z' SNORKEL a z TRANSFER MI (3231 ®► I CONDITIONING OVEN 150 c� 0.la. • W U 0 o 4-1- R & D I STORAGE - • I- r • • • • - ' J I or ® C Q 13211 CLEANROOM GOWN 1 I 14 I I I I I �' m►. CONDITIONING OVEN #1 150 o o 13261 13241 FACILTIES _ j 4 �' ELECT. ROOM 13391- JANITOR 315A ® CONDITIONING OVEN #2 150 = ° Fes-, -e 0 132 I I 4 fil GOWN 2 .- (3251 „ I m SNORKEL 300 ' .'N g, 3 wIP - - _ — ,, w �§ ......�;-. --J -1 ( 1 13181 I I 1 I = o d>'.- __1_o EXH UP QUALITY CONTROL PACKAGING - - © 320 • • 13161 = r m PI PRESS 300 ‘77' Pi GENERAL USE MECHANICAL ROOM 13371 ELECT. ROOM I m PRESS #1 300 c �_ 1335) _ 13151 UTILITY SHED I O z � (24 SQ. FT. LYOPHILIZER) I I • • I • • r I I 1345( 1 I m PRESS #2 300 I t' a U 0 I X z u. _ r TELECOM ROOM f 1 j JANITOR ROOM 50 w ca z 13171 I lg o `L --44-- r--- • - — — — — H — — — B ® LYOPHILIZER #1 LOADING 600 MOTORIZED DAMPER n. NON-CONFORMING SALE R&D I I I V' ( I 1 ROOM EXHAUST _ — WITH TIMER, 110V v. a I- o li & MKTG STORAGE L m LYOP--ILIZER #2 LOADING 600 IOTORIZED DAMPER at _ D STORAGE (3441 CHITOSAN STORAG • ROOM EXHAUST WITH TIMER, 1 10V ,� W = z� .A.1' 13451 •ter .� 13431 0 MOLD WASHER 500 4 W 1° "7 W I I I I I f m POWDER HOOD 400 W QUARANTINE 1 I .. = ci o Qx 4 STORAGE ,, O M LAB STORAGE m SINK (CEILING EXH) 300 PRICE PDDR GRILL ? - D I " 99 J CJ — — — — - 13421__ — — — — -- — — — — — _ _ — _ /� _ W/ S CONNECTION �, w zc I I I—' LABWASHER (CEILING EXH) 300 PRICE PDDR GRILL o N 5 I -' �-. I 1 I I I I I WI 8" CONNECTION Igo -........6......-- g3 PR } �- � CAD FILE. • r, .,-- ,-,, MATERIALS SHIPPING ( ,� '', 006-M2-0 z MANAGEMENT & 13411 GE —�, en 7 8���9 E i ' i c W 2 v,....., Es°''so a,)._.. i. 1 MECHANICAL EXHAUST PLAN 5 '`4„.2. -, - 17 1 M2.0 SCALE: 3/32"=V-0”-0 N tl L5cEE LL. C I T o� O n N la CJ - - - - - - - - - - - - - - - - _ _ _ _ _ _ r - - - - - - - - - - - - - - - - - - - - FMS I( GENERAL NOTES Pr.P11 A FOR DEMOLITION / CONSTRUCTION PHASING SEE X02,/ I SHEET A0.2. Z 0 I a I I v I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I ci c)cs 0 - - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - 1 REMOVE TIMER FROM WALL AND REWIRE FFU TO RUN 1 PANEL rspl SPEED CONTROLLER I CONTINUOUSLY. PLACE COVER PLATE OVER J-BOX. o I Q E L01J - cr 0 rPI1 11111 VFD-01 I °m cri L01,0 PM (VARIABLE SPEED FAN CONTROL) r. O I I I o a - - - _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ I _ _ I _ - - _ _ _ _ - _ _ _ _ - _ _ I o ° W a- I I w a Q < Qm DEMO o � .. 3500 CFI �0 - 200 CFM izi EF-1 GD-1 U! a g • VFD Z P 0 L Illri A 'ii 'k _a_ /13\ Z :f--2- §,. ROOF I L 0 i1 3118 U PT z L • .' I LYOPHILIZER ..� 01 w , . A C; MECHANICAL v I - . 1 1 ' , A • ROOM INTAKE °I ia 1 tig .c 2 1§- u m J p PT 12"-EXH \ > •a, 02 w w C 12"-EXH D 14"-EXH . 8"—EXH 12"-EXH Q 14"-EXH i r ArrAlrerillir , or- .011111/ A ""dr . 'IL: ..:•: • X x . � w w �/ ■i■■■ I w w I QC iA o -I x x } . er-rfry—' ArAllirAir Ary DI w w 1 J .....1 co AA/ 0 61 W W W W w w ED-308-1 = ED-307-1 /Lux,= � I I I I x / D �_ ma 04 y ZANNE �� 7 � W N 5 8a 0 Ao/e AILIII� � � I FFU-308--1 I ' I _ _ v °' ��E (1PI) 1 EILING 32JANIOR a OOLOAIG OM' LOANG ROOM(5CM) ' EXHAUST EXHAUST _ ix � � E3rE ► ooh „ * / (600 CFM) (600 CFM) I I o § 6 P % PI : Li:: ,„. y O w ao ..z La .... eg ri°; A 4 1 (SP a a (:).:A TfM R-1 TIMER-2 W o 0 IP c 306 306 306 306 306 306 A W N iffi 6 SNORKEL OVEN LF ( M) (3M) (3gM) W : ii o 25 ao '.v M 3s 0. F 1 PRODUCTION EXHAUST SYSTEM P & ID -- A 3 = 35 (T) ir ., EQUIPMENT SCHEDULE MD2.1 SCALE: NONEm 0 gt M EF-1 / GD-1 FIL�: it GREENHECK ' GREENHECK /��,D OF� o7oos-IL-1 SWB-2-16-50-CW-TH 0 I 12 x 12 FHI N� , ��� EXHAUST E A GRAVITY INTAKE 4889PE lij FAN 'A►. DAMPER 3.5" WC .g -E o I/ / 0 4 WI y 2 „iN),<C NE L Expires l2/31/2007 co z n 0 _ _ _ _ _ _ _ _ GENERALNOTES _ _ _ _ _ _ _ _ _ - _ _ _ _ _ FMS E - - - - I A ALL DUCTING EXCEPT AS NOTED TO BE GALVANIZED ' I DUCTING DESIGNED FOR -5" WC. (Pr B ALL DUCTING TO BE SUPPORTED PER SMACNA ' 02„) ' GUIDELINES. z 0 C E' ; ;ill DESIGNATES ROOM NUMBER. SEE DWG AO.1. a. 1 cc - - - - - - - - - - - = - - - --- - - - - - - - - - - - - - - - - - - - - - - - - ---i °o En D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. PANEL rSP1 SPEED CONTROLLER 0 I U I < r ►.01J o rPil VW VFD-01 , W = 01 (VARIABLE SPEED FAN CONTROL) KEYED NOTES N I I I 1 PROVIDE 2" PVC PIPE TO THE GM ACID CABINET. io a I__ ________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___1 CONNECT TO ACID CABINET. USE BALL VALVE IN PVC PIPE FOR DAMPER. . 0 0 0 I 2 TRANSITION TO 6" NEDERMAN HUB CONNECTION. d �I Q 3 PROVIDE NEW EXTENSION OF 4' FOR STACK. 0 "11 g 3 4 NEDERMAN 6"0 EXH FLEXIBLE ARM. �. M I Q I 5 TRANSITION TO 3" LIGHT WEIGHT CHEMICALLY RESISTANT F.3850 CFM HOSE WITH PP CAMLOC FITTING ON TANK TOP. :IT°° T EF-1 6 PROVIDE DAMPER ABOVE CAMLOC TO SHUT OFF. r,, ai I VFD 6 CHANGE BELT AND SHEAVES ON FAN TO PROVIDE Z ■2 . �► 1 I Z I I 2100 RPM FAN SPEED. m in �_-- __ ---'\ U V) W I n 7 PROVIDE POLY-FLEX SS METAL HOSE. C=ONNECT DUCT UJ c g4 ABOVE CEILING. NO GALVANIZED SHOULD BE BELOW c,_.� _I_ .� E Z C §� CEILING. � i ROOF Z N . L g Pi o PT _ Z U °m 01 X liii ili 10 EC 01 0 E L 4110 a ..... i 1,1. CE m = ILI a G i PT 12 1!-EXH , > ■rn r" 02 la w W 12"-EXH m D 14"-EXH -, R MEZZANINE • ■ ■ r 8" EXH 4 12"-EXHr a 14"-EXH J .■ " l = E 12"-EXH i 12 O EXH i ■■ w u W W t iir■ 1 ■ •••... w I = W M (� CO . I (FUTURE) l x w x s W I w1 .I ( 1 1 1 J ( 1 , •(0 (0 X X X X I = I I I i �- W W W W w W w w '. O wl wl :i wl 1 tiJ I 1 XI fOd X V N) V �} w w w( • W W v 00 W z i 1 I 4c N � MEZZANINE .- _ o nZ CEILING a °' �- CEILING a o W _ 322 o w of v. JANITOR o 1 ROOM \ U "' ci i a !_§ (50 CFM) = off tcl e �._/ �./ 7 .. O 3 o 301 w • Z d 9 0 to DISPENSING HOOD III A ift =2 301 (600 CFM) `i W u: Pi 60 Z r GM 301 301 301 0 iP CABINET GEL MIX GEL MIX 6" SNORKEL z o W TANK #1 TANK #2 X as-'2" eg (50 CFM) # (600 CFM) W W C0 il (300 CFM) (300 CFM) = b 4 306 306 306 306 0 306 306 309 309 309 Q z 1 m O g8W' 6" u. W O 6" SNORKEL OVEN OVEN 6 SNORKEL PRESS PRESS OVEN PRESS POWDER HOOD _ 1- R. (300 CFM) (150 CFM) (150 CFM) (300 CFM) (300 CFM) (300 CFM) (150 CFM) (300 CFM) (400 CFM) M w � 5 I CZ = W se (1PRODUCTION EXHAUST SYSTEM SCHEMA IC cNI 35 M2.1 SCALE: NONE Z a J -g 6 Eiji e TN' Ct (T) 1: .N.LN EQUIPMENT SCHEDULE 0 n___-, ,, c,,- 4.o PROF 06 2-1 EF-1 $;s ,GINS ry GREENHECK , 7 889PE *'' W SWB-2-16-50-CW-TH - ( L h EXHAUST EGO gc FAN `��c0 G<r1s 20° J 3.5" WC yEN E. G' ` V g Expires 12/31/2007 o ;.: ,. z w 0 h O N A G 3' Y _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ GENERALNOTES r , A ALL DUCTING EXCEPT AS NOTED TO BE GALVANIZED DUCTING DESIGNED FOR —5" WC. B ALL DUCTING TO BE SUPPORTED PER SMACNA Z GUIDELINES. 0 a i C ® DESIGNATES ROOM NUMBER. SEE DWG A0.1 . o 8 U _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. PANEL 0 fr O 0 W KEYED NOTES f. 0 I _ ____ _____ _ _ - - - _ 1 END DUCT OPENING AT 24 AFF. el 1111111 2 ROUTE DUCT TO EACH SIDE OF LYOPHILIZER ON THE WALL BETWEEN ROOM AND CLEANROOM. 1111 .j g 3 GD-1 IS EXISTING. O G.1 N0 0 'at 311C 311C 311B 311B 311A 311A Z 2 0 LYOPHILIZER #3 LYOPHILIZER #3 LYOPHILIZER #2 LYOPHILIZER #2 LYOPHILIZER #1 LYOPHILIZER #1 E m W 1� 1 MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL (J 0 = .r ROOM EXHAUST ROOM INTAKE . ROOM EXHAUST ROOM INTAKE ROOM EXHAUST ROOM INTAKE w c LIT • 2 i! 500 CFM 500 CFM 500 CFM 500 CFM 500 CFM 500 CFM Ei 3 4 EF-4 GD-4 EF-5 GD-1 EF-2 GD-5 Z v w g 0. � U � z ii� = la "2 r . I I 0 o N E c O o ROOF . Q .� . a� _ > a) W W W I I x x x r W W W I I I a 0 0 0 ■ '- P' e- ■ ■ ■•:w • • •■ r■ ' iir■ • •■• r O Y 0 0 0 0 : S z I = I I X X X O � ,v w w w w w w I I I I I I w w w w w W ri co CO CU CO co c o N tag ]L Q i o W ft.i. I I I I I 3 V) O V ^ Ex' g R v Q }x _ I= 8 ----—-------2:114- O io N iCD O e W FLOOR v g 1 § a —0 Pi Q rx c° o w z W co Z U a N0 Q O U al W W r o u-.3 ...j W _ J 4 III © 0 o 4Z � m 1 1°tiU = c. re) iW ro e I zet W W Ni 0O < 1 6„, (ThLYO M ROOM EXHAUST SYSTEM SCHEMATIC ii: = N o . M2.1 A SCALE: NONE ° " rjg ca J ""j E in J ui j N cD__,„ ,,,-i EQUIPMENT SCHEDULE �� F„�: 0 n 4c.�ED fF� a7oos-M2-1a EF-4 GD-4 EF-5 GD-1 3 EF-2 GD-5 � �GREENHECK GREENHECK GREENHECK GREENHECK GREENHECK GREENHECK $P ' w 4 8 PE�' IA Q TCBRU-1 -9-4 12 x 12 FHI TCBRU-1-9-4 12 x 12 FHI TCBRU-1-9-4 12 x 12 FHI EXHAUST GRAVITY INTAKE EXHAUST GRAVITY INTAKE EXHAUST GRAVITY INTAKE • EGO FAN DAMPER FAN DAMPER FAN DAMPER , ,!� 4Yi3,2 J`� V1 6 1 .0” WC 1 .0" WC 1 .0" WC A/YEAI E. GQ` r4N , [ Expires 12/31/2007 .•....�.V .... ,,;.,. 1�,v. S -O .IMII _ _ _ _ _ _ _ _ _ _ _ _ _ _ GENERALNOTES A ALL DUCTING EXCEPT AS NOTED TO BE GALVANIZED r PI 1 DUCTING DESIGNED FOR -5" WC. 1,„02.1 B ALL DUCTING TO BE SUPPORTED PER SMACNA Z GUIDELINES. a C A 0.1 EMI Z _ _ _ _ _ _ _ _ _ _ ___ _ .... _ .... ..... ..... .... _ ..... .... .... ..... ..... ..... .... ..... _ _ i D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. [ ANEL SP ( 8 (- SPEED CONTROLLER r �p iJ -1 ce 0 rPT1 PM VFD-03 K EYED NOTES a iOlJ NM (VARIABLE SPEED FAN CONTROL) 1 PROVIDE CONNECTION TO MOLD WASHER WITH o Q POLY-FLEX SS HOSE FOR LAST 4' OF RUN. o Q - - --- - - - - - - I - - I-1----- - - - - - - - - 1750 CFM MIN - - - - - - - - - - - - - - - - - - _ I o 27�FMf MAX 2 VERIS INDUSTRIES PXPLNO2S PRESSURE SENSOR. a < U � I EF-6 u) I VFD 3 PROVIDE VFD WITH EXHAUST FAN. VFD CONTROL a i \r/ FAN SPEED TO BE INCORPORATED INTO THE CONTROL - Q < I _ PANEL WITH 0-10V INPUT FROM PRESSURE SENSOR. O.�-- An VA o ROOF BDD �� VT i ,s 19 m IZ °_ gg,,;.� Co •� z �2 0 W V) a 4 L (iii) W c 4 • o PT t9 t ,!- 01 Z N N LI o 0,4„, � Z � ��_i D 4 PT 02 g 1§. 14 -EXH —4 D 14 -EXH J CE w g A W I' ' T W fa II 1 r Z • w • 8"-EXH 14"-EXH ] ■l•M'■ ■■' r■■ p :::.: J I go X C W 2 ° W H d 3 0 a ri. • N W N " G r, g CEILING GRIL CEILING GRIL ° P ✓ W �0 i'l CEILING 3 � � � 333 I 333 c Vf o z SINK LABWARE WASHER U g Ex EXHAUST \ EXHAUST E < } 300 CFM 300 CFM _ c`- 12 � Z § / 1::.w Z gi- O U J rn alk Z3 W 6 333 0 °_ 8 MOLD WASHER Z 4J w %6 EXHAUST x W U 500CFM w ~ >2 co 0 < ZQ oQ Q iZW W 4( .9, §g 0 C) P t X W > � N W Z � N(NI O o ;5- CAI M 1 g a 1 Cg _ LAB SERVICES EXHAUST SYSTEM P & ID 3 N M2.2 SCALE: NONE � •• 0 N gm EQUIPMENT SCHEDULE R- .....-o 0 EF-6 CAD FlLE: . GREENHECK ?...S14)t,,,sz.4 Of o7oos-��-2 N TCBRU-1-16-15 „ � Ix�.�, / ii EXHAUST FAN C� 1 .5 WC � � ac89PE� � o 1 1/2HP—VFD I ( C § •,EGO '13,2�� [Expires 12/31/2007 §. /17 z. LE. el eta d 0 0 n 0 N 0 g 1:\lobs\07006 Hemcon Facility Expansion\Dwgs\07006-M2-10.dwg,3/1/2007 5:22:35 PM,pbrenner,Evergreen Engineering , I 1 LI 1 0 (.1 . • 0-. 0_ (n co -0 al _ L_J 0 C C) - I --1-1-1 03/ --10-C13-- (7) STEAM 1_____ • 0 >rn 0 =m— o (3- Lo r--- * * o BOILER , ioo m 70 ,..., L..) ___, \../ 0 -0 . . .,,...;:. •• .......„ C a ,,...., Co _... 3 -0 r--1- I t U H 1 I 0 i . (....) ,.. ›. ---1 , r-i- Cy - il 0 I I 0 D I I i p i CA -1 '. .,, ,I U) ci- E 3) \..1 U (f) (CD I I CD 1 0 7) --1 C---: 0 7. I L.0 CD (9 ' • 4; CI cm OP° 8 il----- Er K UNI I .13-t; rril 0 I ,...___ --‹ (-\ CA o • (e.-■ ____,, I tu,) , > )›. c, , . r____ .-) . c)I cn II > r-i- C'\-1 0 .__ _.p. pi o -0 No 1 z m . -1 3 c(? CI 0 0 P C") ...) p (.0 a) CL 1/4‹ (i) --1 > o r- 0 > cp izp I:1 73 • -< r c) _1 1 I ‘HO iN) , > 0 . _, .611:„.. -0 0 ___;_____i_cri Liiiii.l. IIIi c; . ""1 Ill ineein111 CrY- n < . ____ z • . , ri,. , 0 CD D 1\) —• r-i- _____ 41, , 0 1 — D , , I i U H 0 - • 0 D LO c_ I 1 1 (*_:) —0 llllll E F-7 1110 70 11 -1 0 mt_ _ _ o c 0 CD Cil (-11 IC) Z. °I C.1•1 _ --I —il > •I o - > , 11 ...1— _ -V) -0 n , . K i C.0 co M ---4 00 C.0 . 6 U - . 0 A , _ _ • , . 0 . Ell No s;lm , . te.4% ........., 0 0 o@ , ((tors drivP % .,, , ..... - . 0 \ihk,,, i Il lip 0 ■ . I I 0 0 0 0 I 0 0 0 0 0 1 0 00 0 0 N.) --1 A 0 T e 0 ee 9 4 m m C C,CD Z 00 --< 'II z = --4 I' M u M 1- -1._ 0 i — --I ei 21" C) OK —i XI _[ 1 M L--.... > m--< —I _J DO = o I— I- = z li fri, --1--- 0 z -0 C) ,„K* ■■,, , 0 7_"7"A I•H C, Z '7 1 M""r-1 X I "'."4."-- I-11 o wm 0 o ,0 K 0* U) --i -1 — 0 Z X 1 C) (i)m 1 M M x F) M ---- --- --,..._ 0 r- > =I V) 17 Z r"--o 0 0 c) 7) z , v)5 I ' › = A-I Fn 0 01)" m a) 0 0 I ' IT 2 -1"‹ 3 .., I 0 INS4 I 0 i"-- s iiip V m 11 - 1 m 1 04> r- m 0 N 4') ,,b ee■,,. E '—0 I ...,- •,.- c• - .1, v-- (/) 1-- o 0 (7' /77 "Z 4- Q SI m I I I' Z •: "1 CO "4 '1:2 M > 0 M e iz 8 o -( -% 4A V .'"' Z • / 0 .., & • W 1.•.) 0 0 0 9 09 GB 9 11111111111MMINIP / To 21 g 111-E: LYOPHILIZER #3 & FACILITY EXPANSION co HemCon 1 m MECHANICAL CUENT: • ' • EVERGREEN ENGINEERING Fi E 10575 SW CASCADE AVE, SUITE 130 % 1 PARTIAL FLOOR PLAN LOCATION: TIGARD OREGON 97226 •. . • a • •.. % % • Engineering and Construction Services REV. DWG. #M2.10 JOB # CLIENT REF. # DWN. CHK. IAPPD. ii.•.. • .. .• ..1": e.'ir 07006 SCALE: I •. •.•.' • • HILLSBORO EUGENE SHEET OF 3 16" ••= 1.-0" DATE: DATE: DATE .• 1'1.i •'. a • 7431 NW Evergreen Pkwy, Suite 210 Hillsboro, OR 97124 / 860 Cow St, Eupne, OR 97402 0 ASL SEC 03/02/07 ISSUED FOR CONSTRUCTION ._,(4, THIRD ANGLE THIS DRAWING. INCLUDING ENGINEERING. DESIGN AND PERTINENT SPECIFICATION. IS INTENDED SOLELY FOR THE PROJECT STATED IN THE ATLE BLOCK. IT MAY } (503) 439-8777 FAX: (503) 439-8767 / (541) 484-4n1 FAX (541) 484-6759 PROJECTION NOT BE SUITABLE OR SAFE FOR OTHER PROJECTS. OTHER USE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF INERGREN ENGINEERING. LLC IS PROHIBITED. "--- REV. BY: APPD. DATE: DESCRIPTION • ,r ,L. 0 s, ,r' ,,D 0 0 4, 0 0 O © 0 o O O O 1 0 4 o - o .11 / 0°111111111111111111 E r ° ° ° f II ❑ ❑ H U If 1 J LOBBY - - ^ 1 -^+ \ / , vorAor _ l I I } I 101 I I I I 1 I11 CORRIDOR (k) I N �- , , ,it r `, O 102A SAN S p L _ _ 7 ' O . \ .411 _ OFFICE OFFICE ''� � � -I O z CE OFFICE OFFICE OFFICE OFFICE OFFICE Org, o 4 205 206 207 208 409 210 21 I 1 O I I -I ( I E"�i� I I I k I I © EE Aar . A - 0 o w A MINISTRATIVE STAFF O _ - I - - MI 0 p ° 104 CONFERENCE ROOM OPIER PRINTER ROOM z_=-- . __-- _.--- __:. ---- ---- A,- I I I I 103 I } 110 I _ I : o Lic„ o DOR CORRIDOR �j' .•••• HemCon w .A 202A CORRIDOR �'. Y 12 4" SIA \ 102B CO KEY PLAN,I } I _ I O _ _ I .. _ ___ - __ -_=_ _ N .q TELE DATA MEN S ELECT. — - . ...o a 217 E,� TLT 0 EXIST. 112A m 212 MENSTLT oFD GENERAL NOTES . o Q c-Ni 1 13 - ENGINEERING cn a CORRIDOR — FACILITIES WORK AREA I `1 a A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND J ). / P. D. / Q. A. DOCUMENT CONTROL C'-'IDOR LU NCH ROOM "H ACCOUNTING STA F 0 _ 111 IJ . AND SYMBOLS. m 218 216 glil 215 I 214 — _ --Y1 1 0 3 7- _______ V R B DIMENSIONS SHOWN ARE FROM FACE OF WALL o d- a _ - TO CENTERLINE OF FLOOR DRAIN, CLEANOUT, } I - _ �1 MEN'S TT I I FD i VENT, ETC. r VT WOMEN'S TLT 11� _ „- _ _ C CONTRACTOR TO COORDINATE EXACT LOCATION OF Ve m 0 E 3 SA\ 2A FLOOR DRAINS, CLEANOUTS, VENTS, ETC. WITH Z ca -- - — — - ,.-- _--r — b — — L — — — . — — „ — --- — — — OWNER PRIOR TO CONSTRUCTION. E W is )1) L }LABWARE � _ } (ELIA NG •��� D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Lj W ��---)- 0 c..7\* �', 334 LYOPHILIZER o :J 307 Z v �I T #1 LOADING LYOPHILIZER ROOM ul' g 1 I 2"I VTR 2% I } 31 ' A- 1 th y n \N n / _ _ _ I _ _ KEYED NOTES , , r____ _ 4 SA\ 2AH ` I o LABWARE GOWN! •:A - I � FD Z � � STORAGE 1 DEMO BOTH PROCESS WASTE DRAIN LINES TO AWN TANK -v A = � 1 1 /2"-PWD-PC-1 Q � AWN � � �� 332 BACK TO PIPE RACK. TIE INTO NEW LINE TO NEW p } I I LYOPH►uZER I I TANK LOCATION. U0 0 a CORRIDOR 308 0) 0 -V- 300 #2 Lo tiNG 2 DEMO SANITARY SEWER LINE AT ELBOW. LINE TO BE EXTENDED. VTR re m it - PRODUCT _ 0 3 BREAK SANITARY SEWER LINE BELOW NEW TRENCH FOR E n 2 ' tY I 1 IN COMING I I - � _ _ _ — u — I — - - - CONNECTION TO TRENCH. �' �' la PRODUCTION ROOM 1 1 /� PW D '► W W 302 MANUFACTURING/QC ! 34 6 0 LYOP 4 ,. R ROOM 4 DEMO AWN PWD DISCHARGE LINE FROM PUMP BACK t WORK AREA < 11'B 331 N PRODUCT TO WALL CONNECTION. LINE TO BE REPLACED WITH :ORRIDOR 1 OUT GOING I - 1 I.. NEW 2" LINE. REUSE PH PROBE IN NEW LINE. . 1338] ( '� 303 I I I WCO . . < ri, . VTR - 5 • BREAK SANITARY SEWER LINE FOR NEW FLOOR DRAIN . .. : CONNECTIONS. .. e.•••`.•'�•• Ise■ re.. ALIQUOT MOLD CLEANING I. •' 1 . 309 • sass.■ _ STORAGE � • ••.��f } I I 304 I I I I I il 1 t - PASS - - :: - - - [ - - - t3- - - -a _ _ THRU - _ - _ - _ _ M • ga_l__________ 0 sie C C WALK IN 0 OOLER ' I ___Iul - W $ 6 I 305 I I I p I """""""1r�11 i w �- -PWD- - - W ri Z CORRIDOR CORRIDOR 1� > 300 300 _ - iu .d. „ i — r I I I I I 6 Z W1 ACCEPTED FINISHED I 4 0 0 NCOMING SUPPLIES MATERIALS MANAGEMENT GOODS & ACCEPTED STORAGE FD " W o.b 321 `- OUTGOING SHIPMENTS 313 RAW MATERIALS SHELVING N o _ q _ 314 312 c 0 �'C 0 I I I I E n �---}8 40 JANITOR 2" vTR } _ ° P , 322 PACKAGING z • ,� o 318 _ _ .f gor2 �i FD TORAGE AREA = - U S 0 �� I I I 316 I © � � VTR ' 2 QUALITY COOL - W W gi D 320 N AUQUOTING CORRIDOR o z z co MOP ( 319 300 G Mll ENERAL U z � \ 1 FS a a � W 337 < ELECT. ROOM 4( �_____ sl (r) I I I 315 I I w z I et to Rp 0 al r PRODUCT - z 1 e STORAGE ROOM < z 4c m 410 317 TELECOM ROOM = re ° o 317 I I I , W 0 �� ,,L, — AI Ii. 111111111111111111■111111111111 :iimmi Mai , _ - B.1 � WY CS I P VTR Mill 1 11111 I ul gZ X 4 in ° tIt I I I I ° et a a J alk E � N .. gal L,-, .I g6 11 6 1.,J d or,1 Z M } I I I I I I 1 CAD FILE: ,`���,� ,�� 07006-MD3-1 ,�5 .GINAi� ©� f4 4 89PE 9 ow g 3 (ThSANITARY AND PROCESS DRAIN PIPING EGON �PLAN DEMO 1y13,2 0 MD3.1 SCALE: 1/8"=1'-0" VA'`�'F Gp► 2. Expires 12/31/2007 O O A C? • 0 • e 0 s, s, ,l it , 1 lF ; • m s' a 0 0 3 © 0 ® 0 1Q 9 8 4 © ■ - ME - III all ! I I I 1 I /or ,Ar:ArAo 4,8 .. _ - - - - - - - - - - - ® � ` ° 1 I I I I I I I / ® Z I r// ® Q o / ® I I -1 I I / ' A'A� I I I E rr OFFICE OFFICE OFFICE FFICE OFFICE , , O O w r 11051 11061 11071 11081 (1091 - ■ o I I I I l /i � I I I I I r/ — o // o // �, ®► r r,- ce ��— - ,� �, , / LOBBY -- � J__ / (101 CORRIDOR =� N ---e e e 1 1.--e H em on W 4 SAN D 1 co � I I I I 1o2A I �, I Y PLAN \'/ K E 'i CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFF! E — �, (203( 1204( 12051 12061 12071 12081 1-091 12101 N \` \ o o 8 - / \ A MINISTI144i E STAFF GENERAL NOTES o I I I I I 1 OFFICE OFFICE I ( 1110! � I vi tWn a CONFERENCE ROOM c.) c� 11111 Q 0.1 - --- - - - A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND LOBBY I Piii CORRIDOR CORRIDOR �q E ''m 1202A1 1202A1 COORIDOR AND SYMBOLS. 1 ,� 4" SI'N 1102B1 CO I I _ - I e 1 B DIMENSIONS SHOWN ARE FROM FACE OF WALL •4r I [iEDATA Mil MI i MTL S ® T. ELECT. - TO CENTERLINE OF FLOOR DRAIN, CLEANOUT, � . VENT, ETC. ELECTRICAL AL CONF. ROOM = 12121 MEN'S3TLT °'F 112A F. 220 N # ) ( 1 ENGINEERING Ri _ _ . FACILITIES WORK REA -■_, CORRIDO+ CORRIDOR C CONTRACTOR TO COORDINATE EXACT LOCATION OF to T CONTROL Ce IDOR LUNCH ROOM ° 11111 1 2 � m ^ �" - 202B R. & D. 12181 A. DOCUMEN c L ,� y�\ FLOOR DRAINS, CLEANOUTS, VENTS, ETC. WITH 1 216 I 1— I 1 Z0110 I - 215 1 OWNER PRIOR TO CONSTRUCTION. Imo t W I �� �: � ___ ___ VTR �il W MEN'S TL`T • EN'S TL SERVER ROOM I I EN'S IL' 0 I D FOR DETAILS ON PWD PIPING SEE PID ON M4.3A AND M4.3B. Ui li'CI] 1� i. C 12221 WCO W • _1 I WOMEN'S TLT {� 11141 »- C la Al W � V1'R , -- a vi 2:�. 3"-SAN-2AH I E FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z L' zocei 14 334 Q � � ti E �► T 101 2 LYOPHILIZER °` II 1 I (3071 II O ♦ #1 LO�� ► LYOPHIUZER ROOM KEYED z NOTES f� I 40 CI 003 0111P111pli DEVELOPMENT I I �� , I twill ti r 2"I VT a 2>0 ( » ♦ oJ I w e. — - RESEARCH & DEVELO N _ ••e ._ it 4 -SAN-2AH r— =- --- . 3/8" o -� 791 WORK AREA zI WCO AREA � - 1 INSTALL TRAP PRIMER WITH 3/8 MINIMUM LINES TO � o N VTR �l► .�� ___ Ne. ir a, & N GENERAL PURPOSE - • 1 1/2 PWD-PCH FLOOR DRAIN. 12241 I LAB SER1ICES II OP LIZER • 2"�,; `� L>, ° °3aooR 2 ED G ♦ WC0 2 DRAIN 2 AFF. CAPPED FOR FUTURE USE PROVIDE VENT. gE m = ..L. , -1, VTR PRODUCT �� — � — ,! — — — — 3 ELEVATION OF TIE-IN POINT IS 6 FT BELOW FINISHED FLOOR. IN COMING . - _ W ill 13021 i PRODUC316N ROOM 1 1 �WD H �2 -PWD QCH� 4 TIE SANITARY SEWER LINE TO NEW FLOOR TRENCH DRAIN t 0 = L..__ ,"� `:J LYOPHILIZER ROOM o„ ¶ "-PWD-QCH 1 5 1 POINT. TRAP AND PRIME. I I CORRIDOR I 1 PRODUCT I I ii 1 _ ®O 13381 Z OUT GOING i LYOPHILIZER WCQ i ) I „ ' a I 5 RUN NEW 3" SANITARY SEWER LINE TO NEW FLOOR SINK. - ---: . V) 13091 VTR . ... "° � TRANSFER _ ♦ •+r:ill 1 RESEARCH & DEVELOPMENT I #3 LOADING 11 TRAP AND PRIME. ; -;._ - R & 0 x ROOM •N 1� I © LABWARE M GOWN II 1309B1 a WCO en.�. •••i 0:: cL�2811 c ROOM 6 CONNECT PWD TO NEW AWN TANKS. , ::.: rr I 1 I 1 13041 I I I VTR I ••.: QC WORK \,,. AREA GOWN 7 CONNECT TO CLEANOUT HUB IN WALL. hi I - - - - a -13311 .- 11 - I ta- - - ❑ - - II `OQM - - - - - - - CORRIDOR G 1! I WALK IN (f I3o9AI PROVIDE NEW CLEANOUT ABOVE CONNECTION POINT. U 3 COOLER I LYOPHILIZER ROOM �_ OVEN A/L 77111111111 13 81 13051 13401 - __ �� __= _ CH C a 1 1 2"-P D-QCH' 8 EXTEND VENT THAT CURRENTLY ENDS ABOVE WALL ,o; o 1/2 -r PWD Q �, I 1111111 �� �u �� CORRIDOR 1 CORRIDOR i _, I , , —""' I THROUGH THE ROOF FOR VENTING TRENCH CONNECTION. ==c----.—_1-I 13001 13001 I La c3) EQUIPMENT 9 DISCHARGE FROM FINAL AWN PUMP TO SANITARY SEWER. = W0 TRANSFER / D i . i (3231 10 X 4i R & D �' ■I STORAGE _ Q � ® C 10 OVERFLOW FROM THE FINAL AWN TANK TO DRAIN. a �, <o CLEANROOM GOWN 1 I 13211 I I ® W N z 0 <� 13261 13241 I CO O 0- FACILTIES 11 OVERFLOW FROM AWN PIPE TO NEW FLOOR SINK. °at o " A a JANITOR 2" 11 R ELECT. ROOM 13391 V N 1 0 cowN 2 13221 12 NEW FLOOR SINK FOR WASHER DRAINS, N Ilk VW 1 Nao 13251 3" 3 › L f FD - to H'= 1 211 I 13181 I I I 1 I I 13 NEW FLOOR DRAIN FOR LAB SERVICE AREA. o sO � • PACKAGING III � � Q � �+. o-J I VTR() QUALITY COWROL L U c 13201 N 13161 U ^ � MOP I 14 PRECISE LOCATION AND SIZE OF EXISTING SS IS NOT KNOWN. i o 0-E GENERAL U NK FS z . gi MECHANICAL ROOM 13371 Q ELECT. ROOM •• o (3351 1 (n 13151 UTILITY SHED p I I • 1:1-eg o--{24 S FT. LYOPHILIZER) I I[... . i_..... = O g I • TELECOM ROOM FDA / �r 13171 i Z w gB .!� I : . =�._ ••— L.� — .I , -- 5 VTR p 0 W 0o NON-CONFORMING SALE R&D I I I I I 1 Q Z v & MKTG STORA E STORAGE CHITOSAN STORAG X gi 13451 1 13431 W � Z © ro a o ter. 1 QUARANTINE I I I I I I I I I L < 0 o tit c STORAGE LAB STORAGE i - M L 0 (5 $ - - - _._- __ 1342 _, - - i - - — — — — — — — — 0. 10 g. Q N I I I I I I I I I I = ). o ss c O F- SHIPPING ›- - - MATERIALS & STORAGE 3 = N ._ MANAGEMENT (3411 v`ti I .,� 0 N cal I , , I INCROAMIING 't� I I I I 1 1 `"� GEL SHIPMENT \ 0 �z PREP AREA MATERIALS & di / \ OUTGOING M CAD FlLE: 1 ,����,� PRO,FF�� 07006-M3-1 I \ !' �S I N 4. 4• i I PEDESTRIAN RAMP I I I I I 4889PPE a'�' N d1 -R.:E 1 SANITARY AND PROCESS DRAIN PIPING , -EGO § PLAN o b » s » •13,2 \5 1.i•r 6 M3.1 SCALE: 3/32 =1 -0 �'4y • G� NE 10 [ Expiresl2/31/2007 1 ‘I 8 . . [E • x 0 0 N 0 r 0 � ® ® , . . . ; � (I, ;E. o 0 0 0 0 o p O O e 0 0 1O 9 8 4 ° II......- -............_............._., (c* yr rAr P" .44•FAtirA 8 I Ill AillrA ;.--1— .. /I II II 1/ 0 0 L .T.I. rZ,Agirfflir —C) // / L.. ......r - 0 r.ArrrAr, — E z o O -1 I I L/.'�Am I I I a OFFICE OFFICE OFFICE PEKE OFFICE ® / 11051 11 os1 1 a7 11 os1 11091/ cn I I I I // 111P\/ I I I I I O ///// — ® o / (--- ' LOBBY 0 0 _ _____ _ / { (tail cr' CORRIDOR I I I AT H e 1 C C 1 a co �- / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E KEY PLAN __.-i- — �� 12031 12041 (2051 (206( 12071 {248( I2O91 12,OI N ,....° A MINISTRATIVE STAFF . / \ M O so I I I OFFICE OFFICE 1 11 041 I CONFERENCE ROOM I I , -__N\ (-LA --- 11111 (112( (1101 GENERAL NOTES . . cs ' w W EL [..rfi' _ _ < LOBBY A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND 1 2011 CORRIDOR CORRIDOR II 1202A (202A1 GO 4RIDBOR AND SYMBOLS. -1 m r • . — la I, _ 1 1 - — I B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. ' ` I — I 1 TELE DATA l MEN S ELECT. �' "I ELECTRICAL ®� J TLT Fa.`• 112A -/ MEN'S TLT ® CON 22000M —�-� 121�1 -[} 11131 ENGINEERING C INSULATE CHILLED WATER PIPING PER CODE N FACILITIES WORK REA REQUIREMENTS. PROVIDE PVC JACKET. g? ' CORRIDOR ..�� � ORRIDO 2028 R. & D. P. D. Q. A. DOCUMENT CONTROL CORRIDOR LU CH ROOM �• (111) 11121 y �� I— 218 I 216 202C '12151 I I I I I I D USE ZINC COATED STRUT SUPPORTS FOR 0110 I I _ (STRUT IN CLEANROOM. Z •- � I I HANGING PIPES. NO UN E z ts4, _ , SERVER ROO I ( MEN'S TL C (( �-- ME MEN'S ��� '� ENDS TL 219 I E LABEL PIPE SYSTEMS. w 1. ��� WOMEN'S TLT 0 11141 _ c 7 31 O i L' �7 A - I I1 r L 1I -_-- I - - I - - - I - - I- - - F FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. Z t G REFER TO CHILLED WATER P&ID M4.5A, M4.5B & M4.7 lI , 1 MECH LYOPHILIZER 1334( 1307 CO FOR POCS. U� c co 1 LOADING LYOPHILIZER ROOM 0 0 1 I I " I I c # 1 „ I 13,1AI i_li I , KEYED NOTES RESEARCH & DEVELOPMENT ,/ �� I- --_— GEL PRODUCTION, 1/2 —CHWS—IEC J G W _ _T ii 13291 AREA � 13011 Amu 1 ROUTE COOLING WATER & CHILLED WATER PIPING IN ° N TRENCH. PIPE ELEVATION IN TRENC- TO BE APPROVED GENERAL PURPOSE LYOPHILIZE' � & �� 12241 LAB SERVICES I_ ____ 21:1 13331 CORRIDOR I3os1 BY OWNER. I 1 I I 1 "-CHWR-IEC I #2 LOADIN1 1 1 I CE (1) = I I , 1 "-CHWS-IEC h� I?� • • o0 2 CONNECT TO RA--1 . m C ' . PRODUCT--''"fit ♦ ♦ ♦ li i „ ODU TIT ROM » i " LS W k 13021 — __ — — IllaillibMil — —Ir ' ��J 1 1/4 -CHWR IE� ��� �----2 1/2 CHWR IEC � �� ,� CHWR L�OPHILIZER ROOM 3 CONNECT TO RAH-2. , , 1 1/4"-C-WS-IEC a c} —2 1 /2"-CHWS-IEC--- ♦ """"' �`"-CHWS-IEC-F++91 I U . I I CORRIDOR I I OPRODUCT I I I I r I I 4 CONNECT TO RAH-3. 13381 1 1 1 L / _ LYOPHILQER �� _� j kb u (309 :1� --CWS-J EP , .r . RESEARCH & DEVELOPMENT R & D '� iNS-IE 3 LOAFING 8"—CWR-JEP 5 CONNECT TO VAH-1 . ' . ::. ® © LABWARE ' 1309BI _ �t - COOLING COILS. "' • ' CLEANING - GOWN= 3"-CHWS-IEC �� 6 CONNECT TO CHITOSAN STORAGE r . ROOM U : •° •r. 13281 1 3 -CHWR-IEC • ' . ■rr,r rr r rr r I I 1 I QC WORK ( 13041_ I I I f ♦ 1 .... . AREA GOWN ,;,;4� ,♦�, 7 TRENCHES TO BE WATER TIGHT WHERE TRENCH PASSES ••0 — o —13311 — {, - - _ ___ _ _ R0014 0 _ _ . _ _ _ UNDER WALLS. INSTALL PLATE PER S5.3 DETAIL - � CORRIDOR WALK INt� 1309AI L /'. "95—CHWR—IEC � � 41 OVEN A L 13381 COOLER C _/ LYOPHILIZER ROOM (I) 8 CONNECT TO AU-3. U i, 13401/ » 13051 / 311 C EC 0 M = I, I ..- I CORRIDOR I CORRIDOR I I 1 d u ✓ U �- I _ e o „ n Ilium _ 9 CONNECT TO RAH 7. i so---1 13001 13ao1 ! zin E QUIPMENT TRANSFER — 10 ROUTE 1 1/2" POCS TO ROOF SEE M3.8. WZ --- 13231 � _ � ' � �_, ( STORAGE _ lr.� R & D 321 11 CONNECT TO E CHW PIPING LOCATED IN R&D MEZANININE. W CLEANROOM GOWN 1 ( 1 I I 1 I I Q 326 N f� ( I \ 13241 ___ .__. I FA I ES cv s d 1 Qw CID l► JANITOR ELECT. ROOM Igi] : 12 CONNECT TO RAH-8. a � � S � I A� 1 "� - H -I I 13,5A1 �, U z 0 m �:�-- 13 CONNECT PCW TO {N} LYO #3. a o i a ■ 1 �- HWR-IE; - — , - -- — 6" o M dh /� �'_ wIP ��• "_ C) . © + u + + ++ +o pQ aQ ® © © 40 ® ® o+ 0 7-- ® /- i i-i i C III I 11 1 - 1 { ® L_ _- 7 - CD L.. _.....r - al r_ o� ® - ■ ©_ iIII U ao 0 .I Y O . . 1 I I w N 000 I I KEY PLAN h O CORRIDOR : Q 338 I - I GENERAL NOTES 8 RESEARCH & DEVELOPMENT R & D A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND LAB ,— AND SYMBOLS. g v LABWARE I 327 CLEANING B INSULATE CHILLED WATER PIPING PER CODE I REQUIREMENTS. PROVIDE PVC JACKET. 0 -- f�328 C USE ZINC COATED STRUT SUPPORTS FOR VT V _ HANGING PIPES. USE WHITE POWDER COATED rii I I - I UNISTRUT IN PRODUCTION AREAS WHERE VISIBLE. m r g, Z 2 -g — t La ,14 E « D LABEL PIPE SYSTEMS. Er m g ,.. CORRIDOR w v) W T.,: ,,.--1 E FOR DEMOLITION / CONSTRUCTION PHASING SEE Ui © ri VEN A/L 338 SHEET AO.2. Z •- { / II V y I; 340 F REFER TO CHILLED WATER P&ID MD4.7. i `• OVEN U P Z VI N U i c x- -11 -- i ,1 � th U, 0 o I KEYED NOTES i°i EQUIPMENT U� o o `~1 TRANSFER 1 DEMO PIPING TO CHILLER. RELOCATE CHILLER a, 0 N 323 NEXT TO EXISTING CHILLER NEAR SHED. i --r tt 0 gp �- , INE R & D 2 DEMO PIPE TO FIRST HANGER AFTER 1 L UJ .c 7 D I TO HEAT EXCHANGER AND CAP. > rn ii CLEANROOM GOWN 3 LEAVE ALL OTHER CHWS/CHWR PIPING IN MECHANICAL U w W ROOM. RELABEL AS PC S/PCWR. t 326 324 � .-• JANITOR 4 DEMO AIR SEPARATOR AND MAKE—UP WATER LINE. I. PROVIDE TO OWNER FOR DISPOSITION. . ■■ ■■ ■. .. GOWN 2 322 ■ ■ ■ ■ E 325 r■ -- j ---- b_— I• W SINK !"1 { CIP C CI'- M . §1 1 0 Rio LYO c —SP-1 F-1 U' C a C GENERAL USE �, Z MECHARIOAL RO DI-T-1 337 > 14 1 I aN . -� w N s 3., i�z_' o � v � � . FT. L OPHILI .' ER) 1 _ ` 1 , 0 Z M ec REF �3 r--'' 0 Wo. c I o_ I I cno Z {15 L3) t0j00 g A Eo i - Eina >t� IW STATION A/ 0 4 DI SYSTEM "12, s , 1--: .y al I Ark tri.fstrevor — i B • 0 1..5.1„,5 51_ 0 Mr 4,4., I w a si g i1 �i . - . Rg .4.1.4.- AillIPOrAy r Z Z 8 ,e. / '8 Le2 g,„=,, I !Af#Ai a o. v m 00 8 CO. . x -.1 . < x >.- 0 0 r J Q a © c •"" Q � O ° mW c 1 M.41 5 % -3 '''.' w ZW cr 7.I 1 N o g I 1 CHILLED & COOLING WATER -- PARTIAL PLAN DEMO J 8 a ” s ad MD3.5 SCALE: 3/16 =1 -0 o a J J LA' � ; U o N s N O ri M CAD FILE: ,`%10,D Of jj 07006-MD3-5 ``. 4889P '!:° 4,..444 '46,.§-4.#'-‘02,„ . t o 4øzE? d �tb E LExp1resl2/31/2007 J v n:. N N N "I' s @ Q , s c 0 0 m +o O © O 0 0 0 ® 0 0 O ill /— I I I — 4.041-11 I �rj_ _ I l I I o o o o I r'-- _■- -- O oZ o O I I —1 I ( I I © 0 U Z cn 0 - © U 0.--s) le ,), U.... , L___i j L,_ _,._ JI 01110 • • N —Jci __( c-), , PLAN CORRIDOR o N � •• _ \ 0 i - 338 I I o 0 GENERAL NOTES U N cn a 4 RESEARCH & DEVELOPMENT R & D A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND LAB . AND SYMBOLS. a c' g LABWARE I 327 I I I I B INSULATE CHILLED WATER PIPING PER CODE CLEANING - A REQUIREMENTS. PROVIDE PVC JACKET. 14) " 0 328 _ i V C USE ZINC COATED STRUT SUPPORTS FOR HANGING PIPES. w 1 I I to m 0? C 4101 11- —1--- 13--- 0 D LABEL PIPE SYSTEMS. Z •`—' W• 0 ■ . .0:- CORRIDOR E FOR DEMOLITION / CONSTRUCTION PHASING SEE w ,�'��' 338 SHEET A0.2. c II I pVEN A/L I o 1 I Z 8� a I �; 340 - 0 F REFER TO CHILLED WATER P&ID M4.5A & 4.7 0 UP FOR POCS. N OVEN I . - c A O ~ H-- I II -F-I I------_a. -11:' D 0 O 0 d Z 0 1 `\ I 0 0 I I I I (� 'a ii I '\.e EQUIPMENT !!,I Q 4. KEYED NOTES TRANSFER 323 E _ 1 REFER TO ISOMETRIC DWG M7.7 FOR CHW CONNECTION LL1 m g D RAH-6 ��'�' I I- I -I m i M �✓� I DETAILS ON MEZZANINE. N ,1 _ R & D — — - — III CLEANROOM GOWN 1 I 2 SUPPLY DROP TO PCW PUMPS ON MEZZANINE. SEE L w 1.1 326 324 ,, M4.7 FOR DETAILS. 1 I I 0 _ 1 I 0 3 REFER TO DRAWING M3.8 FOR CONTINUATION OF ROOF. JANITOR r . , ... --- RAH-5 MEZZANINE � n GOWN 2 322 `l' " — ( _C ` ::■ ' Q 325 .• .... r. r 1 (EXIST} 1 » C HWR IEC ,...... ■r ___,B____,__ e FO 1 1 /2 ::Ø _ CHWS _ IEC - D D 0 0 -- - -��, 1 1 /2 "ØCHSIEC . . M SINK �'� FD Cg -. . __ w 3 1 1 /20 — cHwR — IEC D CO i I CIP i> >- I I IM o • LYO e ol 2 J EP -- 1 1 2 � CH R IEC * Al§ GE E AL SE1 1 ( CWS IEC nn M , a HAI\ICAL RO -�, 1 1 P R --J EP ° 0cy 21-d I 1 > 5 44 1 PCWR I E Ii 1 Q o E ") 1 � 2 � IC a � � 1 IEC tIts f, gn W W � °�o L RE W I ( 1 I c � z 0w Fro � n � A $ 0 0 0 0 D O D D i t[! 6 Iw STATION DI SYSTEM B , ~ o B kR 1-/1- j — , a r;,-Esi§I 1 ' I I W aa o I U v o N IL-)Qp° & v:. NON—COMFORMING SALE z Z z lir Fii a.`'�. ~w 1 I z .J J No 34� x _ ...., __ . .0 zi •Q Q U IQ 15 .iiz � D La m c M W _.t ' .� � O Illa w cr W 0 83 N d� v 1 PROCESS . COOLING WATER -- PARTIAL PLAN 2 MEZZ . CHILLED WATER — PARTIAL PLAN il o la i � » »_ � u � W M O M3.5 SCALE: 3/16"=1'-0" M3.5 SCALE: 3/1 6 —1 —0 0 LA ; z8.w 1 a LT" p N p cn,..:iri h .. °o c ris „,,, M 0,.. � Q f CA 6 FlME- 5 z m � GINz� Q - � ,x; •, 4 88PE 9 w 0 a i i C 1 X. . REG )% G'y32 .� 4 u (C)to 1 , QJ EN E. G , e* Expires 12/31/2007 i 0 0 0 s kD 1) �) ak kr 0 0 0 0 0 0 0 0 0 0 — — 0 o • e 0 1 III I I I I I — I I $ O 0 Es 1 II 0 I I —I I I I _ I I I © EE /� _ z RESEARCH & DEVELOPMENT o o W I= ., LAS 0 0 - LABWARE I o �0 I 327 — CLEANING r � I 0 . tx 0 J LL. ,_ 328 Herr� Con co ti 1 • . KEY PLAN y.).. Q . . W I f- GENERAL NOTES _ � _ — _ _ wo 8 C5 0 . A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND I I CORRIDOR AND SYMBOLS. Y 338 B USE ZINC COATED STRUT SUPPORTS FOR HANGING OVEN A L PIPES. USE WHITE POWDER COATED UNISTRUT IN —1 X PRODUCTION AREAS WHERE VISIBLE. a 340 I �° „ P C LABEL PIPE SYSTEMS. y n Z v 0- D FOR DEMOLITION isyCSOTENMSTRpUseCIDTIOFNORPHpAoScINsG. SEE SHEET AO.2._ I E REFER TO STEAM UI W � w c ri gg z a3 EQUIPMENT � � KEYED NOTES z N ' TRANSFER w ,s w th 1 CONNCTO STEAM FLANGE CONNECTION IN GENERAL 323 c � � i _ USE ROOM 337. v I I 2 CONDENSATE PUMPED BACK TO BOILER THROUGH _ _ _ R �C D ROOF CONNECTION IN ROOM 337. L7 m a D � 3 PROVIDE DRIP LEG FOR STEAM PIPE IN GENERAL USE ROOM ir m C LEANR00M c OWN 1 337 AND ROUTE CONDENSATE TO MECHANICAL ROOM 335 o, 326 24 SUMP. id L 1 I 1 la _ 4 REROUTE 2" BLACK IRON VENT FROM CP-1 (CURRENTLY THROUGH WALL) TO VENT THROUGH ROOF. 1 ■ „ JANITOR 1 —S '\ A 5 REROUTE MANIFOLD VENT FOR PRESSURE RELIEF (CURRENTLY ' ,,f GOWN 322 THROUGH WALL) TO VENT THROUGH ROOF. ■. . . ".... ,I 2 ....ka .a a..a 3/4 ".i 325 6 REROUTE TWO DRY VACUUM PUMP VENTS (CURRENTLY ir I 1 THROUGH WALL) TO VENT THROUGH ROOF. I } 7 REROUTE LIQUID VACUUM PUMP VENT (CURRENTLY \\ ' TH- LPC13)--r7- 0 LAJ • THROUGH WALL) TO VENT THROUGH ROOF. Si 1 4,4(E--- w i4 : 0 o—D V U _J 4 W N ' A < a) A o--� 1 GENERAL USE N �� 0 337 � � ° I. � h MECHANICAL ROOK 3in o 1 i 335 , _ ° . J 0 o-EQ4 SQ . FT. L W 4SE�. § U J -- I I I w go : : o I I i Z re a O Z W L__ ._J I W N6 4 a y X Lai 2 . 4 _, cr. 8 '„, . Ps c 1 a-- .11. h 1 ± I L._ _1 —E3) 4( Z r CD ° i I 1 1 I 45 W > 0 0 M iEx c a gg NON = COMFORAING SALE _ o 25 25 u) Q r* . ...... w., !V kA V T( J � : a 6 W 2 ,f,, g., Li' 6 Pto il--h 1— 0 fV CAD FILE: 40 �/� 0?OOH-M3-fi ��� 1 PROCESS STEAM AND VENTS PIPING PLAN ig 8 M3.6 SCALE: 3/16"=1'-0" a PE Iv, � w , - a .EGO i til A 41'13,2 ' 0 NE IL E' Expires 12/31/2007 a O oN o 0 g 1 1 \ it �1 g I 9 8 7 S @ 4 3 2 i 0 Q ® O a O Q 3 Q (\ ) O , o i ] :: ___ (7 f \ 9 3 I I I I I i I�— —9--- F) 0 2 I A5.6 M7.6 O L - - r00, ■ to o M7.6 � s A#A'1 _ ■ o z I �/ritOr I I I a. I I --� I o � E ( 1 1 /2 —C-WS—I_C o L 1 /2 CHWR IEC W @ O U I / _ — Er-, 7 ___ — HemCon . _______ .1., .:-._-_,) N --—-----____E-Q', -———-——- 1 1 /2"—C -WS—IEC Allik ?) KEY PLAN I . Ili 1 1 /2 —CHWR—IEC M7.6 0 o _ ._. _ _ _ .._.. \ tEE ._ GENERAL NOTES y.o) (�il '�`� E' E72 ILI Cl- 9 3 ���111��1 Q ( � °TYP 1 1 /2"—Pcws—JEP A FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET AU.2.A5.6 M7.6 � / � CO 1 1 /2"_PCWR_JEP1j B REFER TO P&I M4.4A M4.5A M4.5B M4.7 & M4.8 FOR POCS D 7 1 a a O FsJ 1 1 /2' ` -IWS—IEC E' 1' C ALL UNISTRUT FRAMES TO BE PLACE ON 4"X4" SLEEPERS OF PRESSURE TREATED WOOD. » t r' III N� 1 1 /2" • HWR—IEC .� ,� N.� D TEMPORARY CONFIGURATION TO BE USED FOR CHW AND PCW cr4 _ C TO R&D PRIOR TO THE NEW WAREHOUSE CONSTRUCTION. Z LI al .� \ 7 \ I rr 1 1 —PCWS JEP �)— - `,,� 1 1 2 PCWR JEP _ 1 ���III� 7 \ r� mI, twt E .. 'III o ��_0, V ME�11._.. 1�_� _ �,_�} .. ..�. .. . KEYED N 0 T S .� as i! i !i ! ! ! U 00� _L _1 rj_2 r-r `L3 •12 �;� - — L— 1 I y 1 POSITION OVER 4"X16" MAIN ROOF BEAMS OR GLULAMS. Z \ ROOF PIPING PLAN — TE PORARY n U as 2 DOWN THROUGH ROOF CURB TO CHW PQC OFF 3 MAIN. Z(ThMECHANICAL M3.8 SCALE: 1/8"=1 '_p m M I I 3 DOWN THROUGH ROOF CURB TO CONNECT TO EXISTING PIPE. 01 T ao I 13 - E3 ir 0, R 4 RUN PIPE DOWN WALL INTO SHED SEE M3.14 FOR E )Q CONTINUATION. M o a) _ 0 6 5 STEAM AND ROOM 311 C. I •2 mM ND CONDENSATE DROPS TO 15, �^ I:: 1a 9 8 6 PROVIDE PIPE SUPPORT FROM MEZZANINE BELOW IN R&D UP ` ' .- —El _ _ _ _ _ THROUGH ROOF TO SUPPORT UNISTRUT FRAME. NO FRAME/PIPE M WEIGHT TO BE PLACED ON ROOF. ] n \ I 1 9 3 1.7.1 A5.6 M 7.6 . �;■- M7.6 Ili • •.. . 1 1 /2"—CHWS—IEC ,w ( [iV III 1 1 2"—C -WR—IEC — 1-m / .o IH' M � 4.1 --"-0. e-- Q a. W m s LsJ ¢ w 0 — — _ _ — — — — — — — --- — _ ,-C9 - `�- c; 1 -177”-----S. TEA —AEA =- i- 1 1 2 —CI-WS—IEC 1 LPCR AEA 1 —LPCR—AEA Q co � 1 1 /2"—cHwR---IEc 1 1 /2 —STEAM—AEA M7.6 p v o �cr cA V c,IX - C.', C� Ca 7 L �7 N Z w I — — I �i i i i i Q U °? •_ �_i4 fig i�_! � w I F- E--a`‘ mil L..-7 L.:', LA L.,:111"2 E_-11.2 c A g 1--z 9 3 ( Ei ,7 0 D W oz VIII Ice o o L-° L.:,' — :,-3 0 ° 1 1 /2"—PCWS—JEP E in Q Jz A5.6 M7.6 TYP Q) o C? _ �w \---� �I 1 1 /2"—PcwR—JEP ::• rj 2 1 /2"—STEAM—AEA b o E!ii! !!■� o =n of- wad.. , J z Q wMwO \ I W U -��`•z C� o vUi cn� /!r Z 3 O Z 1".: F--- : 1 z clo I `L' wi- n_ Z -� \ ''' i E-7. �.. - 4 0 w till X z IN III! —f _ >-Id F-Lij Z CO w°imormai am' 111111 .!as; I I Q � 0 � � Zw LIII �1� 0 1 1 /2 —CHWS—IEC E.: �� I Q in�� � 1 1 2"—C-IWR—IEC NI la- LO guicr 0 w O I — 1 "— _PCR—AEA - o LI NJ 1 1 /2"—STEAM—AEA 1 ... . 1 ■ _, = I. =� - Z..._11•1111111111111111 .m.■■■■■■• imismi=i .alio mit iam. ) B_ 1 /2 -PCWS-JEP .... C, .. �� C�_i7 f;..�7 C�i.� ,� t�.1� L .1 zw LI ! ':Ui'� �'-'�, ��� 1 2"—PCWR—JEP -' '- 2d t J „RP, „nip., „RP, 441111P, I ,11111� I I I L o ( �� I ;.i 08; J W F- v)f- }' }_-Z nn p CAD FILE: ;k1i.� PROF 07006-M3-8 w.4, vb. I I I I I 1 I 46 74889P 01 �REGO MECHANICAL ROOF PIPING PLAN PER1ANENT 0Y13,2 _` M3.8 SCALE: 1/8"=1 —4 , EN F. G Expires 12/31/2007 C • • , 0 . (1, ir., al kr o o o o o 0 0 T' t' ,t' 0 ® 0 0 0 — .. 0 I Cli. 0 11111/1/ 11111 ——IJJAIIIIIIIII or I II I I Or gr. A444 5) rj L refo r 4 , *-- 4 0107 2 ' 0 L. - IS A Ad.orrAr I AU MANUFACTURING/QC WORK AREA ® -1 I VPIr ref# Ad o A 4 A . I I ® A mi- . 6 0.P ir z v., O w P ca ••••11■111■111■11■2. .. I I 0 I - ME 0 Mil 0 331 I . CORRIDOR 4 1 ce 338 wo - HemCon, a KEY PLAN (nua RESEARCH 8c DEVELOPMENT . al cNI I-I R 8( D - . < ... c, LAB . °[ 1 LABWARE GENERAL NOTES ow) .., 327 I w 0- cn 0- . CLEANING - I A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND 328 9 AND SYMBOLS. , . to* ----1 C , FD) * I B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. o b . [ — — r — — — 4- - - - _ - ___ _ _ ®, LI 2 Z P ow, 04 OVEN A/L *---''' CORRIDOR w 338 .., 1 • re w g wu, d 8 Ldcli Z .2 , ni, 13 if.7., 340 4 ct i ' u 2 s .11111 UP I I Z -r. ,....._ _ , , • I I 7 t T x . . . 1 .1) Aa; CORRIDOR CORRIDOR KEYED NOTES 1 ..... z ° ____ .....__. ; 3 3 1 DEMO 1 IW LINE BACK TO THE THE START OF THE 1-1/4', w I Ei i I W 0 ALONG WEST WALL OF MECHANICAL ROOM 335. LINE TO d _,. EQUIPMENT • BE RERUN IN 1 1/4" COPPER. \ LI irc: 1 0 it. 4 cl \TRANSFER 4,t u a iL w 1 'it \ 323 , AO Ar-10. I E I > '6") . 111w P a ----- -R & D / STORAGE 321 0 0 - I C _EANROOM GOWN 1 S7 . 9 i „,. 326 ----- '''''' 324 I . ...,. .. ,..,.. . .......••--.....::: • . — • •.........: JANITOR SS GOWN 2 322 kg L-00 0 gi , 325 r.2 0 0 go 0 I I 1-La 0 a 1 a < co - 1 / — \AI _____ )) 4)** 2 — — c..._ QUALITY CONTROL li 0 OGTI 8 P 5 S 40 til a, ______ w z 0 320 AUQUOTING .40 (,) 0 //////, ///9/ //////////// 16 / c ,„ oww q / GENERAL USE 82 ,9 E g 2§ I / 319 E iri < a) o 0 MECHANICAL ROOM / / 337 u . i":: .... g 80 1 EC ;11: n 335 / :- I" (24 SQ. FT. LYOPHILIZER) / // Lei' so .0z 8 w z5g (77.--- 1 / 2 ” -— lk z ...7., ci) na-4 / o x u) h / y Iasi 0 5 (1 z .„. r■ 4g C j 1/4l.) . 46- I LI'0 Pp gi i i 'I _1 _ S' Li — I ____J b an .1i po 28 1 `15 ! C .1 F.„,......... 0 — — B 46. ig 1 = 6- cl 0 0_ 1 1 4 " -- IIN C 1 I I . _,>.- ; 1 I I I 6 zcii zza. 3 i 5a 0 cn g Lo t:-: cals wi- g' cr a r, c.-; 1 IW PIPING PLAN — DEMO - CAD FILE: 0, ISO PROT 07006-MD3-9 MD3.9 SCALE: 1/4"=1'-0" c nT itAl 14- r....4i, :::, li. I '‘REGO itP ,,,,. A. §. .4,4„ 41,13,2.0- ,N.4( 0 6 - liN e. c'f's • -- r-Expres12/31/2007 —. .r...._....,,,—, 1 __ 1 0 • • • st ® © l s 0 1 a o a '' t l 0 0 0 0 9 6 • 4 . el --- In 4 o DIE _ \I 0 o Pr/ re" r P' -8 I ► RPBP 1 I I 1 1 1 0 0/ : - 0 o.Ayr A . Adi a. -,-. •.:-...,„,MECH ., A 1 WH-3 & 4 _ , 1 Sink Sink I L A / _..0.0A00. o 15 334 -- 1 1 /2 IW IEC - III ■ ° 0. . I o o m C) I b Cc I I Chitoflex Forklift PL r~n L.1J Ware ® z Washer `,_ ® 0 RESEARCH & DEVELOPMENT I o o - I WORK AREA I 1 I N .. 0 HemCon w 329 I Pi 's LYOPHILIZER ROOM ,_____., 311A KEY PLAN r. d- 011 2I Clean molds Carbo o 0 _ _ . I � � 1 LABS � S I I � I } � . d !! : GENERAL NOTES N N.--- , HóI 3 1----„,„... A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND J 111111 AND SYMBOLS. I I 11.111 I I B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. 0 0 ' AO Forklift C USE ZINC COATED STRUT SUPPORTS FOR __ HANGING PIPES. NO UNISTRUT IN CLEANROOM. .1 T 4 1 I 11 _____� I I I D LABEL PIPE SYSTEMS m 8" C I Z _ — 1- — — J — F FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. ri m 1 E CORRIDOR W tn LA tE 338 Z G REFER TO IW P&ID M4.1 M5.0 FOR POCS la c isi I I I Dirty molds = I LYOPHILIZER ROOM I -- Z 311B _ lag i RESEARCH & DEVELOPMENT R & D - z LAB a - u o LABWARE VFD l, 0 v :a I 327 I CLEANING - I -I Yokogawa I � S � Z �� KEYED NOTES ii„ LYOPHILIZER #3 I , I w w 2 328 I : 0 - -- - ° • � _ oN �U QC WORK - I 1 IW DROP FOR GENERAL UTILITY USE HOSE BIB IN SHED AGAINST _ o C -41 AREA :9 e S I I .o. ° - -- --.i ___ pa, : c� E;�■ :� R O NORTH WALL.1 I Ft) •� �,z � I �, 1 i I I -' . 2 NEW 1 1/4 LINE TO USE EXISTING ROUTING ON RACK, >C0RRID0R � Ill Ii -it' t I 'E id El - ( �■i ' � :., t,.__I OVEN A L 338 W « i - �il= ��i !' ! (D-1--\\ 3 CONNECT AT EXISTING 1 1/4" IW LINE. t 'Iy —0 � 340 0 - - I - 4 RECONNECT 1/2" IW BRANCH LINES TO NEW 1 1/4" IW LINE. I UP 10 +SIP - (- -- --3 CORRIDOR 11 1" . . ... SIP : . 5 PROVIDE 1 CONNECTION TO MOLD WASHER. •. �-�. _ ,� I 300 v;�, -s LYOPHILIZER R00 DI .' .. �..` I I I o Condensate .. • d- I 0 S M P �, 31 1 C 1 6 CONNECT AND EXTEND IW AT 1 1 /2" LINE IN ROOM 311 B. ' •-'=.'.� E UIPMENT �� W },- TRANSFER Heat Press '110r 41 I 7 CONNECT AND EXTEND IW AT 1" LINE FROM TRENCH. • Table Table ► 12" c�� c 323 ab e _ UP HEAT TRACE AND INSULATE TO 12 INSIDE SHED. x I H ► H I STORAGE I - I E! ! R & D 8 PROVIDE 1/2" DROP TO BOILER BLOWDOWN COOLING. i 1 m- - -- - 321 bandage DepyrQ eN CLEANROOM GOWN 1 e trays molds I 9 DROP FOR BOILER MAKEUP WATER. NZ 326 324 Conditioning W P I I I Cart ven 10 DROP FOR CIP UNIT. a co N Y °5 JANITOR ='ouchin WIP WIP -1 AWN o n t) 8 6 9 322 - Storage storage 111. 11 DROP FOR SIP UNIT. < Z S GOWN 2 _ o 0 o Q o o ce 325 - (., m 4 6 1 FACILT ES 12 DROP FOR LYO VACUUM PUMP. 3 I 1 1 /L1 "_ IW- 1 E� 1 I 33 � � � : 9 AWN in t 1 El li- I- 1----' © 55 AL 13 DROP FOR LYO COOLING WATER CONNECTION. rag . ,. i•• 1 1W— I E - QUALITY CONTROL 14 DROP FOR DI SYSTEM MAKEUP WATER. Z 49 I I I 320 (D CO it-.1 Oli s I. I ,• 15 DROP FOR LABWARE WASHER. o Ii D - t3�ow » — J a 4 Down I �'GENERAL USE '�' pump IWIE C i D V AC-4 N- L: pg 337 BOIL AC-1 w ( zN MECHANICAL ROOM U FEED o z w-4 I 335, I I TANK DRY-1 I I z w o (24 SQ. FT. LYOPHILIZER) AC-3 � 0 413, -a La . 1 p AC-2 x » DRY-2 Q Z 0 c I 1 2 I •a(0) ii UTILITY SHED p " - •- III 3 45 '� Q Z O ; at = d. a U co °0. 1171 W 5 . mf I 1 _ (- - - - _ 1'-._ 1 ii E I 1E J W LióH m o + NON-COMFORMING SALE 1 /4"— Iw— IEC : 0 R&D !9-- OD .... & MKT Z i STORAGE STORAGE _ _ _ _ _ _ _ _ _ _ o N wa 344 CHITOSAN STORI I I I kni ® 3 riA71 0 n . N "IL ER oteo PROF07006 IM3=s 1 R& D IW PIPING PLAN I �h M3.9 SCALE: 3/16"=1'-0" I I :89PE' - b 1 3 L P ,, li 2 MANUFACTURING IW PIPING PLAN �, .'EGOS .. R R. M3.9 SCALE: 3/16 =1 -0" o y GQ, vii O h Expires 12/31/2007 o g u 4 0 n 0 1.O O m � » m m ® i➢ � m m O 4 CO ® 4 t3 O ® Q 0_9) 10 9 8 4 0 - - T ■ alal al II Pr Pr r pr pr , 111 1 rill 0 _ _ _ _ _ _ _ _ _ _ _ _ _ ____ .,....„ _ _ O I I I I I I /// - I I { L. _.1- — E z/ r, Aly.ft 4 o a. OFFICE OFFICE OFFICE OFFICE 1 I -) I { -�/,� fmCE 10$1 1109 zigoA �� - O o w I I I I I f // \ I I I I \ // @ R o t n /i , . II-S�1-I�i�l.�l ! LOBBY - p loll H L Q CORRIDOR 102A IV - / % / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFF! E KEY L N r, , ...., - 2031 12041 12051 12061 12071 12081 1 091 12101 c w N < o Q i CI A MINISTRATIVE STAFF r o 11041 I COPIER PRINTER ROOt�1 I CONFERENCE ROOM I G E N E R A L N O T E S - v o w a - - anima A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND ' LOBBY ° I COORIDOR AND SYMBOLS. m-CORRIDOR CORRIDOR -' 202A 202A Q } 102B { I I - _ _ _ _ I _-_- -- - I — B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. o I TELE DATA MEN'S �' ELECT. rx ELECTRICAL ® TLT DC' • 12231 CONF. ROOM 12121 MEN'S TLT °F 112A o a in 220 11131 ENGINEERING & o in � .... -CORRIDOR —, t FACILITIES WORK AREA N _ CORRIDOR {112) in -- ---;I------ 2028 R. & D. / P. D. / Q. A. I DOCUMENT CONTROL {CORRIDOR LUNCH ROOM ACCOUNTING STAFF a 1� 111 _ I ( o-_.ifta CI 10 218 2161 202C 215 214 I _ ') CONF. ROOM �- ; - if N E 1 MEN'S TLT EN'S TL 12191 - _ - 12221 ��� '\-_- ] .,... ..,_ WOMEN'S TLT 0 11141 0 1 [Q � ■ SS 12131 •2 -,.,.... co... ..:, ., _ ii _ __I__ I `I, . ��:�,,�I:I: -a�w►srrw�.r- --= �F±rte-=. -s�rr r�rw�►s�i�rr�r.�►���►����.��rwr�r.��r ��i.��.�arw��� ,, .. if ffiii !/�w'�S ►r/= i\/11/.\/x/'/,i/.I�//.////f\//////\///!////./..�\1//\./iI/.yv --- Z k At/%I/ .liFitit.►�►,A 0 Air /fi!fI Aj r 1i%/I///�1/.�I/�►, ,�►.�► A///////// a �� Nr 10- .' Agit Ai . ..ir Air..iii.�i�. ,�,... ._ _ , �riiiiiiir�•_r� 1 RESEARCH & DEVELOPMENT r Io "'�""� �� ' I C� - � !��■ z� WORK AREA KEYED NOTE �J GOWNING ROOM 0 13291 LABWARE � � / � � a o STORAGE 13011 0 MU 00 0 0 0 BREAK ROOM 13321 / 'Y Pi 224 ' LYOPHILIZER 0 1 NEW SYSTEM TO BE OPERATIONAL AND QUALIFIED BEFORE DEMO .c m COR;14. = OF EXISTING DI SYSTEM. COORDINATE WITH SYSTEM OWNER. z- J I I I I I 1 '�r,�►�,�t"',,,`,,,,,,,,r,�: I P INCLUDE DEMO OF ALL DROPS TO POINTS OF USE WITH PIPE N = if.[-a *, I C PP DEMO. 05 M I - - PRODUCT ' roll I "� ED IN COMING 1011 a wo 13021 PRODUCTI N ROOM /d SU w MANUFACTURING QC 3 6 iiii '1� re .• z �, / _.. „�„� LY :ER ROOM WORK AREA = r ril ,7,- 1 I 1 13311 I - PRODUCT I I 01r1 ��� of'I�\.�114/i�r//\/I/\///'`///III ,„ ,, N CORRI R OUT GOING ftpft tf :��.��...t��.��\.�.�..f.'.h,r :ft(338 - 303 N !1 ■■ .L: RESEARCH & DEVELOPMENT R & D �I ..... LAB ® © LABWARE Ø!iii MOLD CLEANING ■• 13271 ALIQUOT ��' 13091 •r .. CLEANING 13281 STORAGE �� I i ■■ ' I I I I 13041 I I 0°1111 ''FD � PASS CORRIDOR WALK IN C) 'OVEN A/L 1338. COOLER '�f - , x �m - - -- 13051 0 """"'."'�r���P 13401 = -_ -__- --= ---- M 0 - I 1liii1�u11111: uP I I A-► iii\smir \Ar.\iririi r►\ iiiriiii.,ii\r� �� _ _ _ _—. CORRIDOR CORr.,.,.,..... �.--�..�.�..III®.ail!' ►.� A !t/� Al I °a Ca Scn :=1 13001 300 1 - w Q c) W 0 URI EQUIPMENT _- TRANSFER i w z �_ 13231 INCOMING SUPPLIES ACCEPTED FINISHED j ?w MATERIALS MANAGEMENT GOODS & ACCEPTED w R & D I STORAGE V OUTGOING SHIPMENTS 13131 RAW MATERIALS SHELVING > zz- CLEANROOM GOWN 1 I Q I 1 I 1314 I I 3121 1 <t N w az 13261 {324) { SS w �°4 = a az■ 0h 0 ° un)w JANITOR i I I U U� Ww \ GOWN 2 3221 — Z -LP PACKAGING <a( O 13251 0 0 aw i (318 STORAGE AREA 1 :' '- - -` - wo ;� 1 I I I I {3161 © �z QUALITY CONTROL 320 AUQUOTING U o ° °o CORRIDOR E j <t >Z GENERAL USE $ 13191 13001 NI 337 ELECT. ROOM = o ~ - N MECHANICAL ROOM 13371 Ei- 13351 - il L315 AI © o w I (24 SQ. FT. LYOPHILIZER) I I { ( I I I 1 z E- Z�� wo PRODUCT J I ri STORAGE ROOM O w v�` '- t..? -J 0 Cl) U) o C*4 _ 13171 a as �:as TELECOM ROOM CD ® 0 OLIO , 13171 W Q0 z ft GI-or) BIKE LOCKER B (n :- I I I I L I I I I I Z C46 LOCKER 0 o Z I w � x p z� 0 , - La w ice— J CD i CL O � 5-- " Z I a� c I I ∎ Z m o Z� I. : ..--. ti- O w tY OM W CD Z w Z , - - - - - _ - _ _ _ A ,,,,LII w Fel- WO � Z� I I I I I I I 1 w Q Zw N w II- = M CI o g� i0- o zU4 o • J ai 6 W z ft'''.f W Lii nm }” E� h z OM PIPING PLAN DE O nnpD CAD FILE: . �u PROf07006-MD3-10 w SCALE. 3/32"=1 '-0" ®c ��N� (ft' ; Z 0 � � 4 ' � oW 4889PE 1) irl WO DX Q •REGO � yyg,Z4 4-. '-/*/ N E. G apires12/31/2007 1 le e • • 0 0 ,r, ,r, ,r at 0 0 0 0 0 Q ® Q O NAM 8 MN 10 9 8 6 4 — — 7I III I V //,/,'",t �Ar---_4 — — — — — — — — — - . D n ��— � 0 'A,_ _, I I I 1 ! I �� - f I I I- s / — /i I I —1 I I 1,4 AA I I 1 a- OFFICE OFFICE OFFICE OFFICE 0 fFFICE 108] 11091 ' / — 0 o W I I } I i/ I // , 0 0/ -: _.,. // LOBBY --� ow ,� I— 11011 0 i CORRIDOR w 1 } I 1 I I I 1102A1 I I .- m.m. CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E . ..,-,-. \, KEY PLAN h 12031 12041 12051 12061 12071 12081 11091 12101 i o I M ° — 1//'--- \ A MINIST11041 E STAFF o , I I I I OFFICE OFICE I 1 CONFERENCE ROOM 1 GENERAL N 0 T E S o 11111 11121 li 101 w a- Q-----i. LOBBY _ - - — A REFER TO SHEET MO.O FOR MECHANICAL LEGEND J 1 201 1 CORRIDOR CORRIDOR 12g2A1 12024 COORIDOR AND SYMBOLS. 110281 1 I -- -- G � I ELECT.I I I _ B EXISTING DI WATER DISTRIBUTION SYSTEM TO o et TELE DATA REMAIN AS PIPED. ELECTRICAL ® I�12] ® MEN'S TLT E` 112A • 12231 CONF. ROOM _ 220 11131 ENGINEERING g�D --1- rag CORRIDORt ..L• - CORRIDOR FACILITIES WORK REA C LABEL PIPE SYSTEMS N '�' - DOCUMENT CONTROL CORRIDOR LUNCH ROOM - "- 1111j 1 U m g^ ----- I 2028 R. & D. / P. D. / Q. A. ( DOC M 1 I [ 1 I I v 4.. a' �� 218 216 2020 215 IT I D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z ._ _ E REFER TO P&ID M5.1 B FOR POCS � SERVER ROOM ( ( - EN'S TL � � �■, � MEN'S TLT ��� ]rm ENS TL- M7.8 12221 221 219 � �,,/ �JJ WOMEN'S TLT 11141 - F REFER TO M7.8 FOR PIPE DROP DETAILS USED IN � li c D € M7.8 s _ _ _ PRODUCTION. Z -° _� d JI 1 _ _ _ I _ _ _ I — DROPS FROM MAIN PIPE TO CLEANROOM AND PRODUC ,,,, " �� ���. Sri — ••� •••�■ j ��. ��■II �« 1-1/2"—DI—N EM G CONTRACTOR TO PROVIDE ROUTING DRAWING FOR DROPS Z +- - Irsm !::.dmJ�� w_ MECH LYOPHILIZER ,, M7�S PRIOR TO INSTALL FOR OWNER APPROVAL. (�/0 13341 .� I Cond tot tmr O — 13071 P S �•✓ O g^ LYOPHILIZER ROOM 0 m I M7 8 Chitoflex Forklift II Lab Pump r7 ! I O ( #1 LOA+, ' O 1311A1 H RUN PIPING WITH MINIMUM ELBOWS. '; Washe e GI RESEARCH & DEVELOPMENT I �---� -i �� -�' PROD 11. • --- — WORK AREA — di ra I aw. 1 ARE' PkIP t. 1 tf _ _ s 301 a _ a Clean molds �� GENERAL PURPOSE I I�11 Carboy ���/// _ storage LYOPHILIZER •— v,'� 12241 , �� S I1 i KEYED N 0 T E S ,,sir le CORRIDOR 13081 CC I I I;-31.1_ 1300, I ( #2 LOADING I I m = I. ie_ it I D M7.8 1 DROP LINES THROUGH DECK PENETRATIONS. RE—SEAL DECK rn P ;, F PRODUCT m s> I 0 �;N I C` - — — - — — — — — OPENINGS AIR TIGHT. IN COMING i i •`II , Forklift 13021 PRODUCTI N ROOM a W W voi I� i LYOPHILIZER ROOM 2 CONNECT TO CIP. ir�l 1311 B) PRODUCT I Packaging Area❑ ,-CORRIDOR I I I 40 O� 13381 OUT GOING - ..y # „ Y k VFD 3 CONNECT TO SIP. ■ Dirty molds 1303 saint s s I LYII o oga a 0 �. - - 13091 !� LYOPHILIZER #3 -,ice_ TRANSFER o ■•..■.- r1"-----"---istryvatn Table ®; ® luiE,I=Ii'� ■ .j.:1"1.7" ' . ■ RESEARCH & DEVELOPMENT R & D #3 LOADING I . .I ..� LAB ROOM .::: . 4 DROP FOR TANKS Forklift �_ - Ra 0 0 LABWARE GOWN I3flse1 �i o illyrf — ,7 � .. ■:•• .CLEANING o �� , I,, •:1 ROOM 2.13281 1304) °s I M O M O _.- - �,_.,_.,.._t 5 CONNECT TO SINK. ..QC WORK nch Q ,t.1,g ■ /AREA �I O O �) caw �� Q 6 CONNECT TO LABWARE WASHER.La MI xi —� —1 1 — — — — — — — �� I 0 WALK IN 309A CORRIDOR °� �2 n� COOLER �'�'�, • r OC'dif'y r� - LYOPHILIZER Rfl0"� IP 7 CONNECT 0 OLD WASHER. t OVEN A L 13381 t�srr- T M ,. 13401 _ � _ _ I305I 0 ,t t E t 0 , 1�'� = —1 2"—D I—NEM o I vi E ll111111111111 � I I I — °Oar I Table Mal ■ - 8 END OF LINE SHUNT ON WALL IN RM 333. 0 E = CORRIDOR CORRIDOR �, I Table ...—:.I�l 1300] 13001 lliiiiii'iiii'1 � EQUIPMENT bandage D■pym Bands ge trays molds y ■ ,TRANSFER molds �� on Mani g w W 1323] ' STORAGE n 8 �' Sealing and Softening Cart ,iwen / -- W :ec � R & D ■".— 13211 •- • • • • 'G. (Sealei Ison+er 1Cutteri Pouching wIP WIP AWN I t0 CLEAN ROOM GOWN 1 1 I--� I RACK I RACK it storage Storage I i N 0 6 13261 13241 SS - - GEL WIP FACILTIES 0 N = V1 JANITOR ELECT.315A1 ROOM 1 5591 GAL Z Vt GOWN 2 13221 • • • • 13251 {1-fl ca AlN -� 00 , � aC k._.....- -�■= I I 13181 [SPONGE WIF I _ [(own ■- III 0 - t 3 >>Y r Per Ac-4 O PACKAGING l R ac-t O Z �z QUALITY CONTROL rE �'�■■ ;13201 • • • . (3161 K �� ill- V N .8 AG-3 E in a GENERAL USE _ MECHANICAL ROOM 13371 PACKAGING WIP ELECT. ROOM c 3 13151 •.,.•'i UTILITY SHED z .1 e (24 SQ. FT. LYOPHILIZER) • • • • s t., �.' 13451 z aU 5 I 6 O I i • ■ V J � Uf f/f NON CONFORM' G/QUARANTINE WIP TELECOM ROOM I 2 I 0 ® (317] w 1— B z O Z W 1 NON-CONFORMING SALE R&D I ( I I I Ch R I Z V1 W �p & M KTG De .q v W TOR eE STORAGE w S A 13441 CHITOSAN STORAG • X 13451 13431 .--. I_ W Z to 10 11ii a � 1 I I I A m I I I 1 < m 0 5w QUARANTINE STORAGE DRUM r r LAB STORAGE STORAGE 4 v a � o n. MWn. 21 13421 13421_ — — N2 - — — �� — — — — — — — A M g _ — — — — — — SYSTEM -- iv�� 0 go 0, u5 I CHEM CZ kJ g 1 I 1 I I CABINET ki J © o5 ta.. z L SHIPPING 0 z MATERIALS & STORAGE �,• w g'MANAGEMENT iC ° N gy N 1-$.- g m O re M 1 DI PIPING PLAN CAD FILE: ° "— �— " ato RQFF o7oas-M3-10 M3.10 SCALE: 3/32 —1 0 N lw co 4:z 'O 0 0. o 4 REGO A. 0 v °FAG<Y1 3,Z° J ' N � O ' 4 I Expires 12/31/2007 I S N. h Ca -6 0 O n r ..........._____________ • �� 0 0 i_t: ,1, m it: _®_i 0 a ® ® 0 1111 —10 9 8 4 _./ 111 0 P v �- / LOBBY _L ( _ I ( _ — I I II I I ;F''or r��' 101 I I I I ' __ CORRIDOR Irj rr# O CI 102A ® L_ - L. s frird / iE CE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E 4 O I I I I a C. 205 206 I t I I I o ce AtIr Anil o o A MINISTRATIVE STAFF ° 104 CONFERENCE ROOM 5 7) ___. __:- COPIER PRINTER ROOM 103 110 — ® U 1 _ I _ I I I I I J �' ce DOR CORRIDOR H m C o n r , I °w :A 202A COORIDOR N 1 o2B KEY PLAN 1 1 i. W TELE DATA MEN'S ELECT. -. o 217 TLT MEN'S TLT D.F.T 112A o 212 GENERAL NOTES . o 113 ENGINEERING n a - )/ / -- CORRIDOR \ FACILITIES WORK AREA I A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND ). P. D. Q. A. DOCUMENT CONTROL CORRIDOR LU 4CH ROOM ACCOUNTING STA F C) ri 1 111 . SYMBOLS. -1 g 218 216 202C 215 I 214 • C p t:Q n B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. i 0 0 0 _ :—' H �)AD ►!MEN'S TL I ( I j-- N - g WOMEN'S TLT 0 114I n (' N 2 is,,,,... 13 —,.. ii — , .- ____ ...._, _ — — — ____ _ I I I i m LABWARE I tE CLEANING AREA » r W 333 MECH = — 3/Z!• -N 2-1 EC - c 1 LYOPHILIZER 334 307 I Z }" 1; v � - #1 LOADING LYOPHILIZER ROOM 13 g 1 { I I { I 311A I I Z CD 1, ,1 0 KEYED NOTES �� LABWARE GOWNING ROOM Z � STORAGE 301 � \ 332 - - 1 DEMO N2 FEED LINE FROM EXISTING DEWER STATION TO v I LYOPHRJZER I I LOOP CONNECTION POINT ON EQUIPMENT DECK. a CORRID�ER ` 308 � � 300 #2 LOADING °m it. a). r" p PRODUCT I c - — - — — - — — — — — — — > IN COMING { PRODUCTION ROOM I W w MANUFACTURING/QC 302 I 306 ,-, LYOPHILIZER ROOM • WORK AREA I " 3118 331, PRODUCT _ :ORRIDOR OUT GOING U ( ■■ • 338 I I 303 I w I I I ■ ■r•.• ■ • N ■ ■ ' . ■• z ■■ ■i■■■■ r■ MOLD CLEANING ■■ ALIQUOT _ I ■■■. 309 • ■■■" STORAGE w w { I 304 I � � I I I I _ _ H _ _ PASS .�ND _ V - - _ THRU __ — — — — — ° WALK IN I COOLER • I I I � 305 �� 1111111111111111111111:112P WZ - �/4 -N2-lEC / - _ q- CORRIDOR Li_l CORRIDOR „ „ , z 300 LiJ 300 i N�\ 1 ! g�4,4 I ACCEPTED FINISHED Z N INCOMING SUPPLIES MATERIALS MANAGEMENT GOODS & ACCEPTED prt- U W iii.1 � � STORAGE I _ _ - OUTGOING SHIPMENTS 313 RAW MATERIALS SHELVING N ° 8 w • 321 N 314 312 0 oZ V h \ I I I I I 7 E <o NE JANITOR o g 322 o PACKAGING g S: • a — — — _1 (RAGE AREA o o V J tn0_GI I I I 316 I z` ■�_ QUALITY CONTROL r___ W g 320 AUQUOTING CORRIDOR o W GENERAL USE 319 300 I a m 337 ELECT. ROOM a X o 65 I 315 1 1 W 2 15 - co c 0 c © PRODUCT U Z ae ii STORAGE ROOM - a o O 317 0 TELECOM ROOM _ (21... o W 317 I xa o M — r I — it r �1 _ �—� — — — — — — — — _ _ — — pp d ° ii IT I I I j N Z •.- W L_I_J = Ki o 25 Sag I I I I —1 0 g° i. I I I I I I I I 6 W 2c ,ii.,: . .c, u) g o b sal- 1 N2 PIPING PLAN DEMO CAD FILE: al 03.1 SCALE: 1 8"=1'-0" 43 PROF 07006-MD3-1 M / .rr, GINS �� 4' -4889P�4 9 gi 6' - ' ? 1/ ig 'ft •REG Vt7Fi. ,' 4y 0 4% 2 el itEpNres 12/31/2007 r _ 18 17 18 15 t4 13 ® co to Q Q O O © Q O O O CO• • • 9 8 07 6 4 C32) 4 _ III pr.," r / ArAr \ o I r-I r r' p 4410410 0 1111 1111 1..... — A A I I I I I // 1 I I r --O O ,.= //// 0. —1 I 1 �.. I l I // OFFICE OFFICE OFFICE FFICE OFFICE I z a_ /4„N 11051 11061 11071 11081 11091 - 0 O w — 0 ° //\\ I I I I I D // — A� 0 // 1 ,� A- L I / LOBBY - __. 2 + r � 1101( � N HemCon CORRIDOR I I I I I I 102A I I I v) --3 KEY P L N h ; \j CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFF! E I O - - `\- 12031 12041 12051 12061 12071 12081 11091 12101 o a I o M N`` A MINISTRATlVE STAFF o cs . , _% �\ 104 C EN N OTES I OFFICE OF"ICE I I I I CONFERENCE ROOM 1 I ' a- 1111 1112) 11101 < _ \ — - -- -- - - - - - _ - A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND LOBBY CORRIDOR CORRIDOR ._ AND SYMBOLS. Q 201 COORIDOR 1202A1 202A 102B B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. > 0 O W TELE DATA I MEN'S — ELECTRICAL ® I I TLT o 112A _ -- Ix �' ELECT. - C o to CONE. ROOM 1212) MEN'S TLT USE ZINC COATED STRUT SUPPORTS FOR Nh (2231 i 22a -° 11131 HANGING PIPES. REFER TO DETAIL 5 ON M7.5 FOR PIPE-ri.) ENGINEERING h�. CORRIDOR FACILITIES WORK REA SUPPORTS TO USE IN CLEANROOM AND PRODUCTION. o�----- `� CORRIDO'202B R. & D. / P. D. / Q. A. DOCUMENT CONTROL CORRIDOR LUNCH ROOM 111 112 V 0 n = 1- ___ 21 s I 216 I 12o2c1 215 I �' I ( 1 I ( Z ,y 1\._ �� _0 D LABEL PIPE SYSTEMS W� 0 n _ SERVER ROOM I iii E FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. � v) E ,�11- MEN'S TLT , To EN'S TL 219 I i, ! EN'S TL' / c c�' 12221 �� 221 , U c, J UWOMENSTLT (} 11141 WH—1 - F REFER TO P Z �= tor. L3 ] 213 0 BcID M6.1 FOR POCS. �. ao.- ..../ SS II r, 1 I U -N, WH-3&4 -- t e Sink Sink L Z h i MEGH - 3/4 -N 2—1 EC LYOPHILIZER - O cr 13341 ill me ur • : 0 13071 I �--� o Chitoflex Forklift Lab P„ ,•' - #1 LOADING Pi's LYOPHILIZER ROOM L `O� Washer I I I 1 - 1 0 1311 A I I I -� N - RESEARCH & DEVELOPMENT C .. - -- - KEYED NOTES =c WORK AREA ;,� _ ► axr/uetF Itzr ( - o 0 13291 »� '� 1 i3� ° N" .�p °' 1 CONNECT TO N2 SKID AT AIR GAS PROVIDED POC. °' ° : 30 LJ GENERAL PURPOSE t Clean mold Carboy c. 1224 lilt storage - "� I s LYOPHILIZER `�' 1 !1 L4B S` co oaa{►• 2 INSTALL PIPE SUPPORTS TO AIR GAS PROVIDED POC.rilit I f. I #2 LOADING I C ._ I a ao ....: , cp i.3,:, if r II , 0 0, �� Ny m SUPPLY w� - - - w L► - - - - Forklift 3 Ewa ii 13021 _ PRODUCT! N ROOM z IBM 0 0 LYOPHILIZER ROOM __I rnearili1 1 311B h CORRIDOR I I �.. GOING I ,�°,� I J �� �" � Packaging Area � I = ��•�,, VFD 13381 Dirty molds -.----! 0 F I l LY8 �i1fr'�`� 0 i � Yokoga a ' O a a ■`'. `■r■ RESEARCH & DEVELOPMENT '___ I TRANSFER 3 LOADING tt LYOPHILIZER #3 - ° U • - # ■U ■ LAB © © LABWARE 411 ROOM .. . g �" \ 327 s ; Forklift es i lti�S�i� ��,i._ - RO CLEANING - Toble • s 3098 :, y�l• lilt � � ■... '. i ill* �.•I I • i ■■i r■ (328) t� d- .�._.��� I_-- _ •-, ���� ;:-, , I QC WORK ! • s a o I 'o c� I DI . .} AREA Bench 0 . o N --,- -- I _ •torag: 1_ �— - -13311 - - ���'. ..� . '► IF. cow in L..., (---__ CORRIDOR r 309A 4 0 (� SIP v !LI. OVEN J \____ 133$ �"" r OC` _ 8SUMP R00 pl 1 ••e o ® (/}l = �1��I' -N2-IE �" '7 r i�� .i ;� ►► __ U; . Sump w oQ ._._ Gel a cn 1 _ M I CORRIDOR ( CORRIDOR I "�°`"` 3/4"—N2—K-X I Table Makin. Heat Press I a o °° -- awl - RRIDO W ���i , �.---;"_ , Table Table W Q J J III13001 W 13001 Mixer , 16686366166667:71"1) t- EQUIPMENT cart bandage No r'° wz ,TRANSFER N Bandc ge trays molds FF-W mil 13231 2 molds Conditioning 4j Z — O R & D -- B STORAGE I _ _ Ir Sealing and Softening Cart oven (AWN Q Z-Z z- h 321 a o a • e s-----\\ t I g Ly ai w yp CLEANROOM N Storage Storage uM GOWN 1 I I I RACK RACK I eat ar utter Poucni i WIP g WIP g I N = `'. , J 1 W ^ U Qp h`�w (326 1324} SS GEL WIP FACILTIES Q Cr) �cc JANITOR I ELECT. ROOM 13391 cn z EE d- Liu., 0•GOWN 2 13221 a 0 • 0 N 1315A1 Ilk 55 GAL 00 d 13251 z UM W O w -- CONTAIN 'It w —, w ir��:-n Q :-C: FZ-Z ----=�- WIP SPONGE WIP d- --- lown• P� z Cc v, -- - QUALITY CONTROL I 13181 1 ACKAGING BOILER �_4 AC-1 ' W ( �j h o °o 13201 13161 -E) ol2lr'1 -"' O W 4._ AC-3 1 a ■GENERAL USE AC-2 _ I-- _ c°nt MECHANICAL ROOM 13371 PACKAGING WIP ELECT. ROOM e z o a (3351 - 13151 .. UTILITY SHED O al- I I • 13451 W 0 O w08 Z O -(24 SQ. FT. LYOPHILIZER) e e • • W m I ■ e e e O NON CONFORMING/QUARANTINE WIP • 0 , � TELECOM ROOM � o , , CI d 13171 Et _ �N z_ a 1 — I— o a — , "� = 1 14,�_N2—KEX — - - - — ° � NON-CO FO LNG , "`-"�' z L ° M RM SALE R&D I I I I I + I I W , ........A.......... ........A...._ & MKTG x z�•STORAGE ( � 1 W Zw STORAt#E 13441 CHITOSAN STORAG 0 ° 13451 343 CO E,5m o Q o a-.0 0-e •• • o e a o e o UUo t'`'om 1 Z V I a 1 I rn rn I �- Z z Q Q (.n3 QUARANTINE o r- I I I z -' pa STORAGE DRUM °� w �- "w N wo LAB STORAGE __.__ ST RACE M i z r — _ 13421___ _ _ _ _ _I rl, w— A SYSTEM 1========= I I CHEM CABINET I I I I w N= z w e— w LL r o o CC MATERIALS & STORAGE O w F .5 MANAGEMENT 13411 ,,_. _IF _ W ° . �- am 0p/� .11 PROf�� 07006—CAD M3 FILE:-11 w - 0 GIN4 + �4 ;o Q 889P 0o Imo. F--d • "EGO 1iN2 PIPING PLAN 0 4 vti M3.11 SCALE: 3/32"=1 '—0" /LEN E. cptres 12/31/2007 I • 0 • 1 0 9 8 0 6 0 4 Q 0 k r 0@kr tOkia. ,r o opo o 000 0 - rIIII. 1,111111111111•111111111 , al 11041111 \ 0 i 2* WrAgrArr All gi / 11•1111/' I I ..- 111---- -- --. -----Ill .--...............- - - --. ,____ III LOBBY - -,- 11011 1111# Aro01 . Ari . - rj 0 ,-- ,- CORRIDOR r r r Aar ® ..... 1102A1 I L _ A 4 Add .-- — *-1 ...- . ..- ,- CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E \ 12031 12041 12051 12061 12071 12081 11091 12101 '1.) 0 z o '■ P -1 r. fir r AO 1 1 ® a.. I , A, d0 4 41 I / \ A MINISTRATIVE STAFF . A A c.) z v) lio4I o o w I I I CONFERENCE ROOM P 0 COPIER PRINTER R001+I1 1 III 0 IN \ I , i 1 — [1 031 11 101 °C):1111111 o n - cl. - 5 \ LOBBY 0 I 201I CORRIDOR CORRIDOR j o 1202A1 1202A1 COORIDOR ' 0 ce 1102B1 o 1 1 _ - 1 I 1 u_ I C:3 TELE DATA MEN S - - La ELECTRICAL Mil TLT 0 07 ELECT. • N ---- ""!1--Q■t------ HeniCon D w 12231 CONF. ROOM 12121 MEN'S TLT •,,, KEY PLAN u) 220 F 1113 ENGINEERING ' r■ _ o 1.111 Ilr CORRIDO-1 H 01 miui CoriTiptoR —. /- FACILITIES WORK REA .., ai CNI 1— 11121 0 < — — 202B R. & D. / P. D. / Q. A. DOCUMENT CONTROL CORRIDOR LUNCH ROOM ACCOUNTING STA F EN a 11 me •... 0 — 1--- I rr) CI IC) 218 216 202C • ' 215 214 o mrsi i --;1 40 r n ro GENERAL NOTES . , Hr.-- Li., - . I CONF. ROOM 13 I pie u) %- MEN'S ILT ,,, 10 OEN'S TL t 219 imig A I EN'S TL' L.....1 A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND 12221 n ' EU H WOMEN'S TLT 0 11 1 41 AND SYMBOLS. gat) a Ilk . ss , n 12T31 I I I I - _..... - el , )1,44>iffi C5/71— 3/4"—DHW—I i C • 1 shtiL pitiitiil mu• Hut 1 6 A D I ii?,,, — M CH 1 — • • I ...t• Ulm 11 Ii a LYOP ILIZEIP 171.2 B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. o " 1 DHW IEC c.i.s1 CP../..3 .,1 — 1 "—DHW—IEC 307 LiL. #1 LOADING LYOPHILIZER ROOM 17. RESEARCH & DEVELOPMENT All I ii.... El 1 1311A1 (xi LI 2 is— r-------7 ---- (-- 1 r ____I CI - WORK AREA , MT LABWARE GOWNING ROOM n Z .° 13011 I CI gm E. w h3 STORAGE immis BREAK ROOM 13321 El CE w w 12241 II 1... LYOPHILIZER ei CD d 11111 Cl) = - = CORRIDOR 7 1 1 13001 #2 LOADING U c gi SIM 1"—D IEC g i ; (..) . III PRODUCT II 1 - 0 1-1-1 111 IN COMING - - - 5 1.,.. I 13021 PRODUCT N ROOM x. 46 mum=...molimm MANUFACTURING/DC bd. _016 LY4:1111) ER ROOM = WORK AREA C i: 0 ([..-2 wilAu ILI 13311 I di PRODUCT J • . -11 I 5,.. CORRIDO9 OUT GOING - 133812 13°3 I.A-I 42. w -2 11 26 RESEARCH & DEVELOPMENT KEYED NOTES _ _ R & 0 III 0 IT LAB LU U.I LABWARE MOLD CLEANING 2 8 13271 1 CLEANING 13281 I 1 ALIQUOT 1 STORAGE 13041 13091 , I 1 DEMO 1/2" DHW & REPLACE WITH 3/4" COPPER LINE. CE 0.) R N- U •c tifti 1§- c 1 IE CD = & Ilk ' • 111■I1E . H- Ii 1 13- - - -13------ - - I PIS I... .........■■■ _ - - - 4131 2 LEAVE 1/2" DHW POC. TO BE CONNECTED WITH EXTENSION OF DHW LOOP. > *a CORRIDOR 11 i • In WALK IN 11..COOLER • 13051 111111111111111:11E: W Li 1 C b.... $.1 OVEN A/L _MN [3401 I MI . III I , - - - - _ _1 CORRIDOR CORRIDOR 110: 2:==----C1=1 00'• L-0 ....._641) • 1 1 —DHW— E imi,—, , , , lig I A .1 \\--L-1 ray 111-■ C INCOMING SUPPLIES MATERIALS MANAGEMENT ACCEPTED FINISHED . .-.-. i R & D -11• EQUIPMENT mo\TRANSFER III 13231 I '' STORAGE a- GOODS & ACCEPTED . aal.e- 1.• . . .. . 13211 ' OUTGOING SHIPMENTS 13131 RAW MATERIALS SHELVING CLEAN ROOM GOWN 1 I I ,___I 9L) 131 41 131 21 13261 , , 13241 SS a„."-, `1" . . 0...• _ •••••■ ' IrANITOR ' tili GOWN 2 13221 f',11 .J1111, ! 111 13251 111=== * I I , 1-.1 -111 I. 111 NI I PACKAGING 13181 STORAGE AREA 13161 .......-1 \....... L.--- -_-■ ° - - . io .,._.) . . 1, . . ' QUALITY CONTROL I . . 0 Pt) ci au 10 13201 1 ill AU?3U10'9T11NG — CORRIDOF ..- ,.... t g ; GENERAL USE 13001 La MECHANICAL ROOM 13371 ELECT. ROOM ' 1.- F 13351 it 13151 . • . tn a (24 SQ. FT. LYOPHILIZER) w"---. -..... . . I a PRODUCT ,,, .. . . . II i < 10 0 STORAGE ROOM ja ty • 0 Ow I 1014 IIII Gil 13171 El TELECOM ROOM 13171 lgt3' lc: g 8 g 1 it 0) ' f S c) , „.. _ ,,,\ 1 — ____ ____ 41 g - B • 1 p)!..... 11 mu IINE MIR p 11111 L _1 1 1 0 0 LA.i o CE) mil II WE MIR ppr ix io 0 11 I 0 ." 0 n )-8 E 0 L . a) 0 0 X •-• i::: 202 5 0 ..h.---, 1 I 0 VIII VII 6 6 . $203 4 - - - A gli Li: pg La 60 Ix min_ I I I I I I I I , z o 1- z 0 z . < . . . a. 81A x ° LI X 15 I I I 5 o 5 l• e a. co 0 II. 1,.. a o ir. 1 id 6 2 -' La a: Pe) i ...• 5 I ° s a. 1° N F cr x " tTs 1.1.1 = 6 NI in ,--- w ----J Hi 14. 25 tki. o Bg a >•• ,..1 lomM 1 ci i- a_ 6 , : Ya k/a R 1 DHW PIPING PLAN DEMO CAD FILE D3.1 SCALE: 3/32"=1'-0" PRO ) 07006-M03-12 +7 G 88N ZS .61 fig „,.. 0, 4 REGO %), /4,* u., K & .,. 4, ,, :) 4 Y13,2. \) /VN E. ‘ TEg . E Expires 12/31/2007 g , -k-„- .0 0 , 0 ® T., �� ‘-r., ® ,4 Qt k: ; _® 0 0 ® O 0 ,e 0 10 9 8 6 4 — o i 0 ., / LOBBY (---.- _ E G I I I ,, r '� /.. .___3 ��o C 11011 , ' - r CORRIDOR L I I I I I I 1102AI I I I L ._ _ NM CI i / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E s / / / _•, N 4 205 206 2071 12081 12091 12101 �E ■ o (2031 (201 1 I I I 1 ® �/rce \ A MINISTRATIVE STAFF O z N a.\\ 1104 — 4 O w I I OFFICE OFICE I I ( CONFERENCE ROOM I ( A — _ ■ O U (1.e____ ...--'''' ...... _----N ...."-N (1111 11121 1 01 Q m I..;\.LOBBY _ — @ 0 (2011 CORRIDOR CORRIDOR ,� v 12024 1202A1 COORIDOR I ® ce 1102B1 I o 1 J I TELE DATA �— 1�— MEN S ELECT. HemCon 1 w ® 1 ESE N o ELECTRICAL I TLT oF ' 11A 1223 ON Z2400M 12121 MEN'S 11 31 TLT ENGINEERING & •� KEY PLAN ` N FACILITIES WORK AREA 6.1 7 PIMA. _ CORRIDO CORRIDOR —"" 2028 R. & D. / P. D. / Q. A. DOCUMENT CONTROL (CORRIDOR LUNCH ROOM 1 ,` t I~ 11111 11121 ` o --\_ Eji'1° L 218 I 216 202C 215 GENERAL NOTES I . ci I I � � N SERVER 2t9R I I S EN'S TL' U MEN S TLT ��,12221 J I WOMEN'S TLT C 11141 A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND " __ 21 I I _ _ I AND SYMBOLS. gi -a 2 --DHW IEC ------- -- I I � m a SS ■ - 3/4" 21=-1_ /4"—DHW " �' 3/4"—DHW—IBC-v ----- i----- '� >�, — a►�x � _ I — — — — — Sink Sink , �i WH-�4 0 B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. 0 �a 't 3 ' o .ti • .. L U� a PMP _JI » I LYOP ILIZE „ r, i'1 STRUT IT SUPPORTS irivn• • • �uR 1 —DHW—IEC O 307 — USE ZINC D S T RU t 1 LOADING • Pen LYOPHILIZER ROOM I HANGING PIPES. g Chitoflex Forklift W17: Pum• � � � - -- � 311 A � �t I I I o 1 1 RESEARCH & DEVELOPMENT — -- WORK AREA - -- PROD •. a I-- D LABEL PIPE SYSTEMS m �� == a ARE• PMP i Z V -. 1329) = 111 .� v GENERAL PURPOSE -t=k - Clean molds array 30 t °� °' ,P E FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. NMI LE m w `IL.- 12241 - S storage LYOPHILIZE' ♦ / 0 g� �1 I� �■ - 13081 .fir _� I ` CORRIDOR R I I I #2 LOA' I I I F REFER TO DHW P&ID M4.9 FOR POCS. Iii c r •rk Tabe Q �`= ii 1 "—D IEC K U ,, PRODUCT ,�SUPPLY w W Nye Forklift 0 IN COMING _ _ — — — — _ — — — ul I �I W , 13021 PRODUCTI N ROOM ♦,,,yin ( I lied Z v� N iml LYOPHILIZER ROOM = PRODUCT I L 1311 B� O 1 4 • O re CO338 2� I I© OUT GOING I I I VFD E IC - 1 j e— Dirty molds 1 1303 ► 'CE 'w LY� I ('7f ; o I Yokaga a o o RESEARCH & DEVELOPMENT �-- TRANSFER #3 LOADING •+�.�"�- LYOPHILIZER #3 KEYEID N M R & D - I yvak I Table ROOM e s a LAB © © LABWARE tation GOWN W W _ 1309B1 — Forklift' =, � # • t l _ wll}._ i1II RO■� �1A1 i#I 3 41 O I ISOTE DHW INTO TWO LOOPS ABOVE MEZZANINE •�02. (�'QC A SARK eench DI(1 — di illi. [-I I , fe) 331) ° o o II GOWNN s •torag: 2 CONNECT TO MAU-3. m = CORRIDOR • 11A WALK IN L (309A) a GIP " •� (3381 COOLER m �'�' oc ?% I�uyi�s LYOPHILIZER R00 SIP DI 3 EXTEND 3 4 DHW LOOP TO FEED ROOMS 221 & 222. c r OVEN A/L �< (3051 1+� m � 'e o SUMP sum aat:® / W W, (340) l �'!?"■ {s3 0 i I CORRIDOR I CORRIDOR I o o a I Table M a ■— --- •• - 4 INSTALL BALL VALVE AND CAP. Table Heat Press a H'- - ° r�1 —DHW—'E '1417-14k. Mixer Iiiiiinilliini:* mu EQUIPMENT _-_- �� 4 �� part bay age Depyro 5 DW & DHW ON WALL FOR RELOCATED SINK IN ROOM 333. `• TRANSFER Q 8ondcge ...% 0231 --- molds tl onditioni g IS '�; k' S' 't` 1' ,r' 0 kt 0 0 0 0 0 0 0 0 0 GI al I O ©- o II I I I I I I I $ ® ( r-J I i I I { 1 r _ -1- -_ O L _ _ L - all O — © z ® I I — I I 1 —__. I I I ( ui —I 0 o w 0 z 0 W, U i1Y o N --- ----(2/---'-- HemCon W KE'LfLAN 2 8 cci .4q • 0 . 10 9 8 GENERAL NOTES on wa — STORAGE I I su 1 I �,� a I A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND BREAK ROOM - U El •• 332 AND SYMBOLS. g 224 I 0 I i CORRIDOR 6 { I I Wino 300 il PRODUCT a woos B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET AO.2. 0 0 Na I I I 1 IN COMING ( I - g Ri 302 PRODUCTION ROOM la m MANUFACTURING/QC 3O6 Z v ® WORK AREA . •2 v 331 PRODUCT U U _ � it _ �`` CORRIDOR OUT GOING LiJ Ebi0 L-L I Li W I - 338 I 303 I I I I I U c II < < — Z RESEARCH & DEVELOPMENT _ R & D CD CD v �S U C.) L.LAB I t 0` � LABWARE _ 327 CLEANING - ALIQUOT "� Z N STORAGE -NI KEYED NOTES c I I 328 I I 304 I SPONGE BACIk SPONGE '*-4<,o I �° � ('------1,_-__ E I I , , (73 OVEN PRESS Z Z3- 1 li DEMO CDA LINE TO AIR COMPRESSORS AND CAP AT TEE. W W 0 2^ CORRIDOR WALK IN 2 COORDINATE WITH OWNER FOR TEMPORARY LOCATION CE rn 2 it VEN A/L , I 1 1 OMLETE. L I I; 340 3� ° " SPONGE PRESS 1 m - o� UP a"o c = ei. CORRIDOR Lai CORRIDOR _ 3 AIR COMPRESSORS & DRYER. TO BE RELOCATED TO - ..,=_=- , , H - - -1 300 w 300 UTILITY SHED COORDINATE WITH SYSTEM OWNER. > �' ILI LS I I I . II UIPMENT \ 1 I I `, TRANSFER I W 0 323 U o- F -I STORAGE _ . . ., `• ID— —. � R & D 321 ., I ..... •CLEANROOM GOWN 1 �,.._•326 324 N Q I I ~ ( � GEL WIP U .--■. .- JANITOR ' en. ( f: .. w :■i■ 322 3'1741. �� �—o 0 . .,,■,, GOWN 2 't"� -- H325 : PACKAGING } H Igil 318 f I 0 TORAGE AREA 1---- _ _ _ SPONGE WIP W �� E1 1 i r� I 1$ 1 1 i 1 316 g ��-j "" QUALITY CO�ITROL Q — LO BYO cl� SP-1 320 I AUQUOTING CD y Iii 319 ""-"" CORRIDOF U ,,� GENERAL USE i 300 I D W MEI;HANICAL ROOM DI- - 337 PACKAGING WIP N ELECT. ROOM I ' 335 -_ .-I N i I it I I 315 W Z •---a. FT. LYOPHILIZER) 1 ; i f . • • i • • g x 86 REF — trc:1 5 g B r PRODUCT .► Q ' E ROOM Lq a_ 1�� - -- NON CONFOIit� ,�' miff `! n17 a "" TELECOM ROOM < 0 1 —CDA—I C '' - n 317 U W ' ink 4 IW STATION DI SYSTEM U ®� B 8 cz ra r -7\1 BIKE uxt lip g 8 —�$ L°I_J = gi I I I o II OE uotE 1 I z o 1 Ei NI , CDA Z . ;I El • o o--o —~ U —1 a to ml U- Pf r — 1 U".: C)i w .=.r� z CHEN .„,_ �.1 P - - E z 0 J s z U W I IL a W W X L 1 ---) ....__ _ ___ — W I La.i tD I il I 411010 I L ..._ ____. ____J LAJ CD LL I —I 13- CD 0 -c.-.5 i4.1 0 *1 g < , z , 0 sw L.- ,K a o jej = 0. oa 1 0 L ___ _I . i.,.. ..... 4 . • i 1-) m < Pub E. I I I I I I I W a p as FN O_ w— Ei J Q it e = 0 M p Z L 0- C) 2 §F) J 4ilte Z a a Ca W M ., N 16,4u'O 1 CDA PARTIAL PIPING PLAN -- DEMO �, FILE: �Z M D3.1 SCALE: 1/8"=1'--0" S IN 9 , 789P r" g o F';zE E t g Expire$12/31/2007 8 P r to a 0 i ,- .. _ . • • • 1 0 4 0 0 0 - a, o o 0 0 0 o O O O 10 9 6 4 0 0 ' �, I•1 IIII omi III I I � /r ArAte i3 . .0/ Air 44 _ _ _ _ _ _ _ _ ........., ._ . __ ,1 I // I I o-- L_ _ o i/ 1 �. O 0 // - --, H // --� - A% •/ _ ® Z OFFICE OFFICE OFFICE OFFICE °0 I I , � A I fFFICE 1 081 I 1 091 - I 1 I I I I // I I I I © v ° ii _ _ — = i % °` c., ■ LOBBY I . 11011 1 it C U-O ., CORRIDOR I H emCon I 0 azA win ,- / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E cn r ` 0 12041 205 206 12071 12081 11091 12101 ___ , .L _ ►2 31 1 1 1 I KEY PLAN h N li.l f 1 A MINISTRATIVE STAFF O Q _ T` Y L I CI I I FC OFFICE I 11041 CONFERENCE ROOM 1 0 -N (1- -- ---.- ______ ---\\, --- 1 _ ---\\ ---- 11 1112, ,1101 GENERAL NOTES . o ;\\: ' r — — a LOBBY 1 201 1 CORRIDOR CORRIDOR A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND 1202A1 1202A1 COORIDOR .. 110281 AND SYMBOLS. g I _ i I I MEN'S I I _____/' TELE DATA ' ' �i ELECT. - - B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. Off; ELECTRICAL ® TLT o.F. 112A tx ® CONF. ROOM 121�1 MEN'S TLT 220 —r-� o I13I ENGINEERING C USE ZINC COATED STRUT SUPPORTS FOR a ----CORRIDOR FACILITIES WORK REA !! � a CORRIDO ..I. o -- 11121 HANGING PIPES. SEE DETAIL 5 ON M7.5 FOR PIPE I. 202B R. & D. P. D. Q. A. DOCUMENT CONTROL CORRIDOR LUNCH ROOM 0 11111 PRODUCTION. - I r I I 1 I 1 SUPPORTS TO USE IN CLEANROOM AND PRODUCT 0 li Qi !Q 218 216 202C 215 m li IT • I - rn n D LABEL PIPE SYSTEMS Z •- E3 MEN'S TL T • N'S TL SERVER ROOM I I = _ EN'S TL m `` I col 1a 1219I I E FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Iii g d� _�J WOMEN S TLT � 11141 _ / 1 ct 3 A _ �___. I ;lam SS ll____ 1__ _ _ _ I n' _ _ I _ I F REFER TO CDA P&ID M6.2 M6.2A & M6.2B FOR POCS. o li I l I .r — _ — Z •- app ru t____ WH-3 dt 4 iRA4, I awme t+ pp.♦- Sink Sink }V ^ Q ttf . � MECH PMP » i I ..) LYOPHILIZER Z L 13341 x „.. 1 CDA-I EC Chitoflex Forklift gab P�m ; O #1 LOADING Pi's LYOPHILIZER ROOM I I I Ware I I '� O I I O 1311 AI I (� 5 Washer Li iii RESEARCH & DEVELOPMENT 1 — — 'Mt PRODUCTION aer r` 1 N a ii PMP KEYED NOTES WORK AREA ;= AREA II � � � � �cv 13291 =_ ii (30'1 a ��) Clean molds ° ° tel GENERAL PURPOSE Ij'�� - Carboy _ °Q ° 1 USE EXISTING ELECTRICAL RACK FOR CDA. a) 0 -4' 12241 1111 I my •4mS 1' LYOPHILIZER I CORRIDOR m i ,l�i�=a I �• 1 C0 0 1 _ 13081 ". 17 .E II§ a� cav Work Table I #2 Lo ING I 2 TEMPORARY LOCATION OF AIR COMPRESSORS AND DRYER. EE w _II !iI _ _ _ _ C—fi. r i Forklift IN COMING PRODUCTI N ROOM I .•'►' - - 13021 v 3 6 --- I LYOPHILIZER ROOM W fa ' ' Sponge (311 BI 1 CORRIDOR 1 1 PRODUCT I V °� I C.) j Packaging Area❑ Purr' I I _ OUT GOING W W VFD 13381 Dirty molds 1 13031 ► I: ,z E ,-w , 0 I LY�1 ICI I 0 i 1 - s�ER � � - Yokogawa ( - Q Q n < Q I I _____ LYOPHILIZER � 7 TRANSFER `' RESEARCH & DEVELOPMENT Tyvek Table C] D #3 LOADING I III i ._ RO LAB ® ® LABWARE Station Ci 3496 — Forklift bondCges I�} ....m ,4,! • .�' . - GOWN I CLEANING ROOM N N ° �' + EI �� ,r� *"�� _ ` �1 II► .. .:.:: ••. 13281 - Q Q _ 1 I 13041 1 ' 1 �, - - O+ ... Ana- - - -- ���..��e���� �r��l� ■ ■ • ■•■■■ QC WORK .— ° g o I�' Mil tea- la dill i� AREA Bench 0 0 �-- hw�N N 1f�7,- jug . .e DI 1 .•.•.• �j GOWN •torag: . ■.•• ( f t — ❑ —13311 F-t— — — ; — _ __ (� 0 — — — _ — — CORRIDOR WALK IN • • s 1309AJ o O IIM . . +� • • '� v " Oc y� u Ps LY*P bZER RO0 SIP rQ GO OVEN A/L (338) 1 3a�AIC ��� m '® d S MP T51DI 1340) _ �� . 11-4.; Q _ 6 C I • ( � � I CORRIDOR I CORRIDOR I �°°ap ( I Table :' • HePress l--1-- -, Ll ____ I!----•n ,Table Te l r � �. m Y .. cart ban 0 t EQUIPMENT ��+ t,� TRANSFER < Banda a trays L. - f– Q 13231 c W molds g w Q Conditioning O l STORAGE 0 r Sealing and Softening Cart Q Oven (/� R & D I321I I • • • •C[ J a---- g. Storage Stora a UM -- -- —}- - � �er putted Pouching �Aqp yyip(�,,7 � �Z R CLEANROOM GOWN 1 I N I I cn RACK I RACK I I I .. 13261 13241 SS GEL WIP U r- FACILTIES N x 0 0 —) T ELECT. ROOM 13391 ,.,, N x JANITOR 315A 55 1 AWN p GOWN 2 13221 • • I • a,. „.,, _.... to 13251 »— �-/ coN'iAiiv UM uM N Z o 1 1 f 2 CDA-fE _-_ �o- _ _ a o O J - WIP SPONGE WIP W N n. U C9 2 I a.k -t ---r ri-I --1 _ ( I 13181 { I PACKAGING I "i __ �� _ 0 o I QUALITY CONTROL .Q — o ' —, N 13201 • . . . 13161K O O i g 1 TS GENERAL USE CI I 1 - - a frig E in Q II MECHANICAL ROOM 13371 PACKAGING WIP c`J — ELECT. ROOM • a = D 13151 •.O•.` UTILITY SHED 13351 I (24 SQ. FT. LYOPHILIZER) • • I • • - I ■-' 13451 I—_—:16... NON CONFORMING QUARANTINE WIP ~'La TELECOM ROOM v g I 1 I , L___. I IM. — , . i___ , ,.._,, .. -J. _ _ a 1 -CDA-IEC - X17 _A _ _ , „ tr . NON-CONFORMING SALE I I i H III B . % !p I I ID I O Z .42 IA...1.A]. & MKTG R&D STORAGE I Z %,6 STORAGE (344) CHITOSAN STORAG v 13451 13431 d e o X 8=1 .,� ...�1i W 0 O 1 • I I I I I I :LI ° � ' QUARANTINE STORAGE DRUM � � `t Z O bp © zW LAB STORAGE STORAGE x �' = a cP -— — — — — — 13421_ — — N2 — —_ I L D — — — — — — — — i W a. O ,..„SYSTEM A „a Zy O °' CHEM r V Z I I CABINET 1 I I I N M Lu 1 1 J 1 e a. o a re O m O C3 LTI i5 n. a N ti 1 CDA PIPING PLAN 6 /8"= '_ AD FILE: M3.13 SCALE. 1 1 0 ��Q,`c,D P�Of�r 07006-M3-13 * w 74 :89 P E 0 � �a t' EGON c 1;,( 0 �y G. c FN E. ;u' /fl1 S I Expires 12/31/2007 N O 6- 0 20 00 ,D z ,D 0 0 m I o 0 0 ® ® o ® O O 4110 1 0 9 8 0 6 0 4 IP. ,� l �� LOBBY - -- I III I I I I '� 101 ) min.- Pr r 01 CORRIDOR H ��� 4.- I - OFFICE OFFICE OFFICE OFFICE OFFICE 0 FICE OFFICE OFF] E 0 204 205 ( 206 207 208 i09 210 21 O I I r A e" A U ill 111 I I ® 0 OCe A MINISTRATIVE STAFF - - • o o w o � 104 CONFERENCE ROOM COPIER PRINTER ROOM 110 ® i I I i I 103 I_ __--)— -- ----) _---) CORRIDOR N H ernCon a CORRIDOR 202A 202A COORIDOR N 102B KEY PLAN n. . I I — I — — — —__ — _ I _ N .. TELE DATA 7 MEN'S ELECT. o 217 TLT 0 EXIST 112A MEN'S TLT M 212 • GENERAL NOTES U � 113 ENGINEERING N a CORRIDOR FACILITIES WORK AREA I A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND ' D. Q. A. DOCUMENT CONTROL CORRIDOR LUCH ROOM ACCOUNTING STA F C) : 111 112 AND SYMBOLS. R. & D. / P. / Q 218 216 202C 215 214 v , 7- B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. o I I I rill% I _ . I WOMEN'S TL I I I el? .. ull ,re.,f,.,, C WOMEN'S TLT � h 114 n °? . SS H 213 (J s, I 4110 v is �Z � WSW. ,_ , . . _ b • I LAB Er!„f. ! ' d— �.niiWV .4er. � w c 3 v ECH - I w LYOPHILIZER - ri : 334 307 ' Z li cQ - #1 LOADING LYOPHILIZER ROOM Li i 3 I I I I IRS I I 311A I I Z y h o O• - _ W c m Q —I� o I" LABWARE GOWNING ROOM -- Z U gN 301 p �� it KEYED NOTES W 13 1 STORAGE t c 2v N 332 a � I ! LYOPHILIZER I I R. LEAVE CONDENSATE TRAP N •�, CORRIDOR • 308 1 DEMO STEAM CONNECTION TO BOILE cn � ' 300 #2 LOADING LINE AND STEAM DROP FOR USE ON LAB WARE WASHER. ,� m i CONDENSATE LINE TO CONNECT TO NEW CONNDENSATE PUMP. m �-- _ a' _g p PRODUCT - - - - - - - - - 2 DEMO HOT WATER HEATER. > v, ( ( IN COMING I I -T I - o la 302 -- PRODUCTION ROOM DJ w MANUFACTURING/QC 306 LYr, ' . WORK AREA � ate :ER ROOM a R 331 PRODUCT �- CORRIDOR OUT GOING r_ ° / r ■ r IV 338 I 303 I I I I : . Q - :— - . ;% . R & D Q •-I%•r••.. MOLD CLEANING LABWARE I ALIQUOT � 309 • •■.• CLEANING �`• ■.••. 328 _ STORAGE 304 I I I I it FD U I - - - PASS T,H R U, - _ - - c o !- - - - - - - CORRIDOR WALK IN W 338 COOLER ( ( I A� __— _ I I 305 11111111111111:112: Mil P 4i z�up-___-- CORRIDOR CORRIDOR u 1t n il 300 300 a _-) ___A____ 0 r■ 5 A gi )UIPMENT RANSFER r I I I I I I U W ACCEPTED FINISHED �a o . 323 ,Lt__ STORAGE _ to o_ INCOMING SUPPLIES MATERIALS MANAGEMENT GOODS & ACCEPTED U 16 321 OUTGOING SHIPMENTS RAW MATERIALS SHELVING 3 o 1--\GOWN 1 4 314 312 v to . I g 2 324 I -- SS I I I I I I a o 4 z l ~ , S JANITOR z i 322 — Imo z �- GOWN 2 0 L PACKAGING w � ' 1_o 318 _ - .� 7 - o o - v ° g r� TORAGE AREA -z » I ( g I I 316 ( w—,---L,) 7 . �a _� QUALITY CONTROL l z � 320 AS o I i q 319 CORRIDOR � � �o U W o GENERAL USE 300 ELECT. ROOM a ' _\\--- 337 I I il I I 315 I . I I W o Z 1 1 2"--STEAM I ' f ,4 z o • PRODUCT •• _ • - - va Z if m N E ,,ii, 0 ° STORAGE ROOM - < z m 'tz 317 ots "'""A oasts TELECOM ROOM U I I I N E] ® 0 317 I I 4 W .. a - — - \______16 — e * — di--- r d 1 — — — — — — — — — — — — R IS W V ° N W BIKE LOCKER I I to • L_I_J = "� o 2 Oa. M ig BIKE LOCKER I I I I ! ! - ° Z 1 I I I I I I I 3 M A qn w 8- 0 y M (ThSTEAM PIPING PLAN DEMO CAD FILE: t » ,`���„o �F��, 07006-MD3-14 D3.1 SCALE. 1/8"=1'-0 0 4' t,, ii ti O W o 89 ' % 4 :;il 1 EcN E. s ,8 r Expires 12/31/2007 8 E a = �a O 0 0 0 N 2 T ., . • • • s ® 0 ,L, ,t, ,t, ,E, , a, , 0 0 o O ® o ® O O 10 9 8 4 o _ _ o o ail MA I III I ( • -Aare 13 _ .- • , , ApplarAp, ® I I I I I I // I I I _ _ r r 0 // / O z / 0 I I 1 1 1 I I/.'/ I I I a OFFICE OFFICE OFFICE OFFICE / 11051 11061 11071 fFF10E 1 081 11091 . / — 0 z W 4 v ° O— — © ° /r // __ @ z ® v , . , , . . , , / z LOBBY r, E�"��E - F i 1101) L'- HernCon i / 1 I I I I I I CORRIDOR I -. I N t___.••„.,,,• -Q,-- --- D rn r CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E KEY n PLAN 12031 12041 12051 12061 12071 12081 I'091 1210(. E D 1 o A MINISTRATIVE STAFF o I1c\4 I I I I I 11041 GENERAL NOTES OFFICE OFFICE I I CONFERENCE ROOM 11111 11121 11101 ° w a• .. LOBBY Li. , - 40 A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND 1 201 1 CORRIDOR CORRIDOR AND SYMBOLS. g 202A 12024 CORRIDOR 102B I 1J 1 TELE DATA E MEN�s - - - I - I _ B ROUTE PIPING 12' AFF EXCEPT 4' ABOVE PLATFORM. o �\ .........../ I I___ELECTRICAL ® TLT E sr. E CON220ROOM (212) MEN'S3J LT •pp C USE ZINC COATED STRUT SUPPORTS FOR _ D - ENGINEERING HANGING PIPES. PROVIDE SADDLE PIPE SUPPORTS FOR lii FACILITIES WORK REA r1 !jIj 1i� I CORRIDOR ( CORRIDOR 11121 STEAM PIPE AND CONDENSATE PIPE EXPANSION MOVEMENT. rn 202B R. & D. P. D. Q. A. DOCUMENT CONTROL CORRIDOR LUNCH ROOM 1111( .� I /218 / 216 202C 1 215 I ( I I 0110 Z m �, 0 �' co D LABEL PIPE SYSTEMS v . n t Z14 � ""�_, SERVER ROOM m „, MEN S TLT ��� 'Q . ENS IL 219 ( I ENS TL E FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. L!1 = ��III „c La ® „lo _ _�� WOMEN'S TLT 11141 - � !IcJ F REFER TO STEAM P&ID M4.4A FOR POCS- _ . SS Il _ _ _ I �lL ., ' ! �'��'� °' ` G INSULATE STEAM AND CONDENSATE PIPE PER CODE.. U� 3 ME Sink Sink E I z (n .V I •Q ♦ MECH $ PMP LYOPHILIZER - a < • c Mg 1 0 - #1 LOADING Pis LYOPHILIZER ROOM (,,) °gm 72 I Chitoflex Forklift are P E 1 I I I Washer I C 1 I 0 I O 1311 Al I I Z RESEARCH & DEVELOPMENT _ KEYED NOTES u� `` WORK AREA : GEL PRODUCTION r,,� 1 a io I, ,l E E. — 13291 h— m AREA PMP ►� 1 0 = 130'I a 0$ GENERAL PURPOSE I'R � Clean molds Carboy �8 1 RUN STEAM PIPE DROP DOWN THE BUILDING WALL ir rn F4 N" 1_ storage N "�!' : 'US 1 LYOPHILIZER _ AND ROUTE THROUGH SIDE OF SHED. •- ig- 12241 11 I I :i;Ir ` ] I CORRIDOR Q I I #2 13081 LOADING I d to = *�I c3U Work Tab - ./ -_E -i 2 RUN CONDENSATE RETURN DOWN THE WALL AND UI C GENET r "'N INRODUCT m Y - I _ _ Y - _ - - - ROUTE THROUGH SIDE OF SHED. �' COMING i Forklift 13021 I PRODUCT( N ROOM i LI Lv W 4 i�l 3 6 V LYOPHILIZER ROOM 3 INSTALL DRIP LEG AT STEAM CONNECTION POINT I I PRODUCT ( I J Packaging Area ❑ Pump 1 - i3'1 e1 _ IN GENERAL ROOM 337 AND ROUTE CONDENSATE :1 CORRI OR _ ,oa. — - 33 Dirty molds OUT 3031NG 6 LY��'I I U O I i Yokogo a VFD i- I 1 _ _ I O 0 DRAIN TO MECHANICAL ROOM SUMP ROOM 335. •• •• ■ • ■• •ct ---- 1309 ;,�,__�_ LYOPHILIZER #3 �_-_�, �•• RESEARCH & DEVELOPMENT R & D Q TRANSFER #3 LOADING I • �� '�' • Tyvek TobEe ROOM NI LAB Station ® © LABWARE Farkiift .: I; • ,1�It"I w i�.. Pi _ _ •- Ro 4 STEAM PIPE FROM ROOF. RUN PIPE ALONG THE WALL. :.•'•;.•:. • _ GOWN 309E — all �( i ����= �� :••CL 328 NG U Ce ROOM 1 1r '��/ "Ill- }� I I. :..• T I I o- I I 13041 S y 1 O O I -----=1.. -,-----�, _, .., .... --� QC WORK ,� o - il_, (el ��1�_ I DI ••• . I AREA Bench O 0 r �' •torag= �. •• ..I �` i � — — —s —I 3311 — _ I _ 1.1_ — _ — II I Gocat N 2 — 1 CORRIDOR L (309A1 duE:_ : IP o C 1/ ; c sIPOVEN A L COOLER _ _ we OC YY0 s .2mps DI U C_ I, 13401, '- t_ 13051 a V3' O SUMP Is mp Sat. - x 00 , -- I CORRIDOR I CORRIDOR I a• 1 ( Table Gel ■� Wee{ Press —— 111 M c in !u)_A- g E -i HE--o--- 13001 13001 I yyy T itJ Table Table T. Mixer I EQUIPMENT cart —� bosxge TRANSFER � � Band ge t'�I moPlda molds I (n Xi I 13231 onditioning Sealing and Softening Cart Yen I.V Z'� _ • • • I r AWN L STORAGE ort er putted Pouching wEP wiP Q I R & D ~ � 13211 - O � fi Store a storage uM CLEAN ROOM GOWN 1 ( I I RACK I — RACK I ( I � NC 0 0 iW 13261 (324 SS I GEL WIP FACILTIES G rN,, g g gi —1 JANITOR ELECT. ROOM 13391 AWN 'a 0) '� 1 1315A1 0 I , � -� GOWN 2 13221 • • • • I ss GAL to P 1 3/4-SOS 13251 �o UM o � WIP • -- — __= W o ■ _ ° o ---- 4,-.,, r I I 13181 I SPONGE WIP I 1 Pam -. I r — _ c o � � PACKAGING --• nc-� �o• 0"a • ; QUALITY CONTROL • • • • (3161 ' U ir. 0 3 1320 1 _ E u~ Q ir '_"""ado O—' GE RAL USE 1 AC-3 AC-2 Ip p 0 337 PACKAGING WIP ELECT. ROOM = H gE MECH (CAL ROOM 1 1 1 UTILITY SHED I ° ° E 13351 - 13151 ..o..•i z .i I O 4 4 SQ. FT. LYOPHILIZER) I 1/2"-STE L •( • I • • I 1 :' (3451 ii:. P. • al i r 'a-s' •I C - 1 U 8 g gym_ NON CONFORMING/QUARANTINE WIP TELECOM ROOM ® (3171 I Pi 6, , , B crw . .I- 1 . i o(-1 .-- ____ ..........._ _...... • ' I 0 _ ____ ____ — _ Z gg • NON-CONFORMING SALE z I I & MKTG R&D I I I I I CH� I Z J %b.-Q Z U vi STORAGE ?aC Q STORA E CHITOSAN STORAG ' z 13451 (3441 13431 • IA], , • .. I ta a. tr INN Mk Z o te Z © fl I 1-- 1 F,4', p, tea _ h. e QUARANTINE I I I o_ �aZa m o � STORAGE DRUM rn EM LAB STORAGE i STORAGE �' 4 U W 13421— _ — N2 — _s — _ — — — — — _ _ N z SYSTEM A Z g I I 1 CABINET ( I I 1 N - J 2 L. W L_ _l J U _ ol .-gz a.MATERIALS SHIPPING J ANACTLI NT & STORAGE a. I O LYJ il vi V7 ri l0 to s $ BM n O 1 STEAM PIPING PLAN c,� FILE: 3.14 SCALE; 1/8"=1'-0" ,����.D roof 07006-M3-14 o r9PEN r' I ij •REGO •D� 0 . '%EN E. G� . Expires 12/31/2007 8 v 0 0 0 • z 0 4 .p . . ,1 0 �� ill 0 0 © 0 0 0._0 0 • • 0 . 10 9 8 (::-J:22/ 4 0 — — o I 1 1 1 I V i / \/ ,Allerme al rj 4000# - ® L ___ _ : o // / ' :::::;°111111111.1!Fr 1.--- - 0 A OFFICE OFFICE OFFICE FFICE OFFICE Q r © o \\//,‘ 11051 11061 11 071 108 109 I 1 —1 I ( er; ( ( I ©- _ o o w AA // I I J I o /// / \ 0 7 wit / — — f ® Z 0 \ �-- LOBBY ® U 11011 ri CORRIDOR O f I I I 1 I I I 1102A1 [I N (_, on W i / CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E 1 ' v=i „; --r 203 204 1205) 1206) (207) 12081 12091 1210) \ N, .1_, I I KEY PLAN A MINISTRATIVE STAFF o a 1 I 1 I 1 OFFICE OF ICE i (1041 J CONFERENCE ROOM ( o --- ....7)__:\ i 11111 11121 11101 GENERAL NOTES 40 ..i--LOBBY — — N 1.,: .. i ., I2011 CORRIDOR CORRIDOR 1202A1 1202A1 COORIDOR A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND 110281 AND SYMBOLS. g _ I I l 1 l I I, _ _ — TELE DATA MEN'S - - - ELECT. — — B ROUTE PIPING 1 2' AFF EXCEPT 4' ABOVE PLATFORM. ELECTRICAL EMI TLT D.F. . ® CONF. ROOM 12121 MEN'S TLT 112A •F o w 220 z (113 ENGINEERING C USE ZINC COATED STRUT SUPPORTS FOR Ca \' r D CORRIDOR `C CORRIDOR FACILITIES WORK REA M \ 11121 HANGING PIPES. On 1 202B R. & D. P. D. Q. A. DOCUMENT CONTROL CORRIDOR LU CH ROOM \ 1111) ,. / / 1 21 s zo2c 215 I I ' 1 I I I Ii Q� (� 218 © D LABEL PIPE SYSTEMS m • g, i 1........._ I _ _ ( n Z V 4 �� SERVER ROOM Li.l I I EN'S TL �- �" W MEN'S X41 I� 4 EN'S IL 219 ,�;- I E FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. m = � � Ø . i WOMEN'S TLT 11141 - W a _ ::I \ I , ,� 1m?--J _ I — _ _ _ _ I 1 F REFER TO DHW P&ID M4.9 FOR POCS. W c cli OA_I WH 4 awmr Sink Sink iii • hil >>P---il:,n.j W OD'- _ MEC'7I 0 PMP 1 1/2"—DW—IEC ° ' LYOD IZER _1- 1/2"—DW—IEC . D -1"—DW—IEC i 'P 13341 �` uR a IJ z ' - LOADING `� P s LYOPHILIZER ROOM Chitofiex Forklift 11Lob I �� O I Q 311 A Washe _ _ I RESEARCH & DEVELOPMENT i 1 ` C_ GEL•PRO' Y = Z QQQ•o WORK AREA ARE' PMP �F orxr awm, E CO .� 1 329 -°' (34 I a• aw��x C =i GENERAL PURPOSE �! I= I Clean molds Carboy \ a^ 12241 , I LYOPHILIZER CORRIDOR EYED N CST E S 1 I U � '= I 13001 rk Tabe I I 1 #2 LOADING I 1 �+ •� I LLI "F PRODUCT mY NEW DW DROP FOR (R) MOLD WASH SINK. w �WHET -1 .....7 C) =41- - Forklift IN COMING PRODUCT N ROOM _ — — _ — — — w� Iii 13021 2 NEW PRESSURE REDUCING VALVE ON BUILDING MAIN. > co) ^ SET TO 80 PSI. LJ W 4 � I�, 3 6 LYOPHILIZER ROOM W LZ 1311 BJ I PRODUCT I I i Packaging Area ❑ Pump 1� CORRIDOR ,no om+ 1 OUT GOING _ — _ .1338 Dirty molds - 13031 t s I LY81 ' ii Yokogawa VFD \ 3 DEMO FAUCET ON OUTSIDE OF BUILDING WALL PRIOR rel >� 13091 ._ LYOPHILIZER #3 _____---11_,.., TO CONSTRUCTION OF TILT UP. (fANSFER 3 LOADING ..• #3 • •. ROOM 1 '�wlh.- RO LAB station GOWN 30981 Forklift banddges i' :11 • I-" ,�il, d 1■,- \ CLEANING - 1 .13271 ROOM d : ••� • 1 1 13281 ( I 13041 a, ----— = 1�-'� DI .. .:••; • •. C WORK `� I W O g O I II-! ■■ �1� 110 °-� ......... Q Bench \ o v, lug —Jinn -- ■ 1 r„.____. .torag= •■ AREA Q O GOWl�►- ...• —�_[ Ft._ — — --e —{3311 _ H _ ROOM c J - 0 — GIP — — — — — CORRIDOR \ WALK IN — .5 1309A1 0 o f SIP OVEN A/L , 13381 COOLER `_ :+� ,-� — a A �'�' s out i,y� li on =ram ROO DI t "- . 13401 _ — �— • 1 1/2"f-Dk1g151 s s • Q SUMP Sump U— — a'SR GeLEI U —' .X 1 f-- G m 1 A 1 CiORRIDOR 1 Sao ota I Table Makin• Heat Press x(3001 13oa1 Table Table V (.7 N 1 _~� Mixer f M 0 V!smommesion EQU IPMENT cart bandoge O. TRANSFER Bandcge trays m molds Conditioning ~ �� CA 13231 _ Cart Oven =Z Sealing and Softening ' STORAGE 1T AWN 1 CLEANROOM GOWN 1 I 13211 1 - I RACK I RACK I °` utter) Pouching Storage Storage uM W" ma 13261 13241 _ SS FACILTIES Q GEL WIP ELECT. ROOM 339 N % °5 JANITOR 0 1315A1 155 AWN Q h - gig GOWN 2 3221 • • • • g ,Q 0) N 13251 MI 1 UM N � WIP SPONGE WIP � ��oaw�❑ - — - --- ---�----- coN N - - a ° — :��_ 1i�. o Pu " -�-- c I I (3181 I I I Ac-4 — — W \ !el,. 1 1 2 —DW—IEC QUALITY CONTROL PACKAGING B�oEt�R Ac -...�' 1 ______ ' Ir 13201 • - • • 13161 rvrK ='� I c A om 1 ,:;-- 8 W AC-3 "" AC-2 ' V lx GENERAL USE MECHANICAL ROOM 13371 PACKAGING WIP I ELECT. ROOM J 13151 UTILITY SHED _ C 0 13351 - - . il I (24 SQ. FT. LYOPHILIZER) I U- I I • I O 13451 Z = -NON CONFORMING/QUARANTINE WIP � • 0 1 I W g r-` 1 di ....._A__...I , „ TELECOM ROOM v p o 13171 I © ® N ' H B W gx NON-COMFORMING SALE1 I 1 I t . I I I Z '� . & MKTG STORAGE e • I 2 8 %I.- STORAGE CHITOSAN STORAGE Z U o 13451 13441 13431 •I�1� co as as Z © 8 . I QUARANTINE I I I g I i 3 Q 0- 4 / .. STORAGE DRUM < Z 0 co 0 5W LAB STORAGE STORAGE - 4- ,q Z o 13421_ N2 — — — \ —. — .— — — — _ 4 0- o, ---- -— — — — — — — — SYSTEM — I' M W i• a w.v, CNEM ir � I .. - - - I tL_ _ __] I cABiNEr I 1 1 I W � z� r 25 MATERIALS SHIPPING p=„ M o °��, i MANAGEMENT & 13411 GE .--—�(-`-•.. mm O `� _i .... ,-- II ,∎ __....._ 11.E . . o W o 0.c o N AN m 0 o H r, M 1 DW PIPING PLAN CAD FILE: 0 g PROF LA M3.15 SCALE: 3/32"=1'-0" ,`���,D f�C 07006 M3-15 ouvt), (024, ii f'8 9PE:06 ' oLa r. 0 REGON (1 v( vii .,� ty,3,24 ",,/YEA/ E. Cic 2 . [ Expires 12/31/2007 0 N. O ... • • • 10 9 8 0 6 5) 4 . ,D 0 — 0 o () o o o 0 o 0 0 o EMI NINNININNIEIAIIIIIIIIIIII ball r Pr OP' r r Air 11 1 1 $ _ _ _ _ _ _ _ _ N.----. ---.- ---- ._ ______ .11 , . , _ . 0074 /i, HI. _ rfr Pr err ,„ I 0 L ---0 // / 0 y 10 0Z OFFICE OFFICE OFFICE FFICE OFFICE ® / / / 0051 0061 11071 0081 0091 1 i A I I 0 1 I // IIIP N A A i — • ° OC1 Z (1) 0 Lai F.--- 0 (...) /// I 1 o D ix 0 .74E4 4, i, / • 6 0 ____ .../ , . I ' II, , . , . . - It • LOBBY ..-.. — _ ...--' ..," 11011 @ ce ,- ,-- ...-- o ....--- CORRIDOR ---". t.L.I..--- I I I ...--"" IT 02AI ----' 0 .--- ..--- w ...--- ---- s'' ..---- ....--- CONFERENCE ROOM OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFI E N --iier! ""rz4b HernCon .....- \ KEY PLAN — . , ,2031 12041 12051 12061 12071 12081 14.091 12101 -,-----i -** \ , ., A MINISTRATIVE STAFF ZNi / \ 1 OFFICE OFkICE I I CONFERENCE ROOM 0 < , 11041 "...In 11111 OE 1110I GENERAL NOTES . _\ rt..... ...." ..1 ..... , _ „... _ w et- _ LOBBY V) 201 CORRIDOR CORRIDOR • A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND /. 1= i2o2A1 I 1202A1 MIMI MI COORIDOR 1102B1 L I 1 AND SYMBOLS. """ s..... m TELE DATA I- MEN S .1t1 ELECT] 0 B ROUTE PIPING 16' AFF EXCEPT 7' ABOVE PLATFORM. 7,-- ELECTRICAL CONF. ROOM HU TLT 12121 0 MEN'S TLT DI% 112A • 1 Ce I. 11131 ENGINEERING C EXISTING NG DISTRIBUTION SYSTEM TO _ 111,•=1 E. CORRIDO CORRIDOR — . FACILITIES WORK REA r-- — 202B R. & D. / P. D. / Q. A. DOCUMENT CONTROL CORRIDOR LUNCH ROOM .44, iii. lip I me 11111 s., 11121 REMAIN ikS PIPED. V T --..-01 10 218 216 202C 1 215 0 Ill 6 we D USE ZINC COATED STRUT SUPPORTS FOR pli u) iii .:N\._ P eS ••••••••••• SERVER ROOM le HANGING PIPES. — MEN'S TLT Ai to . EN'S TL- 219 aig ■11 EN'S TL' r) 0 CC 12221 1" -(2211 CD g • WOMEN'S TLT 0 11141 E LABEL PIPE SYSTEMS W Cr' 1,.....- 11 Ell ssik ,Iii. i 12131 • F FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. W = _:, _ ........1– _i 6 _ _ 0 8i FVP WH-3&4 • 6 — 2"-NG-AEB rill - i _ _ _ Z 4::: Sink Sink lemi 0 , 3 MECH LI Z 13341 -§ PMP • LYOPHILIZER 4. Inn - ,ma El ig a 13071 cv Chitoflex Forklift La b 1241 1 #1 LOADING [7: LYOPHILIZER ROOM III C r: a Wore 1 118111 a 1311A1 Ill 0 g p.. washer Z 0 00 — — ___ RESEARCH & DEVELOPMENT WORK AREA ..•-...- 40FD CE) j.lu. tn PROD •k affrcs AVILE I Tip arm . ARE' PMP (ill III -2 1°3 is i Eil __. , Ei 130 10 cil& 047TXLE w 1161 Clean moldsn .. i58 III 0 el GENERAL PURPOSE is, Carboy storage 12241 III 4:1 S 'figi S 0 KEYED NOTES LYOPH I LIZER CORRIDOR 1301 L9 .c I I§ lr.ff SP 13001 1 1 #2 LOADING E.: ,I;:Ili m g i +rk Tabs Imii.F. w 1 1 NWN TO PROVIDE NEW METER FOR 3,000 MBH SUPPLY OF -±- ILI c -. PRODUCT la WPC _ y- IN COMING I oate — — — — _ NATURAL GAS IN EXISTING HEADER. A LOAD CHECK ON THE 1 '''' al Forklift 13021 i PRODUCT' N ROOM I ' ' °IC II • SUPPLY LINE FROM THE STREET WILL NEED TO BE COMPLETED ..-.-.1 LYOPHILIZER ROOM TO ENSURE PIPE CAN SUPPLY NEW LOAD TO BUILDING. us u..11 t , 131181 1 Sponge PRODUCT I Packaging Area El Pump CORRIDOR N200,3% r - _ 13381 OUT GOING II I iii 1-UP [; 1-UP 1-UP 1g 1..Y8111 Mgr 0 i 1 VFD 1 2 CONNECT EXISTING HOT WATER HEATERS TO NEW GAS LINE. :q - Dirty molds Elaj I Yokogawa fir - - PROVIDE CONNECTION WITH 3/4" GAS LINE. (--- • RESEARCH & DEVELOPMENT — 'I'Yvtotetn TRANSFER #3 LOADING .....m.,. • 1... . • • ,..„, R & D ROOM 1 ; .I r-----111 LAB a u LABWARE 309B — Forklift, bandcges E ii:, : lu-r. , , --- _____________ RO ...• • --- 13.271 CLEANING- GRgTOWabMNie T.Z. ?Alt III 1E4 ...am ,-,:a 3 CONNECT NEW UNIT HEATER TO NEW GAS LINE. . .r...-- _ . 13281 I 0 m 0 1 o_•I . 1111 11 -17-11 It iF-4 PROVIDE CONNECTION WITH 1/2" GAS LINE. 13041 ' 1 —— !!!!ff- - - ww......i■Horoirsr iill 1111111 4"--":. i■ .... . •• g. .1 .. QC WORK I 0 1 0 c '2 .s ,9 L9 ' Mae Iii...:Akiiiii.TALT:, DI ____ r- II F,_Eii AREA _13311 — II — II _Bench — - - I G00 WIN-0. ___. — LIP — •torag= — — \■ } '1"--\ OVEN A/L 13401 ' CORRIDOR 13381 ■ • ) ■ , 1 WALK IN g 8 COOLER 1 I 13051 I it--- _ N 2-111, 2-UP 1-UP i -.'"----"MD 417 .. 1309A1 ;I i s, (Do, —Jr-4r OcK,C II "UPS e LYOPHILIZER ROON a 0 SUMP 2r4Ins( SIP- DI IGO L )- D §R cc ..*--IT _ 1 - .00. Table Gel LIF Table Heat PressU bandage Table - C.) 1 CORRIDOR CORRIDOR Makin. —— ..I.......1 --.1 13001 13001 11111111111-11-HitA-... 2 (4e: gE 1 Mixer I 1 EQUIPMENT cort * 1 1 TRANSFER Bondage 12q. trays molds La I molds LI... I" I 13231 . J . < Cart :;onditioni g Li I 1L1-....._ _ - --I- R & D I STORAGE 13211 it 1 • • • • ' 4---- 1 Sealing and Softening i IIii-[ ifler putted Pou0g WIP WIP .,ven 5 (f) WZ M Storage Storage C LEAN ROOM --.... GOWN 1 RACK RACK 2:1 FR GI Lir z z 5 13261 13241 SS I > GEL WIP 1\1 FACILTIES st 40 ELECT. ROOM 13391 CN * 0 6 JANITOR AWN La CN1 ..... GOWN 2 13221 e • • • g 1315A1 55 GAL tz r.... C.) : 1 4:t a) ' u 13251 i ..............,..........• c o:2 -ft FE:3 • c., . z r. w ------ i_. WIP SPONGE WIP 13181 M toil _ 0 0 _ ' ' AC-4 QUALITY CONTROL PACKAGING --...... AC-1. ilr.... __-_ ..Iii ........_ ....._ _____ ______ ____ g g lei) El X I3201 • • • • I 3161 BiaEr (..... C GENERAL USE I M V.---1 AC-3 • 0 0 CI C.) In te g 6 g 0 MECHANICAL ROOM CM PACKAGING WIP I ELECT. ROOM •=itil 0 ..00,„„,.ii,...:lii 7ILIIT3-Y451ACSIH-2ED ' . E 15 4( '• 0 0 0 13351 I-7 NON eCONFORMING;OUARANTINE WIP _ TELECOM ROOM 1315 . Iv- ri - 1. n , (24 SQ. FT. LYOPHILIZER) • 1 .• ‘± ...al?. al Eio 13171 , A,.. La • P.,) 9 g -: . oike :2 . ___ _ ,........ _.....1=-7—=Ir b... x`Ri ... _ i I- - - -1-- ..............r 1 --) _____ ____ La NON--ICOMFORMING I SALE 41--tp ix wiz R&D e CIO z o 8 a, ....)Q*. & MKTG STORAGE 13451 STORAGE 0441 CHITOSAN STORAGE 1343J • (7)I Z M 0 MIA .....d. —.Ns -. Ish, Ili LI- 5 W a. CO II • I ....____----2 -: , 0 i- - –J Z •-.1 < — C:) 1,-, o 2 . QUARANTINE STORAGE I— — 7 1 DRUM 1 o 0 ,,, Z m LAB STORAGE 13421_- _ -— - — — I N2 — — 1 — — — — _ ____ .._ .2' I SYSTEM 1 I FIT7— A oti 5 ;I La 46 -I CHEM j .• ...... ce 1: ex L _1 1 CABINET 1 LIJ m F 1 . N ti to 23 Z w- CD L. ± Li- Z 0 El g MATERIALS SHIPPING a. 1.-sic5 1 as MANAGEMENT & STORAGE 0 -E. 13411 ...---ii—...... I ).. — 2 .....1 *ft e ...." ...... CA a_ • . , ■ . ..._....._ . . ' . . . 6 w g (T) IR • 6.i g w co cs' i--,-1 1 NATURAL GAS PIPING PLAN AD FILE: Cr) 3k.t PROF 07006-M3-1 6 M3.16 SCALE: 3/32"=1'-0" ,.. cb G I Nt.e. (vo,' li 7 889P E IS' lid I i g =REGON j..._ -E" & 4i) <yi 3,sO` \)4.- 0 AtElY E. 61/4 11411 Expires 12/31/2007 oc g = •.. N. 9 .0.. _.., FMS — - -7 GENERAL NOTES rpo r - LOW HIGH A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND LEVEL ALARM , SYMBOLS. 1.01.J ' B ALL IW PIPING TO BE RUN IN TYPE L COPPER PIPE. , o _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __j C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET -, - - - A0.2. Z o ri cn __,_ H 0 o I PANEL. r t KEYED T► N O ES (:, 0 Lo 1/ __ J L.O2/ ..,..,,i 1 HEAT TRACE AND INSULATE ALL OUTSIDE WATER PIPING. W c I 2 LABELS ARE PART OF DI SYSTEM. DI TOTALIZER. 0 L�_____� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ _ I 3 DEMO AFTER COMMISSIONING NEW DI SYSTEM. COORDINATE DEMO WITH SYSTEM OWNER/REPRESENTATIVE. .... o r i 1 LEAVE HOSE BIB ON WALL. o 4 CAP POC AT CONNECTION. a 41) 4- 410 r r � J 4111) g o CI roverr 4 es f 41 0 CO CI ..41.1 Q. 4 < iiirP%Pi Or■T P?A 411, cn 0 LI : s, r 4 ■ r FEZ .-02)/".P"At'- 1 W W ti.w c L rir CO '- LSLL � � 4E cii 3 GPM MINIMAL 3 GPM 10 GPM 10 GPM . 1 U I S N. czi Q O W LYOPHILIZER CHILLER LYOPHILIZER I Um • COOLING COOLING 1 Z �� # 1 MAKEUP # 2 TOWER TOWER _ j 2 1 1 # 1 # 2 0 0.. HOSE BIB i it 0' &a .e . 4 01 al„, C. n - TO TRAP PRIMER ;jII 4 16 BA w .,.; BA i I @ BA BA I,. 11 .� 10 I • ■.: ■•01 12 13 •0 • T 1. iii ■ 1 1/2"—DW--IEC • • •J • • 1 1/2"—IW—IEC D • H 1" I --IEC I HOSE BIB / �� • BA BA BA 11 STR 02 03 09 Si 01 •PBP 0 o i ► 01 M 0 ;� TO � a DW IW m1 1/2 IW—IEC --5 TRAP _ PRIMER V wg w 2 tcti 12 W 06 a MI .a a v W 45 iE! t F O 1 MANUFACTURING INDUSTRIAL WATER P & ID -- DEMO W I W II MD4.1 SCALE: NONE gi 0 ILL . Z 0 L 0 .... W, Z �3 3 �i0 tL v 8 Cl.. IW VALVE SCHEDULE W ....., 1._ to „,„ _ig 0 0 TAG # DESCRIPTION MANUFACTURER PART # COMMENTS 3 6 a Q ig IW-BA-01 1 1/2" BALL VALVE HAMMOND BRONZE 2-PIECE `` a IT ° @ ai = m _G U g _ _ W E+7 IW-8A-02, 03 1 1/2" BALL VALVE APOLLO / CONBRACO _ 82-107-Q1 BRONZE 3-PIECE FULL PORT . E IW-BA-04 1" BALL VALVE APOLLO / CONBRACO 82-105-G'I BRONZE 3-PIECE FULL PORT W z gE I 09 TO 11 J , 8 2 5 0 1 Os .g >_ L. E IW-BA-12 TO 16 1/2" BALL VALVE APOLLO / CONBRACO 82-103-01 BRONZE 3-PIECE FULL PORT Z • ci IW-SV-01, 02 CONTROL VALVE SUPPLIED BY EVAPCO SUPPLIED BY EVAPCO WITH COOLING TOWER m 0 ( E vi IW-PI-01, 02 PRESSURE GAUGE ym __ 1 84T041-ED:4-1 IW-RPBP-01 REDUCED PRESSURE CONBRACO 40-207-A2Z ��D PROl BACKFLOW PREVENTER �5��" z x� �4 2 ii IW-PRV-01 PRESSURE REGULATOR WATTS REGULATOR U5-Z3-GG 1 INLET/OUTLET WITH GAUGE /, '��`'' `�'7 889P IW-PRV-02 PRESSURE REGULATOR WATTS REGULATOR U5-Z3-GG 1/2" INLET/OUTLET WITH GAUGE l - �~ !'•R O IW-STR-01 1 1/2" STRAINER CONBRACO 59-007-01-P2-E1 CAST BRONZE Y-STRAINER, 20 MESH cP .4'0,, , , �� tli IW-STR-02, 03 1 1/2" STRAINER SUPPLIED BY EVAPCO SUPPLIED BY EVAPCO WITH COOLING TOWER E`�o �J - yEN E. G �V f0 C O .= �._�_. �.�.��.zµ�,M. ,.. ...� .. Expires 12/31/2007 1 0 Fogs _ _ _ _ _ _, - _ _ - _ - _ - - --- _ _ _ - _ _ _ _ - _ _ _ - _ _ - l GENERALNOTES (P1 oil r , LOW/HIGH A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND 'x,_01 X01 J LEVEL ALARM SYMBOLS. B ALL 1W PIPING TO BE RUN IN TYPE L COPPER PIPE. Z L C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET _ - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - --1- - - - - - - -— U A0.2. k) _ o _ _ _ _ _ _ _ -I W - --� = p PANEL , ! , KEYED NOTES ma r ma ( 1 p 01 02 1 HEAT TRACE AND INSULATE ALL OUTSIDE WATER PIPING. o 2 EXTEND PIPE TO AWN TANKS AND CAP. N 1 _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ __t_ _ _ _ 1 _ _ _ ___._I 3 KING INSTURMENT SERIES 7530 WITH VALVE 1-10 GPM OR EQUAL. 8 M 0 I- 1 4 KING INSTURMENT SERIES 7200 3-30.5 GPM CR EQUAL. O 0 m I r r i t N m * n 0 111111 111111 , Nm gi .< Cn © 13 ff, Z .2 0 W N W L iif ii c t t Z 1, 3 GPM MINIMAL 3 GPM 1 10 GPM 10 GPM 1 1.7 I I z +/-) (1- E TO TRAP PRIMER c� o la o LYOPHILIZER 1-- CHILLER LYOPHILIZER ; COOLING COOLING Z v g- # 1 w MAKEUP # 2 TOWER TOWER __ W c li j GEL T J # 1 # 2 W ° o PRODUCTION �= ,Q Ni HOSE BIB N m i:l. •,` r cc TO TRAP PRIMER (7) ILI • ° � "1`' w © -.- > 5) 0 0 SV W li U PRV v I W W I 01 02 g y I T 02 �- j T PI CV _ I STR STR —V R PT \ �I � BA 02 • 03 • �- 02 N BA BA \ cv 16 27 w w ...... . 01 14 04 15 '�.. 8A BA BA I • �.i'= BA BA BA BA �,, ,..ICI 11 ;� 10 �- .... :'�' : • 01 I i!— 13 23 � " � "/44» 1 • • • • » •• • �� a e— a ■■ :■.. () 1 1/2 -DW-IEC • • •� •• •• - - C © 6 II 1 —IW—IEC HOSE BIB _) • . / BA BA `C) BA • BA • BA • BA BA 0 IIP .6 gi STR 02 03 30 17 21 20 09 , _ 01 PBPI Cs 0 � I O w BA M •.01 - - - I 18 g waiso i BA • BA • BA • BA 1"-IW-IEC fw —� __, DW IW 31 32 28 29 i 1/2"-Iw-IEC ,TRAP w . w w U U BA BA W z1 I I w w 33 w 34 w CHOSE BIB N 05 wI ;i- I «I 1 1/2"-IW-IEC U „„ `\ `\. .. D-, I I I� Z 8 ( I I N N V W a6 LYOPHILIZER LYOPHILIZER c",, BA o ° 8 SIP GIP N 22 U in la g Vi # 3 # 3 SKID SKID !. i o ci STEAM VACUUM _ ~ CONDENSOR PUMP rii STEAM BOILER o s n BOILER BLOWDOWN W 44 -.L. BA QUENCH o 4 I-1 U J o of 2 GPM 4 GPM 2 GPM 20 G M 24 eik W pg 1 MANUFACTURING INDUSTRIAL BA SGPM 1GPM CATER o i� M4.1 SCALE: NONE 23 • 'r" o. W ao x -.---8s W IW VALVE SCHEDULE BA o J d 25 v v 0 a . Q Z ti m TAG DESCRIPTION MANUFACTURER PART COMMENTS PRV `` a o ° ta IW-BA-01 1 1/2" BALL VALVE HAMMOND BRONZE 2-PIECE ,� 03 W — —dB I 4 4 m 0 ig IW-BA-02, 03 1 1/2" BALL VALVE APOLLO / CONBRACO 82-107-01 BRONZE 3-PIECE FULL PORT ' ce re IW-BA-04,09 TO 1" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT w m 1 V 11,18,20 TO 29 _ DEIONIZED _ �4,. o WATER o R m I i 8 IW-BA-12 TO 17 1/2" BALL VALVE APOLLO / CONBRACO 82-103-01 BRONZE 3-PIECE FULL PORT J 4C Z 30,31,32,33,34 3 = IW—SV-01, 02 CONTROL VALVE SUPPLIED BY EVAPCO SUPPLIED BY EVAPCO WITH COOLING TOWE IW-PI-01, 02 PRESSURE GAUGE 6 GPM P.e 1 IW-RPBP-01 REDUCED PRESSURE CONBRACO ' 40-207-A2Z ' 40 PROF F�' 7006—M4-1 BACKFLOW PREVENTER t'` ,G I x,4 4 clg IW-PRV-01 PRESSURE REGULATOR WATTS REGULATOR U5-Z3-GG 1" INLET/OUTLET WITH GAUGE t:8 9PE • ' IW-PRV-02 PRESSURE REGULATOR WATTS REGULATOR U5-Z3-GG 1 2 T INLET OUTLET WITH GAUGE I �a 4 IW-PRV-03 PRESSURE REGULATOR WATTS REGULATOR U5-Z3-GG 1 INLET/OUTLET WITH GAUGE 0REGO ; ‘17 R. IW—STR-01 1 1/2" STRAINER CONBRACO 59-007-01—P2—E1 CAST BRONZE Y—STRAINER, 20 MESH 4. '13, ■Jac IW—STR-02, 03 1 1/2" STRAINER SUPPLIED BY EVAPCO SUPPLIED BY EVAPCO WITH COOLING TOWER 'N E. LE [Explresl2/31/2007 z CD 0 IFMSGENERALNOTES f Pi l VT1N A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND 01 I ._.. I 1 ' ' t SYMBOLS. B COOLING WATER PIPING TO BE SCH 10S TYPE 304 STAINLESS STEEL PIPE AND USE VICTAULIC FITTINGS Z _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - WITH GRADE "E" EPDM STANDARD GASKETS. °- - -r—- - - - - - - - - - - - - - - - - - - - - - - - - - C PROVIDE THERMO WELLS FOR ALL THERMOMETERS. o w --7--- - - - - - - - - - - o r r -t °1 1 PANEL � D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET o Mal SPEED ►"Pjc'1 Es SPEED t A0,2, U O1 CONTROL 02 01 03 CONTROL /�� SPEED o 1 ' - -, 1 VFD-02 r•,. ' � 1 , t� � i VFD-03 T FS� ` `` 01 03 CONTROL °w D SPEED l ∎ I 1 ,∎ �VFD-03 N m CONTROL ; KEYED NOTES Q VFD-01 o 0 L._. _ _ _ _ _ _ _ _J____ _ _ _ t _ _ _ _ _ _ _ _ - - - - ---r - - - - --t---r - - - r - - - - - --�- - - - --t - - ---I 1 REROUTE SEPARATOR SLOWDOWN DRAIN LINE 'O AWN N _ TANK. DEMO EXISTING LINE TO 311A. o o J Q 2 INSTALL THE THIRD PUMP IN EXISTING PUMP SKID. 0 N ci 3 EL w NEW VFO IS REQUIRED AND SKID PROGRAMMING < 0 UPDATED TO INCLUDE NEW PUMP. I- ..1 th" g 0 3 CONTRACTOR RESPONSIBLE FOR RECONFIGURING I AND MODIFYING PROCESS COOLING WATER PIPING ON .- M 0 r----- A - - -_-- A --- 1•- A _ J INCOMING LYOPHILIZER #3 TO MATCH EXISTING UNITS: LYOPHILIZER#1 & LYOPHILIZER#2. DEMO OF EXISTING Na FACTORY PIPING ALSO IN CONTRACTOR SCOPE. cii 1 A ll i U m g� 4 4 CONTRACTOR TO PROVIDE HEAT EXCHANGER. Z •0\/Lj IJJ cc ri ''." L'' Sig CD o - _ w II O u m Z C. Ui 6 N: C.7 r' Li 0 L. © -I c O „� - � � M � I� HIGH POINT u- '- < � � < � � u_ o VENT (TYP) < < � Z o W 2 _e < UJ 0 BA o1 HIGH POINT 12 VENT (TYP) � c 1 11 4, 4 t i t t t m � . w 2 0 = c, A • �. > • I! BA BA i 02 1" - I1 W 03 01 , 1 IW MAKE UP L Lk GA BA ---1----r- -#----_f 1 WATER 05 11 : GA • TI w W 02 ■ �■. � 04 • -J - J., • 08 I I t 1 4 K5 , ■ .. ■ cr. ■ w••■w 8"-CWS-JEP —J t t . 0 0 V ♦ V L t 0 ■•■■■�•■ r OM,* ■"•w■w I C . .■_■,, I. 1 w Z•i Z s w ::■r cC N TI N - N s ■ 'r■r: -) . 6" 6" 6" L 04 A L ♦ A t » " ■ TI 1" 2» 2» � ,� Ti D2 O C____<_2" TI D2 0 c2 q D 0 ► 0 c 1 _ 06 LYOPHILIZER i 03 LYOPHILIZER LYOPHILIZER -�- � CT-1 CT-2 � SEPARATOR LYOPHILIZER 05 O O Q 1 2 i (.) # 3 # 3 TI • • • n BF n c PI # # t PI w REFRIGERATION 07 t 2 °a R mN 04 4" 4" 03 4" 4" 01 t 1» 4" SKID 4» t ---I - -o- • 12 W ____g§ D C q D a ■ c • PI SP-1 Iii) • ♦��'• 1 •••••4 0•••••1 •••••� Z T © HEAT © ' 05 t �\\ �`\ �`` BF ■•••••• ►�►••�••�••4 ••••••••••� ►*►••�•���•� BF -- r BF t» BF BF EXCHANGER 3 (� • • 10 �•••i►•It kel th.�❖�•. ••�•.••i•,�•�• ►4►.►•�•.••►•i 09 15 w `z p O O 05 7 - ' i i I .� �--I i i I t an OVERFLOW--- .... 1--D n c� n n C a N �Loll 02 , i , t I 1 —K51'--I j • �, OVERFLOW ° 5 a — t CWP-1 CWP-2 CWP-3 -, -�- _ 3" DRAIN • BF z t ----------- 0 w PI BF BF * P L`J 3" DRAIN BF �► " 16 4c c0� �. BF 06 15 I �► ♦ t 600 GPM 600 GPM fi00 GPM 11 : 3 -PEH • o W W0 07 p A - A 16 • • 080ft TDH 080ft TDH 080ft TDH — --- 3"-PEH vii o `8 0 TI c BA ° �. J 01 BF == = -= BF BF BF 09 08 E �i a BF BF L L� L 0 03 13 14 rr I - mo2 J 06 8"-CWS-JEP 41 8"-CWS-JEP---- ' 1 PEH Z o 01 01 " !- ~ � A '? L I 0 �_ i •Ili w 8" CWR-JEP 8"-CWR-JEP ► ► o J I TI BF Pi A 02 02 gin -J 0 z w� 3 z w o w COOLING WATER P & ID U _ 0 iT) M4.2 SCALE: NONE 4 © Rg 0 - J p tn. U V W ix ~ < Z Q m O w 2 li � WZ 'II cw VALVE 0 SCHEDULE p U zN W N W EQUIPMENT S TAG DESCRIPTION MANUFACTURER PART N A COMMENTS �- 2 -� CW-BA-02, 04, 1/26 BALL VALVE APOLLO / CONBRACO 76-103-01 2-PIECE o 4. O 2° CT-1 & CT-2 CWP-1 , 2, 3 CWP-2 05,06,07,08,11,12 OR SIMILAR o COOLING TOWER 1 & 2 COOLING WATER PUMP 1 COOLING WATER PUMP 2 CW-BF-01 TO 8" BUTTERFLY VALVE DEZURICK BRS SERIES WAFER, STANDARD TRIM GEAR OPERATOR o N EVAPCO B&G SERIES 1531 MODEL 4BC B&G SERIES 1531 MODEL 4BC 04 ---g® AT 29-121 15 HP WITH VFD 15 HP WITH VFD CW-BF-05 TO 6" BUTTERFLY VALVE DEZURICK BRS SERIES •WAFER, STANDARD TRIM GEAR OPERATOR c 2 900 GPM, 80F SUPPLY, 95F RETURN 600 GPM © 80FT TDH 600 GPM © 80FT TDH 08, 11 TO 16 CAD FILE: M 1750 RPM 1750 RPM CW-BF-09 TO 3" BUTTERFLY VALVE +HAYWARD BY140300EL - PVC $ .V PROFf ) 07006-M4-2 GINS �O 3 " 16 �1 4889PE l ii HX-1 SP-1 PF-1 CW-BA-01, 03, 2" GATE VALVE �� '�I. eW SS SHELL AND TUBE ® SEPARATOR CHEMICAL POT FEEDER 04 L' a 2" INLET/OUTLET DRAIN GRISWOLD EVAPCO ►, RE GO MODEL FB-2 CW-BA-08, 09 1 BALL VALVE HAYWARD PVC •REGo 1 INLET/OUTLET WATER MODEL CSS-300 # '�' &Z) 18,'�'`� 4] 4 GPM DELTA OF 100T WITH FUNNEL PACKAGE, VALVE _ _ " . • (It G,*`� d PACKAGE AND BASKET CW GA 04, 05 2" GATE VALVE N E - - [ ptresl2/31/2007 E o P. 4 S- o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -FMS _ GENERAL NOTES 6.0 HIGH LEVEL 60 HIGH LEVEL 03 ALARM 1 2 1 ALARM A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. E - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -E z _ _ _ _ _ _ KEYED NOTES Z 02 P -, i PANEL-1 °- o r — — — — -1 �, �,. 1 1 1 COORDINATE WITH STRUCTURAL CONTRACTOR FOR COLLECTION LEVEL CONTROL LEVEL CONTROL rL LEVEL CONTROL LEVEL CONTROL ,�, TANK. o PUMP 4 SWITCH 03 PUMP 3 SWITCH 03 PUMP 2 SWITCH 02 PUMP 1 SWITCH 02 o i � � / 1 1 ,.... -/ 1 !��/ 1 I ∎ / I I 2 FLEXIBLE CONNECTION TO WITHSTAND 150F. ce I I 1 I o --E - --I - -' D- - II- - �-' � 3 BASKET STRAINER HARRINGTON PLASTICS BS20150S OR EQUAL. ° 1- - - -p- - ►.— �- - -p- - i►- C- - - -p- - I- - - - I I D L__ _ ___ _ - I I -�-- _ _ - - - _ - - - - - - E N 1 I _ _ _ 4 SIGHT GLASS. N. o LiD L LJD 5 THIS PIPE SECTION IS EXISTING.- L -1 ° 1 ° 1 I I "' % CLEAN STEAM CONDENSATE '1 0 o 0 0 0 ° -1 g FROM R&D PROCESS NEUTRALIZATION x I RAH-3 N -i CONDENSATE sr Z .2 0 if L Wal W N a 4- LYOPHILIZER • W c 4 i _ o 4 # 1 to 3 r 8 GPM • LSHH Z 11,1 c c 5 r 02 E U o� 0_ Z - LS 0 ii LYOPHILIZER • 02 a. � � 0 i I. 2 LSL I I �f.... o 0: 02 N∎,, CC m d it 8 GPM • = dli GA > • ) 4111:10 03 ILI w W 1 LYOPHILIZER • # 3 = = = = CK BA PI PI ,, /" . ■• UUUU 03 IP .6 • . .. --0--- V V tilr7 03 • . ■ r• r 8 GPM • r. : . 333 • . ■■ r - a. ri c1_ a. ■ 1 1/2 -PWD—PCH — i ..,•- 1 I I I SP-3 '' SP-4 • 1 IN IN 2041N I 1 I I I ' 5 BA N RAH-7 _ 04 CONDENSATE � 1 .6 - • 3/4 -PWD-IEI' o LSHH T 1 1 CD< ° 0 N 03 _ = W T T a- H Rd LS 0 v) kg 03 • a. c4 12 0 Ow MAU-3 • 3 4"-PWD-IET LSL CI N I la ii t4 v CONDENSATE 03 Z V W !..,6 0 0 IX 1 r -1:3 - c y o L. IN GROUND m o ; il WASTE COLLECTION I , CK BA PI PI TANK TO WASTE NEUTRALIZATION P&ID o 0 01 01 T-2 ti---�- 2"-PWD-PCH DWG. W 11 8 - P 2� i _. 0 M4.3B � J g lhi -.• • �1 1/2"-PWD-PCH ` P Z SP-5 S S0 z d BA Z 7 � 02 PWD VALVE SCHEDULE a 2,, ° gi_ w z GK TAG DESCRIPTION MANUFACTURER PART COMMENTS } 2 co IV 02 _T T P R O C E S S WASTE S UMP P & I a PWD-BA_01,02,03,04 2" BALL VALVE HARRINGTON/SPEARS 3629-020 CPVC WITH EPDM SEATS v y ^ g 4.3 SCALE: NONE PWD-CK 01,02,03,04 1 1 2" CHECK VALVE HARRINGTON/SPEARS 4529-015 CPVC BALL CHECK VALVE a a w o a IL" PWD-GA-01 1 1/2" GATE VALVE HARRINGTON/SPEARS 2022-015 CPVC w/EPDM 0-RINGS *V s •Q o M 8 _€ g v, c z W gl6 N o <g EQUIPMENT SCHEDULE INSTRUMENT LIST M 05 w 0_, : VC k 0 ra:13 m PWD—SP-1 , 2, 3, 4 (N) PWD-FS-1 J Zr, VERTICAL CENTRIFUGAL PUMP FLOW LINE ECHO SWITCH LEVEL SWITCH 6 W � IN GROUND FINISH THOMPSON #LU75-5005 W/ 3 RELAYS . N WASTE COLLECTION MODEL AV4, 345D RPM, 1 HPm h TANK 37.1 GPM 1- 0 ri a o N ti T-3 54.5 HEAD PWD-pH-2 3 CAD FILE: t +GF+-SIGNET pH TRANS 3-8750-3 , c� Q �,o of 07006—M4-3A M _ W/ 3-2714 PROBE � �z N�� 4.stPWD-T 1 , 2 (N) / ii 16 GA THICK 316E STAINLESS STEEL PWD-pH-1 (N) .4889PE GOUND COLLECTION TANK P (. w {," ii. 2'W x 2'L x 3'H +GF+-SIGNET pH TRANS 3-8750-3 vrO�R3O �� rc'L N W/ 3-2714 PROBE W 1 - /YEN E. Expires 12/31/2007 a 2 ,- FMS TRANE MONITOR TRANE MONITOR LOW LEVEL ALARM GENERAL NOTE S LSLL L HIGH LEVEL ALARM rsul r_itif-- HIGH LEVEL ALARM E3 EN TEMPERATURE rpHIT� pH 04 04 LOW LEVEL ALARM 05 05 LOW LEVEL ALARM Os 0I MONITOR 01 MONITOR .��1 , L,,1,� , _. , . , A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND SYMBOLS. L - - --I L_ - - - -I L _ _ _ _ I _ _ - - I B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2.-■ - ---1 I L - - - - - - I - - - j - - - - - _ --J Z_ _________ _ _iPANELriKEYEDNOTE5 v -1 I ri1I-i :i1 PROVIDE FEMALE HOSE THREAD FITTING FOR DRAIN.CONTROL I Ps HIT pH — — —'~ �► ME rPS1 NM TEMPERATURE pHIT pH PUMP SWITCH 04 I 01 01 03 MONITOR LEVEL CONTROL I I 02 02 01 MONITOR O1 MONITOR ' 2 DOUBLE CONTAINMENT FOR 55 GAL DRUM. ON/OFF `•- I ,- t t ..� I rLS 1 rpHIT, pH I i i , ■ I 1 1 , , 1 , fx I 1 1 PUMP SWITCH 05 t I I j 02 MONITOR I I ON/OFF I r 1 , , DRUM. I1- - - -A- - -4 - - 9 L _ _ _ _ _ _ _ _ ______L_ _ _ _ _ _ _ _ _ _ _ _J 4 ON/OFF BY pHIT RELAY. ocn I I o I-- — — — -D- - 0-- -' I I I I I L._ _ _ _ I I I 5 LMI INJECTION NOZZLE IN TEE IN LINE. o a I I D- _ 0-- -I I I ° 6 FLOWLINE ECHOSWITCH LEVEL RELAYS CONTROL PUMP AND LMI ° ° VENT THROUGH WALL ° ° VENT THROUGH WALL ° `z PUMP THROUGH CONTROL PANEL. a LS-1 I `C a 18 I 18 7 SET LSLL ALARM TO 8" FROM TANK BOTTOM. .. .V 8 SET LSHH TO ALARM AT 10" BELOW TANK TOP. ° 0 FROM PROCESS WASTE SUMP I L -5 - - - - - 9 MIXING EDUCTORS 1/4" PIPE CONNECTION. 6 PLACES SPACE DWG. " I j / � M4.3A 2 -PWD-PCH EQUALLY APART. s I 1--- - - - ---1 10 MIXING EDUCTORS 3/4" PIPE CONNECTION. : 5, Z al I.:- " " 11 NEW SIGNET pH TRANS 3-8750-3 W/ 3-2714 PROBE. USE PVC m 1 1/2 -PWD-PCH BA 1 1/2 -PWD-PCH MOUNT FOR PROBE #PV8T015F. Li W kE BA 0 18 4, _ W C 3 07 12 SIGNET 3-2714 PROBE. USE PVC NET H TRANS 3 8750 3 W/ 7 � �, MOUNT FOR PROBE #PV8T015F (EXISTING). c,. W WN /2"-PWD--PCII BA LS-2 FROM BOILER BLO DO 1 1 19 13 LOCATE CL OF OVERFLOW 24" FROM TANK TOP. Z N DWG. 3/4"-PWD-PCH • S 31/8"-259 NaOH-PE s I 1 1/2"-PwD-PcH "_ _ 14 NOT USED. �, 8m BA 01 I u vi • - g 1 1/2 PWD PCI I - - - Z A? Al)— 08 it F 3/8" I 15 30 GPM GLASS TUBE FLOW METER. RYANHERO #5864.067 III ° T T I 1 s BA 3/8 PE TUBE OR EQUAL. LLI ° 17 I I • i I 16 PROVIDE 2" PVC SCH 80 PIPE TO REDUCE L . 8 4§. I (7 ® TURBULANCE DISTURBANCE ON ULTRASONICS. PROVIDE VENT 13 a 4" m = � MX-1 I MX I END OF PIPE 4 FROM TANK BOTTOM. .� -2 I > 5 Ea 0 r MP-2 MP-1 17 LOCKABLE HANDLE BALL VALVE IN OPEN POSITION. U w a 15 ■ 1 _ I. LS-3 18 COMBINE VENTS FOR SINGLE WALL PENTRATION. :1.• = U!!rr 1 2" DIP TUBE 19 HAYWARD ELECTRIC ACTUATOR P/N EAU28 OR EQUAL. �I( " G L � a a re 16 V°- - - -� 01 Q I 0 p •,•. 10 HIT ■r ■: CL. I I 01 .. -II—TO DRAIN 2 �..:./ I l` • ...., _I Iv I II- pHIT Q 02 pHIT Ti c 0 pHIT o1 o xi pHIT BA 11 25% NaOH TANK 12 "� . le 16 16 1 * A V BA 03 � pHIT "_ 15 1- gcl 1900 GAL 21 1000 GAL BA r1 1/2 PWD-PCH W 5 Z TANK 0 31 TANK 23 ► W Z� 10 0 I 2 -PWD-PCH a N BA I— _ _ _ --I 1 42 p i 2 PWD PCH 0 z W• < 0 gi TK-01 BA PWD-1 11 TK-02 BA PWD-2 v W6 09 BA 14 0 2 to m ob 22 BA TO SANITARY DRAIN A 2 1 1 1 ri h �C y. 24 oct� _ ° , 4 z o U m z 1 PROCESS WASTE NEUTRALIZATION P & ID F* 4.3 SCALE: NONE _ O � F- w 6 a4, Z 0" - tn U j Z PWD VALVE SCHEDULE 04. �W EQUIPMENT S C H E D ULE TAG # DESCRIPTION Ja • ESCRi� ON MANUFACTURER PART � _ COMMENTS U � � � n �� PWD-BA-07,08,09,11, 1 1/2 BALL VALVE HARRINGTON/SPEARS 3622-015 CPVC WITH EPDM SEATS 5 z m ° PWD-ED-7, 8 (N) PWD-MX-1 & 2 (N) PWD-ED-1 /2/3/4/5/6 (N) , , , , = Z a ig SPRAYING SYSTEMS KOMAX STATIC MIXER SPRAYING SYSTEMS POLYPRO EDUCTOR INSTRUMENT LIST PWD-S-01,02 1 1/2" SOLENOID VALVE HARRINGTON/SPEARS TM W EIS ELECTRIC ACTUATOR M W W 01 1 litt" U) lb MIXING EDUCTOR POLYPROPYLENE CPS- 1/4 POLYPROPYLENE CONNECTION - / / 1 4" PIPE CONNECTION MODEL 46550 _ _ < / PWD LS 1 ,2 (N) PWD-BA-21,22,23,24 1" BALL VALVE HARRINGTON/SPEARS 3622-010 CPVC WITH EPDM SEATS W 3 5g - FLOW LINE ECHO SWITCH LEVEL SWITCH ' W M 25 #LU75-5005 W/ 3 RELAYS a i er a �� �' PWD-TK-1 (N} PWD-TK-2 (N} o SNYDER FLAT BOTTOM TANK, HDPE SNYDER FLAT BOTTOM TANK, HDPE � 1 GAL. 1000 GAL. " J 4 PWD-GL-01, 02 1 1/2 GLOBE VALVE �, W r N 72" DIA, 119 HT 60" DIA, 89.5" HT PWD-LS-3 (N) =ci N o RYAN NERCO SWITCH PAK W/ JUNCTION � � �z BOX MODEL # 6904-X-125, PP CAD FlLE: PROF(N) PWD-DP-1 (N) ®S����d�z N �j0 GRUNDFOS LM 1 PUMP 4889PE 9 oW Model# CRN-5-10 A-FGJ-G-E HQQE MODEL #B121 -392S1 , Xa. , c, G k 20 GPM PWD- H-1 (N' ®-- MAX HEAD SIGN pH/OR TRANS 3-8750-3 t vOREGO W/ 3-2714 PROBE c(A �Y13,2� eJ) 0 C NEC W /E [ EXpres12/31/20O7 ‘1 I h N .fl O FMS - -- - - - - - - ------ - - --- - 0,,,�� - - -- - - - - - - - - • � - - - - - - - - - - - GENERALNOTES wit-1/ ;or A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND onr ) O /��J O SYMBOLS. B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A02. o a. EE �' 2 � g ce O \01� �o� O L02,4 02_,) ' 2 SIGNAL FROM LYOPHILIZER FOR TURNING ON/OFF BOILER. I I W 3 TRANSITION TO 316 SS DI FEED WATER PIPE TO BOILER y A PROVIDE r Aer A- _ _ _ - - - - - - Pr , - - - - - - - - - - - - - _ BETWEEN BOILER AND BALL VALVE FOR HEAT SEPARATION. N Aar 1 INN 4 PROVIDE TEE WITH PLUG IN OPEN END. �`��` � � :., �` '� 5 DEMO BACK TO SANITARY FITTING ON LYOPHILIZER #1 AND N � "� ..� `` LYOPHILIZER #2.� � J •• c "� , �►`+ ° . � 6 REMOVE POINTS FROM FMS. � � NA. 0 0 IS\ IN■ \NA. 4' . 1i., . L I a (4), '''' g, EEZ I w i: ti,IT: ,N111\. 16.. 4ke 16k- ss4dts tai‘\0\1\LO 1 — 0 Lull %.67 N X INI,N ■ . W v) VE 0 : . \ : .N \' W c il B , 8 4 0 Z ..4-2 4 Iti .‘.Vors, 4■ . \., v . 1,,,,\.\\I"\\.. ,,,, .„.:\\S „,. -„,,, 1 N, ;IS 41■- Nos:4% 044 1....: 1.9 g '43-4- At, (.164 -101. 14 tik.\ lip,‘..- W g 5 \ N• 0 z (-) ., 1 \.61, bi, \.,.s,,s,N 6,x.. N . -tic i. N NSTkib1/4. ..Ns 2- I : I, il.t. '11""S‘L\\\\\si\ I,.,iss4i\\N\\k \": -1., ,-•...- \INIL:1441\111■1:1114141 fikik \bk. ititik` 'Ike 4;. `Wilk 'le • w o o� cr . 2 L.--4,N-. ,,,.., o- a :. ,. '144‘ it 0 pp- Niik, Nr , ,,,,,,,„„,„ ILI 2 .1' %listb. XX. 11& 'Mhi.. .. ' igatememamm. -40, ft, X. I• I. db. \iik. AtI■1416. %■' AIL. I ' > -6) La ilill\\ISiss6L , El 6..\\ N\ tit WA. IN\ \'-'," . IN-. Sho..\11.- Sik rilAb. Xitilh. 1 \Lb. 111 .. .1711.. \... tee.• !;M: r.2 ci W la I- 0 LYOPHILIZER LYOPHILIZER '" h # 1 # 2 a N , ow talic: g A 4 AC CD FINISHED FLOOR n Z M LAI 16 c A 674 . .,, q f) 11/9 4 x , i= g 5.. Pl. 0 k 511: 1 dlY 1 STEAM SYSTEM P & ID — DEMO � ° D4. ', SCALE: NONE ° z �, FT, � ", a W 1§ x o W � � O 11 � ao O � . � aa �ca O NE LPCS VALVE SCHEDULE � � W W F �� i to x tn g TAG # DESCRIPTION MANUFACTURER PART # COMMENTS � � 1 E1� U I P M E N T S C H E D U L E LPCS-BA-01 1 1/2" BALL VALVE 2ggK SS- 67P4P STEAM SERVICE BALL VALVE� ° K SS-S67PSW24P STEAM SERVICE BALL VALVE z h p u_125 .h 2 s�d� SB-2 LPCS-BA-03 1 1/2" BALL VALVE DURAVALVE STEAM SERVICE BALL VALVE . � M i STEAM BOILER 1 STEAM BOILER 2 LPCS-BA-04 1 1/2° BALL VALVE DURAVALVE STEAM SERVICE BALL VALVE _ J 414 � SSB ELECTRIC SSB ELECTRIC LPC!I1! 1/4" BALL VALVE DURAVALVE o y LPC 1/4" BALL VALVE FNW rm MODEL N0. SSB-100 MODEL N0. SSB-100 1/4" BALL VALVE DURAVALVE 0 �_, _- LPCS-BA-08 1/4" BALL VALVE FNW �Ep PROf, 07006-M04-4 CAD FILE: ILPCS-BA-09, 10 1" BALL VALVE DURAVALVE _ ���. �1xE�,�j�� li s LPCS-PRV-01 1 1/2" PRESSURE REGULATOR JORDAN 60200S6/PTS6W820S6MC STEAM SERVICE, 6-8 PSI SPRING, 316 SS � �7,e/89�� r I LPCS-PRV-02 1 1/2" PRESSURE REGULATOR JORDAN 60200S6/PTS6W820S6MC STEAM SERVICE, 6-8 PSI SPRING, 316 SS .R GoN ig ° 4 ✓ % a �a V , `• AftN E. GP Li L 'Y ,,,i7). � Expr,esl2/31/200 8 7 FMS GENERALNOTES i A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. r _ _ _ _ _ _ ^_� _ _ _ _ _ _ _ _ _ _ = - = _ - � - _ - _ _ E. B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. PAN KEYED NOTES Z 0 1 THERMOSTATIC VALVE OFCI. z 0 r_____ _ _ _ _ - - - - - _ _ - - - -_ _ _ _ _ - _ _ _ _ _ _ _ _ 2 NEW FLASH TANK FROM OFCI. U ° 1 w 1 1/2"-STEAM-AEA 3 PROVIDE 5 GAL LIFTSTATION CAPABLE OF 140E TEMPERATURES. �, VENT TO ROOF z ' PUMP TO AWN TANK. ' GA Q 4 PROVIDE SEISMIC SUPPORT FOR EXHAUST STACK. 0 0 4 ROOF 5 ALL PIPING, FITTINGS & VALVES SELECTED ARE TO MEET OR W S. I EXCEED APPLICABLE ASME BOILER PRESSURE CODE & PIPE " _ i 6 PROVIDE 12" EXHAUST STACK THROUGH ROOF PER MANF REQUIREMENTS. o .. 4 —STEAM AEA _-`> EXTEND 2' ABOVE ANY ROOF SURFACE 10' HORIZONTAL. o Q 1 ... 0 i 7 ADD CHECK VALVE TO EXISTING LINE. O 6"--- -----2.,_ I- T W a°17-49 cn ic 'N.._.€4 ."-1"-LPCR-AEA ca SATE R R 1 cam, 1" STEAM AEA , g FROM SERVICES nCES p (LPT)fl (E) END OF LINE o ° TRAP A k' GA GA 3 N GA i v g M7.5 CK 03 U V I.t ;Pb * � 05 06 �..-� lU N g- 01 44 No °C) bo. 2 Z 2 �'- STEAM BOILER � "- � W "� 1 1/2"-LPCR-AEA ■ o a cn LE m L. V cn w 0 F., k- —'T ►1 D � (LPT)• MOLD WASHER (LPT) CONDENSATE RETURN THROUGH DISH WASHER � o Q • ROOM 333 {LPT) . ROOM 334 ROOF BACK TO BOILER Z ,r -I 0 STEAM BOILER-1 iI 3 I M7.5 (LPT) CK Z 17) it IN ----- 1 1/2"-LPCR-AA ♦ III o °' ... 3/4"-STEAM-AEB '�' Z v 5.�° L J I i FROM R&D CP-1 la ` , 1"-LPCR-AEA DWG• U.I o la; I F- M4.8 fc v, o iN 1 11. 1"—BLOWDOWN-AEB , N II m A f igg KI BY OWNER 0K > g) I! 03 w Wik 3" I I 1 1/2"-LPCR-AEA t VENT ' I 0 ! ' '#.• THROUGH ROOF I 7----*/ I ) I i GA $. 07 LEVEL /- r � Q ■ ■• r r CONTROL . • 1/2 i I' ° 60 o PUMP PKG. .. .:.:rr.�;. PUMP PUMP (DI • •:�•.•. a • 1" 1W IEC ` �" CONDENSATE RETURN • •::•••• LIFT STATION = T .I .: 1/2 CI11EM a. . 2 o w !I ix 40) a. i j'AD"AAAAAATO:7 o di tf2 g 0 til r o MP-3 d- = CONDENSATE W -. 14.) © i PUMP PACKAGE - �, I CP-2 I N W I HORIZONTAL BOILER FEED V V co ° • , ROOM 334 1"-LPCR-AEA a �► . P � � CHEMICAL � --I W N . � _ FEED z TO CLEAN STEAM °h o ___A.1 n = 2"-CS-KE1 DWG. V V V M4.4B L cam.-�---1"-STEAM-AEA 3t 0 ,rt 0 1 q 11 - CONTROLLER = c 0 g • . BOILER FEED-1 0 z g A GA W L` -� 8 09 1 O. '1 1 1/2"-LPCR-A CA • Lai Il i LEVEL z gN 1/2"-IW-IEC CIP 51P CONTROL z ce g. s (LPT),çJ i,`O _ o �. PUMP PKG. .� � CIP—XX (LPT)fl SIP--XX WELL- g... ag 3 ROOM 311C ROOM 311C W � c° �� 1 PLANT STEAM SYSTEM P& ID a M7.5 ® _, v2 a 4.4 A SCALE: NONE �..../ gn /� M7.5 1 1/2"-LPCR-AEA - w a 21) i CONDENSATE i f, PUMP PACKAGE N <t EQUIPMENT SCHEDULE STEAM VALVE SCHEDULE Cp-3 i < PS-STEAM - - ROOM 311C ; It g S STEAM BOILER 1 (N) PS MP 3 (N) TAG # DESCRIPTION MANUFACTURER PART COMMENTS Ps % BRYAN LM1 PUMP 8 FLANGE CONNECTION AT ROOF. PROVIDE DRAIN FROM ROOF BACK ci W A-B 250 S F MODEL# B121 -39251 TO LIFT STATION. a cn gli it 1 -°- - STEAM-GA-03 1 1/2" GATE VALVE CRANE OR EQUAL GATE VALVE 9 FLOW METER RELOCATED. n LOC TED. F 0 r$ . I° STEAM—GA-05,06 2" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE �.D PROF 077006 M4-4A CAD 08,11 — — �p PS—BOILER FEED-1 (N) "STEAM—GA-04 4 GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE ':::::13:s64 ii �, BRYAN II STEAM—GA-07,10 1 1/2" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE "HFS-150—xx-100—x STEAM—CK-01 1 1/2" CHECK VALVE CRANE OR EQUAL k`, T " FN E• P 1i STEAM—CK-02,03 1 CHECK VALVE CRANE OR EQUAL a O —.yam.::,..,. �cw..�. h .s.:.r`ra y 3cpires 12/31/2007 GENERAL NOTES FMS - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - _ - - - - : A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND SYMBOLS. B KE1-PIPE CLASS: 316 STAINLESS STEEL, SANITARY FITTINGS. Z 0 a C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z 0 - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - _ - _ _ p o cn _ _ _ _ z _ __ _ _ PANEL KEYED NOTES U 0 1 INSULATE ALL STEAM PIPING & CONDENSATE RETURN PIPING o PER OREGON CODE CHAPTER 13 AND TABLE 13-D. w 2 USE TEF-STEEL GASKETS. o _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - - - - - - _ - 3 TRI-CLAMP CONNECTIONS & FITTINGS. M 4 CONCENTRIC REDUCER. N ci Q 5 SANITARY CONNECTION TO PRESSURE GAUGE. J •• SET SET SET o 25 PSI 10-15 PSI 10-15 PSI - PRV PRV PRV 01 02 03 m gr r, Z .2 ll 2 2 2 �7 FE. (c) 2 w 4, -I 11-61 1---- O E I F 1 BA 0 _ I 1 ►• 1 ' g BA BA W to = - W �- 01 02 Q O 03 Q® iiii c 4 _ � .=® - 0 z .9- 1.-.-.$ FROM SIP I SLOPE DIRECTION • • 173- - [----_.� - - z i DWG. • 2"-CS-KE1 T ›c.:\ T 1 1 /2"-CS-KE1 Z c gi M4.0 • ST o iTR U 40-50 PSI 01 Z .o I:, I1 1 ® - CE a) R Nv BA IJ .E 2 g- 04 w0 Et m — 0 _ W W W w Y Y • Y > .6) i^ _- W W 11 0 0 0 E I I I'r� w w .w. n Iv ,- .■ L.• • .■ r•■ i r• YEl- •r■■■.■r ., E T cn T • ■r ■ LYOPHILIZER LYOPHILIZER cI LYOPHILIZER 3 #2 #1 _ i . 0 i 2 0 !u)0 W cg d H D Lai y 5 w 311C 311B 311A a � Z N G r. c) U) � Z ~O U a g W N Ct � ' ° . SUMP #1 � � 0 . g !§ r• Q 0 1 CLEAN STEAM SYSTEM P & ID 0 1:-: M4.4B SCALE: NONE J o • 1%i 41. lal W 1! Z o z gt x at. 52 U 8§.' W a- Z W o Q„, ▪ J • _ I a M W H 2 milt IA io c CLEAN STEAM VALVE SCHEDULE m �J '4= Li.. TAG # DESCRIPTION MANUFACTURER PART COMMENTS O m I d5 t CS-BA-02,03,04 1" BALL VALVE _ JORDAN VALVE 90BH-15-S-C-T--T-1-0-0 STAINLESS STEEL SANITARY CONNECTIONS 6 W ie N 3 = NR a CS—BA-01 2" BALL VALVE JORDAN VALVE 90BH-15—S—C—T—T-1-0-0 STAINLESS STEEL SANITARY CONNECTIONS •• 0 co g81 N CS-PRV-02,03 1" PRESSURE REDUCING JORDON VALVE 96-150-6L-A-X-A-X-X- STAINLESS •STEEL SANITARY CONNECTIONS P c z -A-X-EP-BA CAD FILE: _ ���,p PROFF� 07006—M4-4B li CS-PRV-01 2" PRESSURE REDUCING JORDON VALVE 96-150-6L-A-X-A-X-X- STAINLESS STEEL SANITARY CONNECTIONS �G 1 N�4, y ,..„4",2 A-X-EP-BA4889PE - r 4. -, CS—ST-01 1" STEAM TRAP JORDAN VALVE 93-075—TC-6L— STAINLESS STEEL SANITARY CONNECTIONS c w ( ti. 4 - - cA 'REGO \--17 �" Ati G EN E. Expires 12 J31 J2007 a c, N 5 , UNIT STATUS ( 1flkflflflUNBTSTATUS, GENERAL NOTES J _ / , ��� , � �,_. � J .m ' l J � ' I � , / I (TYP) FMS A INSTALL HIGH POINT VENTS (HPV) AND LOW POINT DRAINS (LPD) AS REQ'D BY PIPE ROUTE. HPV AND LPD TO BE 3/4" HOSE BIBB WITH CAP. z B INSULATE ALL PIPING PER CODE REQUIREMENTS. ° PROVIDE PVC JACKET ON ALL INSULATION. ri z PANEL U C AIR HANDLER CHW CONTROL VALVES, STRAINER, BALL ° _ _ _ _ _ - - - - - - - 4____ _ _ _ ____4_ _ ____4_ _-$ _ -A-_ _ _ _ _ _ _ _ _ _ _ _ VALVES AND BALANCING VALVES ARE SUPPLIED WITH 6 TO MANUFACTURING CHILLED WATER . .z Q . Q < 4 TRANE UNITS. z DWG. D FOR DEMOLITION / CONSTRUCTION PHASING SEE 0 M4.5B 0 SHEET A0.2. W FROM MANUFACTURING CHILLED WA 0 6 PLACES r DWG. ■ BA 3 N o M4.5B t- /43-1(51---- • K EYE D N OTES a BA ! 08 M o 07,/ BA 62 MBH �cv1 Q1 TYP , ° I 24 14 GPM 03 BA 1 TEMPERATURE CONTROL VALVE MODULATED BY RAH w ci CV OR MAH CONTROL BOARD BASED ON ZONE w a- 1 " RAH-3 p a0. 14 -_ TEMPERATURE THERMOSTAT. ► r, • 1 " J • •�--1--.-- DELUXE 3-WAY VALVE PACKAGE PROVIDED BY TRANE. I 101—I ,L• BA H H POINT VENT ON ROOF PIPING.. ° 0 I �-, 05 FROM R&D CHILLED WAFER - , —� BA 1 -1/2"—CHWS—IEC DWG. gm F 7 15 M4.7A 4 BA 72 MBH,--S „ `I _-J 0 m 5� I 23 17 GPM; cv BA Z 2 0 p ti i ti 83 1 n D I• I I 1 RAH-2 ...- 1 cnk- W • © - W oc ii I W Z 1....(J) i4I-1 �w — i LL BA I " 2 U L _J BA 06 " Z in A R BA �cv'N 16 U U °m :::� I 22 72 MBH 01 S. -I• wl Z � I 17 GPM; cv I BA cv III v -16 N I 1 " RAH-1 p a: I 12 v a -D • I I i . „1 IX v, o0 ,,., V I • 4 0 11 "i") .... p V I j ImF—I 2 • BA ° .- d- L _J BA 07 d' 111 W bs (— 17 . 1 BA 134 M Bli..S (Tc■1 s. 4 rrl 21 29 GPM I 05 BA BA i I 1 " MAU-1 p a 3 I 11 BA ' ``•``.�•.• ■ . . 31 44 r•.r•!•..-s I •4 ■a,r .rrr.■IP 4. • •08 .• I 1 1 01 ? BA If L-- - - -- -J BA � 1/2 p 18 /2" N m BA (C 0 .t .t U ( 20 6 MBH j) 04 - - U � d in w I 2 GPM cv I BA w I I RAH-4 p 40 ► 10 i ki. I • I • I W I I 4» , ! •I = TO R&D CHILLED WATER W e U 13/ • ► U > 3 zi I I I 1 -1/2"-CHWS-IEC ► DWG. Q N x '. 0w N m1 ----1 • ` M4.7A W f I BA (V v � � L - - _ - - - - - -J BA 09 1 y z o W C) W V � a� BA 6 MBH �-�, �0 + - ------J 0 8 28 2 GPM ; of BA "3 i 1 o • RAH-8 i© 40 29 i o (1 ›.0 3/4I• ■ 0 8 il � 7 W Lli BA .9 il z cn •46, - 7.2 33 11 EL:30 0 Th 411 o z W N w a,-L.Z Cl- J U w W 'Q �� EQUIPMENT SCHEDULE 1 MANUFACTURING CHILLED CATER PB� ID .�. ,J o M4.5A SCALE: NONE W RAH-8 (N) ? = o ° m w TRANE cks = oa La MLaZ z5 MODEL CHILLED VALVE SCHEDULE " _ c _ tea 1 8 - TAG DESCRIPTION MANUFACTURER PART COMMENTS N ce m P.- F L�.- CHW-BA-03, 04 3" BALL VALVE APOLLO / CONBRACO 82-140-01 BRONZE 3-PIECE FULL PORT = 1 . o 2 05, 06, 07,08 o a M I 06 CHW-BA-01, 02, 1/2" BALL VALVE APOLLO / CONBRACO 82-103-01 BRONZE 3-PIECE FULL PORT 2 -44 09 TO 19, 25, 3 = 0 v, S 26,27,29,31,33 o� n CHW-BA-20, 28 3/4" BALL VALVE APOLLO / CONBRACO 82-104-01 BRONZE 3-PIECE FULL PORT .._ J , 30 CAD FILE: ED PROF 07006-M4-5A CHW-BA-21, 22, 1" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT .`�'�► '� �23, 24 �S �G I N�� O� li n s CHW-BF-01, 02 3" BUTTERFLY VALVE MILWAUKEE ' - 7'889PE r & 3. Q. CHW-CK-01, 02 SWING CHECK VALVE APOLLO BRONZE HYDRONIC FLOW CHECK VALVES )R it4' G•v6ly OPDI 41/4 107 CHW-BA-32 1 1/4" BALL VALVE APOLLO / CONBRACO 82-200-01 BRONZE 3-PIECE FULL PORT A"SN E. CI(‘ u c Expires 12/31/2007 a N O O T - - - - - - - _ _ ALARM � ALARM - - - - _ _ _ -RUI'�- - - - - - -� - -- - - - - UNIT STATUS TYP. GENERALNOTES ALA - ( ) r 1 r 1 r P11 r-- 1 r1 A INSTALL HIGH POINT VENTS HPV AND LOW POINT 02 01 02 01 01 02 01 , ter„ , �,,,. , 1 �� 1 r•—°r1./ IN..._,-.� � � �-I-� � I ._ ...91 1 ,. I� i , �� ./ , DRAINS (LPD) AS READ BY PIPE ROUTE. HPV AND FMS _ _ _ _ _ _ _ ' _ _ _ _ _ _ _ _ _ _ _ _ ' _ _ 1.._._._ _ _ _ -' _ i _ _ _ _ _ ' _ _ ' . _ _ _ LPD TO BE 3/4" HOSE BIBB WITH CAP. - _ - _ ----I- —,- ,-- --T-- _T" �- _ - - - --1 - - - -- - - _ - -—1-- - - -�--_ - - - -�-- - -i— - - - - - I - _ -I _ - - - z " _ " B INSULATE ALL PIPING PER CODE REQUIREMENTS. a PROVIDE PVC JACKET ON ALL INSULATION. re z c o w C AIR HANDLER CHW CONTROL VALVES, STRAINER, BALL 1--= ° PANEL VALVES AND BALANCING VALVES ARE SUPPLIED WITH - - - - - - - - ---f-- - - - - - - - - - - - - - -r--- - - _ -,-- - -,- - - - - - ---,-- --,---- - - - TRAN E UNITS. 0 c.) 1 1 fr D FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET A0.2. I 1 1 1 I w 0 Q < < < < < D h 1 PT N 01 KEYED NOTES . .., Tr M ° AIR 01 ° VENT 0 1 B&G MODEL 107A AUTOMATIC AIR VENT OR EQUAL. W a 4019 • TO MANUFACTURING CHILLED WATER (2) 2 PUMPS ARE INTERNAL TO CHILLER UNIT. •s I 3"-CHWR--IEC ,. DWG. < g V M4.5A 3 PROVIDE THERMOWELL. BA 1/2"/2"-IW-IEC -4 ._._. o ' 4 TEMPERATURE CONTROL VALVE MODULATED BY RAH 25 02 � FROM MANUFACTURING CHILLED WATER (2) OR MAH CONTROL BOARD BASED ON ZONE PF-1 BF AIR 3"-CHWS-IEC . I DWG. TEMPERATURE THERMOSTAT. gm 02 SEPARATOR M4.5A CHEMICAL POT BA 3-WAY BY TRANS. N FEEDER. 5 DELUXE 3 WAY VALVE PACKAGE PROVIDED o� it 29 Z V gh 6 AS-i 01 6 POT FEEDER VALVES SUPPLIED WITH UNIT. ii m ♦ - c� 0 w cn I; • 3/4"-CHWS-IEC— <I— BA !:E! w 7 CHILLER REMOTE START. U C li 28 • `�I' MOTOR TO 5 HP UNIT Z 3 �� I 1 _ 8 UPGRADE EXISTING CHILLER 0 � � • 2 PLACES - FROM CARRIER. L. w (2) BA P (--- y N C 5 . BA 87 M BH T&' �� t- ° S.N 02 I 21 17 GPM �� X08 �' � r- � BA Z 'o L 0 OV w 12 li AIR COOLED ■J ► • I I 1 MAU-3 © ,� I 11 0 ' C !! ® ' • ' I AIRUNIT I 1 4. p BA �' '^ PI 04 ET-1 8 0 30 12 BA c W W W 02 BA ■ 1 I 0 S_ BA .,I ■ 26 -1 _ • • .■ BA 62 MBH (cvv I ` L 23 IA) ®9E a i .. •` r.rr ,-C2><3 C>CD O BA . ate. .. AIR COOLED 1 " RAH-7 © .3 I 13 - ■ •r • C CHILLER I • d • I I °.A4 I • 1 " } 22 TON IC's •• 4 & ›M 0 2 BA CK 101—I • M \ °` LC\ CH-2 a LU I BA H mN BA 06 01 BA 06 % A La 3 � 05 ET-2 31 14 ill PI 03 BA 27 �i ■ a ( N W oh ' A , ----- a 00 t P 6 0 � o CZ X csi IA 1 MANUFACTURING CHILLED WATER P & ID Umx . I - I M4.5B SCALE: NONE al = .- P- 0 3 W. 0 a cc3 g "- II W cc z am Z � J NO CHILLED WATER VALVE SC — EDULE z a- EQUIPMENT SCHEDULE x � � W 3 t0 �o TAG # DESCRIPTION MANUFACTURER PART COMMENTS o 0 CHW-BA-03, 04 3" BALL VALVE APOLLO / CONBRACO 82-140-01 BRONZE 3-PIECE FULL PORT < ° a CH-1 (EXISTING) PF-1 (EXISTING) pi 05, 06 � Z ; mo AIR COOLED CHILLER CHEMICAL POT FEEDER CHW-BA-01, 02, 1/2" BALL VALVE APOLLO / CONBRACO 82-103-01 BRONZE 3-PIECE FULL PORT s X o CARRIER AQUASNAP CHILLER EVAPCO 5 MODEL 3ORANO35GS-6-5QM MODEL FB-2 25, 26, 27 zo 34.8 TON (NOMINAL) WITH FUNNEL PACKAGE, VALVE 3/4" � CHW-BA-20 3/4 BALL VALVE APOLLO / CONBRACO 82-104-01 BRONZE 3-PIECE FULL PORT W 12 0 80 GPM © 35F, 1OF DELTA PACKAGE AND BASKET J Ll. Ln ,. ET--1 EXISTING AS-1 (EXISTING) CHW-BA-06,08,11 1" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT E z `( ) 21 23, qk EXPANSION TANK AIR SEPARATOR TO 14, 30,31 " ° 3" BUTTERFLY VALVE MILWAUKEE _� PROVIDED BY CARRIER BELL & GOSSL I I CHW-BF-01, 02 x co 3y INTEGRAL TO CHILLER ROLAIRTROL •. gw CHW-CK-01, 02 SWING CHECK VALVE APOLLO BRONZE HYDRONIC FLOW CHECK VALVES 10.2 GAL ACCEPTANCE R-3 TC k r ---- CHW-BA-28, 29 1 1/2" BALL CAD FILE: "VALVE APOLLO / CONBRACO BRONZE 3-PIECE FULL PORT 1.0 PROT, 07006-M4-5B 444‘.+G INS `4 li CH-2 (R) ET-2 (R) � AIR COOLED CHILLER EXPANSION TANK 4' 889PE'� `" MODEL #3ORA022 PROVIDED BY CARRIER �� 1 21 .6 TON (NOMINAL) INTEGRAL TO CHILLER ,v •REGO A, ' 51 .8 GPM C� 35 F, 10 F DELTA XX GAL ACCEPTANCE 0 ��y13,2 0 �k s �flE'N E. G4 F�Aires 12/31/200? , _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ GENERAL NOTES FMS ME �i�`,�`�� � " , r,�,�ARM i____;2, `' �i1 -# 1 L. .J 1 AND LPD TO BE 3/4" HOSE BIBB WITH CAP. 1 -----�- _ - - - - �, - - B INSULATE ALL PIPING PER CODE REQUIREMENTS. r.PANEL ` PROVIDE PVC JACKET ON ALL INSULATION. E rr U C AIR HANDLER CHW CONTROL VALVES, STRAINER, s o 4.- 161.N. \I. BALL VALVES AND BALANCING VALVES ARE SUPPLIED WITH TRANS UNITS. c' \''' IN:SC) 111 *(4141 - - - - - - - - - — D FOR DEMOLITION / CONSTRUCTION PHASING SEE re 'l A ►S 0 SHEET A0.2. 111\%16 1 W V) cn k'l° ■KEYED NOTES: . ,t\\ , ,,,' IEC--�-5 �� � \lik.1 "� 1 RELOCATE THE TEMPERATURE AND PRESSURE cq AI ,� � TO CHILLED WATER PIPING SHOWN ON M4.7A. N a:-.7■4, \\. \ �i i. 56 AA IR m ';49 kik 0- 46" VENT AIR •� k � �` BA VENT ��� t i 40\\ ,�I �„� 2"-CHWR-IEC �, BA m\ :� 45 SSsk \\\h,, 0 43 ? tv W �•�f 0 La ..... g \N\ ` O � - , � BA CG 39 I 1 I 141%\ L-c s 1 " CHWS IEC w I II 111\11IN _ 44 _ = N U 4*; 1 MOL- *- 4 -41,4 -1 1 BA 64 U v ► ! !w w 1,,1 to I 48 W w U U 1' � SP 1 ut _W W I 1 U BA 03 U I i N N ( L ! n 9 02 V) 1-0:?-''--U U _.i .: . .w I wl\%\\\N‘ BA�_ I w i■■r r• \1111 :11% :11.�� 65 62 W i i \`,T •►► �► �. 1► 1---- - (FUTURE) ``�'�►'`►1+ BA _ to -- I -c� T T i LLçi r� �- -f !'10 61611k. 1 _Y ° g1 i IN It 4 . ►I �► 15 GPM LYO U ,,> L i I BA I. h �'�. LU -Imp- ------.■ � '�' ; . REFRIGERATION � 60 o‘N‘ BA�► W g7;' N:, "'�� 1 PWD KEA� 63 SKID L— W w•(FROM M4.6� I > ?a ft •� 59 BA FUTURE z o n �' Narl. 14 GPM Q cri -- �- ,r.► • I<►1 ! C 7---I�I--- 1 -PWD J EA--► r � :t I �, Z W bR ksib„ a p �1 (TO M4.6) ('' ,/ 1 SP 14 1 V La w° L. � 01 BA f H X—0 1 BA 87 MBH I- i o � ° 42 50 17 GPM ; `®2A,4 V 0 I A MAU-2 m NO v 1! 1 I MAKEUP • • Z RI AIR UNIT I lm BA g 1 "-CHWS-IEC 53 6 o ' $l°SP 52 I 05 1 "-CHWS-IEC 61 BA 1 CHILLED WATER P & ID - DEMO 52 W F MD4.7 SCALE: NONE sP z ce 5-g- 04 FA' ?.1 Q ; it X W - Jo Q Q EQUIPMENT SCHEDULE CHILLED WATER VALVE SCHEDULE U < e ^ ti 4tZo. m o Ew CH-2 (R) TAG # DESCRIPTION MANUFACTURER PART # COMMENTS �a W .Q z AIR COOLED CHILLER _ _ 2" _ _ v CARRIER A UASNAP CHILLER CHW BA 32,34 2 BALL VALVE APOLLO / CONBRACO 82-108 01 BRONZE 3-PIECE FULL PORT o Q 35,36 w MODEL # 30RAN022GS-6-5QM N 9 h. g,,E1-22 TON (NOMINAL) CHW-BA-44,45 1 1 2" BALL VALVE APOLLO CONBRACO 82-107-01 BRONZE 3-PIECE FULL PORT z c=.� -4 o o U ,57,58 / / a � 3� L_± GPM 39F, 10F DELTA CHW-BA-38,39,41 1" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT © - i HX-01 42,46,48,50,53,59 CI ilia' SHELL & TUBE HEAT EXCHANGER ,60,64,66 0 (T) r ig BELL & GOSSETT CHW-BA-31,33 3/4" BALL VALVE APOLLO / CONBRACO 82-104-01 BRONZE 3-PIECE FULL PORT 0 n MODEL # CHXS 336-2L CAD FILE: 6.0 GPM MAX PWD CHW-BA-37,49, 1/2" BALL VALVE APOLLO 1 CONBRACO 82-103-01 BRONZE i��D P ROFF 07406-MO4-7 51,52,56,61,62,63 c3zxe /p o 5 ,65,68,69,70 7 889PE ' off' CHW-SP-01 1" BALANCING VALVE BELL & GOSSETT - - �, L` 4a REGO t. CHW-SP-02,03, 1" BALANCING VALVE - - SUPPLIED WITH TRANE VALVE PACKAGE z��- . t�`c' &. 04,05 o0� �Q�J 41 V Expires 12/31/2007 z D g 1 Q -. FMS - - - - - - - - r PI, GENERAL NOTES ®2 I ∎._ / 1 I A INSTALL HIGH POINT VENTS (HPV) AND LOW POINT _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ -- - - - - - - - - � - - - - - - - - - - - - -r- - - - - - - - - DRAINS (LPD) AS REQ'D BY PIPE ROUTE. HPV AND PANEL- _ - - - - - - - - - - - - - - - � - - - - - - - - - - �- - - - - - - - - ��- - - - - - _ - _ - LPD TO BE 3/4" HOSE BIBB WITH CAP. RUN RUN Z M (- 1 I B INSULATE ALL PIPING PER CODE REQUIREMENTS. CL PROVIDE PVC JACKET ON ALL INSULATION. et I � JI ■-- z w � 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --I - - - - ---I - 1 - - - C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. Z 0 U O r-----i KEYED NOTES W AIR VENT 1 B&G MODEL 107A AUTOMATIC AIR VENT OR EQUAL. h AI 0 0 o ■2 PROVIDE AUTO AIR VENT AT HIGH POINTS IN SYSTEM. o BA TUBE WATER TAP TO NEAREST DRAIN. Q • 43 co o® , 3 CAP LINE AFTER SUPPORT HANGER. a • 4 REPAIR INSULATION AFTER DEMO. •• . TO MANUFACTURING PCW . g 0 IEC JEP ■ 1 -1/2"-PcwR-IEc DWG. 5 PROVIDE CONTROL PANEL FOR PUMPS TO PROVIDE o M4.2 LEAD/LAG OPERATION. 0 . ' BP-1 3 ; 6 PROVIDE HIGH POINT VENT ON ROOF PIPING. gm (3 o FROM MANUFACTURING PCW z m g� ! - /2"-PCWS--IEC DWG. Z I C , q 1 1 E z BA BA IEC JEP I M4.2 (f) � J• 45 39 BA O U3 c i 44 I Z non V w • 73 BP-2 1.7 S -4- (5 N 5 � N BA E " eg 66 ©H/ ' -� � � � c0 V U o- IX m IE w w I I c I N N > 61 cr y) �. % I,! ; r 0 0 t . ..I • ,5: r , V r;' ■ r rr ■ ,e BA BA rr'.. 65 62 ■■ ■■ rr r ' r■ ._I .,.... BA 74 BA • • C .TM.... • :•. 15 GPM 41 LYO } • REFRIGERATION -0*-- 1 "-PWD-KEA • I(FROM M4.6) ,r- 3 *1--.4-*1--.4- s3 SKID �� W 14 GPM n WZ -0110--1 41 I •F \_ ] K5 1 PWD—J EA—► Z(TO M4.6) a 1 SP N 0 1 BA H0uI W n 5 A 0 v °' ' bs 42 Q o o 0 10 W BA La W° 75 gig • V ^ EC 1 A 8 a m o <? = '- I- Z H S a 9 § p-.% .Me Z„ W 6 . 1 R & D MECHANICAL ROOM PROCESS COOLING P & ID Z 21 M4.7 SCALE: NONE (7) 6 o Z G 5 -1 W LL,LTI et O o CHILLED WATER VALVE SCHEDULE -71. 4,, . 0 '4' O W TAG DESCRIPTION MANUFACTURER PART # COMMENTS .d ZO m = �Iv o c� PCW-BA-32,34 2" BALL VALVE APOLLO CONBRACO 82-108-01 BRONZE 3-PIECE FULL PORT m °v P L 35,36 E QU I PM ENT S CHEDULE W . Z W N V PCW-BA-39,41,42, 1 1/2" FULL PORT H X—01" BALL VALVE APOLLO / CONBRACO 82-107-01 BRONZE 3-PIECE F (EXISTING) s 0 - L. 72,73,43,44 4- C- 'd' 3% • PCW-BA-74,75 1"" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT SHELL & TUBE HEAT EXCHANGER o BELL & GOSSETT 45 MODEL # CHXS 336-2L o N 3y --- 6.0 GPM MAX PWD PCW-BA- 3 4" BALL VALVE APOLLO CONBRACO 82-104-01 BRONZE 3-PIECE FULL PORT �6 N / / x FZ ■ CAD FILE: a PCW-BA-62,63,64 1/2" BALL VALVE APOLLO / CONBRACO 82-103-01 BRONZE ��,D PRQf 07006-M4-7 65,66 BP-01 & 2 (N) ��& ;N 4. /e& 0 - 7 889P PCW-SP-01 1" BALANCING VALVE BELL & GOSSET - - G R U N D FOS — — — / /� fg 0: ,L MODEL # CRN 5-3 A FGJ G E HQQE �aGo N - - - - - 30 GPM `��' vG<Y13,z ! _ 'Ohs GQJ • 5_ ______.S - ::_.. Expires 12/31/2007 O O 11 FMS pr PT, (TT's1 e3 02 04 ETITi UNIT STATUS GENERAL N i '�!1' I L` 'J I �-r./ I L_ _ _ _ _ _ _ _ i I A INSTALL HIGH POINT VENTS (HPV) AND LOW POINT - - - - " - - - - - - - -" " - - - - - - DRAINS (LPD) AS REVD BY PIPE ROUTE. HPV AND - - - - - - - - - -- - - - - - - - - - - L - --�--- - - -� - - - - - - - -4- - --f-------! - - - - - - - - - PANEL LPD TO BE 3/4" HOSE BIBB WITH CAP. Z 1 , B INSULATE ALL PIPING PER CODE REQUIREMENTS. a L PROVIDE PVC JACKET ON ALL INSULATION. 0 O W _.�._ _ _, _ _ _ _ _ _ _ _ _ _ _ _, _ _ _ _ r _ -�-- - - - - - - - - - --�--- - - --.—�- - - - - - - - - - C FOR DEMOLITION / CONSTRUCTION PHASING SEE F ° SHEET A0.2. g 0 Z 0 PT o FROM MANUFACTURING CHW 411110 KEYED NOTES W DWG. > 1 1/2"—CHWS—IEC °Cfl M4.5A 1 JOIN AT EXISTING TEE IN PIPE WHERE THE 2" FROM o BELOW SPLITS TO FEED RAH-5 & MAU-2. Q I 1 1 /2" CHWR IEC ; ° 2 0 LIJ ,;j cL cs I w �' % cK = w w “ I 1 = . w 0 0 o 1 "—CHWR—IEC N IN 0 1 "—CHWS—IEC r -, . o,S e— BA I BA I I °e AIR N I AIR VENT 61 14 VENT 1,3 m BA A ~ BA /�� ZS BA Z tv a �� 53 MBHF --- -s (;- ---J 72 LA, n 46 6 GPM i .06� ca • NO W W dE • I \I_ RAH-5 • © • ■∎ Q. W o 4 I 4. v x � 10►I ■� V r BA�..:/ 10 48 0 thI ��BA ii BA w 49 W V BA z U ii� 57 I 0 ( 58 � � TO MANUFACTURING CHW • c I-0". 2 .. DWG. M4.5A U - 1 k w ° -! , rTGV w p?0_____\_s 0 > _ W j j \�� rI , I W W W I + (FUTURE} Lo ` M I I 1 0 • N�----T-r 1 RAH-6 1 r� 3- -1 •• r r 1 Y R o I I I I . — N N ::. ■.: ■.■'■.■■. �,, FUTURE �,, ,■ .. .• 1 BA BA ::.: 59 Bq 60 A '' ,1 51� r cv 1 14 1 _ !i3 _ BA 87 MBH ` ., M °° 50 17 GPM F �' `02A■ tel m� MAU-2 � N 0 , W a I• 1 I MAKEUP © : • 0 4, C AIR UNIT 1 I0, BA a zg 1 "—CHWS—IEC 53 a N to ,gib 14■ SP �� 4 g 5 6 BA 05 1 "—CHWR—IEC 0 Z MS 52 .c 0 1! SP 0 0 04 Cgp g 8 0 IT A -§tir; 0 :c - -- gE Z pl 1 R & D CHWS P & ID 5 P CO M4.7A SCALE: NONE ` -"1 W� to Z5 Z O z w� U) w u°'io 0 z< 0 X z= w o to 1E° : J 2 0 CHILLED WATER VALVE SCHEDULE 2 •C a © gig TAG # DESCRIPTION MANUFACTURER PART # COMMENTS I s _ ro CI - - - - - o _ j 1 Z4.cx N Q W 1 CHW—BA-46,49,51,51' 1 1/2 BALL VALVE APOLLO / CONBRACO 82-107-01 BRONZE 3—PIECE FULL PORT -71 ,d o 52,57,58,59,60,71,72 0.. ' 1 CHW-BA-48,50,53 1" BALL VALVE APOLLO / CONBRACO 82-105-01 BRONZE 3-PIECE FULL PORT o : il n 6_ A (T, in -�! r P$ N CAD— — PRO FILE:M 103 PRO/ 07006-M4-7A I G 44 4)Si.... 4889PE"' aW CHW-SP-02,03,04,05 1" BALANCING VALVE BELL & GOSSETT - - L n r •REGO ' `'l./, o 4>, y13, , J 4 ilEn e. & Expires 12/31/2007 E ,. v o } i 0 r I FMS GENERAL NOTES ' A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND SYMBOLS. a L____ _ _ _ _ _ _ _ _ _ _ _ _ _ _______ _ _ ' B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET AO.2. a ce o PANEL E KEYED NOTES 8 (La-,, �LS I o X02 1 FROM EXISTING 10 BoHP BOILER IN ROOM W I 333 (DEAREATOR). N _ _ _____J '8 . _ _ _ _ _ r _ _ —I-- _ _ _ _ _ _ _ _ _ _ _ _ _ :4 4:q -.... . O 0 W d En 4 O N0 is : gi Z v .4 � c W W �3"� � W �.^_ i~ i 3/4"-HPDIS-RDW 2 1 Z §...., L z VENT OUTSIDE 2 Cj g.t GA Z 'ir GA 09 w '2 01 p =� CLEAN STEAM a GENERATOR • . 3/4"-SCS-ADA T., Q cp R N 5 SIP-01 8 m g P.- 0 ? 1 1 2"—STEAM—ADAM 1 ,rte la, > -6) li (F) 335 •�. W L (E.,,T) 3/4"-LPCR-ADA ■ .y N GA BA ■, •L■•"I\ ,• • • 02 35 M7.5 ■■■r■r�■ • N , 1 1/2"-STL'AM-ADA �`—'� 1 1 2"—HWC KEX • •''•_ i - O • • ■ 3/4 LPCR ADA ,. . 'w ,'le) • � 03,0., ��Ad, ,, 1 -LPCR-ADA SOS M � a 111%) \II, . . . " PUMP (TYP) � ► 1 —SCS—ADA LEVEL 4�, �, CDNTROL ' W Z \\,, , LYO CIP SKID GA PUMP PKG. (D �, ` CIP 01 07'0 o ? ,................................�'` ► ', - T LYOPHILIZER a „, -- <1 �- 1-1/2"-PWD-PCH 3/4 -PWD-JEA R&D a 0 "- - HX-41 1 PWD J " W �, \\\\*\\\\T\N vil S 1 211:41UN ziN, ,'�`� `? - . . . 2 -PWD-JEA J r.,i�►� �����,���� �i'L�,. v►� FINISHED FLOOR g 1 1 PMP-1 CONDENSATE I I = ° 3 FD 3 334 335 g PUMP PACKAGE 335 1 CP-1 z ° Y .. °o C W TRENCH 6 o Y3 D 335 a s o H3 I RI z ,. g,n 0 12X In w 856 Q 0 1 R & D STEAM SYSTEM P & ID DEMO W a. il 0 �D4.: SCALE: NONE o 0-o 0 0 0 `r ° 1E F LPCS VALVE SCHIDULE et 0 IA W ra i a x (>2 Eg TAG DESCRIPTION MANUFACTURER PART COMMENTS v) u s EQUIPMENT SCHEDULE STEAM—GA-01,09 3/4 GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE N Woo 1 Z! STEAM—GA-02 1 1/2"/2" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE i c~n �' U. SIP-01 (oFu) CP-1 (E) STEAM—GA-03,04,05,06,07,08 1" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE o ! ° e STEAM TO STEAM CONDENSATE PUMP PACKAGE p MODEL NO. - BELL & GOSSETT o N Ed ` OFCI MODEL NO. ITT WCD-12-20-BMA W � 1/3 HP �, CAD FILE: 0 } tt PRO, 07006-MD4-8 PMP-1 (EXISTING) 4:440u/44'T®3 (D) 4 1 BOILER FEED TANK BOOSTER PUMP 7 889PE I' CHEMLINE CORP GRUNDFOS I- �a MODEL V8FST 2.0 GPM , REGON I _ a Q` vU 4 ' ‘17 u,r i4 41,13,20 \) J ' , N E. G V 4 g T---es 12/31/2007 1 FMS GENERAL NOTES A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. B FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. o a. _ _ _ - - _ o °_ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1NEL KEYED NOTES �Z 1 NOT USED. 0 ' O J 2 FROM DRAWING M5.3 w m 3 REFERENCE M4.7 FOR HX DETAILS. I - - - - - _ _ _ _ _ _ - _ - - - -- -- - - - - - - - - - - - - - - - - - - - N � 4 VENT THROUGH : 8 HROUGH ROOF. O O 5 WASTE TO SUMP. W W a ci EL co 4 Q ii; M N 0 ftl ni. ' L9 2 O^� V .g FE LA' n it d III 0 a 4. 1111 c si 0 ? 344 —HPDIS—RDW Z 1 1-' i Z N \ VENT 4 Ili c '%., o g GA 'Z ILI m o GA 09 C =; 01 m W � CLEAN STEAM ,.� LE 0) & N.- GENERATOR ■ a 3/4 —SCS—ADA w ,� g I a o L FROM MANUFACTURING STEAM SYSTEM P&ID SIP-01 w m =EC m DWG. 1 1/2 —STEAM—ADA ■ ,� III _� > Y U� c•M4 4A x ti) y v) csi 335 v W w W (LPT) 1 M v- 3/4 —LPCR—ADA ■ GA BA ■ .. . 42 3 35 .■■:r M7.5 /2"-Hwc—KEx(Q) ■ ■1 1 2 —STEAM—ADA 1 1 ■• •. ••.• • : . , O. 1 I l . • •."...1:7;Or III (LPT) 3/4"—LPCR—ADA GA / , 03,0 gi TO CONDENSATE "— — c, DWG. 1 LPCR ADA SOS S M N M4.4A _ _ t A W " PUMP OYP) LEVEL ' rr ~ ' i 1 —SCS—ADA ► �;; ;;► ' I CONTROL W XZ 3 4"—HPDIS—RDW LYO CIP SKID GA A - -- IMO PUMP PKG. a N 2 i • 07,0• 3 0 ^ .g t CIP-01 O T " LYOPHILIZER v a) W I " o 3/4 —PWD—JEA R&D Z 1-1/2 —PWD—PCH ? „— — HX-01 5 1 PWD JEA IX " � o 2 —PWD—JEA � o o � o � � �a FINISHED FLOOR L a CONDENSATE I I = ° , ,= 335 335 PUMP PACKAGE Ahli 335 z B A — CP-1 M7.5 W O Z ...�./ TRENCH 6 o S_E 335 v J O :3 Z W re tg z a z � U 1 W R & D STEAM SYSTEM P & ID o SCALE: NONE >.. ifs © ag M4.8 JJa.W o u C) 0 4* ,...,1 a z I- m o 5w Li. itt (/) l � _ � o 0 tx la < M5 Lai Ij N II- s _ a. d' O 98 C 0 : g- >- ...I a U W Z L N W tit, EQUIPMENT SCHEDULE LPCS VALUE SCHEDULE w X CAD FILE: 2. ti 0 PRO/�J' 07006-M4-8 p TAG # DESCRIPTION MANUFACTURER PART COMMENTS °'A�' I N `�j0 SIP-01 (EXISTING) CP-1 (EXISTING) STEAM—GA-01,09 3/4" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE fi ��',,) It. ig STEAM TO STEAM CONDENSATE PUMP PACKAGE STEAM—GA-02 _1" 1/2" GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE 48 9P ( 2g i MODEL NO. — BELL & GOSSEI I STEAM—GA-03,04,07,08 1 GATE VALVE CRANE OR EQUAL STEAM SERVICE GATE VALVE OFCI MODEL NO. ITT WCD-12-20—BMA STEAM—BA-35 1 1/2" BALL VALVE APOLLO / CONBRACO \ v& ,13 w REG°" ,Zp Vt!if 0 1/3 H P I '0y r�'J ZNE. . LEx pi res 12/31/2007 !•• - _ - - - - - - - - FMS GEN ERAL NOTES CI UNIT i \ UNIT STATUS STATUS A INSTALL HIGH POINT VENTS (HPV) AND LOW POINT L__ _ _ _ _ _ -� (TYP) ' -, (TYP) DRAINS (LPD) AS REQ'D BY PIPE ROUTE. HPV AND - _ _ _ _ _ - _ _ _ _ _ _ _ _ �-_ �l _ _ _ - _ _• - - - _ - _ - - - - _ _ _ - _ LPD TO BE 3/4" HOSE BIBB WITH CAP. PANEL - - - - - - - - - - - - - - - - ----�--- - - - - -• - - - - - - - - _ _ -t-- o B INSULATE ALL PIPING PER CODE REQUIREMENTS. o. PROVIDE PVC JACKET ON ALL INSULATION. ce U P in L _ C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. - - - - - - - - - - - - - - - - - _ —�----1 - - - - - - - - - - - - _ _ - - - - - - - U 0 ce O J KEYED NOTES W co DWG. > 1 3-WAY VALVE BELIMO. h DWG. M4.B CD N >)_ M4.9B 2 2-WAY VALVE BELIMO. cl M h O O 3 CONNECT TO CONDENSATE DRAIN LINE TO FLOOR BA DRAIN. ,� v o N Q 13 4 PIPED TO DRAIN PAN. m d m°---\BA BA 5 VALVES TYP(10) APOLLO 2 PIECE BALL VALVE. ■ 09 �., • 1 -DHWS-IEC S 1 -DHWS-IEC 1 s "' N t AO BA • 6 LOCATE VENT ON PIPE HIGH POINT. li 0 BA — — BA 14 U 10 CIRC. PMP 1 07 L� w N I 1. Ea DOMESTIC WATER t� s Z �'I-C PUMP = _ _ m :t3 in 0 0 X1. ` h s w / 2: w i. T' N _ Si!. BA BA ~ v `� 05 20 0 MAU-3 - o IQ MAU-2 Cv B � CIRC.-PMP-S MAU 3 Z N 45 MpM i i �4 1 i W e .5 G � � 1 ,...,, cG �m BA 01 a SP BA> __ b —I © NC 01 08 PREHEAT ► ,, s & a 1/2 -DHWS-IEC COIL • O c R - • • 1/2"-DHWS-IEC v it i g i w BA BA 0 03 DII 19 12 = d 0 wl R 2: f i 0 (.1 i- 1 0 i CV I i CV . • ■. ::r i 22 i i e►® BA �' . . 30 MBH I' d S• 75 MBH - -S 0 -' " 02 O ; 4 3 GPM 7.5 GPM ■ 1 /2"-DHWS-IEC • REHEAT ©' NO 1 2"-DHWS-IEC-- ►- ► • 1 2"-DHWS-IEC • REHEAT © NO 1 - • • N • /2 / / /2 DHWS IEC• L COIL m • L COIL m. BA BA SP 04 15 4, SP BA / 0 Si 03 05 17 r,./ M a 0 90 C-.) BA 21 o W % 8 06 _ ro 1 N SP Wz 02 04 w to > z� co Q N W ^ U Ag <a) 1 R & D MAU - 2 HOT CATER P & ID 2 MANUFACTURING MAU - 3 HOT WATER P & ID . . < 0 0 (D • M4.9 SCALE: NONE • o g M4.9 SCALE: NONE goo no gEl �t D _ c; i., 8 w U � o oil :7 if ww 6° Z mN _O z pw V1 w °ui J a. 0 v x c li 1p W d. co W p c.,=--i 04 ;'""z .41. P EQUIPMENT SCHEDULE DOV1ESTIC — OT CATER VALVE SCHEDULE az c °= o -I la o U = :, DHW—CIRC.—PMP-1 ,5 TAG # DESCRIPTION _MANUFACTURER PART # COMMENTS 2 Z0 R EC I R C. PUMP DHW-BA-01,02,03,04, 1/2" BALL VALVE APOLLO / CONBRACO 82-203-01 BRONZE W in BELL & GOSSL I I 06,12,14,15,16,17 g rn 25 MODEL NBF22 _ a O i # 103252 DHW-BA-05,07,08, 1" BALL VALVE APOLLO / CONBRACO 82-205-01 BRONZE 3-PIECE FULL PORT i it)_ ,09,10,11,13,19,20,21 . Z n - - 117412 B+6 DHW SP-01,02,03,04,05 1/2 BALANCING VALVE B+ Z h CAD FILE: •\ GIN 41 PROf 07006-M4-9 Z� /�? h a -' 7 889PE ' VW 1 �a D. �REGO C 0 0 V" 0 vG :a LY132- ' N) Ati*N E. G u FApires 12/31/2007 m a 2 0 0 3 T .- _ _ _ _ _ _ _ _ _ _ �_ _ _ _ _ _ _ GENERAL NOTES FMS A REFER TO SHEET MO.O FOR MECHANICAL LEGEND AND SYMBOLS. PANEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 KEYED NOTES Z U I I W L _ 1 ALL VALVES APPALLO 2 PIECE BRASS VALVES. ° _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - 2 SEE M4.9 FOR DETAILS. 0 v ce 3 REDUCE PIPE TO 3/4" AT CONNECTION TO HEATER. 0 W 4 TO DRAIN LINE LOCATED IN ROOM 334. D 5 HOT WATER MIXING VALVE. N ..q 6 REPIPE THE 1/2" CONNECTION LINES TO DUCT COIL o in SUCH THAT SUPPLY TO COIL IS ON THE UPSTREAM o SIDE OF LOOP. PROVIDE 15" SPACE BETWEEN RINNAI WATER RINNAI WATER SUPPLY AND RETURN CONNECTION TO MAIN. AUTO (5") 0 HEATER-1 0 HEATER-1 g SINK (E) (E) 7 PIPE RETURN DOWN STREAM OF FLOW. � CO I OR K K5 I 1 —DW—IEC 8 INSULATE LINE. 0 0 RR POC LOCATED ON 3Q w GMF'IG FTY I SHOWER ®.z!= _ 1 3 T 1 T MEZZANIN_ _ E EQUIPMENT DECK CIRC. PMP-4 ROOM EXPANSION 3/4"—NG—ADA g � ROOM 306 TANK 471 � � Ur 2 g(E) = 301 — � � Z .0 4 0 —' 41 3/4"—NG—ADA _ rE .,E Z 1 2"—DHWS—IEC N 5 V7k 0 Di 3/4"—DHWS—IEC ENGINEERING FACILITIES W o li TYP 3/4 DHWS IEC WORK AREA Z 42 � • 1 "—DHWS—i EC --� —vt lai g A 1 L. 12 Z In A 1!I oc o F.' or. C5-1 Z o di "o IS -2 fi 0 CIRC. PMP-1 a, 0 Ea (N) r_' — D •,,,i-5 1 0 o..., O LYOPHILIZER —K5r— #3 II 1111 e > 15) ii LYOPHILIZER LYOPHILIZER 31 1C t ROOM #1 0 w w r 307 311A Cn • .- u. ■ 0 DUCT -•LYOP ILIZER -■■: ■■r #2 w ■. w • REEH T ROOM ,/ C0� — 308 .1 il Y-1 5 0 j M - O la Iw ~ Pci ri-1 a I m Z 7 W a _Z1 o v v o ^ 5 a - w V+ C)C. c51..._ 1 "—D S—IEC 3 4"—DHWS—IEC ' z W CIRC. PMP 5 (E) rD I W W O g � G g q5o i ii;;; i..4 _„I E . � LYOPHILIZER = o r- l�1 #3 B3 4 0 05 Di C) ROOM Z • W O 309 . L''' g gliEi U J 0 to SAFETY REHEAT o go SHOWER COIL z 4 Se CO I OR MAU-3 0 in ce W `` RRp 300 zQ � U _ W 0 CD 1 m J = V v rJ �` I� �� DOMESTIC HOT WATER P & ID E UIPMENT SCHEDULE (ThMANUFACTURING Q . SCALE: NONE M W o g6 Ile P DHW—CIRC. PMP-1 (N) DHW—HEATER-1 & 2 (EXISTING) to Z RECIRC. PUMP R981 (323FFU) TANKLESS WATER HTR ce Z P Lai = GRUNDFOS RINNAI N <i r,- 01 L,_o $25 y MODEL UP26-99F MODEL R98i 1 33 GPM FLOW 9.8 GPM -8. -J Z k a o w 2g Q Xi TING DHW—CIVC. PMP-4 (EXISTING) W -DHW CIVC. PMP 5 {E S ) RECIRC. PUMP RECIRC. PUMP i= . h- -,--- CAD FILE: 0 PROTT� 07006-M4-9A � GINt4,. /.1p 0 1 L _ 4-. 4889P 4$ W' N V ' OEG N 0 s1: N 0 GQJ 2 °IP' c EE-xpores12/31/2007 z 0 O 0 2 FMS _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ ._ _ _ _ _ _ _ , _ _. _ _ _ _ _ _ _ _ _ _ _ _ - - GENERAL NOTES A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. z - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 P PANEL KEYED NOTES re U O W 1 ALL VALVES APPALLO 2 PIECE BRASS VALVES. to _._.- _ - - - - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - 2 INSTALL BALL VALVE AND CAP. o 0 ce MECHANICAL ROOM 334 3 SEE DWG. M4.9 FOR CONNECTION DETAILS. o W LAB SERVICES 4 RELOCATE SINK FROM ROOM 309. 0 SHOWERS SINK #1 . r. (E) (E) 1 "—a IT- ! 5 REDUCE PIPE TO 3/4" FOR CONNECTION TO it° Q 333 HOT WATER HEATER. .. o RINNAI W WATER RINNAI W ATER o s EA 0 HEATER—1 6 PIPE TO FLOOR DRAIN LOCATED IN MECHANICAL omo d 0 ----Pr-01 (N) (N) ROOM. 1 /2 —R&D DHWS IEC P DHS—WH-3 DHS—WH-4 g 7 EXTEND PIPE LOOP DOWN HALL TO EXISTING _L 1, 1 1. BATHROOMS TO CIRCULATE HOT WATER CLOSE 3/4"—R&D — EXPANSION Q — ® ` 3/4 —NG—ADA TO OUTLET TO SHOWERS. 0 i TANK .,� G1 A y, A • a . • -- 1 —NG—ADA li 0 m o� nil Z U 0 tE � taJ 7 2 w = liF i0 • 0 � tn W� t /1�1 r51 3 Hi o ti • 1 "—DHWS—IEC • 2 g, •MP 6 Z 1.9 1- t N ILI c LAB SERVICES L_ ____I (1) 8m SINK 2 Z (R) Ø W 1:2 P 333 A O �2 CE 01 0 Nv R&D GLASSWARE � c m 1§- WASHER w K51 I CC IlJ m = (N) c 1 327 > .A � o uk III W i � w U r T i:i R&D SINK CIRC. PMP-7 T (v) (E) K5 . ... K5 3 4"—R&D—DHWS—IEC . ..;;....... . 327 0 ..:•.• ,•• w ■■ 1 K:51 I- L a a / R&D LABWARE it CL ENING e M o e 328 �� C4-1 D R&D ANE w Z� z MZ IN W co E) 3 ' N Y � �- (1) o N 5 � a °' ✓ k <1 "—DHWS—IEC • ° ✓ W D-1 0 o C5-1 w u)C g ; O LO G A 2z MOJANITOR QUALITY CONTROL QUALITY CONTROL QUALITY CONTROL I °. .2 g SINK IK #1 SINK #2 SINK #3 §3 (E) E) E) E) w cg 1111 322 320 320 320 P 3 W g. Z O p U, 2 w v6 Z 0 < a. --_""_"8 W W co p a o 1 V V E- '1` ~ E LAB SERVICES AND R & D DHW a o EQUIPMENT SCHEDULE M4.9B SCALE: NONE 1Q = l iw T U • DHW—CIRC. PMP-6 (E) DHW—CIRC. PMP-7 (N) W RECIRC. PUMP RECIRC. PUMP W o 2 BELL & GOSSEI I — o Q, E N • _ id .�. o � MODEL — a. � # 103252 — > I gg r_______ R. i'..' ch n DHW—HEATER-3 AND 4 (N) gal R98i (323FFU) TANKLESS WATER HTR 0 Z RINNAI CARD FILE: O PROTE� 07006-M4-9B MODEL 8981 �V' GI NZ ��� 9.8 GPM �' S 74889PE 9 Rig t 4 a. E +R GON c A. ii ���plit�is,2`� J 0 0 h'E N E. O I Expires12/31/2007 Ii �.w r � Fps _ _ _ _ _ _ _ _ _ ,_ _ _ _ _ _ _ _ _ _ _ _ _._.l GENERALNOTES (--PI A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND SYMBOLS. .C)3J B ALL IW PIPING TO BE RUN IN TYPE L COPPER PIPE. C FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET AO.2. o a' Z 0 0 Lai PANEL � KEYED NOTES � ° 1 CONNECT TO EXISTING 1/2"-IW TO SAWS IV. 0 IX 2 TO LIQUID RING VACUUM PUMPS. m m 3 CONNECT TO EXISTING FUTURE VALVE OUTSIDE JANITOR'S RM 322. Ow ; N M r... O O 0 0 0 N t d r-<::: --1 it' g 1 GPM M N 0 1 g� QC SAWS IV rif LAB Z v a an th 1 1/4"-DW-IEC wcn i dtF W511 elt iii= BA L!1 c gi 1/2"-IW-KEE 40 Z Cmg ° �� U BA K5 : Z L. \ 25 14...\ p C o BA BA 0 w • 41 37 z U o 1/, -IW-IEC 111 _ _t W 0 a ca v IE O 0N W W U .- 1 I:4 0 0 BA w W T is 2 -±". 4 a 32 - .-� ,�! .5) PI 0_\:-. I T IS L45 II PT 04 . BA in r) 02 2"-IW-IEC 42 r-•0' BA 0 BA ♦ * ••••: 22 23 a—■ • a• ' MOLD LABWARE '•. `I '- 1 1/2" • •J --� 1 1/2'-IW-IEC © 1 -IW-IEC — , . .•!•a. w W WASHING . WASHER #1 •a•, ell. RM. 333 RM. 334 PBP w W !s; DW ■ 1W 02 '� d- BA 1 GPM T 6 GPM 4 GPM o .0 "�, BA \ BA 28 F "' 31 27 3/4"-IW-IEC w 1 , • • w W 1"—IW—IEC • 4 ► • 1/2"-IW-IEC- SIP 3 GPM A XZ QUENCH us' ZZ LYOPHILIZER `` co • 0 0 �► R&D • BA o h g A W • 1/2 —1W—IEC—I -- aat 34 0 z o BA Fl • [-0 vW N 24 01 yp c c BA ' 13i' fil IN. BA 35 36 zoS2 2 � PRV ► O �. 0 8 1 R & D INDUSTRIAL WATER P & ID Z PO 37 M5.0 SCALE: NONE o 0 J 0 in Z Li Pg DEIONIZED lig gy WATER 2 EX SYSTEM z o = ! 5 GPM 111 W co it :-.3 :- °o 0 r Qz � ao 8 A IW VALVE SCHEDULE _ 4 ° 01 TO M5.2 W v) Zx TAG M DESCRIPTION MANUFACTURER PART # COMMENTS t x o MS T ix z z� IW-BA-27,31,34 3/4" BALL VALVE APOLLO / CONBRACO 82-204-01 BRONZE 3-PIECE FULL PORT N c ° ,35,36,37 _ it 0 o IW-BA-22,23,24 1/2 BALL VALVE APOLLO / CONBRACO 82-203-01 BRONZE 3-PIECE FULL PORT o A z 25,28,32 g � IW-PI-04 PRESSURE GAUGE ° ri 0 Iii IW-RPBP-02 REDUCED PRESSURE CONBRACO 40-207-A2Z a BACKFLOW PREVENTER ��,� PROF�C 006-M5•o �siH',� ��O � n IW-PRV-37 PRESSURE REGULATOR WATTS REGULATOR 3/4" INLET/OUTLET WITH GAUGE -889PE I` IW-F1-01 1/2"/2 FLOW MTR 0.5-5 GPM REGO tS� G IW-BA-40,41,42 1-1/4" BALL VALVE APOLLO / CONBRACO .BRONZE 3-PIECE FULL PORT 41, °`s 41/4 0 Ah'�NE. G4` u J Q Expires 12/31/2007 z. G O 0 0 . 0 x, r Azer ,A,A, - r Awry e* ; 4r 4eeAr idcgerry #r -Pyle) . AO, 1 z , rri 1 2 1 u) 1 4 er- V, . /4:7 i ' ,, Or_ • i'AV Je I 6.: 04'7 PAP " 40ir JO ■orii■ ' .A•1 - g 400 ..-A1 / 1 1 1 r mPA,, ";-:-Trierf.07 14* V171P 4 ' ;i 0 6 ,.414-Pf 0, "esoo: 'r r ill 4440 -> Ar . 74 ; v.I 444r1 7 " el I. 47 1 1 1 . 1 A7-- :;., rie :::orer .or , , / 244 : 40, 4 Fri d'AiF: ' fir , .. /ev 1 i 0.4 , , rV , / Z Ad 0 , -; e*:::' A 4ffi w :: se 1 1 rAr; A.,wAte.: 1 1 1 ir.vot/e://,,, lit 4 ti er a, AY- PPS , AZ PArer 44 PV/Ati4 --# : . r tp?r ip 44/ Atti' 1 1 re JPIV ,:i 0 • irrAtio, -0744r/Ariirvorr:/441:415;4, A ll 1 i 1 i ■ :. 0 . , Ailt • 'I 0 OW fir Z- ■15/ w) Alg I I I . , Pi Aral A 4444i '‘: 1 8 0 , • AP r 4, /Pr A4717 ''WP ' '. 1 r • r' -/ .17, r■ A At4L.A 4?A r ; edr;04,407m, ,,, I, :14 rolry /rdr I RI r/64 tr,Ay, r 1 7,, Att riP VI r ,,,,, / .. , .4/ -0 Aro r P . ": , ;14. Ardi e At-414 9 i: 4 Li , iti 440 - . WI a W 4 V; 7/4::// A/00 1 0 . ' 4P-ir r. A r -I' rAi0; Ar 7 AI" rev Aki/ f A. . K % AA 47 .4744IrAr 4. 4•:. 1 71r el ■:#-. 41 .1 A ris, Toy/ dAD -4 1 ,...t, /447,Apf, r earrol,*„ 1111 AlP7o I , a 4orreliv -ri t•-",, , , . AlftP■di #1.. . ,I 147, ■pv;;AT■AAK; "Avr; AtfrAiA P; 4trArf Arr-"I■st; K- 1 Ald AM , Ad , .., r..... 0 ,... .0K 4Air MAIM"r A VA CAAr ,44 //44/40/Atilliii/y4(jr/r/r"dir ir ra 4 Or 07 • Ad r :A4r. A/d A ;e4°°/1".. - ■ 039, / Agin ZZA Ar., A r z iii/ A1,..Z...... . .44. A. 404_ _i 7 __. , c) c) co > z m Ph 0 m ›..›. --I --"‹ M 1:j1) 0 rg r- Tog 243 ,FcSju) > -, =.1 ...,>.-0 Eno Clm ....._ gem_ 0 ,,c- • -0 . rn 1 x (/) = ,.....< •=1 0 r<-- m V) 0 m 0 v) ---i > , 2 1201 1- n C:7 m m --d .0„s 8474/ b _ 0,,,.. Ril o z z -• Z *1 Xi 00 (i) Z N) .-, M.#...e■a, I..# ..c: M — G5 rn 14 C) (L) Z = M M rri (G2 P O 0 IC 4 D- dt.i. , !13) 1 1 g TITLE: LYOPHILIZER #3 & FACILITY EXPANSION i' : MECHANICAL CUENT: HemCon 10575 SW CASCADE AVE, SUITE 130 • Z. . EVERGREEN ENGINEERING Er' DEIONIZED WATER PAID — DEMO • .. • . I LOCATION: TIGARD OREGON 97226 1.: ;..I. .• Engineering and Construction Services REV. DWG. i MD5.1 JOB # CLIENT REF. # DEs. . CHK. APPD. ,• • .• .••'•:lie:•ri SHEET OF 07006 SCALE: NONE DAM DATE: DATE: .. • . _ .: ee.V..: • ' HILLSBORO •% . 7431 NW Evergreen Pkwy, Suite 210 Hnleboro, OR 97124 / 860414U:,,ELLErne, OR 97402 0 ASL SEC 03/02/07 ISSUED FOR CONSTRUCTION () E. TpHRIEErioNGLE THIS BITAZITGA.BrieCFEENF&NEERIN8i DESIGN AND apnEgirgairgE osFpusicAnotus INIEBEDwRSOLELYcoFOR THE PROJECT SENEUINEEM7L.ELeBiliOCK. al MAY } (503) 439-8777 FAX: (503) 439-8787 I ) (541 771 F • (541) 484-6759 REV. BY: APPD. DATE: DESCRIPTION FMS GENERAL NOTES A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. B ALL POLYPROPYLENE BALL VALVES TO HAVE UNION END CONNECTIONS. o C ALL THERMOPLASTIC VALVES TO UTILIZE EPDM 0-RINGS ri - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - AND DIAPHRAGMS. Z PANEL D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. g Z O ' KEYED NOTES ° 1 FSI DPGX100 DIFFERENTIAL PRESSURE GAUGE 6-8 PSIG w DELTA P RANGE, FIELD MOUNTED TO X100 HOUSING. N 2 1/2" SAMPLE TAP WITH BALL VALVE. o ill � o M 3 TOTALIZER. 0 4 SET PRESSURE TO 35 PSI. N BA g IEC SCH 80 PVC 23 0 . 4 0 0 ■.. 0 • 1 g� PW-1.OBF-31 . m n 5~ 2x1 2x1 1/2 - Z -4 F-2" ›""‹ • PI Ea t Z n.Lij• 25 W lit 411.....L.I■ 0 ® ;: • I �W 1 1/2"-IW-PCH °° 15 -1.08E-4I y N BAr 2x1 1/2 r— O 24 / • N DA z o 'b r. E -0 22 w 1.0 MICRON BA w BAG FILTERS 26 FROM DISTRIBUTION IE rn 0 " =T . 1 1 2"-DI--NEW DWG. •i ag 1§-► [ / M5.1 B il m .a KID c RO S 1� •_v "� SIEMENS I— —1 > � L- J w I ta DI t STORAGE TANK 3 BY VENDOR r • --\ . .. % „,.., • *. .;,;• i.:7-"- • MS • IW N.O. N.O. •• •• :ue • ■ r■ s ; ■ ■■ ■• • :.�.■• N.C. ■. ..J D—HDPE STORAGE TK-1 g W 1dN . W H L44 U! �Z TO DISTRIBUTION a CO ZI L - 1 1/2"-DI-NEW DWG. W n DEIONIZED WATER SKID BY VENDOR M5.1B ° �, — L SIEMENS PUREFIT HIGH PURITY WATER TREATMENT SYSTEM o tlA O o ` 8 = ° I . Z 0 Z U z ° o to vita a� W gpg z o 1 rg O z EX z o. W tL 0 X 1-- W $ � to, 1 MANUFACTURING DEIONIZED WATER P & ID u � o o M5.1A SCALE: NONE U v N O .h i U0 it 0 0 s W i6 41k Z — yT F2 a Z 5 LE— Q v _ 25 MANUFACTURING DEIONIZED EQUIPMENT SCHE DULE O Z J TAG # DESCRIPTION MANUFACTURER PART # COMMENTS DI-FILTER HOUSING 3 & 4 (N) IW-1 .OBF-3 & 4 (N) = 35 DI-BA-23,24, 2" PVC BALL VALVE EPDM GASKET FSI SPECIALISTS, INC. FSI BAG FILTER g ( ii6:,: A 25,26 PLASTIC FILTER HOUSING P/N: BPONG1 X01 0 ri DI-BA-01 2° POLYPRO BALL VALVE ASAHI OR EQUAL EPDM GASKET W ON STAND 40 GPM MAX. -.- M DLL # X 100 CAD FILE: s _' DI-BA-02 1 POLYPRO BALL VALVE ASAHI OR EQUAL EPDM GASKET \OD PROFjP 07006-M5-1A DI-DA-22 1 1/2" DIAPHRAGM VALVE ASAHI /AMERICA OR EQUAL POLYPURE, PPN EPDM GASKET HPC R.O. (N) PURE FIT HIGH PURITY (N) GINS /t - BY SIEMENS WATER TECHNOLOGIES SIEMENS WATER TECHNOLOGIES .- ,889PE 21 — - MAKEUP RATE 5 GPM WATER TREATMENT SYSTEM " - - -6. - - DISTRIBUTION FLOW 30 GPM �k - oN` 1 - - - - PEAK USAGE 30 GPM ` 40,13,20,5 J b 1 i — —— A#'' N GQ` w . Ii Expires 12/31/2007 J ' GENERAL NOTES A REFER TO SHEET MO.O FOR MECHANICAL LEGEND AND ' SYMBOLS. B ALL POLYPROPYLENE BALL VALVES TO HAVE UNION END - ( CONNECTIONS. Z 0 _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ C ALL THERMOPLASTIC VALVES TO UTILIZE EPDM 0-RINGS PANEL AND DIAPHRAGMS. o 0 D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET g A0.2. 0 fx E ALL DEADLEGS HAVE LENGTH & DIAMETER RATIO LESS • ° THAN 2. cl Ed L__ _ _ _ _ _ - - _ _ _ _ _____ _ _ _ _ _ ____ _ _ _ _ _ _ _ ____I O l'i ..q KEYED COTES ... ., 2 0 1 END OF LINE SHUNT FOR RECIRCULATION. u) EL EL PLACE ON WALL IN LAB SERVICES AFTER a MOLD WASHER. g 2 1/2" DIAPHRAGM VALVE WITH FEMALE THREADED ADAPTER o i 3 RYANHERCO HIGH PURITY UPW ROTAMETER P/N 5808-202. ' 0.6-3.5 GPM li HIGH POINT 4 RYANHERCO HIGH PURITY UPW ROTAMETER P/N 5808-203. U m g� VENT DA 6 VE Z 2.5-10 GPM Z �•f.-) 1:: TO MANUFACTURING DEIONIZED WATER 23 w w ro S d.- 5 1" DIAPHRAGM VALVE WITH FEMALE THREADED ADAPTER W � DWG. 1-1/2"-DIWR-NEM . 4 o li M5.1A 6 INSTALL VENT AT SYSTEM HIGH POINT. Z � u g ,!- 7 INSTALL 4-FEET ABOVE FF. z 4,-; 8 INSTALL 5-FEET ABOVE FF. ' o fi Z U 5R DA I C 6 34 W O 0 w w � c ° N....i.•■, *■,, •■,.. '.. . ■,, ■,, --., ■ ,. ■. .. 2�. w w � ri IN � r, C® �A Lg. CV 0a t *1 -- > - ) 16 HIGH POINT c VENT W IS 20 FROM MANUFACTURING DEIONIZED WATER • DWG. 1-1 2"-DIWS-NEM DA ` ;• M5.1A a •E a!!al . l KM! s .s • • . • • • 0 . • • . Ai II BA BA BA BA BA BA BA BA BA BA • •••- N O 01 � 02 w ® � 03 , 011 04 N O 05 O � 06 ® 07 ®� 08 al 09 w 3 10 - \ , � % _ . .' 14 A' A' .,. ., .' .4 ., t- C DA DA DA DA DA '� DA DA DA DA , DA ° `" gY. 24 25 26 27 28 29 30 31 32 33 0 W P,v. i _ 2 DA 5 2 g A 2 DA 2 DA DA v �/ DA 2 DA 2 DAB . a o 2 o a ® �Z 22 a 2 a 07 a a 06 19 18 17 cn 16 a a DA 4i �a DA 08 > � -0 TO TO 05 TO TO TO TO TO TO TO TO W N Y 11; 311C 311C • 309 308 307 301 333 333 333 333 •°t - -- SIP STEAM LYOPHILIZER LYOPHILIZER #3 LYOPHILIZER LYOPHILIZER PRODUCTION SINK SINK DISHWASHER #1 MOLD WASHER o Mg IN PLACE 3 CIP LOADING RINSE RINSE GEL MIXING CARBOY 0 CARBOY CARBOY AND 0 o g 20 GPM 4 GPM 4 GPM 4 GPM WASH ND 4 GPM w o � W� 5 GPM $ WAS WASH LAB WARE rg 9 8 0 0 $ � 2 GPM 2 GPM 2 GP M o 019 z l 1 DISTRIBUTION DEIONIZED CATER P & ID i � � Z E M5.18 SCALE: NONE o es W �o 81114 1 W 6 gi 0 o z �� DEIONIZED WATER VALUE SCHEDULE ( is W �o TAG # DESCRIPTION MANUFACTURER PART COMMENTS z a U W W DI—DA-02,06,07, T-343 NATURAL PP ZERO ASAHI /AMERICA 6345208 POLYPURE, PPN EPDM GASKET 3 � 11015 08,16,17,18,19,22 STATIC DIAPHRAGM VALVE 1/2" x 1/2" v W �g DI—DA-20,24,25,26 1/2" DIAPHRAGM VALVE ASAHI /AMERICA OR EQUAL — POLYPURE, PPN EPDM GASKET `L` a Z ti o alg 27,28,29,30,31,32,33 / / ad = — — U W 34, xo Z a Z E Z g IV M CON1/4, DI—DA-05 T-343 NATURAL PP ZERO ASAHI /AMERICA OR EQUAL — POLYPURE, PPN EPDM GASKET 2 2 e, STATIC DIAPHRAGM VALVE E N Id- . 1 X 1/2" VALVE J G 3 E DI—DA-21, 23 T-343 NATURAL PP ZERO ASAHI /AMERICA OR EQUAL — POLYPURE, PPN EPDM GASKET q STATIC DIAPHRAGM VALVE _ iN 1 1/2" X 1/2" VALVE _ m s 1/2" BALL VALVES it z DI-BA-01-10 TYPE 346 OR 546 +GF+ OR EQUAL - W/EPDM GASKETS, BUTT FUSION 4,.��0 Fl PRaf j 07006 5-1B 889PE ( ht ° if, 4„t0 4 '4 4:6 ig o a 1 a r- Xa N Ot a 2. `� er I REGON b 4 } 13,i \:t/ A,YEN E• G• u E S r Expires 12/31/2007 P ,..�...,,o N O h O N 0 O 2 GENERALNOTES _ _ _ _ _ _ _ _ _ _ _ _ _ _____ _ __ _ _ _ _ _ _ _ _ _ _ FMS ' A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND (Ai (Pi AND SYMBOLS. 0 02,) ° B ALL NITROGEN PIPE AND COMPONENTS TO BE Q CLEANED FOR OXYGEN SERVICE. N2 COPPER a. ° PIPE TO BE SILVER SOLDERED. Z N - - - - - - -- - - - - - - - - - - - - - - - - - - — 0 6 _ _ _ _ _�}. I —_ - C KEE PIPE CLASS. 316 STAINLESS STEEL,150LB,COMPRESSION. { PANEL I ( D FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. S ce 0 ° 1 1 ° W 1 h I !� KEYED NOTES N I I I ■ C4 { _ _ _ - _ _ _ - - - _ -- - _ _ - - - _ _ -- _ _ _ _ _ - _-I-- - - - - I CO BA1 0 1 D EM 0 TO BALL VALVE AND CAP. ci 04 `rak :IF Irk'N '1 'Il 2 DEMO PRESSURE SENSOR & RELOCATE PER DWG M6.1 . g — 3/4"—N2—IET " " „ • I ht... \' - ,c,--1/2 ET " ,c,-1/2 ET o- 1/2 ET o 0 1 2"—N2—KEE 07 c-T-1 2"—N2—KEE 1 2"—N —K PL...1 ■►'' �BA o-- / / cam— / 2 EE ' `,, l: \bH\ 8 13 CEILING ` �% !�- MEZZANINE DECK '— -- 5 ' m BA BA 1 / , ; es .. KEE 06 05 P �4 BA Z BA 19 PI PI ‘4111■14t •� E, E W 18 • 07 08 + I 8 ti�. 11 pi 4.PRV 14 PI PRV 06 Z 05 BA BA 3 05 � 06 � kli■ �, lu 7/1 —Q 21 20 Z In" gi 7:7--1/2"—N2—KEE BA 7:7-1/2"—N2—KEE c7----1/2"—N2—KEE 5 27 ENGINEERING/ LYHOPHILIZER #1 LYOPHILIZER #2 U 56- FILTER UNIT 1&2 FACILITES Z I WORK AREA UU -v ii CEILING CEILING a S- S— -S It o, R v BA BA BA ` C g 114- 22 310 311 311 c n 30 28 \ 306 m 08 04 1 › .-6) ri PRV ___------"'"°4 PI PRV IJ w 1 W 10 / 10 g PI R ' " 3/4"—N2—IET I. ,. ..�► kb.R&D LAB R&D CLEANROOM R&D LYOPHILIZER �,--1/2 IET ©---1/2 IET ��N• '( . ••• :`-.-• BA (E) N___.N -1/2"—N2—KEE • ((]] BA 7:7-1/2"—N2—KEE , \ '- . 08 s'"-----.ZI 4%MEZZANINE DECK , •. i i r■ IET �� • '•r.r• 327 326 335 KEE �- BA BA 40 5— �S 15 14 e Q-1/2"—N2—KEE PT CEILING • M Y& 02 (E) � PI PRV PI w $ A BA � PRV /'� � � � . - �= Pa —0" —0' li. \ 03 01 02 a L----- O1, N2KEE 16 02 I BA .q N w� 31 PRV "9■ PI SEALER 1&2 �' r 03 P ,/ 09 SEALER 3&4 U ori a) a 4c 0 CYLINDER C.3 QC LAB 306 306 % ': 4 320 .�, .......- /V%\.,/) 32 PC) Id 1 -i 1 - DEMO N2 DISTRIBUTION P & I D W 6 MD6.1 SCALE: NONE o CC CE to w % CYLINDER z v ° #2 11 W c0 Il J W 0 a • 5 c) m 'Q N2 SALVE--1/2"—N2 Z 1 O Z O ' a ) W a gm TAG # DESCRIPTION MANUFACTURER PART # COMMENTS N MB c _ N2—BA-03,05, 1/2" BALL VALVE SWAGELOK 45S8 STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS b Z N I 1E 06,09,11,13, J • .)i- E QUIPMENT S CHEDULE � _ � � 25 22,23,27,28,31 0 m ° so DEWER #1 & #2 (DEMO) ST--1 (RELOCATE) ,32 0 e. LIQUID NITROGEN DEWER STORAGE TANK 1 N2—BA-07, 19 1/2" BALL VALVE HAMMOND BRASS THREE PIECE BALL VALVE c, wt's SUPPLIED BY VENDOR 60 GALLON A (T) W N2—BA-08,20,21 1/2" BALL VALVE MATHESON TRI_GAS STAINLESS STEEL 0 (RENTAL) CARBON STEEL, 150 PSIG ,30 0 n N2—PRV-01, 02 PRESSURE REGULATING VALVE TESCOM 44-3263—H263-621 STAINLESS STEEL PRA CAS FILE:_ o7oos Mss 1 N2—PRV-03, 05 PRESSURE REGULATING VALVE SWAGELOK SERIES K STAINLESS STEEL �����GIN 4, ii o CYLINDER #1 & #2 (E) 06,09,10 74138 P �' W NITROGEN CYLINDER ` N2—PRV-08 PRESSURE REGULATING VALVE MATHESON TRI—GAS STAINLESS STEEL Xa. SUPPLIED BY VENDOR OREG•` N2—PRV-07 PRESSURE REGULATING AND CHART M-45 6' PIGTAILS FOR TWO DEWER CONNECTION ` ), `tity�3, 00' 4' 0 1 SWITCHOVER MANIFOLD iO""E . Cc' 'J i - LExpires 12/31/2007 IIII Y GENERAL NOTES - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -FF----NiiS I A REFER TO SHEET M0.0 FOR MECHANICAL LEGEND AND SYMBOLS. (AD EPE B ALL NITROGEN PIPE AND COMPONENTS TO BE CLEANED FOR KO:1} E E ' OXYGEN SERVICE. N2 COPPER PIPE TO BE SILVER Es SOLDERED. v en - - - - - - I- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - C KEE-PIPE CLASS: 316 STAINLESS STEEL,150LB,COMPRESSION. P La L - _. - - - - - - - - - - - - - - - - - - - - - - - - - - D FOR DEMOLITION CONSTRUCTION PHASING SEE SHEET PANEL A0.2. 0 o ce O J °w m KEYED NOTES N Q 0 0 d 1 TRI-CLAMP CONNECTIONS. o Q i ■ 0 f—— — — - — — — — — — — — — — - - - - - - - - - - - - - - - - - - - - - - - - - I - - - 1 SANITARY FITTINGS. a o r ( N N a I PI / 109 .. 3/4"-N2-IET o-1/2" IET [6I ICI K2,-1/2 IET 1/2 IET I M N 0 BA o-1/2 IET = 3/4"-N2-IET-c7 BA K=7-1/2"-N2-KEE 07 0-1/2"-N2-KEE K7---1/2"-N2-KEE KEX 13 • 5--- CEILING --1/2" KEX KE1 IET MEZZANINE DECK BA BA m �� PI g Z v 14 KEE BA os 05 Q-1/2"-N2-KEE _ El W— -S BA 19 PI 08 ( ;;. W W 18 07 - Q W to LA dkE • 0 0 BA BA W c li PRV ____---� 06 �-`J 0 Z .2 §, 05 // 05 PRV 0 BA BA �� U S -0 06 21 20 _ I „+- 0 z � K7-1 2"-N2-KEE BA c7-1/2"-N2-KEE K7-1/2"-N2-KEE _ d 1/2"-N2-KEE LYHOPHILIZER #1 LYOPHILIZER #2 w U 27 FILTER UNIT 1&2 FACILITES BA B x Z g WORK AREA 36 = 1 N LO -2 1 CEILING CEILING I 0 01 S- -S S- -S LYOPHILIZER #3 CE C g .■ C3D BA 310 311 A 311 B 311 C CIP `�- ��28 22 306 CC m 08 1 w � � IET p) PRV -1 PI PRV •E� KEX I U� W �v 10 10 8 PI A - 0 11 I FROM N2 SKID 1 2" IET 3/4"-N2-IET IET d 1 1/4"-N2-IBEX DWG. ' . .1.11. R&D LAB R&D CLEANROOM R&D LYOPHILIZER (E) o-- / ,,,_1/2" M6.1 A • • •• 8A N:7---1/2"-N2-KEE X BA K:2-1/2"-N2-KEE Y ■ 37 1 • •■ • IET MEZZANINE DECK :s r■ (r--327 326 335 KEE E - - BA BA 41 -" �-1/2"-N2-KEE 5- --S 15 14 � PT CEILING M §I 02 (E) PRV •`� PRV :�i PI L BA ' - _ -0 1 fi 02 P /7 CO 03 01 02 5 W 2 L_ .._ _' 1/2" N2—KEE —0 0 vg BA a 31 PRV •'l PI W n g 5i 0 05 � r 03 09 SEALERS SEALERS °° o, �W w CYLINDER c) W a� #1 QC LAB � � � ' qi Q 306 306 v 'n N c°r 1 ,Q E Z ° H 1Z BA 23 o !al N. _.--INA&/) BA 320 L o El r 0 J n N 32 —0 1 N2 DISTRIBUTION P & IDZ W 1! M6.1 SCALE: NONE z �' o Z Wg CYLINDER z w o Z U �w a.#2 W to gi N2 VALVE SCHEDULE 0 a. o n C) 0 ° a TAG # DESCRIPTION MANUFACTURER PART # COMMENTS < 0- o N2-BA-05,06,09 1/2 BALL VALVE SWAGELOK 45S8 STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS M W zfi 13,14,15,16,18 �o 23,27,28,31,32 W I 36,37 N EQUIPMENT SCHEDULE _ _ 1 " V - J 7 lIg`A N2 BA 19 /2 BALL ALVE HAMMOND BRASS THREE PIECE BALL VALVE I' co O °a O. y CYLINDER 1 & #2 N2-BA-08,20,21 1/2" BALL VALVE MATHESON TRI-GAS STAINLESS STEEL ° - io 5 # ,30 j NITROGEN CYLINDER C� w z� r SUPPLIED BY VENDOR 02 PRESSURE REGULATING VALVE TESCOM 44-3263-H263-621 STAINLESS STEEL o N gN v � W i n® n N2-PRV-03, 05 PRESSURE REGULATING VALVE SWAGELOK SERIES K STAINLESS STEEL 0 PI 06,10 CAD FILE: ���� PROF��� 07006-M6-1 N2-PRV-08 PRESSURE REGULATING VALVE MATHESON TRI-GAS STAINLESS STEEL e4', 0,IN z4, /per gi ' /4 839PE 9 � N2-PRV- PRESSURE REGULATING AND CHART M-45 6' PIGTAILS FOR TWO DEWER CONNECTION J �, ( P- lig N SWITCHOVER MANIFOLD 1. e REGON. L N2-BA-22,33 1/2" BALL VALVE SWAGELOK 4558 STAINLESS STEEL �6' `''Z '13,20' J41' 0 kg N2-BA-34,35 3 4" BALL VALVE COLE-PARMER OR EQUAL EN-30530-00 STAINLESS STEEL TRI-CLAMP CONNECTIONS �' 'Y \` / FN E. Expires 12/31/2007 E r o 7 i IFMSI C (Pr\\ (AE DEWPOINT ALARM A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND 0 E Kpi- ' SYMBOLS. I I B USE TYPE L COPPER FOR ALL CDA PIPING. USE I LEAD-FREE SOLDER. I — - — — — — _ _ _ — _ — — — — — L — — — — — _ _ _ _ - _ _ - _ _ _ _ — - 1 z 0 C FOR DEMOLITION / CONSTRUCTION PHASING SEE a. - - - - - - - - - - - - - - - - I- - - - - - - - - - - - - - - - - - - - - - SHEET A0.2. Z ix U PANEL 1 A I o w I o I 1 KEYED NOTES 0 C3 0 Q 1 COALESCING AND FINAL FILTERS ARE INTERNAL TO THE L___ _ _ _ _ _ _ _ _ - ' I _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - I DRYER. er 0 0 1 j 2 TRANSITION TO STAINLESS TUBING BEFORE DROPPING N 1" CDA IEC BELOW CLEANROOM MEZZANINE. en I. BA BA ( I a Q BA 07 30 3 GENERAL USE PORT. QUICK CONNECT. a at( 23 No 0 4 REGULATOR, VALVE, AND PI SUPPLIED BY VENDOR. » " 1"-CDA-IEC 0 - » w a 1 -CDA-IEC v n 3/4"-CDA-KEE 0� 1/2 -CDA-IEC BA • 1/2" BA • 1/2,-CDA-IEC �0 BA 2 1/2 -CDA-IEC \,_) 1/2 -CDA-IEC v 2 IN 1( '\\ - - " " 5 SPARE DROPS VALVED OFF AT CEILING. BA 1/2 -CDA-KEE 35 i 14 1/2 CDA KEE U 12 /2 -CDA-KEE , 1/2 -CDA-KEE , J 1/2"-CDA-I EC pfi BA ' PRV 1/2"-CDA-KEE BA 6 MANIFOLD OF (4) 1/2" SWAGELOK VALVES TO �_ 20 1 fi 06 :�� N N BA N z 08 OS SEALERS. 2 BA • BA • V A BA BA •, \ 10 BA \ BA ° w 31 15 13 BA BA 1/2"-CDA- 56 57 i PI 09 37 7 CAP POC AT BALL VALVE. 24 1/2 C D » 17 < 05 � Bq U 3 4"-CDA-KEE 3/4 -CDA-KEE � 06 PRV g / 11 PRV BA .J W PRV . BA PRV I •�7� NN 07 04 38 J �, BA 21 � '- � PI • PI al Dior- •� 01 PI 05 ¢ 01 i • . 11 .� PI . PRV z . PI PI PI �� '��' �� '!� 07 '4 08 •11 08 v 3 d�BA t�� �� 02 �,,�� 03 t.�� 04 � E �t o ` ` 42 i 43 0 iie m 240 GAL 0 ` PI to Si CAPACITY �� 12 � W rn Z QC LAB tilt 0 0 trirrirr PRESSES ! a• . ' LYHOPHILIZER 2 ENGINEERING/ LYHOPHILIZER 1 FILTERING FUTURE Z c �J PT FACILITIES GEL USE "' ' BA WORK AREA a w h 01 Z c i;,,POUCH POUCH 33 , , + •a SEALERS SEALERS w ri 320 306 306 306 MO: 311 112 311 306 306 E ..to.IlliSk1111.1 X. 05 BA I ■ E`1■ "IL ° '" ` m 40 I (C t 1 ip 1"-CDA-IEC I 1"-CDA-IEC la O = 1 2"-- — a► " " ® " t-1— " U I/ CDA IEC --b 1/2 1/2 1/2 1/2 i ' - - - - p— J BA in 47 DI\ BA ,�--- 1/2"-CDA-IEC i 52 " 45 u u u 1" CDA - w 5 5 5 E !1 1 CDA IEC � BA - PI 2 — l�J ® _ u = `-c • 27 :- V BA " _ O w w w I BA BA BA BA ,' ., �.. A •. -- ,• 1/2"-CDA- w 14 1/2 --CDA KEE •. w ¢ '::;. B �E_'�__EE_ `�' - "� \ ; ` , D / w j 50 A' Y BA Y o ■. ,.r:.- 18 No, ,.. ,\ q �,► ,r- ` r = ' ,, w w I w w ¢ 44 <I ¢ z i .-• .;..:. 11 IL ■ ' / ' IN, . I i U .. 1 2 CDA KEE .. 19 \1/40.1 . , - OD 0 .w I /''` U U a U U Q I N PRV N N�� I I I BA N I I o _ ¢ i \ ,. .�► , , z BA = U 3 ST 3 D 11 PRV ��, . 1 . 1 ; ► I N N 55 .- N N I O • - i,► \ ��� fi0 \ \ \ BA E ,.�, �• e- �• 1 BA • BA i 3 �„ ,,,,... l� ` � �• 48� : \ 1��,''� : . :,.� � 1I 60 GAL `- 53 PI 63 t1 � BA BA � • 1 fi �,� M 1 � , I ` • CAPACITY .,► • i ,� � � !E \,, ,i `. �, ` \ ”- _ 59 fit •' 114 1/2 CDA KEE • • • W IL ,-,.,,. — 49 1- • • w 1,1 , � � � 46 w �kiiiik ��.�► � 7 N � BA 4 l�J 4 W Z�• TYP. 0 a. BA. . , � � 58 '� E•y VERTIS (2) ¢ N .. _�54• R&D � ' ' POUCH FILTERING R&D 'j' � �MEZZANINE GENERAL o�� LYOPHILIZER USE SEALER GEL LAB r t� �► SIP CIP SAWS 0 z W' ► ��� , . PRV BA p�, �- • 01 51 I 02 v W i lite 326 326 326 327 329 3 0 klb, 4!w. ��w� �. ,11,. 335 335 335 328 0 in ° i 1 39 � 38 VI W o El S •— !- o S k P • a Xo w 8 1 CDA DISTRIBUTION P & ID - DEMO .4h Z. MD6.2 SCALE: NONE w 60 Jv 4( PA CDA VALVE SCHEDULE Z X TAG DESCRIPTION MANUFACTURER PART COMMENTS w 0 3 tO 115 CDA-BA-10,11, 1/2" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT < ° 0 1. 18,19,31,32,35, OR APOLLO OR #82-203-01 5 z � 24* o zW 36,38,39,40,41, J G 5 I 45,51,53,55,58 M a. Zg ,59,60 © Po CDA-BA-02 TO 1" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT N U N E QUIPMENT S 07,25 TO 28,30, OR APOLLO OR #82-205-01 .7.1 w 25 33,46,47,49,50 a o v o AC-1 D-1 ST-1 AND ST-3 52,54,61 ° � Q. AIR COMPRESSOR (E) AIR DRYER (E) STORAGE TANK -P -CDA RV 01 TO PRESSURE REGULATING VALVE SWAGELOK SERIES K STAINLESS STEEL � . _ P POWEREX SED 1007 AI RTEK TW-55 CARBON STEEL 03 & 05 TO 08 W et 09,12-17, 1/2 BALL VALVE SWEGLOCK 4555 STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS �'B 29.4 SCFM DEMPOINT MONITORING 60 BA-08, 1/2" -' iZ M 60 SCFM (ST-3 RELOCATED) 20,23,24,37,38, CAD Fl LE: , 44,45,48,53,62,63 ��k,D PROF F� 07006-MD6-2 CDA-BA-42,43,48 1 2" BALL VALVE MATHESON TRI-GAS STAINLESS STEEL �,, .�,. i5 4, h ° AC-2 D-2 ST-2 / w AIR COMPRESSOR (E) AIR DRYER (N) STORAGE TANK BA-21,22,56,57 3/4" BALL VALVE SWEGLOCK - STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS I , ,1 �'' &� I)- POWEREX SED1007 AIRTEK TW 40 CARBON STEEL CDA-PRV-04,11 PRESSURE REGULATING VALVE TESCOM 44-3263-H263-621 STAINLESS STEEL 5REGO 29.4 SCFM 42 SCFM 240 GALLON CAPACITY • t vt, o t � '13 ''• i .6•,0 Q� 0 thi A/4% E. c;"1/4 "1 c ptres 7 E ,c, a ,;. 1-;- O _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - - - IFMSGENERALNOTES , (Pi A REFER TO SHEET MO.0 FOR . MECHANICAL LEGEND O1 I AND SYMBOLS. B USE TYPE L COPPER FOR ALL CDA PIPING. USE LEAD-FREE SOLDER. z _ - - - - - _ - _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - C FOR DEMOLITION CONSTRUCTION PHASING SEE ° a _ _ - - - _ _ - - I _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ SHEET AO.2. C) __. - - - _ _ _ - - - —�- Z O W PANEL L ° KEYED NOTES 1 0 v < 1 TRANSITION TO STAINLESS TUBING BEFORE DROPPING — — ---I-— — — - — — — — — — — — _ — — — — — — I O m L__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ BELOW CLEANROOM MEZZANINE. W a 1 "-CDA-IEC 2 GENERAL USE PORT. QUICK CONNECT. so 1 r. CO BA BA I . ■ cd BA 06 PI I �' PRV 3 REGULATOR, VALVE, AND PI SUPPLIED BY VENDOR. 0 Q o BA 07 31 M n 23 20 21 alai 06 O c Ardalli . • 1"-CDA-IEC 4 SPARE DROPS VALVED OFF AT CEILING. W W a • • ►• " CDA-IEC 1/2"-CDA—IEC v q/21CDA1KEE/2"-CDA-IEC �, , 1/2"-CDA-IEC v `� �' a 1 -CDA-IEC v ••. 3 4"-CDA-KEE 1 •� "_ BA = 1 BA 1 �,BA c- _ / 3 4 CDA-IEC • VES TO 3/4 CDA al� CDA-KEE / 1 2 -CDA-KEE 5 MANIFOLD OF {4) 1/2 SWAGELOK VAL�� 14 —�© / - SEALERS. _ ..• 1/2"-CDA-IEC ��1� BA BA BA BA �, ar---- BA .., �"' 67 i 11 20 16 68 BA = _ = 0f • BA 0 PRV • • • PI 15 ,� 10 BA ''� BA ∎ N. 37 M N 0 - 13 N PRV ØBA BA PRV 23 w BA ( 1/2" CD•- E `I� .O� 12 56 BA ' PI ` 57 17 09 `, ¢ 05 LYHOPN3LIZER CIP • (15 09 Ri 0 24 " " o iF 3/4 -CD -KEE �,) 3 j4 -CDA-KEE t. • v PRV PRV BA 0 PRV GEL BA BA PRV [ =I 07 04 38 LI m &I 21 �� ROOM PI PI z v 03 :p PI PRODUCTION S 1 22 2 05 :.i 309 SUMP ® �, 10 PI `--' i 2 `� PUMPS _ �_ _ _ 1 . 11 PI PRV z • • 01 301 P1 PI ST-2 !�` 11 C 311 C 311 C 07 `P 08 08 U .- PI • lr•� BA •_ BAS r<� 02 03 t!' 04 42 l�` 43 L�' pi li 0 1 240 GAL BA 12 Z v li C CAPACITY U (�1 (�1 PRESSES • BA w 69 LYHOPHILIZER 2 ENGINEERING LYHOPHILIZER 1 FILTERING FUTURE E N QC LAB A • • II 0 0 PT i FACILITIES / GEL USE Z N • 49 SAWS 01 : n¢ WORK AREA c W #3 BA N 0 0 6m POUCH POUCH 33 BA ` d- Z SEALERS SEALERS 64 • N • 5 320 306 306 306 BA 311B 112 311A 306 306 v 68 a� — BA 0 GI -.•BA PI 1 pi .e s O. 65 E.: FROM DISTRIBUTION 40 14 22 EC m I 4 7 DWG. > 1" I> 3/4" > .5) P M6.2A BA ® Li w id 1/2" 05 [ • - 1"-CDA-IEC • 1 f 2"-CDA-IEC -d •` 1/2" •` 1/2" '` 1/2" ( ,-1/2" • el---1 -� BA • • • • • ■■ B..• BA '- 1" 47 BA u u u u . j.•.: 1/2"-CDA-IEC-------,, 1 52 '' 1"-CDA-IEC - • ] w 4 4 4 . ■ 1"-CDA-IEC PI - 1 - 1 cj = u Y ' C-) BA I BA BA BA BA - ••'.•' BA • 1/2"-CDA-IEC v v c.� w 50 14 w o 18 BA I D w w w .Q � w w w v N 61 0 0 T T 1 w © W Y Y BA Y Y A L► BA 1 T o 0 0 1 1 ! I I ¢ 44 ¢ ¢ N. (# ;:\\ x < ¢ U U U ¢ _ ¢ <t 0 0 p M 1/2"-CDA-KEE ci • " M 19 D U =1 =i =1 O U o V U I I BA N N N j I v =1 k =I PRV •- m0 I % c� C4 cs4 55 1 '' ST-3 '- PRV \ !LLA 60 \ IF r 11 _ C; 0 I� 60 GAL B8 BA • BA v� Xi • BA BA BA CAPACITY • 53 PI 63 1 w ?z 1/2"-CDA-KEE 59 62 16 ►� 49 �'4 44 008 - PI . • BA 3 1► 01 3 3 46 BA 0 0 4 0 11 BA VERTIS (2) to A V LiJ 58 54 o I R&D MEZZANINE c o i LYOPHILIZEF 17 SIP CIP SAWS 8A SV GENERAL POUCH FILTERING R&D c.� ^ e8 PRV USE SEALER GEL LAB 01 51 02 m 0 0 x .- i= dE 329 z ®t 335 335 335 328 326 326 326 327 L o o ••W: C) _! G VJ qk -12 W IA c 1 CDA DISTRIBUTION F & ID Z ig N . �o M6.2 SCALE: NONE Z a. U �w X 0 CDA VALVE SCHEDULE w il J Z ° o, TAG DESCRIPTION MANUFACTURER _PART COMMENTS Q o qh 03 o z CDA-BA-10,11 1/2" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT 18,19,35,38,40 OR APOLLO OR #82-203-01 La I_ ig 45,51,55,58 v o mg - 59,60,69 w a CI I2E p_ EQUIPMENT SCHEDULE N u_l IAA K CDA-BA-05,06 1" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT z I ST-1 AND ST-3 07,30,33,46,47,49 OR APOLLO OR #82-205-01 ° _ Z g AC-1 D-1 50,52,54,61 J 17 AIR COMPRESSOR (E) AIR DRYER (E) STORAGE TANK _ POWEREX SED1007 AIRTEK TW-55 CARBON STEEL CDA-PRV-01,03 PRESSURE REGULATING VALVE SWAGELOK SERIES K STAINLESS STEEL ° �' ei), v 29.4 SCFM DEMPOINT MONITORING 60 GALLON CAPACITY 05,07,08,09 zeZ 60 SCFM (ST-3 RELOCATED) BA-08,09,12-17 1/2" BALL VALVE SWEGLOCK 45S8 STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS Ot CAD FILE: PROF 07006-M6-2 n 20,23,24,37,44 • GIN Z j•.46 Z 4.AC-2 D-2 ST-2 48 53,62,63,64,65 4 89PE ea. 4 AIR COMPRESSOR (E) AIR DRYER (N) STORAGE TANK CODA-BA-42,43,48 1/2" BALL VALVE MATHESON TRI-GAS STAINLESS STEEL Lc j 9, 68 " REDO a. N POWEREX SED1007 AIRTEK TW-75 CARBON STEEL BA-21,22,56,57 3/4" BALL VALVE SWEGLOCK - STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS R. 29.4 SCFM 42 SCFM 240 GALLON CAPACITY • 66,67 z� vo 00. CDA-PRV-04,11 PRESSURE REGULATING VALVE TESCOM 44-3263-H263-621 STAINLESS STEEL ''Ohs GQ`� 12, 13 ENE. :0 i Dxpres12/31/2007 c E z a a r. a o 0 T GE IFMSINERALNOT DEWPOINT ALARM LARM �'qLI DEWPOINT ALARM _ J A REFER TO SHEET MO.0 FOR MECHANICAL LEGEND AND SYMBOLS. s � B USE TYPE L COPPER FOR ALL CDA PIPING. USE LEAD-FREE SOLDER. Z 0 _ _ C FOR DEMOLITION / CONSTRUCTION PHASING SEE E SHEET A0.2. o W 1 ° HANEL ' o I KEYED NOTES 0 0 L.,.. 1 COALESCING AND FINAL FILTERS ARE INTERNAL TO THE DRYER. N cn - - - - - - — — — — - - - - - - - - - -°- - - - - - _ - - - - - — — — - - - - - - h I� \ 0 M 0 _ N a a BA 0 g I I 26 o �r / / — 1"-CDA-IEC —at/INLET FILTER SCROLL � �0. / -...--... AIR COMPRESSOR rn °° SILENCER v v 5^ AC-1 i,,1 I U 1:1 I — ■ . W = .2 W U I 0 . .r I ( gl; N BA I BA W s L..._____.411M 00■•••■•■■WM 111•■■•••■•IMO••■■111/11 27 I lia/-----------—-—- -—∎---------- - ■' 28 z T fTh I LI 3 3 Mb Z -V) AN UJ o 5 P--_ - _----- ---- ----_---_.-_----_--_ Z U �� BA 'v �i, 25 �-� mg .) HEATLESS o - 1"-CDA-IEC DESICCANT F______01.._____ -► ► AIR DRYER E s 1,- SCROLL II ii ii g __t1 INLET FILTER AIR COMPRESSOR BA BA CDA-D-001 BA ILI SILENCER 64 65 '�lat/ 0� 04 � .., AC-2 0 TO DISTRIBUTION is wa • 1-1/2"-CDA-IEC 1-1/2"-CDA-IEC DWG. 1 I I M6.2 Lam -�--- - ------------ -------- --- ----- BA r e. 1 . . '. PI _I 1/2"D 4 :::" 09 r I. / / •• — BA ST-1 � .1 —i o I I 63 • BA BA �� WET TANK 02 03 t2 1"-CDA-IEC �.. 80 GAL PSV fTh I - -- I CAPACITY XX M oo. `� I INLET FILTER SCROLL �,,, W SILENCER AIR COMPRESSOR AC-3 cn X i SV ``' Z�ffl 01 C: Q N W I I �� HEATLESS o ° 1(51,\ -:–.--- --- ----------------------___ ------- DESICCANT 0 z I AIR DRYER v w BA CDA—D-002 o 7 BA z z R _ --------- - - ------- - ----_ ---- 39 O 0 N, CX F___ BA W �o � I I 62 TO DRAIN o ,� Z W O 1"—CDA—IEC J Z / / I CDA-ST-OO1 CDA DISTRIBUTION P & I D INLET FILTER SCROLL — M6.2A SCALE: NONE SILENCER AIR COMPRESSOR b a in 1 AC-4 I Z :tn AC oe Z U W X _ W lit 0 0� 0 n L c) 5- id © W:ism 'tea °' o 12 o' — � M iLd v z ,, EQU I PM ENT SCHEDULE CDA VALVE SCH EDU LE WE is -71 CI 1 05 CDA-CPRSR-001 CDA-CPRSR-002 CDA-CPRSR-003 CDA-ST-001 (N) TAG # DESCRIPTION MANUFACTURER PART # COMMENTS a cO o is POWEREX SED1007 (E) (AC-1 ) POWEREX SED1007 (E) (AC-2) POWEREX SED1 007 (N) (AC-3) RECEIVER (ST-1 CDA-BA-02,03, 1/2" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT ° 29.4 SCFM 29.4 SCFM 29.4 SCFM 80 GALLONS g 100 PSI --- D IA x -- HIGH 04,27,38,41 OR APOLLO OR #82-203-01 3 = 0� 100 PSI 100 PSI o F 10 HP 10 HP 10 HP �i yy al al .j ^' CAD FILE: - CDA-D-001 CDA-D-002 CDA-BA-25,26,28, 1" BALL VALVE HAMMOND VALVE 8614 SERIES BRONZE 3-PIECE FULL PORT (rtr• d PHOijJ 07006-r�s-zA CDA CP007 (N)4 AIRTEK TW-75 (N) HEATLESS DESICCANT AIRTEK TW-55 (E) HEATLESS DESICCANT 39,62,63,64,65 OR APOLLO OR #82-205-01 Gi11% 4 POWEREX SED 1007 (AC-4) �` 4 89PE� � lg.i r 29.4 SCFM DRYERS DRYERS-1 OF — —30F DEW POINT —10F — —30F DEW POINT '' s 100 PSI g " •REGO 10 HP CDA-BA- 1/2 BALL VALVE SWEGLOCK 45S8 STAINLESS STEEL IN CLEANROOM, BRASS ALL OTHER AREAS `�vo�r�s, o�.`k� 'n v . 'EN E. 0' -L 't., . 41 r Expires 12/31/2007 D. c 0 3 r TOP ANCHORAGE PER PLAN 4 'TA' CAN BE USED AS LONGITUDINAL THREADED ROD, SEE M7.4 BRACE FOR RUN 'B' AND 'TB' AS 5&6 �---■ LONGITUDINAL BRACE FOR RUN 'A' TOP ANCHORAGE PER PLAN WHEN 'd' IS G 24" FOR PIPES -.-T TOP ANCHORAGE PER PLAN 58c6 TOP ANCHORAGE _ PROVIDE TRANSVERSE BRACE � 58c6 PER PLAN AT LAST VERTICAL SUPPORT TYPICAL Z 58c6 Z J THREADED ROD, SEE V. a. M7:i _ = `'''� � CLEVIS OR J HANGER N Lu TA o W 4. _ L ' RUN 'B' ...� .. ' A \\ CLEVIS OR J-HANGER i \�\ _ 2 T t T T r Tv TB► MAX ° TRANSVERSE _ U ix `i e:l BRACE ----.._.. 1 MAX 0 PIPE SLEEVE '``�-- MAX SPACING W m 2 MAX _ Q FOR TRANSVERSE /d/ v' 1 MIN `\ ZE CHANNEL STRUT BRACES SEE NOTES h © o C) MAX SPACING FOR o o p 1 ',,N\7.--------,,\ c':, 1" (7 ‘ (. o \ LONGITUDINAL BRACES � N a SEE NOTES Q_/ / I CHANNEL STRUT PIPE CLAMP �.� _ J g (INSTALLED WITHIN �a-- » - INDICATES TRANVERSE - T ESE BRACING CHANNEL STRUT BRACE OR 2 OPPOSING j -�' \,., 4" OF CLEVIS OR CABLE BRACES AT PIPES M N �. J-HANGER) PIPE CLAMPS 1 (INSTALLED WITHIN 'L' INDICATES LONGITUDINAL BRACING-CHANNEL SRUT BRACE OR 4 OPPOSING A CABLE BRACES AT DUCTS OPTION - A 4" OF CLEVIS S " g OR J-HANGER) m a: Z i .-ANCHORAGE PER PLAN - TOP 4 LE w 5 °- THREADED ROD, SEE 3 TYP PIPE B RACING LOCATION P LAN u� ._ TOP ANCHORAGE 5&6 (5--87c6 M�7.4 PER PLAN _ M7.2 SCALE: NOT TO SCALE W c li ■:_../ .---" TOP ANCHORAGE PER PLAN Z o �i 17 3 Z TOP ANCHORAGE y---THREADED ROD, SIZE PER NOTE W \ ANGLE FITTING PER PLAN - �m \ = 5&6 Z `...-- 4 _- THREADED ROD, SEE M 7.4 _ /�' �. Qr a, 0 Ny \ b" ll O `\ m 2 MAX \ \ _ 2 MAX CHANNEL STRUT STIFFENER III .� p 1 MIN TRANSVERSE BRACE I e �, 1 MAX ADJACENT TO BRACE WITH > c I,i 1 `� = 1 CRADLE CLIPS SPACED PER I!I w W 4,:,'' Fa ;*;.$ NOTE TYPICAL CHANNEL STRUT / ',1 IL ANGLE FITTING = - • CHANNEL STRUT PIPE SLEEVE IL nu LONGITUDINAL U-CLIP ' a 'r CLEVIS OR J-HANGER :ww■; am a. am an a ar 0 AZ x a ..-:-%: CLEVIS OR J-HANGER 'r •-� - BRACE NOT SHOWN N `x - FOR CLARITY Cz I `'.Q M \ 0 mo ,/ - - POINT OF CONNECTION 1 0 N WZ NOTES: W Z1 OPTION - -- 1 CHANNEL STRUT aN 0 0 o ^ a �� UT STIFFENER NOT REQUIRED WHEN TOTAL ROD LENGTH IS LESS � THAN THE CRADLE CLIP SPACING SHOWN. --- a 8z 2 1 T R A N S V E R S E BRACING - SINGLE PIPE CLEVIS 2 ROD SIZE AND CRADLE CLIP SPACING SHALL BE: ° o W W 6 M7.2 SCALE: NOT TO SCALE PIPE SIZE THREADED ROD SIZE CRADLE CLIP SPACING ° q (TLONGlTUDINAL BRACING - SINGLE PIPE CLEVIS 2"0 OR LESS 3/8"0 1 $" ci k1 1 8 y, M7.2 SCALE: NOT TO SCALE 2�� ,5»0 1 /2"0 24" 0 . 0 8 STEEL BEAM 6 - 8"0 5/8"0 30" Z �I STEEL BEAM Z o , BEAM CLAMP W MI iiiii�yi/i riifii/iii UNISTRUT P1379S -0 gl ti F 4 THREADED ROD HANGER DETAIL . gl l;;, 1 M7.2 SCALE: NOT TO SCALE o i w -;;;. THREADED ROD STEEL BEAM v _ STRUT j -- W o $.1 HANGER, TYP , © 5" CONCRETE WEDGE ANCHOR CONCRETE OVER METAL DECK Z J a o(f) "I% t MAX � ZQ o o W OPTION 1 OPTION 2 OPTION 3 4 4 Q 4 4 U W a n / NOTES: T . IF ask in q 1 . LINES SHALL BE HUNG WITH A CLAMP OF THE STYLE SHOWN ABOVE. -�. © `' N Lt `` n ■ ■ J RS CV j d Z EQL II , EQL o r g� 2. CONTRACTOR SHALL INSTALL BEAM CLAMP PER MANUFACTURER'S 01 J Z L REQUIREMENTS. = ROD COUPLING STRUT Z 3. CONTRACTOR SHALL SIZE THE CLAMP FOR THE APPROPRIATE BEAM SIZE THREADED ROD AND DESIGN LOAD. w a 2 THIS BRACE SHALL BE INSTALLED WITHIN 4" OF SUPPORT HANGER NOTE: FOR INFORMATION NOT NOTED, SEE CONDITION "A". O.D PROF 0 006—M-2 4. CONTRACTOR SHALL REMOVE AND REPLACE FIREPROOFING QN BEAMS CONDITION A ,� J�� CONDITION B �`Ix�'� �y 0 AS REQUIRED. 7.889PE , ( ii■ 21 w a n DETAIL to REGOo� BEAM CLAMP OPTIONS �Y, 41/4 fi M7.2 SCALE: NOT TO SCALE Cj)ANCHOR . SCALE: NOT SCALE eO'* 3' Cie N E. Expires 12/31/2007 1 THREADED ROD, SEE 4 (E) GLULAM BEAM o M7.2 58c6 8'-0" / Z E N TOP ANCHORAGE PER PLAN / M7.2 TYP ° ■..,..,,,i = il Z U O LONGITUDINAL BRACE w/ANGLE TOP ANCHORAGE [ (E) GLULAM BEAMS re wo o j FITTING SIDE OF TRAPEZE SLOPED PER PLAN 0 CEn n SAME AS TRANSVERSE BRACE m I (NOT SHOWN FOR CLARITY) �. N N 1 0 0 STD PIPE CLAMP ' UNISTRUT P1026 AND � ° 1 5/8 WIDE x 1/4" ,/ // 1/2"x3" LAG SCREW ti .._ \ ;. ----,, �, U P1026 AND m -. i 1/2"0x3" LAG SCREW , i ' 2 MAX '` 11 .1 ,' ) J .. a s // 1 MIN - 1 I I -5 ,f' -le- ■r--- I I 1 A Z !.�I _ m I I I I CO m - 4 : $ I I 6 S 0.0 TRANSVERSE "TI ° li BRACE = Z \ . ri E II.' 14 CHANNEL ANGLE FITTING ON W t F STRUT TOP OR BOTTOM - Z---. W c cri 3'-0" MAX OF CHANNEL STRUT ROD WHERE OCCURS Z 0 I, NOTE UNISTRUT P1001 Z 16 1 THIS BRACE SHALL BE INSTALLED WITHIN 4" OF SUPPORT HANGER BETWEEN BEAMS THREADED ROD ill o sc?, \ , Z ° °-'''' UJ o 0 1 TRAPEZE BRACE DETAIL 2 HANGER CONNECTION BTWN GLULAMS CD HANGER HANGER CONNECTION AT GLULAM a M7.3 SCALE: NOT TO SCALE M7.3 SCALE: NOT TO SCALE SCALE: NOT TO SCALE u ' ft.: > .6, ig ILI W irl m M� .i' ■■■ ■r•;• ■ •r■••II ■ • • i i■■ J UNISTRUT P1026 AND 1O'-0" i • 1/2"0x3" LAG SCREW / z MAX (E) WIDE FLANGE BEAMS ° 8�ie W �, L--�, f AIR HANDLING UNIT ie MAU-2, RAH-5 AND 6. > Za \ 0 N z d' IA Z ° o N FROM CC SECTION U .6 I rigLa W o en i ° BEAM CLAMP 3 \ in in a UNISTRUT P1379S DOUBLE 1 5/8" STRUT = c ii 2x6 ROOF PURLIN OR GLULAM BEAM BETWEEN BEAMS EQUIPMENT '\ \ Z 8 CURB J g°E W d••W J \ ,�1 ___/— g 1 4.5" DRAIN TO V J N '> C FLOOR SINK Z BRACE WHERE OCCURS - •�- ��'g. :///PARALLEL TO BEAM ONLY °— 'p ,.% ♦rte NOTES: 1.1..1 ko IR 1 COORDINATE CON ° CONDENSATE TRAP J a ROD WHERE OCCURS ASSEMBLY WITH AIR HANDLER Q z 9 m ° / MANUFACTURER FOR PROPER DRAINAGE. aks = W —o s V). Z xffi 2 CONNECT PIPING TO AIR HANDLER AND n E6 ii s BRACE WHERE OCCURS DECK TO AVOID BREAKAGE. N 5E (PERPENDICULAR OR . PARALLEL TO BEAMS) a r: ° y (;-) r E C6 W z L d 6 AHU CONDENSATE DRAIN la M7.3 SCALE: NOT TO SCALE 10e th gioDo6F-10:-3,����,� OFf, 4 BRACE CONNECTION AT 2x6 OR GLULAM \� 0IN� 7.3 SCALE: NOT TO SCALE C) HANGER CONNECTION B TW N W F BEAMS 7 889PE . 10-'.. �`.7 SCALE: NOT TO SCALE c �� ve, REGO�N1� if, x'13,2 J T k �A N E. /Th a Expires 12/31/2007 S , . t , v i a 0 r TOP ANCHORAGE ROD STIFFENER 4, PER PER 4 THREADED ROD, SEE 5 6 M7.2 M7.2 M7.2 W '' TOP ANCHORAGE PER 5 6 _1 M7.2 M7.2 ct ==1 61% TOP ANCHORAGE ...... ::11J � w PER m m m alk 6 33 TOP ANCHORAGE PER � VERT HANGER L L itH i n)"" /11111►�d 6 ° 1— UNISTRUT P5501 ,/'\\N g °- ,/— w \ w CHANNEL STRUT ``\ °0' - 2MAX `\ == iiii ...... ....- MX I N 4//ZTh % L:1 MAX.. �•% ANGLE FITTING ,�1 14 le IP II N■,_ / 01 - 0 0 METAL STRAP W i DUCT SIZE 12 GA x 2 1/2" a BRACE WHERE OCCURS �1 _Z. .2 0 (PERPENDICULAR OR �2,x', ` � °' � �'� PARALLEL TO BEAMS) ,,.-- ',., , `_ '' Z :2 1„, ./- ibm 2 -4- , cij .... N Z c Z " I (Th' HANGER CONNECTION 2 LONGITUDINAL BRACING 3 ROUND DUCT TRANSVERSE o4 SCALE: NOT TO SCALE M7.4 SCALE: NOT TO SCALE M7.4 SCALE: NOT TO SCALE CC c o 11 m 4. L!1 ' °� v, i! W 1.5 111 t i • .4,,, __ __ __ __ __ . •r • • 6 ir:a Ct W Allaki w TOP ANCHORAGE TOP ANCHORAGE PER - `�a� • ° P 1001 P 1380, FRONT ', • PER www .. .. D w & BACK, TYP a a 7 • • .�a�w. r ._ __ __ __e__��_.__ __...�__a..�.�__.ar..___.....___ • __ __ __- H' VERT HANGER 1 01 \F0 J, ROD STIFFENER / i" ° 0 f ° ° PER _ J x 4' E TOP ANCHORAGE C §it,,,-� U w M 7.2 ,r Q <t M ROD STIFFENER m m PER O. PER ADD ADD'L CROSS 1- w - M7.- .P, O 4 BEAMS AS REQ D cn �� I P1000 OR P1001 /" TYP P1031 J Xi 1 /2”0 ANCHOR .. Voro o �- ,� > z� W/ 3 1 /2" MIN ' lo �,i o 0 0 o x< Ai° a co = 0 p W EMBED �/ Q c� 0 0 m o- CHANNEL STRUT o _- o u, 1/2 � BOLT y Z 0 W 111 1/I1 < O 7. i="71 ) „:-.— i '�y : !42ETl % STRAP �,� o X P 01 I a TYf E16 a METAL STRAP Z e% DUCT SIZE 12 GA x 2 1 /2" 6 1/2" ! W P ' w � pli Fg. a 9 R z; ADDED LONGITUDINAL ° ° Pg BRACE o ° ° o z `�re t!f w °�i. ._ I rib ' , 1 " _. .. .. _7, eg P2073A W t° 1 4or _ DUCT SIZE E. 6 y N g--1- \-----=1/111111=0/0 emenewma.""""'"" re) m ©c J 0 cgs Rig L ip c S W mg N W k:::; :: # ) L s t 6 ROUND DUCT LONGITUDINAL BRACING og sa 2'-0" MIN / J / NS/FS ONLY M7.4 SCALE: NOT TO SCALE d W 6 -0 MAX o N g@ M ti U7 N,- o H X2 N CAD FILE: ROf��' 07006-M7-4 M 4 4 ROUND DUCT LATERAL BRACING 5 STA N DA R D FACILITY RACK eor NS �% M7.4 SCALE: NOT TO SCALE M7.4 SCALE: NOT TO SCALE 7 4i4889PE,' i 1:1 0 li 1‘4 A \\(\s,:. ve;REG Di A. . 4Y13, °° \it AyN E. GI% 0 tz TExpires12/31/2007 i r'1 T HPS FROM BOILER Z 0 z a moll , z O 8 0 re a 3 4" GATE VALVE Z / 0 � o EXHAUST FAN INTAKE HOOD f . U o ix V STRAINER STEAM TRAP 0 0 W PREFAB. CURB BIRD SCREEN PREFAB. CURB r P. \ W LAG SCREW LAG SCREW a CANT STRIP CANT STRIP I ° ° I w o a ROOF ROOF L„..\ 81 I 3/4" CHECK VALVE 4 Mr[115113111°"112111 \r" --2::::1:24 AirAliwil =2:::::=4,-k L —a...— ......s z .------ -- BACKDRAFT DAMPER � --'� N ...- 0 ' DUCT DUCT (IF REQUIRED) N---- TO CONDENSATE PUMP g� Wm 5-,:- Z .0 IX t th IS (1) cui d1 i ! _ o (ThROOF 2 ROOF INTAKE HOOD DETAIL 3 LOW PRESSURE STEAM TRAP 6 (F.,' ,-! EXH . FAN M7.5 SCALE. NOT TO SCALE M7.5 SCALE: NOT TO SCALE M7.5 SCALE: NOT TO SCALE Z y gi I _ Z U si° '2 C ii ILI 0 8 II co 0 o N� lac 1 il II 2.? g. tE ill ' !'!\ E MAKE UP WATER 2" VENT TO L a r"■ „J GROUP 6 BEHRINGER 100 BLOCK STYLE ATMOSPHERE T LPCR COND. .l N m m PRESSURE REDUCING VALVE RETURN TO BOILER o x I--�—� �—T- 1 ( •• dN CONDENSATE 1/4-20 LT FROM W STAINLESS STEEL BO I ■ AIR SEPARATOR AND VENT SYSTEM mZ i W z1 A BALL VALVE (1YP.) 4.. a N x •• CHECK VALVE (2j . W N = .g g II I ca GATE VALVE (2) � � o ��to Li FLEX CONNECTOR (riP,) j Cu) W < W° .) 0 14 I S-1-1><1 l J iS° Q 3/8 STAINLESS TUBE CONDENSATE PUMP z I 1\--/ W/ RECEIVING TANK os. 1 e CHWS CARRIER AQUASNAP Zz c is*- .ca ' CHILLER WITH BUILT DUPLEX W xg Er la___.64....,,,, IN PUMP PACKAGE "—' In \--j R: L z U X W to 0 CHILLER STORAGE TANK J . . ., ..... N 6 . TOGGLER BB 1/4"-20 CHWR I Q — o TOGGLE BOLT ANCHOR = W ii c WALL ANCHORS 7 M CONDENSATE PUMP DETAIL . 1g .c. IP M7.5 SCALE: NOT TO SCALE N It U E WALL = 'n or. 25 il 4 CHILLER CONNECTION PIPING J . s M7.5 SCALE: NOT TO SCALE (.3 = Z: ° cn I j 0 M tf7 h O d =_ CAD FILE: 3 ,`���„o PROF j, 07006-M7-5 il M IN ��' w� 4'�� 7.889PE 0 h PIPE HANGER DETAIL �� I 5 CLEANROOM & LAB SERVICES ,R Go M7.5 SCALE: NOT TO SCALE 2� Y a e A Y �J yN E. � I�, ■./ Expires 12/31/2007 g E Z 0 0 n O 4. O 2 Y ep- 7N. 41 1 N' GENERAL NOTES 41 A FOR DEMOLITION / CONSTRUCTION PHASING SEE SHEET A0.2. • z 0 1 11 I H 0 P2000 (TYP) 0 z cf, 0 1p,2001 (TYP) : , KEYED NOTES ow • I I, 1 0P--. 1 - ii• 1 1 1 TRIM AND CAP (TYPICAL). oz ce 1 41, P2000 (TYP) 1 r, il 1 2 , , a 1 ' it (0'9 11 lo ' % o oN ri '0 .., .. , il , ' 0, 0 ■ .„, 61 i I o di LLI CL. , ,.. b., „..-- il 1 .1111 On.. . -.4 ...--...„. _ •i I, .• , .-- 0 ...,,. .- 1 - ..., ... . 1 • _., P2225 (8 TYP) , ,... . ' 1 ri P2225 (4 TYP) , Ri :41%.: 11 '1110011:44,1,111 , - 1:11"4 I H: Ili .4...T.: 21,1° , fi I i 1 1.7 2 -,.., 1 i •-•-”. - -- ' - i 1 • P I: I , • 111•1111 t Laj 4 11 Pi 1 ---7. : .4 .. Z 4. 0 1 i , CC a) id d — i, 0 0 W (1) ° E , •;;% ii., .1. (4 , 4, - , -Ai, . 1 iii c ■ 1 a 1 — I 1 ,,, , -.OR ..., i _ , 1 1 • , i :Is*4 Z :4":" 1.411 1 • ... 0 .., i 3 „... 4 ,0 L.. -i•-• II N %1111 Z (n /4 ii 4/II° ■ 0.00•000e --,. - _Ai . , -■10, 4dr.... ,1 I , gli 00, ---, 14,,,,. 111.10,. 11 i ' / ..010`."' 41, ' fr1111SAN . : .1- r 111:11-7411■74 ip it r i 1 1 II. io04 I li I i, .41 0.411; lis*. #4 ,1, ii :: ILI cS Z ° W 12 i! -0 ri 0 '.'-8 Nissi ,N44,1%4%44 444 i'Aii.711 :*4 ■ 1 ■ W 0 a: 13 .F. co ah- 01 I 1 1 1 P2072 SQ (4 TYP) 1 il I is I 1 '; U. a) II, ILI c .7 ..--La ,ff F, . WIZ a' 4. 10,,i 40,0 ,, . ,NNI44: ' r, '2*• ■ , 0 , 4/.°11'11- II • WOOD BLOCK TO 0 SUPPORT FEET' in> .C°) fl III Ld w : iiiii ■Nss41:1 '41:piP v0.4 i 5 ■ (-- P2073A (2 lYP) 441 T • ,..01 P2072 SQ (4 TYP) .. al.% ■ .40,0/1,, , p...- a 4/0 IP .%1 JP' al*4 4 .......• . al/ .... i„. ..„ . op WOOD BLOCK TO ...... COCHW AND STEAM PIPE RACK ) OCHW AND STEAM PIPE RACK SUPPORT FEET M7.6 SCALE: NOT TO SCALE , M7 6 SCALE: NOT TO SCALE 19 R W gge % g 0 w cn wz X a 31 > 4:c (CI CV li R 0 W CNI z 8 4g0 ci r•- ' itt ai 0 ti° v) Z 0 wi 0 3 c.) 0 w R 0-6 ...... w O cl g ° ri in A 8 1111110111116, 1 1/2"—PCWS 1 "—LPCR cl L!E 8)-5 = 8 12 • 11 zE• in < wwk: z mw o .2 pg 60 v. -43 w ks,.. w xa- 11 w to le 41111111t 4 ,,,4 .. RI 0 Il■ 6) 1 1/2"—STEAM 1 "13 0 1 ilc- —PCVR ■■411 , Otlirk S) 0 LM A IA 2c3cimla,o i:•t I0 w i.L.1 1 I E w 22a iEIl1 2 l,M 1 1/2"—CHWS 1 1/2 f—CHWR ± g E 5 5 a re g21--. CAD FILE: OD PRIketr 07006—M7-6 40 11 3 PIPE CURB DETAIL ,..,,, GiNz c■-•_ 4,b, iti` 414 .';.■ M7 6 SCALE: NOT TO SCALE 4-E ON „A t y 13 2.0.4 N544 0 Expires12/31/2007 ........ ..... -i:\Jobs\07006 Hemcon Facility Expansion\Dwgs\07006417-/Awg,3/1/2407 5:30:36 PM,ptrenner,tvergreen tngineering ■ , f \ . V) C) K › Fn: m 2, NA --I 0 (/) Z (-) _ › z Ph v) m 0 m Iv z 2 m --1 ..... \... S ... 2.....„:A-\%■:4 -v 0 ...,.,,, ...;r3 X 0 1 1/2" PCWR 1 1/2" PCWR a Aill11111111161. m r (.4 S 1 1/2" PCWS 1 1/2" PCWS cri 04 ■4 -V *...4 Z.) ,...lb \...._ 2„....1 i r_Nh- Ni ......s% ‘'...., ''`.4 X A \ > A.....4 M ,...,t, -v ',a 4 (II ..... -....\ 0.• \ _ r) -... .. ,••• ■ .,.. c v,... - 0 • 4110 ...(5 0 ,.. Of "K-o• --I —0 C TI K —0 (/) E m > c 1 N.) clir o o -113:3 w .....h. M i70.".1 M ---‹ XI Ph P1 -71 0 ri X) m M C) z 0-!1> r---v):73Zr IC) Ph = ril _A 0 c) Pi o z 0 , (/) 2 48 m m 4). (/) Pt u) , 3, hf",....' • - ro = m9,. 8Th irg TITLE: LYOPHILIZER #3 & FACILITY EXPANSION (- : --'s HemCon 1 -Ti MECHANICAL CUENT: • • =r- 10575 SW CASCADE AVE, SUITE 130 •• • EVERGREEN ENGINEERING ...irt, . DETAILS :-. . .. '. .1 LOCATION: TIGARD OREGON 97226 • . 1".. . • Engineering and Construction Services REV. DWG. #M77 JOB # CLIENT REF. iii CHK. APPD. %...m. .. •'•":::IN.":11r. SHEET OF 07006 SCALE: NONE DATE:12/20/05 DATE: DATE: e•riv.": ' . •1. . HILLSBORO EUGENE 7431 NW Evergreen Plot Suite 210 _tilbarioi6)R 97124/(541) St. s. nos. OR ( 1) 4r4-4771 FAX: (541) 4:— 759 97402 0 ASL SEC .3/02/0 ISSUED FOR CONSTRUCTION r _ THIRD ANGLE THIS DRAWING, INCLUDING ENGINEERING. DESIGN AND PERTINENT SPEaFICATION. IS INTENDED SOLELY FOR THE PROJECT STATED IN THE TITLE BLOCK. IT MAY \ "On\ ---) (503) 439-8777 FAX: (503) \I 1.......1 PROJECTION NOT BE SUITABLE OR WE FOR OTHER PROJECTS. OTHER USE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF EVERGREEN ENGINEERING. LLC IS PROHIBITED. '*--- REV. E3Y: APPD. DATE: DESCRIPTION i:\Jobs\07006 Hemcon Facility Expansion\Dwgs\07006-M7-8.dwg,3/1/2007 5:30:43 PM,pbrenner,Evergreen Engineering . p/i, m A z —�-�`— O w I 0—I 0 O VARIES c F Al` . .11. . =II I VARIES N m • 7) . O i V) n 0 C -0 A3 r m C) A rn m > C m 0 O M 81.\\ v N Co C) Q m 1 1 ' CTS I N./ ("'.1 ut z00 ■ -I o - V) N n M D m 4 7 co C Na m 01 P o 0 I to '—I c, > a I r m —< 53 z ri rn o m > om 33 _r__.- > r-- o z --I 0 r- _....Q_ I' 1K/2/9 ____ 4 / -175- / ;15- ___I ITl °z Q xi o C) Z -v a x c ; r m r- m to —II RF/'® m m - i� c$ r- .4' � ii Z - Ri N O! ; 2 , 1 V , s 6 TITLE: LYOPHILIZER #3 & FACILITY EXPANSION HeimCon " �� MECHANICAL CLIENT: 10575 SW CASCADE AVE, SUITE 130 EVERGREEN ENGINEERING c DETAILS LOCATION: TIGARD OREGON 97226 : • ' r • Engineering and Construction Services REV. DWG. #M 7.8 JOB # CLIENT REF. if DES. - '• . •• ■ DWN. CHK. APPD. .0% .r, y.•.•■r. 07006 all,:.1: ••• • • HILLSBORO EUGENE , SHEET OF NONE DATE:12/20/05 DATE DATE: ' t' 7431 NW Eve green , Sits 210 Hatboro OR 97124 880 Conger St. Eugene. OR 97402 0 ASL SEC 03/02/07 ISSUED FOR CONSTRUCTION 1 PRIOJJECT1ON NOT BE SUITABLE SAFE FOR SECTS AND PERTINENT SPECIFICATION,OF T IS WING WITHOUT SOLELY CO R 7H PROJECT EY NTEENGIINEERIRING LLC IS BLOCK. r (503) —°"' FAX: ( ) 439-8767 (541) 484-4771 FAX (541) 484-6759 o G. REV. BY: APPD. DATE: DESCRIPTION 8 7 6 I 5 \L/ 4 3 1 REVISIONS ZONE REV DESCRIPTION DRAWN/DATE CHK/DATE APPVD/DATE WATER COOLED HEAT EXCHANGE 2C SUPPLY, z 3C RETURN E w DW D 12" THICK WALL 12C DRAIN, ° 13C VENT (111) J z VALIDATION ° W U z THERMOCOUPLE VACUUM - 6' - 15' - r. SPARE PSIA _ W A i , a (11H) 1 T . .............._ i 1=EIREINID AIM ..---- (cl I : d 0 0 ...i, I IN on E/ 1171 (4) (6) A LAIIIIIIIIIILA LANNI=LI LIMN=Li 11111.51-111M111... 1191111 Ill I Li..1 = aNO, 11111111111111V is ci SPARE 4 _ FiiI I = 1 n 0._ Ix .. .___ . , .L.L... 0 1....i t m I I ..... .............. ...... - , — ^ 1 g. PSIA ;, ;, I ,�� < < = 1 0 ..0. - - 7 , ; �ti� � (1 ) m _ 07 0 0 "24% III VACUUM (7) — • L - — 4, 0 limp.rim Non 1 N. ► 0 (hA) - WI I■ (3A) (3E) to a tE si i W c li i _ ^ • 1II1Tr�� O ring 11111111111•1111111111 U C r ilr (11J) ! R ` Z�M . (2A) I A WALL CUT OUT \ ��!,` (5G) _ O °° 8 Z " Lm FOR FLUID INLET OIL FILTER (TYP)8 -- THERMOCOUPLE L!1 10 - � J LIQUID (' I im °, . . I _ RING PUMP � � I § 19 -Q .- IE m 2 A VALIDATION 4 W Fb(13F) > . -® EQUIPMENT PLAN VIEW <- id w 1 r,1 WALL CUT OUT FOR r `� FLUID OUTLET (ill) ��- ..(liD) 0 1 04'''r i 1 0 1 I I _Fl •, 4 fi I s -I'r ii _ _ r 1 r1 1 1 - N 2A 2E 2 , ( ) ( ) ,_ 3„ ml (8A) .�. _ r . . (3A),(3E)g 14 3 (7) g, 1 1 `� `i B ay - . N. ■ ' W(N -O • Il•" rr/ t i ■ ,.\ ■ �.a.. ! f f .,� [ .,„ - -' `_,` ; ...I�i,I 1 , a�; •� f. L O LI OII 9 —3 1° , TRANSFER PIPING _ �:_ v L --* - -- g 8 -(N.1 N �� ' MAX HEIGHT , �� (11 J) s., ( 1 J) -,� h . X8 Lie 4- (10) III! ' t Lt. il `1' II .- gl -4 . I LI i I i..., .4, Ibi IN' 00 -:1-. Z ���i'�fi,_■ —_■ —1111F-z-- v ter. _ — la..4%.,'";JIIIIIII loieloilliiiiAlE•M 1 p O Jo a 9 d -I i 11111 I I It 00 CO .k. et I 1 I I•1 I 11111111 .4all _I - I - 6 6 . •. , ._........,...................__ .., Eli 6. iiii zil to "VI DJ t ET ° A rill r". Li: 6 Ril"lilaill I ‘' • �..r �` mar �,: • .r. imumemmir e' III i IIIP■IIIII.. w 60 M11111111111111111111 1-- §g I "T:= .-- 1 ---IPA C ANN ] 1. in W Nt CL» f ,, -- 11 -" 14 UNLESS OTHERWISE SPECIFIED FIRST K 0 M p 2 4 / J � 00 DIMENSIONS ARE IN INCHES. SP INDUSTRIES J d (12B) TOLERANCES; 06V133$$ v t, r'`� FRACTIONAL: t� 64 H U 1017 935 MEARNS ROAD a Z W a r-A RING PUMP (1 2 F) 2 DECIMAL• t.01 DRAWN: DATE -- d o LIQUID WARMINSTER, PA 1890 = o n (1 2 D) 3 DECIMAL• t.005 JEL 12/5/06 5 a .� CHAMBER FRONT ELEVATION (5G),(12G),(13G) EQUIPMENT SIDE ELEVATION t,�r CHECK: DATE TITLE A � o GENERAL ARRANGEMENT J n CZ Z DO NOT SCALE DRAWING APPROVED: DATE 2 85 FXS 45 0-S S 25C a BREAK SHARP EDGES AND SIMILAR TO: H E M C O N INC. _ • o E i REMOVE ALL BURRS N/A HEMCON, ..�. O m g THIS DRAWING IS THE PROPERTY OF THE HULL COMPANY, CAD NO. SIZE DWG. NO. REV J m AND ITS SUBSTANCE IS CONFIDENTIAL AND PROPRIETARY. 89402 W 0 THE CONTENTS HEREIN SHALL NOT BE PUBLISHED OR DISCLOSED TO OUTSIDE PARTIES, OR USED FOR THEIR BENEFIT WITHOUT .. ° t= g THE WRITTEN AUTHORIZATION OF THE HULL COMPANY. SCALE SHEET 1 OF 1 DISK NO. 8 7 6 5 4 4 3 2 1 FIL : �Z CAD E 07006-M8-OA z F 0 H H H (-----\ N ......, 0 \ v iW xt °111 • 8 1 7 6 5 '! 4 3 I 1 ZSL ZSH REVISIONS 903 © 903 903 903 ZONE DESCRIPTION DRAWN/DATE CHK/DATE APPVD/DATE NI ADD SLOPES,PIC1014,HS1160,SV1160,FV1160,HV5191 CDD Fv ADD NOTE 8, DEL 7248'S,813B'S,1018B'S 12/5/06 •' :: 903 ■■ •I Z O / ZSL ZSH D ( HS� sv 902 902 9 7 © D �g0, © 902 © EC) PT /\ FV 927 927 , i 904 " ' 902 ��� •/ C 6A> CLEAN STEAM I r`-- ,...---1 2 O. D. S/S ■■ 2 O. D. S/S I /� < CIP SUPPLY w W el 0= © \.1.,)J 2 O. D. S/S ..---"'"I -- -- 2 O. D. S/S 1 — o 0 ■411 •/ .■ .. I ® , 1 O. D. S/S --'''1 4 1--1 a ° 1 O. D. 5/5 ..-----1 14"I E3 r� o I - -- o c . � G (4-- ZSH ZSL ZSH ZSL ZSH ZSL ci A ZSL ZSH A ZSL ZSH A ZSL ZSH A ZSL ZSH A ZSL ZSH A A 812A 812A t a 709 709 708L 708L 711 711 ZSL ZSH ZSL ZSH 812C 2C 812C 812E 812E d o d d 712 712 p 708R 708R p 713 713 p 710 710 Q ,. .-+ •-. ,. .•. .y .•-E FV FV FV FV FV FV 812C 812E " 709 708L 708R 710 I m Hv , ■ , ■ , ■ , ■ , ■ , ■ , ■ 1: ► 1: ■ r 1016 A ■1 A •1 w •1 . ■1 ,. ■1 . ■1 . ■1 \ _. .._ 01 / SV 5173A sv ( HS� I 0 0 5 © 11016/ © FLT SV SV SV PSV 812C /' 812E L. Al FV \ / FV 1017 709 708L 7088 713 710 ,` 5065 rHS 1 ♦ 1-H--S-.. I - o /\ - 1015 4111111roi• 1016 ♦ ♦ ♦ ♦ ♦ ♦ ♦ SET AT 812A © / PSV 8120 © 2 812E © / n 4114; /�■ ■ l C. © / © ► © / a / © / © ► © 25 PSIG 5064 VT 1/2 O. D. S/S 1/2 NOM S/S � -''� ! \ °' J10A CDA 1 2 O S S O--I o} 1 I 1 O. D. S/S s. I ii I 1111 I ( g �sET AT / uI �^ I i >- C 11A)0 25 PSIG A.C.A.P. _ r r r r r , ¢ EMI. Z �" \ PI z U if 1/2' COMPRESSION (HS� N 7 �- "s� 7® 710 VENT N PI 1 C H z �80 1014 y . 703 / 11 ) ZSL ZSH ZSL ZSH ZSL ZSH INEZ w N w / TO GAS BLEED�,,,, VENT z / PI p1. 812B 812E 8120 812D 812F 812F r� SV PCV C:5. TI A Z J Q Q �NOL . (80,) 803 �,i E cu " 1014 1013 p 1018) to1`1 S � � � ti g U 703 --+ 8128 8 20 8 2F Q r, CP �. H = y Q PT PE .- �°' 1/2 O. D. S/S TT Pi '' z o✓ _ 804 803 • ■ C Z .2 1 8A NITROGEN a •• ■ ► ' ,018 a d w : PE L..1 • ■1 IFTI u1 3 1/4 NOM S/S va, Z sv sv -t- cU E- >- o � A 703 \ � y � sv L- 1/2' COMPRESSION , O Z p `�' `�' C4 r i c'i, 812B 812D 812F u) /" '`� /� C al 1018 L'- J J LL t/1 A Ch CI) p A A A 1 © / HS , ♦ r H;\ ♦ �HS Q cu I I i I A to N �12� ' © l 812 / © �12F Z C� — � 1 1 1 1 Ci INSTALL RTD I — —" — "— 1 ..L .... J_ a i VERTICAL IN - I `� o Fv 1 55 RUN OF TEE 2 O. D. S/S PT l'.-F' _ Nv ■ 704 704 ' HV \ _/„ ,::,1■ • 5,2s Pi 1-1/2 2 O. D. S/S ( i 15 .m 4 �� �” ,702 �, D. S!S I � SPARE D A m = sv 1155 2 O. D. S/S o • � •� I SPARE D Cu U w W1' 3 O, D, S/S _t �� OH 5191 s1 I THERMOCOUPLE- R \H5/ 11 so I 3 0, D. S/S ] n THERMOCOUPLE ■ ■ • rr rir■/il 30. D. S/S 30, B. S/S • •.....• © �% VALIDATION ] C VALIDATION . .ir. r•I NOTE: ALL CONNECTIONS •r• ....Ir.r S4 )so I G H A V B E R LOCATED VON I TOP ION CONDENSER .....-,,••.;•.■ FLT e FLT M = 5041 FV © �•�-� ��,� © 5042 .r. •� 766 /\ •I : .... to No u9 g B • IffillMniellr W w2 Fv / 809 xpj ■ Pi, 1 a --�IP RETURN o h z (HS� _ y 809 r , 0 z �Z �716 © / ' A A . 0 � d 0 R � Nig V W W 1� O � � G� dME, `�' �' STANDARD NOTES: W° TE ® 2 O. D. S/S "'�� TE 1) SEE HULL DRAWING C843397 FOR P&I D SYMBOL LEGEND. v h W724 _ 813 - '13 2) ALL VALVES NORMALLY CLOSED UNLESS SPECIFIED OTHERWISE. W o 0 I z 3) ALL 0. D. TUBE MATERIAL COPPER UNLESS SPECIFIED OTHERWISE. = I- >-8 4) ALL NOM, PIPE MATERIAL CARBON STEEL UNLESS SPECIFED OTHERWISE. 5) ALL CHAMBER AND CONDENSER PENETRATIONS STAINLESS STEEL z LE UNLESS SPECIFIED OTHERWISE. 0 §S 6) ALL ELBOWS LONG RADIUS UNLESS SPECIFIED OTHERWISE. 6 Z - W . 9 ER 1/2 O, D. S/S - r., CONDENSATE 7) ALL HYDRAULIC PIPING RATED AT 3000 PSI. U 9 8) ALL SLOPES ® 1/8 IN PER FOORT UNLESS SPECIFIED OTHERWISE. ,� ant v: I SV Z w 1153 XCV TCV Q Z `, SV � © FV HV 5038 x x 5039 W6 1413G VENT ,104 ���.% �\ 1153 5055 y x =I BY OTHERS Z U gj I Qum 5057 Fv x I�-I <14(2B) WATER W z ;l�o_ 1104 ■∎4 1/2 O. D. S/S �,I I: o lg y ■■ I I x M Eng 2 NOM ''�� 2 O. D. S/S + t MIN — x UNLESS OTHERWISE SPECIFIED FIRST K/0 -I ' 0 t . I I DIMENSIONS ARE IN INCHES. S P INDUSTRIES < 2 r` w A �„ 2 NOM �� :5: x TOLERANCES; 0 6V 13388 ff a -- W m o W 11 0 N ,52 x FRACTIONAL: ±1/64 U l 935 MEARNS ROAD �- a o 12G DRAIN MUD © x 2 DEg: i MAL t.01 DRAWN: DATE o3 = a RING (DOOR GASKET A CDD WARMINSTER, PA 1 5974 c■) _ PUMP A A NEZ FV 3 MA t.005. 10/200 w CL i5 ;, ci p •IS : 1,52 5056 x ANGLE: f 1/2 CHECK:x LJM 10/23/06 PROCESS & INSTRUMENT DIAGRAM -� IE L5059 1101 5058 X N m a 7' I� 2 O. D. S/S �, x x x x x x DO NOT SCALE DRAWING APPROVED: CDD 10/3/OE H E M C O N INC. TI GAR D, a R 0 0 © it C7 BREAK SHARP EDGES AND SIMILAR TO: _ 0 S°" i 0 CIP/SIP/GAS BLEED AND DRAIN PIPING 5G WATER 5/8 O. D. ► ►t REDUCED D I A. CONDENSATE REMOVE ALL BURRS o il THIS DRAWING IS THE PROPERTY OF SP INDUSTRIES, CAD NO. SIZE DWG. NO. REV >- �..,_,•. TRAP C RETURN BEND) `� AND ITS SUBSTANCE IS CONFIDENTIAL AND PROPRIETARY. "'� -°.� BY OTHERS BELOW FAST EXHAUST MAIN C 12B) DRAIN THE CONTENTS HEREOF SHALL NOT BE PUBLISHED OR DISCLOSED D 894QLD A 3 w xa .. 3 s �e TO OUTSIDE PARTIES, OR USED FOR THEIR BENEFIT WITHOUT : 0 N g - THE WRITTEN AUTHORIZATION OF SP INDUSTRIES. SCALE 1:1 SHEET 1 OF 4 DISK NO. cW 7 8 � � 2 1 T CAD FILE: 3 07006-M8-08 coz a ig /".---..N‘ ^W T J H--- 0 R H \ , %1 , 0 \ a J 6 H E i _ _ 7 i 7 R i 8 7 6 5 117 4 3 1 REVISIONS ZONE REV DESCRIPTION DRAWN/DATE CHK/DATE APPVD/DATE A ADD HS753H&L,HS979H&L,HS800 CDD 12/5/06 95PI 1 I I I I I I 2t 0 7 LUBRICATED AIR \) :,> CHAMBER PNEUMATIC -------] VALVE ACTUATORS re" SOLENOID VALVE BANK c., D I i I I I i EN c t ' ,). D ...... -1 TEST POINT FOR sv z 0 n PRESSURE GAUGE 979L —— —— Lu 1 i I i I I _1 1/2 O. D. STL ..J A © „ Z W SET @ PSV ' r- Fir L,C5 , 062 SET @ Aft. CONDENSER PNEUMATIC • 1 VALVE ACTUATORS:,> 750 PSIG ...tx, ,... NI b ..., A. 06 890 PSIG B ST0h. EY SOLENOID VALVE BANK ,- ce Id 0 I I -J J 1/2 O. D. STL u TEST POINT FOR sv Mil , L.... r. . .-J PRESSURE GAUGE 979H _1 0 ..J %--4- 1 , r„ 5F " 062 CV 0 < , 1 I I I I 1 1 L____ _I__ REFRIGERATION PNEUMATIC SOLENOID VALVE BANK VALVE ACTUATORS> , , -' , , pr) 1 g 0_ .c I I i I I I .J .-J„ Eli 1 g ... loY ..J-.I , L ..., Ilia _. SV ..J 0 ■ -a 800H ——--I _1 SET @ 1/2 0. D. STL Plir 0 , 1000 PSIG , A r P I VT -J .1 AIL, NI I PSV ra i -I B %h. 5040 1.5 PSV ..., I k 5170 -1i _, Ei L. HV Z P il 1/2 O. D. STL Mil- . 5061 E La WI -.I mile a k. .4 -_I IE SET AT 800L .., 55 PSIG -1 -1 PI 00' FCV t■A 5061 w v) = .— .... w s.,. , „ 5061 III (s 4 „ , PSV PCV PI -0 Z ..4... 754A -- 5170 / 754 _1 . -1 , ZSH .41 C C . . 46, eia 979 XCV -1 PM ...i 0 bum 3 X , 1/4 NOM CU 11111 , 5037 • _I G Z 15 44(8B) NITROGEN o■4 O•ill 10o1 L... SET @ v2-0 ‘ 5063 ..J W C IT: 0 45 PSIG C2 L IL L L r -.I I 4.7B -i 754EI al , 6' NOM S/S LJ, 4' NOM S/S dfAkvi■ , 0 NW 1 , Z u . it 1 ..J L..] NI INV PM W tic i ILI 0 NT SET e C A -L---It--i-t--L—X I I I , .- V1 -, 807 ral (-1.1 lei — 807 es 12 PSIG .2 II Cl .4.. ..._r. 1 -J ..I piliAn. — — U c 2 1,1 NI II w 1 p -4)) V) Pi ZSL • DOOR POSITION 750 C3 ZSH DOOR UNLOCKED 751 ZSL DOOR LOCKED 751 -,t- cv) 4E3 1 II ---- - SET COUNTERBALANCE PILOT PRESS. = 450 PSIG [3, 5 X 5 SHELF] , , , , , , , .0 , , ZSH 800 ZSL 800 -- :I ..... FV 807 C4 ■ V) X E:3 = CO sv 100 ' El Illi IN v) v) = C:1 Z ZY) sv 10028 © <I-- > m c iui 1.4.1 11 riji c • • . . .:Y. I .. 1 . . .., s.7 rHS- LLLLL 5.) 800 , • ":::11; NM I ..2 IIIIIII p- :1 I- -r -- I I I a. 24 NOM S/S FV FV J B roc) .- miaji- —1 .1k-11: 0 I PAM HV I- F-. vi 753L DOOR LOCKED . ! .1.41 , CONDENSER B . T 4.-A ii 100 . 1002B i 753L El Lai toN r 1,, c•I .416.. CHAMBER 31 NI HV ca N• 753H NE 4E3 I a al 0 Ou sv Ila I PM 44(12A) VENT V PM t *12A) VENT 8 z 5 A gi < 0 753H ,■74 v) 100*. v) -..„ 1000B DOOR UNLOCKED . c.) 41 C4 C.1 kJ (LOCATED IN . cn . PNEUM. MANIFOLD) gi vo ——-{ (.4 0 In ci ci r- C3 1 M1/4,0 r- in—•—( ) cr) 1 Itil 1 v) , - . C.) P■ q5 . ta N.O. s N.O. s •.. 4111111 (53 4111111111k li,:i La 0 0 g A R cl ..-- 17- •44 0 I■1 0 \7 VACUUM Amor Vi ..., = ie sv sv 0.1g 1049A 1049B _. 0 N. :: 1- pl. VE5243A VE5243B 6 6 9 P 431 El OIL FILTER OIL•1/4 NOM CU FILTER c9 S Mk glsa <LIQ. RING PUMP o.44 w 6 ix z mE o z le in w u15 z m a 0 a. e= x w (D 15 42, 0 g :11 --I 2 . UNLESS OTHERWISE SPECIFIED FIRST K/O 0 < DIMENSIONS ARE IN INCHES. SP INDUSTRIES I.) 06v 1 3388 < A TOLERANCES; FRACTIONAL ±1/64 U 71 1 935 MEARNS ROAD I„,„ z N 03 < :3 P.3 igE MOM DME N ..........••••F WARMINSTER, PA 18974 STANDARD NOTES= 2 DECIMAL: ±.01 CDD 10/20/0E La 0.• IIC5 3 DECIMAL: ±.005 A te) . 0 .,_ 1) SEE HULL DRAWING C843397 FOR P&ID SYMBOL LEGEND. Ilik ANGLE: DATE 2) ALL VALVES NORMALLY CLOSED UNLESS SPECIFIED OTHERWISE. ±1/7 CHECK: LJM 10/23/06 PROCESS & INSTRUMENT DIAGRA\A ..... Y, is 3) ALL D. D. TUBE MATERIAL COPPER UNLESS SPECIFIED OTHERWISE, N () DO NOT SCALE DRAWING APPROVED: DATE HEMCON INC. TIGARD, OR 4) ALL NOM, PIPE MATERIAL CARBON STEEL UNLESS SPECIFED OTHERWISE. CDD 10/23/0€ 57 5) UNLESS SPECIFIED OTHERWISE.ALL CHAMBER AND CONDENSER PENETRATIONS STAINLESS STEEL BREAK SHARP EDGES AND SIMILAR TO: AIR, HYDRAULIC AND VACUUM PIPING CL 06 0 ligz REMOVE AU. BURRS 0 M 0° g 6) ALL ELBOWS LONG RADIUS UNLESS SPECIFIED OTHERWISE. THIS DRAWING IS THE PROPERTY OF SP INDUSTRIES, CAD NO. SIZE DWG. NO. REV >- ....1 1 7) ALL HYDRAULIC PIPING RATED AT 3000 PSI. AND ITS SUBSTANCE IS CONFIDENTIAL AND PROPRIETARY. ,.. THE CONTENTS HEREOF SHALL NOT BE PUBUSHED OR DISCLOSED D 89402 0 A ti • Lli 1 co TO OUTSIDE PARTIES, OR USED FOR THEIR BENEFIT WITHOUT ci cn •• c.., c4 tn, THE WRITTEN AUTHORIZATION OF SP INDUSTRIES. SCALE 1:1 I SHEET 2 0E-77;;—< No. ..,, _ - . f! P . 8 7 6 5 All. 4 3 2 1 - ........, CAD FILE: - , 6 07006-M8-0C "R li o e ..4 c).. -,,-, c, -E- 0 OH H E H \ C 0 \ v :.: ......_ a : .., . G) - 0 5-, 0 • 8 7 6 5 V► 4 3 1 REVISIONS ZONE REV DESCRIPTION DRAWN/DATE CHK/DATE APPVD/DATE A 1 71210,1259,1260 WERE TY,TE701 Z WAS 701X CDD CLARIFY COPPER SIZES AROUND HE5140'S & HE5027'S 12/5/06 z 0 DLi HV J 123• _ o 1 ► W sv z f HS� 12028 d A w 12023 - ■ ;;��� C"5 jiTo TTE 2 5/8 O. D. 4 1210 120 1260 2 1/8 O. D.la I 4 . / N.O. HS� © 1202 A. 'A A■ A■ A. 0 \20� ,6 A. A. A. ,% 1202V r GIMMINO Pi •■ ■■■xi °a co 0(30 WATER �r n I �� 5/8 0. D,I 1., - _ 13C) VENT — . Q #' 2 1/8 O. D. N.O. ----\-4 ' Fy 701A g I 1202- _, I •_ spill It* A. 2. A∎ nk ->, s FV re re x• .i. `i. 'Z. ,2. NNt. % `� *t. `�. `NA. A. .� ` A. nt. .� `. 12021 I I Ill , •• N N 2 5/8 O. D. 2 1/8 O. D. •I - i'"" gm , liw=1101I14I y cb i Z ._ ,�� 1202 I I : z „ y • '� �- �i IX111II� W _ li �' 1202S 1202D TE O 701Z C b _ _ 44 ,c` 2 1/8 0. D. N.O. M-- C 2C) WATER V S ,�, I��� 5/8 0. D. � ° % -∎ A∎ INNN s N. NNM AV AVAV .$1A. CHAMBER CONDENSER Z L N ,$1 , , ' N —.. T - - U� c CA 0 11 .$1 4' .' .. Z Vm \/ (12C) DRAIN ' A 1 '° .I sv Mil WO 11 1214 — el ■ `11. /AO. A. As A. `s't. A. A. A■ A.NM lag C i 1§- C 2 1/8 O. D. i I Q �y • �• 2 5/8 O. D. 1 TE TT TO TIC 123i4,B,c�, Q m l 1 101 INSTALL RTD 2os 1209 1- m = °-� HV .s N.O. I III 5 ii a31. ,�,� A IN RUN OF TEE n '5 ' .� ° 1209 � IC ra Fv♦ ♦ ♦ 1214C ODD j" w W .4)1 to /V V V °z FIT / / / ,4 �■ 03 'A ;j ; HE HE HE FV A di �' 027 027= 5027C 1214D ' ■ . : co FISH HV ' o mmmilm 5.. TT TO TIC 123-B;C^,� ∎. ■'.0.0-: ■!n ■ O 029 T- s '.HV XCV 1218 #4 r • I. 2 1/8 O, D. 1259 N ■■ .:■: •�". Cu PM 130. 130= ,G t� X-I N. C.12o0B y 2 1/8 0. D, 2 5/8 O, D.I �T, ,■ ., .. FV N.O. 1259 ►, 4 3 1, 1, I 1218 N. O. ,�'� 1214B ` ■` ■ •• • 1111 [El() in e A t �-- TSH HV HE HE HE Q �o 12008 2 5/8 O. D. •30 PSV ( i i I) 140 2 1/8 O. D. 140= 14oC 146= 458 PM e© i 03 1 I u� I HS 2 5/8 O. D. 1201 I I I I I ID / U Ld �— p i \0/ u HEE / D 1 5/8 O. D.. 12503 lit i- cd 0 B ® p`"1 Hv 1218 / SET AT B to e e PM . 130- 40 PSIG G C 8E) \�. " (�© w u120•• ,_t., 1 5/8 O. o j co _______4>Ti C3 O. D. Q n, ' 1214 N. O TSH o < N z 5129 1250B I I W N -s n _21/8 O. D. or• 6 . 2 1I8O. D, �HS 1 in 1 am • g < ca z 25oe 2 1/8 O. D. 0 z d TSH 1204 ►1 u,� 01/4 NOM I HV XCV IN < o LOCATE ON I , 1200 z n 030 C� 0 U LOWEST SIDE OF , °z °z N. C. -�' 14 PM D W 1250 u HV 0 1 5/8 O. D. PUMP (TYP) �� •a% PT ♦ s' - 1/2 NOM 1 029= E . 14s: o o W� L� L IT EI% 1221 ► TA 5201 z ► 4 . p rem' �; U • �i PRESS. W/ N2 TO 2 PS I G LG o FLT w W o � 1201 Z 030= x A Z ..- h- o HV WITH SYSTEM @ -60'C c� TSH d '" .g.E mill 5149 s Z 1250 1 di 1�,� co •� --� v- co LOCATE ON �, Ix i/z NOM •- I I LOWEST SIDE OF - o §s e. DX zz 031- ,v PT PUMP (TYP) W � o g o 1 1250 �•7 v J to HV r 211111 U 146 A HV $ Ci —/ 1250 , Fg 03 X■ Z � ?.J NO Z U ei W co IX STANDARD NOTES ") 0 o • . 1) SEE HULL DRAWING C843397 FOR P&I D SYMBOL LEGEND. UNLESS OTHERWISE SPECIFIED FIRST K/0 U V • 2) ALL VALVES NORMALLY CLOSED UNLESS SPECIFIED OTHERWISE. DIMENSIONS ARE IN INCHES. 0 6v 13388 SP INDUSTRIES a z N m elift o i A 3) ALL O. D. TUBE MATERIAL COPPER UNLESS SPECIFIED OTHERWISE. TOLERANCES' I I 935 MEARNS ROAD u- _ o o FRACTIONAL: ±1/64 T 4) ALL NOM. PIPE MATERIAL CARBON STEEL UNLESS SPECIFED OTHERWISE. 2 DECIMAL ±.01 DRAWN: DATE WARM I NSTER, PA 18974 `� 0 _ 5) ALL CHAMBER AND CONDENSER PENETRATIONS STAINLESS STEEL 3 DECIMAL ±.005 CDD 9/19/06 A o 3 UNLESS SPECIFIED OTHERWISE. ANGLE: ±t/r CHECK: LAM 10/23/06�� PROCESS (Sc INSTRUMENT DIAGRAM > cr P 6) ALL ELBOWS LONG RADIUS UNLESS SPECIFIED OTHERWISE. W �� } 7) ALL HYDRAULIC PIPING RATED AT 3000 PSI. DO NOT SCALE DRAWING APPROVED: CDD 10/23/0E HEMCON INC. TIGARD, OR °c■, c BREAK SHARP EDGES AND SIMILAR TO: HEAT TRANSFER PIPING U g a REMOVE ALL BURRS 0 m do s THIS DRAWING IS THE PROPERTY OF SP INDUSTRIES, CAD NO. SIZE DWG. NO. REV J . AND ITS SUBSTANCE IS CONFIDENTIAL AND PROPRIETARY. Q,- (� (� THE CONTENTS HEREOF SHALL NOT BE PUBUSHED OR DISCLOSED D V�7 4 V 2�1 A 3 = *a a 1 TO OUTSIDE PARTIES, OR USED FOR THEIR BENEFIT WITHOUT .. o gS THE WRITTEN AUTHORIZATION OF THE SP INDUSTRIES. SCALE 1:1 SHEET 3 OF 4 DISK NO. I� t �Z 8 7 6 5 4 3 2 1 CAD FILE: r ' 07006-M8-OD �Z g .-,. TyQ W 7 F ,. T YY J s 0 H = n 7 6 5 t 4 3 2 I 1 REVISIONS HS 1 ZONE REV DESCRIPTION DRAWN/DATE CHK/DATE •APPVD/DATE / A DEL FLT1353, ADD MOTOR AND HIGH DISCHARGE CDO 1 TEMPERATURE NOTES,CHANGE OIL PIPING TO AS BUILT 12/5/06 I CONNECT PCV142 EQUALIZER LINE TO COMPR. VALVE SUPERHEAT � VARIABLE Z SETPOINT FROM TIC - -_ --�- FREQUENCY I T11259 138A/ bop. •'' / T DRIVE SHELF TEMP. r CONDENSER I SETPOINT I- -1 SET POINT I I I D . re D p W MISI I / Ft?o0M (13D) JACKET VENT J c -rl'_'-- TI12os LWA , �/\ / z w 1 0 SHELF - --J 0 SUPERHEAT - .► W /, CALCULATION w, I cr --1 5/8 0. D. Psv 1 . 705 SET @ ..., TCV La cc e 50PSIG Ir q. .- 1L-.._- �� © 5024• oo 4W11D) ow 1 I I I xx x4 Y A HE H„ - N. 0. N 0 HEE TCV FLT X 019 500 , .Y yt.ITY, _--- „ SATURATION 1 TE i 23A 12 1 © 02 - A x a O TEMPERATURE 1 3/8 0. D. •2 • 1/8 0. D. COUNTERFLOW S/8 0. D. I CI- CONDENSER X SUB-COOLER SUPERHEAT HEAT-X © x A FL a ;1„....impiwn 71$R e[ CALCULATION HE I © : x x 1= a 1 1/8 0, D, 027- , 2 1/8 0. D. �I el < (3D) WATER t g 4. N. C. di (...)1, p 070 PI� �,43 d TCV ' \3/ .l. 144A a A - I Pi I ; r a N Ili I I\n XCV ♦ �, \ �. o I I X 02*- 11L A a N Z v - L_ L .J'- _ 30 SEC. % ' g I J- ' ON DEL. PSV ,' Z x , L � � L. 1 L I r---4' MOTOR �j• 7 /� FLT V> 4. ILI.. X OVERTEMP■ r TI 02• W SET AT e. HEE V ¢ THERMISTOR '�0� 350 PSIG O 4 FLT W ¢ x \ . 138A 02 .. W MI e F- . 4 •4 .41 A i I X h2 pH DI TE 1514 5/8 0. D. p cn •: TEMPERATURE 106A V X HV I a a PUMP CONDENSER Sy q 01 • L DOWN HEAT-X HE 128A _I " X I------ SV a a _J Ui = n as 1,�0. 30 SEC. x ON DEL. 104A , V gr.IC CO INN-. x 1354 , V� HV © '� - - 5/8 0. D. x o7 ►AI x I ►� ,. ,, _ .,.. 4110 a ! a aml =mid Iti■��� : El 'T U X DII x i/?IBSPT PM a 4, o N`✓ PT A PCV A q ( 11 OOA « a _ 2 I a. 124A o, 142A Li p p I w y TS HEE �1 a , m CO �.. \ tx1 102A 172A p4 a 0 = n (� 0\0 I / as m d. "' r' k a, C c I 1 4 m„ 2 5/8 O. D, n I / ba . . M/ "1 > .13) CU / c� 077 �. �, �.. HV 1/4 NOM -.1 HV © a / 124A FS �..� LJ PI / I 13 - �.. e6 ILI L.L.1 LI 1 10 IN. 135 - Z PT OFF DEL. 0.1--• 20 • 0 143A v ,. ." _..� ® ■ if 04LiAtrA A8• -.' -DS `■ e ...... VE5010A .. FLT k. p � 081 ( PDI a CHAMBER ■■ r■•••■■a al s I■ • SUCTION l co 143A �,71,e ACCUMULATOR ■ _ • ■• •• © 3 _' A ' N r■■ ilt4(2E) WATER 2 1/8 0, D. 1 1/8 0, D. , Cr‘ c en O �j HV Lv © Q 50 = 4. 1a M C 0o co E A II ••-- -a--, V O c.i a d Cu a - ur In HE HV CL 42 CO a II-- n°. 0 ut HV oo B 515• X ' v 0$1 5079A M L �, ^' , a B 0 u 2 1/8 0. D. 1 1/8 0. D. ► TCV HV ~' _ '� '� B - (3E) WATER ► 081 013 �, WE HOT GAS TO SUCTION % W N z 4.►� • a o ^ . v FLT ,� '2. `2s � �t. � � � `2. �t. `� � �t. `2. 'z. `2. �2. `2. �i. v� �2. '2. �. � `2. � � `2. �t. � �>,. � �2. � v. � �. % < • ROW e . k , `2. . '2. �t. `2. , `A `2. `2. `2. `2. `2. '2. `2. `2. `2. `2. `2. `2. `2. '2. `2. `2. `2. `2. `2. `2. `2. `2 % `t. `2 % NI. `2. `2. �2 % % 7FV V 0 �gi -I /ATI --I A PSV CI p 11J La W 0 o SET AT �/ oo 4 N O �. x c v o 350 PSIG ip, M a val 2 1/8 0. D. I (2D) WATER o 0 0 7.M -0 M -0 IA - 501 HE .- a C) I y m y x N. C. N. p c4 o o a W o � E 8m8 70 (4 m (4 0 C7 C3 W X _ a ~ Vw �, `/ c, 5085 x CONDENSER/RECEIVER -Pi 1: •• N. 0. 8 dE x lei - % _J COMPRESSOR A X 78D 5 SEMI-HERMETIC, SCREW WITH SMART x XQ A W 2-STAGE, SEMI HERMETC, H„ O 6 . li aa•• 0 . o COOL ELECTRONIC REFRIGERATION CONTROL TCV i ._ I.X-- ' HV L.: §g 4 NOM � ^ 075 z � ��n (3A) WATER ..---- CFROM COMPRESSORS B&C w6 Z 1 U 4 NOM 4 Q x 8 0(2A) WATER 1... TO COMPRESSORS B&C > Y44( DRAIN ICJ cG 1 M O ��glib STANDARD NOTES. - 1) SEE HULL DRAWING C843397 FOR P&I D SYMBOL LEGEND. UNLESS OTHERWISE SPECIFIED FIRST K/O V V O 2 A 2) ALL VALVES NORMALLY CLOSED UNLESS SPECIFIED OTHERWISE. DIMENSIONS ARE IN INCHES. 06V13388 S P INDUSTRIES a Z N m o 3) ALL 0. D. TUBE MATERIAL COPPER UNLESS SPECIFIED OTHERWISE. FRACTIONAL: C ±1/64 U 935 MEARNS ROAD �- = J o t C M P R E S S O R S B AND C 4) ALL NOM. PIPE MATERIAL CARBON STEEL UNLESS SPEC I FED OTHERWISE. 2 DECIMAL ±.O1 DRAWN: DATE WARMINSTER, PA 18974 , c, _ 5) ALL CHAMBER AND CONDENSER PENETRATIONS STAINLESS STEEL 3 DECIMAL• ±.005 CDD 10/19/DE ' 1 0 gp IDENTICAL EXCEPT FOR UNLESS SPECIFIED OTHERWISE. ANGLE: ±1/r CHECK: DATE J,,.. g o L N N . LJM 10/23/06 PROCESS & INSTRUMENT DIAL cc TAG SUBSCR I PT ( E. G B OR C' ) 6) ALL ELBOWS LONG RADIUS UNLESS SPECIFIED OTHERWISE. DO NOT SCALE DRAWING APPROVED: DATE N L+,- �� 7) ALL HYDRAULIC PIPING RATED AT 3000 PSI. CDD 10/23/OE HEMCON, INC., TIGARD OR O L.L. `15 8) BSPT = BRITISH STANDARD PIPE THREAD z O a BREAK REMOVE ALL BURRS D SIMILAR TO: 0 ij5 COMPRESSORS AND COOLING JACK a. oo THIS DRAWING IS THE PROPERTY OF SP INDUSTRIES, CAD NO. SIZE DWG. NO. REV J 1 AND ITS SUBSTANCE IS CONFIDENTIAL AND PROPRIETARY. C THE CONTENTS HEREOF SHALL NOT BE PUBLISHED OR DISCLOSED ® 894020 A (.6 = l� TO OUTSIDE PARTIES, OR USED FOR THEIR BENEFIT WITHOUT cil THE WRITTEN AUTHORIZATION OF SP INDUSTRIES. SCALE 1:1 1FSHEET 4 OF 4 DISK NO. lil -.. 8 7 6 5 4 3 2 1 c Uzi CAD FlLE: Q; 07006-M8-OF z , ig E ,,, 3 01 3' 0 0 P 0 H H E H \ C 0 N ..i. :n ,,,.. ,. .,, :;, _ ,i7F , r' o c:x , n