Loading...
Plans BUP2007-00376 COMMON SENSE 15350 SW SEQUOIA PKWY PACTRUST 15350 S.W.Sequoia Pkwy.,Suite 300 Portland, Oregon 97224 Pacific Realty Associates, L.P. 503/624-6300 Facsimile: 503/624-7755 MEMORANDUM Date: June 26, 2007 To: Dan Nelson City of Tigard Building Department For: IBC Code Analysis PacTrust Corporate Center Buildings 16 and 17 Portland, OR 97224 To facilitate future tenant improvement construction work, we have decided to do a code analysis for the two, three-story buildings in this park. This code analysis is to demonstrate how these buildings, which were built under the UBC as a type II-1 Hr., will figure as an IBC type II-B. Chapter 3—Use and Occupancy Classification; the building will be figured as a B occupancy, with subsidiary A-3 and S-2 uses. The A-3 by size and occupancy fits into the B group. Chapter 4—Special Detailed Requirements based on Use and Occupancy Classification—N/A Chapter 5—General Building Heights and Areas; per table 503 basic area for Type II-B, B occupancy is 23,000 SF per floor, and four stores tall. Existing building is three-story with a lower level floor plate of 16,222 SF and 22,879 SF for the upper two levels—totaling approximately 62,000 SF. 22,879 SF < 23,000 SF and three stories <four stories; allowing non-separated uses. Chapter 6—Types of Construction; Type II-B. Chapter 7—Fire-resistance Rated Construction; N/A due to type and proximity to other buildings other than shaft(stair towers), which can be 1-Hr. (in lieu of 2-Hr.) due to being fully sprinklered. Chapter 8—Interior Finishes—N/A Chapter 9—Fire Protection Systems; fully spinklered up and down. Chapter 10—Means of Egress, two required exit stair towers + non-required central stair which opens between 1 and 2 and 2 and 3 when hold-opens close (triggered off of sprinkler system)— this also encloses elevator lobby. Corridor can be non-rated, with smoke control and closers at doorway penetrations because of fire sprinklers. Chapter 11 —Accessibility; building complies as constructed. Chapter 12—28; N/A Chapter 29—Minimum Plumbing Fixtures; 62,000/200 = 310 occupants/2 = 155 occupants each sex= 6 T+ 3 L required. 11 T+ 6 L (women), 5 T+ 6 U + 6 L (men) provided. Pair accessible DF each floor. Chapter 30—34; N/A End of Memorandum { d" a LEGEND Ai* � U NE.:.S . . HALL -NA:- NEW PARTITION . ..- -t .i,••-.- .r../trf'' : ... U i rc. oR L"N.}. :;•c.-Go .r EXISTING PARTITION TO REMAIN ' ifi 0 I %4'. Y a ———— EXISTING PARTITION OR ITEMS TO ---- BE REMOVED a co 0 Ts GLASS RECITE >- AREA NOT IN CONTRACT SHEET NOTES 1. PARTITIONS, DOORS, RECITES, AND ITEMS SHOWN DASHED ARE TO BE REMOVED OR RELOCATED. REUSABLE MATERIALS ARE TO BE REUSED OR RETURNED TO BUILDING STOCK. 2. REMOVE ALL POWER SIGNAL, SWITCHING AND OTHER PERTINENT ITEMS FROM WALLS TO BE DEMOLISHED. TERMINATE WIRING BACK TO SOURCE. 3, EXISTING ELECTRICAL OUTLETS IN EXISTING WALLS TO REMAIN UNLESS co NOTED OTHERWISE. REMOVE ALL UNUSED FLOOR MONUMENTS. FLOOR = to PATCH SHALL PROVIDE A 2–HOUR RATING. ABANDONED WIRING SHALL BE c REMOVED BACK TO SOURCE. 4. ALL ABANDONED UTILITIES AND SERVICES SHALL HAVE CONDUIT CABLING OR PIPING REMOVED BACK TO SOURCE. • El? © Qcp 5. GENERAL ITEMS FOR DEMOLITION ARE INDICATED ON DRAWINGS. i N co o PLUMBING FIXTURES, CEILINGS, MISCELLANEOUS EQUIPMENT, FINISHES, ETC S N Lri .CD NOT SPECIFICALLY SHOWN THAT ARE LOCATED IN AREAS OR WALLS SHOWN TO BE DEMOLISHED ARE TO BE REMOVED AND/ OR RELOCATED AS REQD. i 2; Q ' 6. PATCH, REPAIR AND REFINISH EXISTING ITEMS TO REMAIN TO THE —' 7 8 SPECIFIED CONDITION OF EACH MATERIAL WIEiji A WORKMANLIKE TRANSITION 0 Q O �J o `"J o TO ADJACENT NEW CONSTRUCTION. +� `� 0 0 7. CUT EXISTING FINISHES THAT ARE TO B REMOVED WITH METHODS TO o TERMINATE SURFACES IN A STRAIGHT, NEAT INE AT A NATURAL POINT OF r p N CD DIVISION. N N !.� �— co 9_ 8. WHERE REMOVAL OF PARTITIONS OR EQPMENT RESULTS IN ADJACENT -� SPACES BECOMING A SINGLE SPACE, REWORK FLOORS, WALLS AND o CEILINGS TO PROVIDE SMOOTH PLANES WITHOUT BREAKS, STEPS OR ~ RAMPS. }' 4,., co 9. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE v 0 • DEMOLITION PLAN. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF D ›.- EMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. I I .r.-, •i i L Q %� !: 1101.. REMOVE EXISTING WINDOW TREATMENTS PRIOR TO CONSTRUCTIO ' REWORK AS REQUIRED FOR NEW WALL LOCATIONS & REINSTALL AT• co T i I I COMPLETION.r: PROJECT COMPL N ! I I � 11 1 . I 1 I I I 1 N THROUGHOUT TENANT 0 V EXISTING VOICE DATA CABLI G R MO A '1 i i B E E ALL E S Ti T—I I—T• I I I ! ! 1 i 1 1 I I '.3 1 1 SPACE. REMOVE BACK TO SOURCE.II a II _4...T11-111_1 rt rt � r tic_ �o I I �:. I I I I 1 I — — I I — THROUGHOUT AN BASE FINISH AND RUBBER BBE B as V XISTING FLOOR S ES I I 12 REMO E E 4H4FI ! I 1. , P F W RK. 1 1 1 1 1 1 1 1 C �• SCO E 0 0 1 T—1 I—T li I I I I I I I I �1fi r-1---t-r-1--1-1-1-7 - 1, I I —I� I I �I� ,•. � I N 0 MI I I a•o _ 1 =t- 1 I 1 ! ! 1 1 1 ! —I—` I I 1 1 1 1 ( 1 1 0 I o I _ tU c�.. _ _ to cv N ts>L I d- .� _ KEY NOTES o N L— —I----�.� � 1 -1 1 ! 1 1— � � _c�I I I �- I--- . r ...r , co r) 0 F.., ELD).. .. :: F: .. I 1 0�� r • • .; • • • • ♦• • • < ''rr.�::w..-Y::..>..X...-::,>: `"� �:r•,i�:•�Y�.•/•.y.�A.y-�••,�• 1�. — I 1 1\ ! 1 1 /I I I I 1 :• T-�-,• ,•♦ �' o m _I_ L _I_i ...1.•'":%T.• •- •f• iEr: I 1 C) :: n II I I I I I i• ill 1 7—r — Tin----r-r LI I ♦s I— I—�� I— r' ♦'T'•r �•s yr h♦ rA. r :: I, -17.--T „ T Eirl w• •ii__„__+ :, ,.: it .::: _y L L • • ITV• • .....T.. ..• • • • , • • • • • • '•a.:•�:�::.1::�:::{! ......,,,_ :_:........---------- __, . • _2, ,_._.._• ____ -f •1 0 :: T 1 •"r• - ! I •:s J J L I1 I I 1 1 1 1 -- r -i �T-i T .� I-- J L I I F --I-- +---I EC T •_ I siti ,< • • • •• - ♦ • ♦••• • •-�,• "'^• • Yom•_♦ Is !r_ (5 0 MI \ ., n I a) J ..: I .._ —_/2 f n I . •*.•....'.....; E II I:P a) c> :. 11 cNi I I ! II --,—F-f-1'—1-1' I 1, u r - • ..: .. ,-- ll . . , . . . . .. . . .. . . . . .. , .. . :: ._ ED I c — — Z 0 co ,,El w .. -,- '71- �� N Zc: .• ...........•.•••....• .•.......•....•... .....• . .... .........•. .... ..... .....................•....................... . ... . .•.. ... . .... . ......... ...,. ..........,.... ............... 0 CD ---g S 9- .,. 00 co F 2 ...-0 11 . ggR ,..... ,, 2 u) o 0 _�0 LO t • � � � i Eo 0 • • .•• •••• .•', •••• ...•••••••••• 2 0 C E2 E. 1792 , •••••:.•••••••••••••':.*:•..............................*****.....................................................................i................................................•......."..................................:.................*...........•••••••,.....................................•....................•..'..:*:.......:..................................*:..........*:.................."...****.•••••••••••••••••••....................'............;.•*'....................."........:.......,........................................•........................••••...........................................**:..........*...4.................*•.....:....••••••,.....•"..*............................:.:....................•.........................•............................•.......................................:................•.............:•...........................•...................................:•...,.......•...•••............*.........:!,....................'...........................................*.......................•......................................r...•1 1 •• N 0 ,••-..: i °ft I i . ! E. a ( 1 I o ... .... .. • . . • .. • ._ ___-____,===,..,-- II LJ II `� II 7. LCD N co co O O N N N p 0 vs o OOOOD ED p N • t- L0 1- -;j (n "> 0 000p7 0 0 0 0 0 0 Q Q <CQQU Sheet Title LEVEL 2 A11 .2 DEMOU11ON PLAN Drawing No. , Scale V� = 1'-0" Date 05,30.07 Project No. 88800 0 .S' 1" 2. 11:1:1:1 ±H:11:1:-"M=1 I O O ,i- . � • ' LEGEND „v11..) Ait/6),,Q. ,4, 1 KEYNOTE �> a U .� •0 Q DOOR NUMBER ,� DETAIL OR SECTION REFERENCE Y 0 I v k)-Ct*.\.% Ilir INTERIOR ELEVATION REFERENCE co 0 0 SPECIAL WALL FINISH —— —-- EXISTING PARTITION OR ITEMS TO ———— BE REMOVED EXISTING PARTITION TO REMAIN NEW PARTITION 1/2" BUTT-GLAZED FULL-HEIGHT GLASS FT RECITE I 1 PARTIAL-HEIGHT RELITE, SEE 10/A6.1 +' c CO FLUSH UNITPROVIDE FLOOR MONUMENT CUT SHEET LOCATIONTO • DEVICE ARCHITECT FOR TO BE APPROVA POWER L & VOICE/DATA COMBINATION c . o DUPLEX ELECTRICAL OUTLET 0 C DUPLEX ELECTRICAL OUTLET CEILING ' �l 8 < DUPLEX ELECTRICAL OUTLET ON A 0 N D DEDICATED CIRCUIT D N I Q. � � o 0 C1-) CD = FOURPLEX ELECTRICAL OUTLET —" I > c°v x a CD LL C3� ® 0 a --© SPECIAL PURPOSE ELECTRICAL OUTLET - n (5 0 a) � 0 ° -d PHONE/DATA OUTLET _N : coo A PHONE OUTLET O Lo a_. ,___7,-) 1+ © CABLE TV TERMINAL - VFY. MOUNTING HEIGHT WITH ARCHITECT 4 (J) 0 >11. WALL CONTROL PANEL "` Ci) .:.;;.;: I 1 cR CARD READER J ED•'4• CEILING MOUNTED .:.:::. 0 ED V PROJECTOR• co CED .: :. . . .:• . . . . A R2 + BOARD RECP 9 w I I „ O I 202 201 �E T S NOTES' z° $ pl 65 w w I E •OFFICE O w �� CST D • OFFICE ��- - - N (I) I OFFICE - - OFFICE A6.1 208 J -! A6,1 _ OFFICE , 1. ALL WORK AND MATERIALS ;• E ALS TO CONFORM WITH•';�� ••}:•' ( H BUILDING STANDARDS UNLESS 207 0 ESS OTHERWISE•cn cn 203 206 .. 204 CIE M 2 r I OFFICE =-D ' i N NOTED. ..� Qom. S r I 1 b O O O ��, A6,1 .::::::: .. , z z 205 - _ Oi 13. !- -- 2. ALL NEW OFFICE WALLS TO BE IN o SULATED FULL HEIGHT BUILDING STANDARD PARTITIONS N T N W , N U LESS 0TH WI ER N SE OT D. P E ROV DE T LA ERAL f WALL BRAC NG AS REQD. I c�• III AL O O i O - a' 240 0 o N r O p E ;• N 6 , N N ( N N o r 2438 o 3 ALL W 00 o _ ,�- D BLOCKING ;• NAIL R E S ET T 1 '' ° C 0 1 BE F RE RETAR N DANT• J L_ co A5. 0 1 tll � 8 R1 9 -0 CLR �-' c�• HALL •2 •�9 c� d' P. TYP. -- �••� • 4. WALLS TO BE CENTERED ON BUI fN 4? 235 LD G GRID UNLESS NOTED OTHERWISE. ALL O N 6 i 10 -._co D MENSfON FR F-' S OM CENT R F E 0 WA c NF LL OR R! o , G D N U LESS NOT ED OT RWI -f- -a • HE SE. 14 10 - u-) 1:3 0 1 2 1 240 ..y >, O ED ; •�► 225 ► �► _ :°•'.••'.• •'.••'. •'.• •'.••'.�••�• •i., - -•.'.-'- - ---•:::-- •, ..'"x".".. LL MECHANICAL ELECTRICAL PLUMBING AND FIRE P - �C}•i N _ •. ,��. :•:• •�= S A , ROTECTION TO BE DESIGN BUILD. 224 ..:, CO 0 -a3 30 N � . CONTRACTOR T P O 0 •'�= 0 ROVIDE ALL DO M N '.• CU ENTATlON INCLUDING SHOP DRAWIN TH F T I GS. AT IS O CL � z— I- FO 0 FOW „ BREAK •';' EAK N EC ES Y SAR F R 0 CONSTRUCTION N AND PERMITS.. S PROVIDE AR ARCHITECT ECT WITH A R -5 1/2", �r ° LL D AW(N 0 N 221 OFFICE S ICE F D CON ~.- OFFI - OFFICE • . F Roo REVf W E F ;• 0 LOCATION P A . R R T 61 0 0 N .:: • CO STR T UC ION. DE I N ! SG T BULD CON RAT R T NO SLIDE 225 224 .. C 0 S O O 22 3 +4 i' I •'° •� PROVIDE BUILDING MANAGEMENT WITH H AS BUILT DOCUMENTATION AT COMPLETION OF 0 •'i a• PRO �- N '.� : • JECT. OFFICE ALIGN ';• A61 C) 209 . . i• C • , 1 ...i� ,.; •. •. • . •. •. • , �'��� 6. SEE 8 A6.1 & 9 A6.1 FOR STANDARD R IT F• NATION ("TYPES R 1 & 209 R SEE 7 id @Rik. ,. •- L E IN OR TY N 221 » - .:'r••r•;:"'. ••..•r....•..'.-•: ;, , FINISH SCHEDULE FOR ELECTRONIC GLASS INFORMATION 21O • 7. WIRIN N ... ....................................: GAD A6.1 TERMINALS FOR DATA AND TELEPHONE TO BE PROVIDED BY OTHERS. OFFICE �► OFFICE - ° 22 6 ' CONF ':,. r 210 8. WIRI NG AN P D S K EA ERS F R 0 T N E ANT PAG I N Y S G T M N ••`t• SSE A D TN T E AN AC 222 •'�° S ACCESS CONTROL FEc r' •'r E: — — • . : : SYSTEM TO BE PROVlD '. . .. . . . . . . . . . . .'r ED BY OTHERS ............................ 226 ♦ CF) ° •- `♦ ,... a ..� •a �y� s ' • 227 �� .:.: < .. , •:.y-.- • •�.... ATION OF ALL FLOOR MONUMENTS WITH ARCHITECT ALIG `�4 CLR• 0.::: ER FY LOC C ECT PRIOR TO• ___� D _ - �r► I _,�,.... (� . .cLOSET CORE-DRILLING. A I N� 'rl s ° H ALL LG 239 O 233 V •OFFICE 237 1 5 5 6 4 I A - •A .1 1• 6 0. A P LL STI LA C LAM I N T A E A C SEWORK S• � SHALL A LL BE WI UST C M RA 0 G DE AL Mf RK 227 r- I � L LLWO SHALL AW BE I PR EMI M U RA • . .- DE SHOP. S DRAWINGS F GS O A w • - -'�- •' LL CASEWORK AN MI F HALL E ' OFFICE _ ..•::..:... PRI T CE W +4 •�<• OR 0 FABRICATION° —� 236 + N 4�1- 2 11 , I •�� rn � 1 232 „ CR ►. _`` • - •,.',„.' ri 4 I 2 C H OW S E' •°.- PROVIDE GAR A•.. B GE DISPOSER AND WAT R F TR T• E iL A ION AT SINK BREAK 221 GARBAGE 211 r ( OPEN 0 E \ � 6 4 241 A6.1 2 - WORK $, i Df P S T S 0 R -';- E 0 BE IN !NK / S ERATOR MODEL 777SS. WATER FILTRATION DEVICE TO BE PURITEC 228 z 21 23 4 6 232 I 2 Q] O 1 A5.01 URA UV1 AND T - INS ALL UP ED STR EAM OF INK S INST H \ A OT AN C FF ';• D 0 EE MA E MAKER SINK 1 5 S w a w • OFFICE „ I A I - TO BE ADA 0 M P C CANT STAINLESS STEEL BLANCO 513-610 AND FAUCET F-1 KOHLER• +44 ( ) E D . r 212 W as O _ N 111_ _ ..•., •.• . ,•.••.,•. , .,•. ,-. •a.�.'• ;• K-377-4M- N. -1 Fo cv -,-....\ � � .�•�;• B INSTA HOT TO BE (NSINKERATOR, TRANSCAPE H-WAVE-SS. PROVIDE l �'�P HALL _. ^^,, -���' ♦- .s. r°' POWER AS RE UIRED.•�- � 238 .�� '� � ';• r�>• Q 1 1 • a • , _ . .. ... ... . ...•.. "...._. ,: .. DE ND f NSTALL NEW REFRIGERATOR AN ! H A In _._ � �. : - - .. . r ,.r.. , r,';.°' •�-:;• �.'..� • HER SHALL BE OFFICE - - - - - ... ,.:.,._,. .• .:...,��:�: �:�::,::::,: z . . . . . . . . . . . . . .: -. . , . . . . — — .a. 231 •. F.; ASKO D31 12 STAINLESS. REFRIGERATOR RF 1 TO BE SUB R I { I � \ I 229 � - ( ) ZE 0, BU LT-fNEE 632/S/B. OVEN Z � (n2 (1 ,_ T co )E.--• 9 0 BE MAYTAG MER6875BAS STAINLESS STEEL. OVEN--HOOD OH-1 T B N 0 E JE N--AIR, a _ -.:• S, STAINLESS STEEL. PROVIDE ASSOCIATED DUCTING AND ELECTRICAL. 220 STORAGE •r•g.:74 �• 23 • 1 -•• M I ROW C AV M W T E 1 f 0 E BU T B L N G LR L M2O 60 STAIN LESS STEEL W TRIM K1T LX ';--' 2060ST OFFICE • 5,-2 '•,• Q- N•213 OFFICE • z• OPEN CLR. .•;• ccs o� as 213 220 13. PROVI 213) DE AND INSTALL 24 HOU P ••� ••;• R SU PLEMENTAL COOLING UNIT AND ASSOCIATED 230 I ^^,, •O• '. • O W O INFRASTRUCTURE AT TEL SERVER V I o >�•' 232 ER FY LOAD RE UIREMENTS WITH TENANT. di 214 .� / Q E -• E 0 OFFICE •, .... yg ' 14. ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT�� EQ E T LOCATIONS WITH ARCHITECT PRIOR TO O •• . N T T CO S RU N C f0 �j. a w V r •ice cJ J � c� , n1 � a) „ , „ V D 1 1 -0" 1 1 -0 O CLR 0 ; ,�' 15. ALL ELECTRICAL OUTLETS ABOVE COUNTER �•,� CO ER HEIGHT TO BE ORIENTED HORIZONTALLY, o CD' 1 U N.O. 7...-4.-4 0 a� N •OQ V .. .: .. .. \ OFFICE N N d " .... • 215 N N N OPEN OFF CE ••. . _ 16. PROVIDE AND INSTALL REFRIGERATOR(RF-2) IN BOARDROOM 202 AND CONFERENCE J \ / 219 .•;• • O I II Si • ROOM 222. RF-2 T w 2 0 BE SUMMIT SCR310L UNDERCOUNTER .5 CU FT.•I 2 C•.- OFFICE E � OFFICE E j" OFFICE I 12' ( � I OFFICE ��= I J F 216 242 i 217 218 �'+- -e O •'•• • o I • t; i 19. PROs(VIDE AND INSTALL NEW SINK FAUCET AND ASSOCIATED PLUMBINGIN SHOWER ROOM•O O 4 2 NK 2 - S TO K BE OH ER R L 0 EAU K 2907 4 U ER NT UND COU ER MO NT. (I ::: . ,, , o ..` ' e :::........::: r ) U a < • ♦ i • CD _ '. 'r •:r� FAUCET F 2 TO BE KOHLER TRITON, K 7443 K W K-16012 4 HANDLES. .: . KEY NOTES O CDNOT USED ' ''• 2 PROVIDE AND INSTALL 1/4" COPPER WATER LINE AND SHUT-OFF VALVE. C1) ; I.... • - A . , , • , PROVIDE AND INSTALL COAT ROD AND PLASTIC LAMINATE SHELF. SEE Cn• •t v #1/A9.14. r` I` I` I` z o � ° �? OO � co co O) — 4 COFFEE MAKER LOCATION. PROVIDE DEDICATED CIRCUIT AND "COPPER N n! N o O o• WATER LINE WITH SHUT-OFF VALVE. cfl t� U ED COPIER LOCATION. PROVIDE DEDICATED CIRCUIT. .0 to '> 0 ooaOz O 20AMP DEDICATED CIRCUIT, (1)CIRCUIT/DUPLEX 000000 Q QQzCQU 7 NOT USED , Sheet Title CDPROVIDE POWER & VOICE/DATA FROM WALL TO TENANTS FURNITURE 2 SYSTEM VIA MFRS INFEED. FLOOR PLAN Drawing No. A2.2 Scale 1/8” = 1'-0" N w Date 05,30,07 Project No. 88800 0 .5" 1' 2" 1 I I I I -:t• . • cv c) II . . • • - cz) I I .1 I I 1 1 1 - • . - • ik'':41) Alcie • ,A.., :4/5:2., LD_ . . • • . ".'\•,,N) • • J.. NELS P. HALL a) - .7t-.2. — . /4" xte.,„,—.• . ..c • . E-.) • -....r4 < Ali REC EP - . •••• POF:TLAND. ,....4*:G ON -- 75 NW 201 ST-1 • • .,., ,,, .<4N„,it•:, = . '.7:7•40,2; ici,) W CLOSET • - 1•/)1 0 F k):"4 _0 243 • 2 ST-1 . . 8' 0" • 1 ,1' • o) ' 0 4111•111i, • >•• • , © \ ■••••I1M • 1 \\ ri-f' 2 i------- • . • • • \-- • i 1 I 4'-0" r 7/ Jr di , / . - • ...... . , -cif2c° N ink • _ ----y4 • • • . • \--- . rn ....... . v --17---■.-_, T— w — . _ . . . . I • . . / PTD WR \-% \ . . E - t - \ \• —. ,/ ct •,---, / N Milk , \ . / D 40 8 1'-5" • . .4... 3 1 \ , Mr . . tn c \ . . 0 0 1 , w 1 , \ . 1 III I (2) ROBE HOOKS _ 1 . . , - , N -11- 11_)1 '\\ MOUNTED @ 4'-6" \. =0 1-_ f - 1--,71-5-1 ca) < c) \ AFF \ ---Ivr- 1.1.1 C \ • . D N.-CD DC1) .:1-00 \ — -- I -\- // \ • 0 c\I P. / , \ 0 0-, • . • . • . - . • . • . • . • . • ci) 0 c..1 1.0 / s -.-- ,,,_ \ co i—w •ct.. —1 • • - . • • • . • . • . • . — L-,-, oo cr) C D N-- (N1 N V qo \ 0 CO • • • I-< • - • - - • • - L.) co co cr5 _ L, , e\ -""----ADA COMPLIANT, TRANSFER SHOWER x • • - • • - - < a) Er; ,-- -..,...__. ........ _..-- . \ - -7t- r--... 4Y1 -""' \ MFR: AQUA GLASS PRODUCT NO: 634139B-RA \‘ \ ><Lu <0_ mo . • . • . • . • . • . • . • . • . • . • . • . • . • . • . • . • . • > c) et- C\I X a$ IN- al ; '4 --7-- 4. NAME: ACRYLIC ACRYLIC SPECIAL CARE I LO E \ • • • • • • • . - . - . . - . cr L \ . • - • • . • • • • • • 0 c) • - - Fp . . . . • . . • • — FItOOR EAST - . • - • - . • i PT-2 • • ' • • • • • ° L AIN / ,- \ r ----- • ■••••■•• I • • • • • • • • • • • • • • • ID C71 7 i'(\•1 I • . • • ' • a • D T--- c cf) ' • a a5 C) ° • . ' . - . . • . •• . • . • • • . • s. VFY.W/MFR. • • • • • ° , 0 0 TD- / / 1,,.; •..4 0 ENLARGED TOILET ROOM PLAN 411 TOILET ROOM ELEVATIONS ZS GO 1/2- = r-o" 1/2" = r-o" -= 0 c.) >" ENLARGED PLAN 6 1/2" = c) C:D CO .a) CO W -3 D F.E. as ST-1 A5.01 i 1 6'-O" ' 1 WD-2 _ i■-• FRAMED / as 0) MIRROR \ - ; \ 2" WD-1 FRAME '1 _7--- .}// 2" WD-2 FRAME ' \ 7 I\ \ , 1 7 I , --, \ ALIGN -71— i -, , 1 t.,.., F-- , 1 1 I GRAB BAR \ 'co 1 ,b, WD-> 1 1 _ , " W 0 C CD CO 'Cr) \ . /i I ■ ' , I , -- P-X -"' T H co o a) 1 , PT-1 SEAT COVER ---N --tillID-i — PM-1 1 ___ _ 1 1 / ..''' r DISPENSER I 11 ., , L s, t-- 1 1 i I 1 TOILET PAPER DISPENSER • \ \ ' 1 WD-2 j F.E. ... \. \-4- 1 1 EAST I T WEST 4,-6"CLR. ST-3 \ \ ---_ - \- P-X---\ , SANITARY NAPKIN 36" \ WD-3 , T 11 DISPOSAL UNIT / / / 2"3" 1 1 10 ( 1 (-- ) a 3) *. .w.....■■■• \--- \ • - v i -14-> ' -c-_, T -,4- 1 1 1 1 I 1 1 1 7 : 1 C - 1 r -=-_-_,-, in 1 1 1 1 - ¢:1 1------4 (11) ENLARGED RECEPTION DESK ELEVATIONS 1/2- = l'-a- 1/2- = 1.-0- >,, J 1 , 1 , ,.‘ , , . ENLARGED RECEPTION DESK ELEVATIONS - 11 7 "CD I I 8 -: 2 1 i i --- co 1 v) _ 1 I I 1 . 10 N) , I i I 1 , I 2 i 1 —/ t 1 , 1 1 \ \ \ —,1 SOUTH Algalk PT-2 WEST PT-2 WEST PT-2 c.01 1) PLAM-2 ....j A9.XX -ST-1 PM-2 - ____ 7 // al""mir —WD-2 C 1 1 CD ' - WD-1 E PLAM-1-- 0 TOILET ROOM ELEVATIONS N " CD 1/2- .. 1.-0- / WD 3 Liii 0) CD LC) C\I — (/) CO (1) ; z (Ti • _ _ —I l_...._----- WD-2 Li.1 EAST NORTH w 2 i (9) ENLARGED RECEPTION DESK ELEVATIONS ENLARGED RECEPTION DESK ELEVATIONS Z as 0) 1/2" = v-o- 1/2" = 1.--o" 0 s`D 2 aii....„E 1 r Thca2 `76cc\01 2 co „is) 46 G) (1) cf) -E3 cra c) > Fij Lr) 36" MIN 51/4" ••■•••., 2 ( 1 1 ....., TOILET ACCESSORY LEGEND ST-1 'Tr '17 \ \ SD SOAP DISPENSER \ ) • i FLUSH ACTIVATOR / --C1 MU-1 MIRROR UNIT 28x42 I- I • 25" 2'-6" ON WIDE SIDE i \ - GB-1 GRAB BAR 36 IN. / GB-2 GRAB BAR 42 IN. 1 , 1 A A PLAM-2 SOLID WD-1 EDGE 01 PLAM-2 SOLID WD-2 EDGE— PROVIDE BACKING IN WALL 1 FEC GB-3 GRAB BAR 18 IN. WD-2 1 IN A h. AS REQUIRED FOR SINK TPD TOILET PAPER DISPENSER 1, A 1 o PTD/WR PAPER TOWEL DISPENSER SOLID WD-2 EDGE _.-.!-_._...... A ill SOLID WD-2 EDGE - \ \ c WR WASTE RECEPTACLE IN\ C \ FEC FIRE EXTINGUISHER CABINET WD-1 WD-1 " 'C',, I -- - - -1 -,--- .0- SCD SEAT COVER DISPENSER , 1 o . U = s I IL" --\--- I-- r L..1 TOILET ROOM NOTES 1 4 I) ,1,__ L....i EY . , 4 \ i < 8" o 0- 1. SEE SPECIFICATION SECTION 10800 FOR 4 ' 1.... r---. N- i--- N- Z MIN/ Ii.1.1 TOILET ACCESSORY SCHEDULE , = = CD -J t 4 M Lo hs- 00 (0 Cr) 0 CO i cAt) , h v C\I C\-1 CN P P 0 rt n V - C■I 0 c:, c) C:) CD C) D \ •I• x Lu .4 i m 0 ,, 0 A * 20 I` 2C) C 7 .1.11=10 \ \ \ \ V. IN .•C'N > 0 0 0 0 0 Z r-5" 5 A v *4 ' , ID 0 0 0 0 a 0 MIN :A Cr < < < < < 0 N D = 10 .4 ' s ."--'v Sheet Title . i :$ , 4 0 SECTION AT SINK TYPICAL PLAN DIMENSIONS AT TOILET 4) TYPICAL ACCESSORY MOUNTING HEIGHTS SOLID WD-2 EDGE I N SOLID WD-2 EDGE s A LEVEL 2 4 i. ,■ ENLARGED PLANS 1/2" = 1 -0" 1/2" = 1 -0 1/2" = 1 -0 ---\ I C'j ==l1107"4111 IN .-" Irsip.--" WD-2 . WD-2 ro .....4. ...1 -. .4 Drawing No. _.,,,.... ;;; - \ \ V- / 3" ---/-r A5.1 K 1 VERTICAL SECTION VERTICAL SECTION n RECEPTION DESK VRP14a RECEPTION DESK VRP14a Scale V2' = - SCALE: 1 1/2" =1'-0" 1 1 SCALE: 1 1/2" =V-0" Date 05.30.07 Project No. 88800 0 .r 1 2" milm..••■••■ Elimmimmummulm. CD CD C\J AN.:S Al/ 7. co. 2 3 EQUAL SECTIONS ,.., ,,. T D / / ,zs.„,,.....,.. ti ST-4 '"Ir...Zr NELS P. HALL • a) Z MITERED OUTSIDE CORNERS-TYP. WD-2, TYP. WD-2, TYP. 0-4;4 . ...., .. .:: .. ±.-._ ,. . . , .„•...• . ..c •./..:::: '-i•-' .0::.:','''.. ,:... . WD-2 RETURN PANEL -/ / /1.1 / .,- , .-,r . $(2 \ ' / . . ( ....:„.,--:, PORTLAND: OREGON ----, .,..,c , < ik----*-- -':''-'-.4 17-;-:-7-2A4:3-cV-X0-‘ 11,1X,Ilr'L-.7-:---ft,,f-'-s-,----,....--')■-.-. -'--'-''-'-...''..--7---"-'- ),.,'-- ' . 1.1,0170 c,111,:* _ , ...0o---o-o-- --0-615-0--'--cY,L_ _ ,...c.7., „, , _- ,_,,e_, e,77" ,---.6 . -,,,o( TYP. \ WD-1, TYP. -7--z-5- A il:::?,:_c,,,- 4,„:,4tc,:,:,,. 7--;cz- 11-67:71 kli , . 1 Ask %Li-)'';1/;to.:q3 :11totc WD-1/WD-2 -SIM. © OPP. FACE ./7 '''''''› ? = tali 7 ; - ,--)<,..,( • - - ...„------ -4, Ai PERIM. , / a) !I, . .--7-4-•,.., ,,,6--.4" r- P 0 . <> ‘,...---,• <, „,-- ..."-----RELITEEXI& 6 .. / \ , \ .1) Allki"--tif cl-!_74__A-A.,.' • LC-I; SCREE- -1'7111 GL-2 RELITE ; ,*."- " - WINDOW / \ , \ 2 I •4, '. 5-'0!- I l!'''w? " 9--/ '' -c- '-'? N.I.C. , • • „. ,,...„4"...., ...ov, c .PERIM. . ,,, WD-1 / WD-2 DOORS WITH A9.2 0 -410,ri0.-rt6,-\---6 :1-,( - - - --1 • '_- 74■-, .._.,.. , ,,.._ , WINDOW7 / I /, 1 ;A ' CONCEALED SOSS HINGES -4--, or,,.. #, :■•,, a #. .._1-73,..,_,..t;1'a -•• _ , . \ , co 1,..i. • ,• 1 - .0'` .-C::) .,).--,___,1.01C ( i / / 0 ,...;if 41;''-iitt ,tliLACji.,'nr ' :4 I:: ..7:', ---' 7--17'-, ,'if:-I:-,--- ‘4;:' ,k_, ,,,'Dlit ........."." WD-2, TYP. I . / ,,, ›- -,...i. iik AI -(3 .1'410 ...--,.11 t<7.0,!-,i'lVPIOcs-5-0,.-S PLANTER BASIN ' / © -' ' AP.: iiiw,---ali-a „,_,....,- IV. 0,__,,Ht--0-; ; --' -- 1,0- 1 • • ft...it . c•,..„...),L.:,,_,,,,,.., , .... „... 0.11111 0.,....4) . ,--K je, ... ...c..-,,,......„.< PROVIDE WATER TIGHT 1 I — i I I , '. 0 ' " law 4W ''''a■IA'' -/V-!:41.'"eitellPai. . SHEET METAL SURROUND ' , , i , -.• . ' . -,- \, I' I , t417:41:11.4.:7, 747."-)--V°: :"..."°,-V41-", `--ko'-' , . -., 417. '.1" 17: 1 It — i 77 .,- WD-1, TYP. \\ 1 I I ' o.or. *As' oralrip al' • lb—.%Sa : ......,i,o.sll. ororal, • 1 • - - •• ' /---ls!-y-- z-,/-- -,-f,-.-,--y;_(--y<y--ya,-7--,---yc -7-,/---F-y7---,---fc,,--T,:-,,--)z--n ,--T--fr-m---- i/-I--,'-f-,---)z-T \ / / NORTH EAST 21 , 23a SOUTH 1 11-EtA9.2 / ---' I RECEPTION AREA 0 ti 3 EQUAL SECTIONS CV 4., / = Ca C 0 WD-1 TYP. WD-2 TYP. r WD-1 CABINET 0 , I - . Amy • .-I -• --. 2-66-• 5' ri ' Il ,,,, lir " I 1 11 . , ! * I ' • \‘ 1/4" REVEAL BETWEEN .)- . -oh- s • - - , _ . • r,-_, I I . \ .....::::' UNDERSIDE ------------- '-'-- --- c.- ' - ------ -- --'743`4_;•," "."---i2 - 1 c) < c) , 1 1 \ 5-, ‘ s-7-,octo ; ' 1 OF WINDOW TRIM ST-4 D; N. D oo • 5.4D?:-&14■ 5)4i ti 1 CV c) ! 1 11 1 „. . Ns, r- ----—I I , LC D SO i . „ .....:. AND TO Ts. GL-2 RELITE - ' I .‘ ■ , 11 .IC. \ °. Ar', ., IIIII . , c„:-=-.•,, -.■'-;__ ---,II) I ±.---_c D N— C\I ' 1 ' BENCH,CABINET GL-2 . <) ' ST-2 -,: , ,o, _ • WD-2 ..._.1 -..) co c? co r i 1 1 1 I ) > (1,... .c - - :3-3 c) / 1 , RF-2 ),!-_,-,-,<5,-, .,-0,"--c--;,-_ ' -_,- -to?,:-7C-'--, ,,...-7',C,,-s'-,tti? AI-,•, -.,-(:),, , i <I (35 OPE _______J ,• -' ---\---Hip - - ' -' 12-="114-72. --.2,a--A-4 --4- , -:A I .e,r> (a x / __, GL-1 ,,,-,.,, ,--,•,-.573c`'7..1) z: 0 ' ..,..--J. ,-- ,,-, - ,17 w," """ i --..... I , I 1 , 1 I 1 1 i---1 --1 ,,,,11 1 7 , , , i !„ 7 i ,i• 't- I ' H i ■ , , ' ;; I GL-2 / A- . ., , i - 1,,, --- -i'l WD-3 -,,---1, -.),74747-- _,77c-07-- ---)k-27-t-0,'---0.---4._RQ-90r---O= _,!: : 1 1.----- LO C 11 I 1 i 1 , I ll 1 '- II 1'' _- --L' ' 'i i i I ./ -- - , 1, N.. ,_ N., .- a--s-1.-a--7C)-','-7":6-,L--'6<t6; (1et-Oc=5:20:`"="5,66-,.6-, Jc .k 0 c) .,,..,/ -. Ti 1 cs)Lo :- --)1,i - *---)4.1,-... .0_,?-3, - 14 ./,;-.._0 ' --- 0.) '1111111k \-- WD BASE ,' ,----_,..-----_---rt---.,r-,,- ,=-1--\--,---r-p--r--rir CD o --- WEST 23 b WD-2 CABINET , EAST - A/V WALL CONTROL MOUNTED IN VERTICAL FACE- 9 4 SOUTH ...C) M7--- c co a/ c) A9.2 .,.As.92) VFY. SIZE W/ A/V A9.2 A9.2 L... CONSULTANT SIM • RECEPTIO\ AREA, CONTI\UED BOARDROOM 202 1/4" = 1'-o'' 2 1/4" = 1'-0" 6 Cil) ee- °C 0 c.) 1 4k >- 2 4)(e9.2 A EQ. 6'-O" EQ. TRACKTYP. /11 RACO HEAD t EQ. / 6'-O" / EQ. 1"----/ .- IY 1 „ . , ..., „ I,. , 1, „.. . . s 1 ., 1 __-, ! ' z I IL.- . 1 . ! " 7 1' f I Li 1 I '' ' 11 11 I! 1! ! ' A/V WALL CONTROL 17 .1I . i , i . ,, , ,i ,, . , , , , , , 1\ , , .'' 11 ..,- 1 .. ,! ,1 ; I ! 1 !! I ! ! ! 11 ! !I MOUNTED IN VERTICAL c) c) A9.2 111 . „ _ ii () 1- . ., • 1. ,, , . , • , . „ ' I. .? ,. , 1 i . , , , . 11 ,,, , !,1 '! 1 I FACE- co . . ,.,. . 1. i ' ,. 1 1 ■ 1, II 1 .a) li . ' ED ' , ; A -. ' . ' I i , I !I ,; I' :I , VF'SIZE W/ A/V . , , SIM __.- __- --- __- ---- FIXED PANEL .‘ ' is.6..9_.:1,1 I , , :'' ': ,i I, . ' ., ' . 1 ' : 'I . , !, . , A9.2 . .. ,. . , . I 1 . , : ' CONSULTANT OD ' , : , :1 i i! li i 1 GL-2 • GL-2 ' GL-2 • GL-2 • GL-2 • GL-2 * GL-2 \ , , 11 1 !; 1 , , . , ,! . ! ,,, ;; 1. GL-2 GL-2 ; . iI 1, • •. . ' . 1 , :' 1 ; , L_1 , .1 1 . ! II 1, 1 IF ‘, : , RF-2 --. , , I ti i I' -'I : ' ' ST-2 ; , . . i ' r._____I . . -- 7f- t6 c\1 I . , .. . .. 1 , i 777 ! ,I , . .- .- 1 . ., _GL-2 GL-2 GL-2 GL-2 GL-2 GL-2 1 GL-2 I I I 1 . ii _ ;:1---- , _.,_____ __ __.,_ __7_ = .0 '=0C(1 Cpc3)., c3C) - !, 11. 1 ; . 1 .. - i 1 ' . 1 1 '• 1 11' h '.-f , 1 h 'I I 11 d ' ' Li__1, , il 11 ' , - ... . i i . , „ . 1 , n , , - i_ I' . _, — i 0 Cr 6c0 .., - ■PP- -•"-A •■■•• -1P- — WEST NOR NORTH Co a) co rmCn CO c.,P- -,7t: ' 1 SOUTH WEST 23b 23b 23 b , 23 b Z-1--\ 23 b 23b 9 ik...„. A..9._...2,i A9.2 v2...._k9.2) A9.2 A9.2 A9.2 A9.2 Q) c 7 EQ. WD-3 Ct$ 0 cite)) "S --(15 BOARDROOM 202, CONTINUED I 2 1/4" = 1'-0" 0 C CONFERENCE ROOM 222 1/4- . 1'-o- / 0 C 1.. CC -ti--Q a_ 1--- 6,-- CD) (6,9.2„) A9.2 . . i I ,-- 1 , I, i 10 EQ. 10 EQ. ......\____ — L. d,_:. I \ \ ,_i PLAM-1 . 1,0 ...„ PLAM 1 1.0 I 1 1 PLAM 1 :, cv IN 0 ' 1 I - Si1/4-- —N-..-- .--- ---" \ ........, \ - -"•*- F.E. ....j to „, ",c-.) ._, ..,-- 1 PLAM 2 COUNTERTOP & Zo 1 PLAM-2 COUNTERTOP & 1 PI LAM-2 COUNTERTOP & PLAM-2 COUNTERTOP -j COPIER IN -- BACKSPLASH 1, 1 --„, ____./.._/ BACKSPLASH IN //_/k__, INI BACKSPLASH OPEN ' 1---, --N---- —1 _...1„, .......\ ' \-- Ilinitiliilli. - Men I I - --- , 4-7 II cp ij) I 1 PLAM-1 , PLAM-1 1 , '..5) )(.1 0( • .----> C PLAM 1 ' ' PLAM-1 1 COPIER 0 L . \ I ___\______N \ \ , EAST SOUTH 8 EQ. WEST jr 9 EQ. ' WEST NOTE: EAST FACE TO , a) cp MATCH THIS ELEV. C ---- de 12 LL1 cp Lcci) A9__..., A9.2 WORK ROOM 234 i'.'-';) WORK COUNTER W 2 I 4 CO 1/4" = 1'-0" 1/4" = 1'-O" • Z C C1- 19 1 14 0 a) 1 . P. 2 4.....E crap_ c3cc>151176 A A9.2 A9.2 „ I' te, . i — WD-3 FASCIA PANEL t'2" WD-3 FASCIA PANEL ,.., a) CI) 12 cper5 , 1 \ , ,, (1) 0 > C) --Ch-C) ., ----. 1 I NOTE: ALL UPPER & LOWER CABINETS ,.. •. r- ,, _ ,.., --. , " WD-3 1..0 t, IN BREAKROOM 221 TO BE RAISED , .___ __, ___ _— __•,__ ‘ , . ' = - -=--„_-,--- - -- ' , , . -. WD-3 -co , . -- --- --- - - - -- , :- ---'- ---,' ,, ,..- ,- 2 a_ 0 111111•1■1 ..."' Cl- H PANEL CONSTRUCTION TO MATCH NEIL > • , . . , , , ,, , ,, ,,, 1 , , .., ‘,- , I' '' 1. . „ KELLY CRAFTSMAN COLLECTION, #582 ,- / , OH-1 IN " ■ RF-1 _ ,,- 7, — , ,1 , ST-2 WITH (3) 7 DIAMETER EWEING STYLE. ----_- ___-_,' -P,•____2_ a MINIM_ . — — — — — — — -- - , P-] . , .,i FINISHED OPENINGS ' - 7 7 I 1 1 ST-2 COUNTERTOP "i) COFFEE ST-2 COUNTERTOP ' ,1 ' (3= ' ' WD-3 I MW-1 AND BACKSPLASH IN AND BACKSPLASH 7,J- ---,,r-- - -,;--- --h-i ___,,,..._ H 1-------. 1 1 , ! 1. : ' 1 !1 k . ; H c:::,' ,. , .s.. -N II , , WD-3 ,! u •,,I , II II . , :,, '-' 1‘, _ . WD-3 , / - ,1 ,, , l' ,I , ,. 1 „ , , \ - . - r--- ,I. I- OV-1 I .._\____ ' — ,, . -.in 0•NORTH OUTH 3 VFY W/ 4-i '---- \N WEST VFY.W VFY.W/M FR. c:-.3 1:1-1-6 A . ) A9.2 A9.2,49.2.) ,.49.2y 0 .,,.92_, E BREAK ROOV 221 (.1) 6 1/4" = i'-0" 1,- ,--- z KJ ic'-i &Di .S) ec?"*-_)) „E- C-i) co 0 c) c) c) cp c) D C ir. A9.1 0 ,•-• c\,1 .71- t..0 (0 F_. ,1, 2 EQ SECTIONS 1 GLAZING CHANNEL-PROV1DE --63 * * * * * (i) •....., ...,=5-'" - STRUCTURAL REINFORCEMENT AS REVD. > 0 0 0 0 0 Z , - i___ I ' , . , \ • ; FRAMELESS ALL GLASS ..,....„------- RELES AND SLIDER TO • , _...-------- , DOOR AND OFFICE FRONT, TYP. MATC ITH Sheet Title 1 EXISTING CONDITIONS AT , 17-1 S 51-2 . . \ ____- ■ GL-1 GL-1 GL-1 • GL-1 I CURRENT COMMON SENSE LEVEL. 2 NOTE: LOWER CABINETS IN BREAKROOM A9.2 --,. . • OFFICES. NOTE LOCATIONS INTERIOR ELEVATIONS 221 TO BE RAISED PANEL _.- .) './. < . • (ON A2.2) WHERE SLIDER IS CONSTRUCTION TO MATCH NEIL KELLY /::: F.E.D3 / 11 „,/ \'',, TO BE EXCLUDED CRAFTSMAN COLLECTION, #582 EWEING - . , GL-1 FACE OF OFFICE (DOOR LOCATION) STYLE. :4- . . - , Drawing No 1 -,) \ (2"DIAM)STAINLESS STEEL LEGS . ,//' . . \ I . 17 de , Ii/ 7, 9,, 4' 30"CLR *".i... NOTE: SAME AT OPPOSITE FACE 'EAST \ GLAZING CHANNEL NORTH A 6 1 Scale 1/4k = 1-0" 01S_AND @ BREA< RM 221 8 TYPICAL OFFICE (FACE WALL) RELITE (R1 ) TYPICAL OFFICE (DEMISING WALL) RELITE/SLIDER (R2) 7 9 Date 05.30.07 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = Project No. 88800 0 .5° 1 2° I I I - 1 1 1 _ 1111111 1 .,,_ D v 4-,,,,,..- iii.) Aipop. ,, ..,,...., D c-..1 El? SHEET NOTES LEGEND 1.,"\->,..-- ed.,;*-- ) i:::::z.,--.3.- - NE.,..s p. HALL .--„,.. _ - 0 • 1, CONTRACTOR TO VERIFY ALL DIMENSIONS PRIOR .. i ' re'_'--'' , . v TO CONSTRUCTION. CONFLICTS SHOULD BE BROUGHT O KEYNOTE ; Q TO THE ATTENTION OF THE ARCHITECT BEFORE ,; .rr3,, ,. .4};•RECESSED FLUORESCENT DOWNLIGHT CONSTRUCTION. 0 MFR: RUDD LIGHTING: RIFT LAMP: FLUORESCENT QUAD TUBE (2-13W) F 0 2. ALL WORK AND MATERIALS TO CONFORM WITH Q • � ? I C WIDTH: 6" BUILDING STANDARDS UNLESS OTHERWISE NOTED. 2 3. ALL WOOD BLOCKING, NAILERS, ETC. TO BE FIRE RECESSED FLUORESCENT WALLWASHER a v MFR: RUDD LIGHTING RETARDANT. LAMP: INCANDESCENT LAMP REFLECTOR KIT: - Q 4. ITEMS TO BE RELOCATED: WIDTH: 6" -CONTRACTOR TO INSPECT INSTALLATON OF CEILING MOUNTED PENDANT ITEMS AT EXISTING LOCATION PRIOR TO • RELOCATION. MFR: NESSEN: NH817 METAL FINISH: ANTIQUE BRASS -MODIFY ITEM AS REQUIRED FOR NEW QUANTITY: 7 DIMS: 6"X12» INSTALLATION; VERIFY WITH ARCHITECT AS REQUIRED. CEILING MOUNTED PENDANT -INSTALLATION AT NEW LOCATION TO MATCH EXISTING MFR: HOLLY HUNT COLLECTION: SOLIS BETANCOURT •••(>•• CONDITION N TH RWI N T NIMBUS HANGING LIGHT QUANTITY: 3 U LESS O E SE 0 ED WIDTH: 4» X 7,5» 5. EMERGENCY LIGHTING, SPRINKLERS, FIRE DETECTORS, FIRE ALARM COMMUNICATION DEVICES OCCUPANY SENSOR AND ALL OTHER REQUIREMENTS TO CONFORM TO © MFR: - OREGON STATE BUILDING AND LIFE SAFETY CODES. QUANTITY: - WIDTH: 8" a$ VERIFY LOCATIONS WITH ARCHITECT PRIOR TO 0 INSTALLATION. BUILDING STANDARD 24"X48" FIXTURE o 6. ANY MECHANICAL, ELECTRICAL & FIRE PROTECTIO MFR: LITHONIA 2PM3N G B 32 0 18LD MVOLT GEB 10LS LS MODIFICATIONS ARE TO BE DESIGN-BUILD. CONTRACTOR TO PROVIDE ALL DOCUMENTATION, INCLUDING SHOP DRAWINGS, NECESSARY FOR ail © � �°- CONSTRUCTION AND PERMITS. PROVIDE ARCHITECT FIXTURE TO BE REMOVED OR RELOCATED ..,?..,1 1 N WITH ALL DRAWINGS FOR REVIEW OF LOCATIONS ` _ � N PRIOR TO CONSTRUCTION. ALL DESIGN-BUILD — — -� �- CONTRACTORS TO APPLY FOR SEPARATE PERMIT. I i co I co Q a� o DESIGN-BUILD CONTRACTORS TO PROVIDE BUILDING ® MFR: EXITRONIX 4000 LB-BA o ° � MANAGEMENT WITH AS-BUILT DOCUMENTATION AT RED HIGH INTENSITY LED Q 0 � � 0 ® O O � COMPLETION OF PROJECT. — 1 UNDERCABINET LIGHT FIXTURE o CD 7. RESWITCH LIGHT FIXTURES AS REQUIRED FOR `n NEW ROOM LOCATIONS AND AS SHOWN. v p T N • RETURN REGISTER N 8. USE FLUSH SPRINKLER HEADS AT ALL NEW GYP. � CEILING LOCATIONS. HEADCOVERS TO BE FACTORY - PAINTED TO MATCH ADJACENT CEILING COLOR. X SUPPLY DIFFUSER H 9. ANY CEILING OR WALL-MOUNTED DEVICES o ♦ .' AND/OR CONTROLS REQUIRED BUT NOT SHOWN ON o• GO THESE DOCUMENTS ARE TO BE REVIEWED AND EMERGENCY LIGHT FIXTURE SWITCHED TO COMPLY W/ v COORDINATED WITH ARCHITECT PRIOR TO N , >-' INSTALLATION. LINEAR DIFF ER 5 q 10. PROVIDE A SUBMITTAL OF ALL LIGHT FIXTURES d d d PRIOR TO PROCUREMENT. + SPRINKLER HEAD• TO PROVIDE - , • ♦ i i I %• •,' '.• 11 MECHANICAL CONTRACTOR _ IN r0 :LC: ':. ` �R, COORDINATE ( N.I 0 B •o BALANCE TESTING AT PRO T MP ,J EC CO LET W LOCATION A ITECT•a I SUBMIT COPY OF REPORT T I IN 1 O 0 BULD G I '- I J W3 ..O a •t. MANAGEMENT OFF C E i I a0 0 0 0 I EXHAUST FAN CATI N +J, , � � JJ a ota oa 0 f . ,. I I; I • •• 12. AT GYP CEILING LOCATIONS, ANY CIS ell. 8-11� CE LI G LOC 0 S AN I •O 0: .�. ° :� SWITCH LIGHT U• SW H a LIGH FIXTURE a M HAN{ A fl C E EC C L DIFFUSERS OR RETURN GRILLES JJ I ET LE -1 - � 8 1 ACT` i+ • O , a5 i r► t j . SHALL B F IN AR TYP . _ i ;�� ;'` E O L E E•_ ACT 2 ' I Ill I 0 I a N • • •.... PATH F•' O EGRESS, 0 0 0 N as ac 13. ALL UNDERCABINET LIGHT FIXTURES ARE as ll TO WIT H BE S C ED W TH ROOM OR AR I HT J EA LG S•8 10 -O o t 8 fi e e e C) - C ._ :_.. TN\\ GYP o •1 t ec. I s a 14. KEY NOTES DEMO OR RE CAT T E LIGHT ORES AS U : AT "At4 --, GYP: -�-� cv cfl _�..- • . U I R 0 - H I EV E OCATI O t!? • v O N b -a b °c c c ca ' ECTRI R N R N. PR R T R P T EL C P OJECTIO S Vl T UC U AL P R A 15. F C EE 0 DES SU O AS 50% CEILING TO REMAIN IN N OF C E L O E A INTACT 1 cn . • a R {R NT P Y i T O E U ED U { IS ROVIDED B T NANT NS ALLED BY THR U H T Q E • 0 G OU COURSE OF CONSTRU TI N. C 0 , IT) i-517:. D �n c • , • CONTRACTOR. CO O E Y !6.d FiXT R W1T W U ES H S ITCH I N T• DES G A IONS O P - G YP P.. '�.._:::< .... . . . ..... .. . .... AR TO WIT H: . ae r:. .:.. . E BE S C ED ON A 'r• f f f f f•f• q J JJ w o •,�rY. © © DIMMER, O r..„,iniarAvi 4•, ,_., .. ' 111`., ^, •'- vim.„_ - - 7:7 ':-.. 771 .. ... y. `O k '•,, _. . 4 17 ALL ELE TR A F DST T C C L EE 0 OUTLE 8 1.D :•4•v v�:•9.v`�:'?:' '}x-•::r.:r:v:•Ar•r v:•9i• -a P y .' s':�� SWITCHES ETC, MUST BE VERTICAL DROPS GYP: •f♦ FROM CEILINGS U NO EXCE 0 - PTION E CE ION OF- ,,; _ L;11 :•;• HTRUNDER WINDOWS AND , ':I • 1 � FIXTURES ON THE SAME STUD ACCEPTED. 0 ^ r ♦ 'ri rio ' 18 PROVIDE LABEL FOR EACH CIRCUIT 3 T O - PAN F R L I I I E 0 NDENT FICAT ON PURP ur _iA PURPOSES. •O _• 1 L^III' ` , �rJ i , 19 ELECTRICAL CONTRACTOR T P VI•F v. TO PROVIDE - . • L - INDENTIFYING NL BE R ...j E (....) b b b b b :.: WIT H ._. .. ..... ...:. S C AND PANEL, .....j w._. 0 fr b , _ . - : 'NM O 20 CONTRACTOR TO VERIFY ELECTRICAL o , 7 • METER AND TAG METER WITH THE TENANT S w ..f . ADDR R !T R ='➢� ESS O NS E NUM R b , ... b b G P BE METE m � INDENTIFI ATI N N M R A T , , _F:,:7 ___ - ----;_t. . r-----.7""„: - ' ,: C O U N T A BE D EN N •: _ M CI OM C n TO • ,• �:•;•, ADDRESS INFORMATION SHALL BE GIVEN v R a I . •• : i� _ PACTR T P I R U S R 0 TO T NS V N .ks E S M O E I .•fit........: 1 0 o GYP b b G • • ......._...: • • • • ..::..is,:.._'.: '+,.: • • ,.::-:. > • • :• .:+_'::�':._':. ',:• __ --, wo , • • i 1 . T 2 ELEC R CAL CQNTRACTOR TO PROVI a• v. EMERGENCY LIGHTING IN PATH SHOWN N 0 , • i • 0 PLAN UAL T 1 E Q F T CANDLE. Q 00 ..T. ©C O n�• W • Ell (1) : . 22. WHERE NEEDED NTRA T R T F R b b b b CO C O 0 U N SH b f o c7 1 AND INSTALL NEW DRY TYPE TRANSFORMERS• I,_co 2 TO PROVIDE 208V/1 OV POWER FROM THE y. n ....___ _, „ . .. ..... __. .,, .. , ... .. : _.. SYST S E TO BE BIDDER i ... : 2 © • DESIGN. N eL N A. TRANSFORMERS TO BE ENERGY STAR r-- b b b b b LABE LED 'o CD . .) B. CASE TO BE TOTALLY ENC WITH 0 v LOSER o _.r b n n o- ••i.•�,of�'•w:•j:�•,' , ' £: LOUVERS TO PR NT F { a> EVE ORE GN OBJECTS _ '. E N t� r _ o CO .i - M i._.. '. "., v__.. .. ..,� :. :• is. •',�• ... ....... . .x• INT O • • • • - C ENCLOSED AND VENTI T AIR LA ED CC• .. COOLE TYP H INS• C) C LO a_ 1..._ D E CLASS T N I N ULA 0 DES G E U f O , oo e FOR 115 DEGREES C TEMPERATURE RISE 0 > 0 ccs A T 4 0 co 0 0 BOU 0 DEGREES AM ES C AMBIENT 0 BE E E E r $ 0 AT FU A NTIN OPERATION. ^ L IP , A -a • WITH 2-1/2 PERCENT ANFC TAPS AND FOUR - ' • • • 2-1 2 PERCENT BNFC TAPS. MAXIMUM SOON•i LEVEL SHALL BE NEMA STANDARD WITH•O CO O © 1 i n _ , r�..x,,: •.�..�••.•••. •: '.•.•••.•'.• N THE CORE AND� �- �;.,�..:.,�,'• .:�';.���• ISOLATION O LATI 0 N DAMPERS B ETW E E f . . COIL ASS M Y E BL AND CASE. C ' n J - 't. =�`:�.. 23. FOR FLOOR POWER AND DATA ACCESS cp a ' ....... _ • } , T r } a r s r x , r r f r. . ♦ r r ••t a ♦ r r. _... ... '.. .. ............:....:......._........ :.......:. .._ _ FLUSH POKE THRU• • 1. USE WIREMOLD R 7 SERIES• •• SER OR EQUAL. - •; ' • ,n • COMMUNICATION SYSTEM BY FUTURE ' <. '• TENANT. O ' 1111111• . ,,,,..- ..m 25L...1 N Y MANA M N G E ERG GE E T IS a • . SF AND • w ( GAR • N BUlLDIN EAS 0Q S cn -. LARGER.............. 26. OCCUPANCY CONTROL DEVICES SHALL BE c N co (D c•-?. O LEVITON OR WATT STOP, (0 CO N-: r,•` U �, 00 © oD 27. CONTRACTOR SHALL TEST ALL LIGHTING N d' (Z c� rz CONTROL SYSTEMS TO ENSURE THAT CONTROL li 0 0 0 a 0 Z . DEVICES, COMPONENTS, EQUIPMENT AND � 0 0 0 a 0 Z < < < < < C) SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. SEQUENCES OF Sheet Title OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THAT THEY OPERATE IN LEVEL 2 ACCORDANCE WITH APPROVED PLANS AND ACTED SPECIFICATIONS. CBUNG PLAN Drawing No. A7.2 Scale 1/8" = 1'-0" Date 0530,07 Project No. 88800 0 .5" 1. 2" =117-E1::::=1:=Ed d' 0 c°v �� MIN 20 GA STEEL TOP TRACK MIN. 24 GA STEEL WALL STUDS, GENERAL ,. 4Pe �1) - 4 ..e... 2. v HEADER M S€ NOTES: F50-2P `' 7,,,,,...> E SCHEDULE ABOVE 2 / � TRACK FLANGE W/ 2 #12 EA. SIDE TYP. 1 NOT USED. • Q \ / OPENING >6'-0" L2X2 12GA ) Ti r ler7 ' • \>< W/ 3 #12 EA LEG TYP. 2) PARTITION TYPE SYMBOLS ARE INDICATED ON PLANS, WALL SECTIONS AND DETAILS. IF NOT / \ MIN. 24 GA STEEL WALL STUDS, v /�' INDICATED, THE DEFAULT PARTITION TYPE IS N.9A2S. o / \ I` 24" O.C. MAX. \ •• MIN. 1 20 GA JAMB STUD OR '" 6\ 2 \ ( ) 3) FIRE RATED PARTITIONS ARE TO BE FIRESTOPPED AT THE FLOOR AND CEILING SUBSTRATE \ Pi_CD (2) 24 GA ABOVE. +� OPENING >8'-0" L2X2 12GA W/ 3 #12 EA LEG TYP. 4) STUD SIZE, GAGE AND SPACING INDICATED IN THE SPAN TABLE SUPERCEDE SIZES INDICATED 2 1 SILL- SEE SCHEDULE ABOVE IN THE PARTITION TYPE SYMBOL. VERIFY ALL VERTICAL STUD SPANS. -...'� MIN 24 GA STEEL BOTTOM TRACK 5) ALL GWB TO BE 5/8" TYPE "X" UNLESS OTHERWISE NOTED. 1 TYPICAL HEADER, JAMB & SILL FRAMING F50-4P 6) ALL STEEL HEAD TRACKS 20 GA UNLESS OTHERWISE NOTED. NTS 7) ALL DOOR AND RELIGHT JAMBS TO BE (1) 20 GA STUD OR (2) 25 GA STUDS. T� WALL LATERAL BRACING: 8} NOT USED. ill • 12 GA. STL WIRE © 5'-O" O.C. BOTH SIDES, EXTEND AT 450ANGLE FROM 9) ACOUSTICAL SEALANT, (2) CONTINUOUS BEADS UNDER BOTTOM TRACK AND AT PARTITION END Illai=Mll.„ PARTITION HEAD TO STRUCTURE ABOVE. WALLS ABUTTING ADJACENT SURFACES, TYPICAL AT ALL PARTITIONS. SUSPENDED TILE CEILING IIIIIIIiIIIIP!!!..:!!![/1_! 11111 NEOPRENE FOAM TAPE 10) ALL WOOD IN ASSEMBLIES SHALL BE FIRE-RETARDANT TREATED. I IQ CONT BETWEEN BLOCKS 11) NOT USED. +-� SOUND ATTENUATION CONT. METAL CASING BEAD E. BLANKET 4'-0" E.A. Orli� � FAST N �i I II E RUNNER TO CLG SUPPORT 12 ALL EXTERIOR WALL FURRING TO BE THERMALLY INSULATED. z SIDE OF PARTITION r 0 2'-0" OC THRU NEOPRENE BLOCKS ) AT "S" WALL TYPE o Inl� �'�l SOUND ATTENUATION BLANKET 0 S 13) NOT USED. CENTERLINE STUD III. ���I ) ON PLANNING Will SEE PLANS FOR PARTITION TYPE U GRID MODULE OR N - ACOUS SEALANT 0 S 14) ALL INTERIOR WALL AND CEILING FINISHES TO BE MINIMUM OF CLASS II FLAME SPREAD. AS DIMENSIONED 6111 s, TOP OF SLAB 15) USE WATER RESISTANT GYPSUM WALL BOARD ("WRGB") AT TOILET ROOMS, JANITOR CLOSETS, aDI o < O WATER COOLERS, SINKS, AND WALL TILE LOCATIONS. DI CO co SECTION: TYPE "C" PARTITION HEAD -I N D o 21 SECTION DETAIL AT GLAZING CHANNEL VRP26 17 SECTION DETAIL AT OPERABLE WOOD PANELING VRP23 10 SECTION DETAIL AT BOARDROOM 202 VRP22 STUDS EXTEND TO ACOUSTICAL TILE CEILING M354-1P a) a> cv rn \' — SCALE: 1 1/2" =1'-0" SCALE: 1 1/2" =1'-0" SCALE: 1 1/2" =1'-0" SCALE: 3= 1'-0" i -CI C IY. cv WALL LATERAL BRACING: < R 12 GA. STL WIRE ® 5'-O" O.C. BOTH PARTITION RATING l � ..c 1 I (, '---;---, STEEL STUDS , . SIDES, EXTEND AT 450ANGLE FROM n . _\ I ,.:: 5/8" f I PARTITION HEAD TO STRUCTURE ABOVE. NON COMBUSTIBLE • FI : ( ;. ,.:: 5/8 TYPE X GYPSUM WALL BOARD EA. .. '�=, I � ., ; SIDE. USE WRGB � C.T. FINISH .� RUNNER CHANNEL 0 GYPSUM Q,� � „.... . r' ,/ BOARD CEILING 1 1 ,� r N }_ N �•x. I Liiiii:� TAPE OVER ACOUS SEALANT @ S PARTITION RATING (IN HOURS) co p (,��. �� . , FASTEN RUNNER TO CLG SUPPORT PARTITION DETAIL NUMBER L. o in ),.• ACOUSTICAL INSULATION 'S' TYPE WALLS III* ::' © 2-0 OC 0 o• . PARTITION HEAD CONDITION �- I- ..�:_L STUD DIMENSION .'-' �-+ 1/11161111521 SOUND ATTENUATION BLANKET S V CENTERLINE STUD I�j, III INSULATION TYPE GO ON PLANNING 111111111111 SEE PLANS FOR PARTITION TYPE _ GRID MODULE OR ACOUS SEALANT 0 S s= SOUND ATTENUATION BLANKET U 0 AS DIMENSIONED ` � TOP OF SLAB PARTITION TYPE SYMBOL >a- SEE PLANS & DETAILS FOR LOCATIONS TYPICAL GYPSUM WALL BOARD SECTION: "C" PARTITION TYPE SUSP. GYP BD 0 PARTITION CONSTRUCTION F521-1P 0 STUDS EXTEND TO SUSP. SYP BD CEILING M344-1P CLG CLG SCALE: 3= 1'-0" STC 45-49 AT 1-HR SCALE: 3" = 1'-0" 2 3 4 5 6 7 LINE OF I A9.1 A9.1 A9.1 A9.1 A9.1 A9.1 STRUCTURE ° 4 FLOOR OR ROOF SYSTEM: CONC. & /OR ' . . 4.. . 4 . 4 4 . STEEL 1" 'Z's 0 24"o.c. - _ - - - ABOVE o•v , o STEEL DECK W/FIREPROOFING • ° .4 SPAN FLUTES I € co ° PACK CAVITY W/ SOUND ATTENUATION -MI (2) FLU ES M N. I F ( BRACE o / r TACK WELD TO DECK � I 0 BLANKET _■ I I = I SUSPENDED r" 7 7 " „ " - STL DEFORMED TRACK CEILING 18 GA Z CLIP @ 24 O.C., SPAN (2) STEEL ROOF/FLOOR " -- — — a ° / 1 \ FLUTES MIN. TACK WELD TO DECKING DECK - SEE SECTIONS \ \ / / - 2 1/2 STL STUDS n II I I ccs a PRIOR TO FIREPROOFING. PAIR AT EA. DOOR JAMB I II f ( l N FOR TYPE \ / ALTERNATING l�'� �``'`� 1/2" DEFLECTION SPACE SEE PLANS FOR I , ,ennnnuuuu„ a- n, ttten ttttt,.. . STL DEFLECTION TRACK nrciotamummmun• -^ % �( T W/2" PARTITION TYPE lV C _ HEAD TRACK: 20 GA. W/2 DEEP LEG W/ •� w/1" DEFLECTION SPACE - l l k O o PARTITION TYPE .- (2) #8 TEK SCREWS TO Z CLIP @ 24" CEILING PER x �� or o p• AS SCHEDULED - O.C. SCREW GWB TO WALL STUDS MIN SCHEDULE , z, Y y -` ) X a GYP. BD./ .f..# CU l) CD 5= SOUND ATTEN. 1/2" BELOW TRACK LEG. Y c° ' �: V`/ Y 1 STEEL STUD t/? C!) BLANKET I I :: CENTERLINE STUD P " '' INSULATION 4'w. EA. SIDE OF i $ • �- O (0 D 0 CANNING GRID �„_ CO/ c� „. iwnum^�imtuu �• ••. . , PARTITION 'S' P LI A V OI..• MODULE OR AS DIMENSIONED ,� F INSULATION 0 'S' CONTRACTOR ( 0 c� SECTION: TYPE "A" PARTITION HEAD SECTION: TYPE "P" PARTITION HEAD OPTION OPTION AT CEILING TION 0 po IZ SECTION DETAIL AT A V CABINET VRP24 NON COMBUSTIBLE PARTITIONS - M354-2P I - / F514 1P 4 STUDS BRACED TO ROOF OR FLOOR SUBSTRATE M354 2P SCALE: 1 1/2" =1' 0" SCALE: 3= 1'-O" SCALE: 1 1/2= 1'-0" PARTITION HEAD CONDITION • . .� 4 . • . INSULATION . 4 . . ' , • 4 0` . •' '. ' STUD DIMENSION SOUND ATTENUATION THERMAL INSULATION . .4 .,. 0 . STL 1" 'Z"s © 24"o.c. SPAN 2 FLUTES MIN. 7/8" HAT CHANNEL DETAIL SPECIFIC DETAIL SPECIFIC Y" GYPSUM BOARD STEEL ROOF/FLOOR DECK - SEE SECTIONS � ( )TACK WELD TO DECK - - ADHERED TO (E) FOR TYPE ';: STL DEFLECTION TRACK 1 1 5/8" 1" UNO. 1" UNO. WALL :'?--N>-',1, w/1" DEFLECTION SPACE SEE PLANS FOR .�.f 2 2 1/2" 2 1/2" UNO. 2 1/2" UNO. PARTITION TYPE :>>: _.�' STL STUD 'x" . INSULATION 0 'S' 3 1/2" 3 1/2" UNO. 3 1/2" R 1 1 UNO d N CEILING PER � c ,>-,'.- SCHEDULE :' ,:. 5/8" GYP BD., TYPE 'X' . \ - . r",�: . EXTEND TO DECK ONE SIDE 4 4" 3 1/2" UNO 3 1/2" R11 UNO 41 / , CD ,\ (BOTH SIDES 0 RATED .....1- uuuuwuumuuuuc UIumIuuu•• • '`K:x • uum uummmmuuumuuiumI PARTITIONS) - DO NOT LOCATE 6" 3 1/2" UNO. 5 1/2" R19 UNO. ( ` (_,><".*, SCREWS CLOSER THAN 1 1 1/4" - -- -_ f». FROM BOTTOM OF DEFLECTION 8 8" 5 1/2" UNO. 5 1/2" R1 9 UNO. '�� / SECTION: TYPE "P" PARTITION HEAD TRACK - -- ---- -- ;�I STUDS EXTEND TO ROOF FLOOR DECK M354-3P ROOF/FLOOR STUD DIMENSION, INSULATION TYPE SCALE: 1 1 2= V-0" F50- 1 P / / 3/4= 1'-0" a) c) , FLOOR OR ROOF SYSTEM: CONC. & /OR N d j j ° v , . °a • STEEL DECK W/FIREPROOFING WD-2 ' I ! °� PACK CAVITY W/ SOUND AI I LNUATION SPAN TABLE Z C / j BLANKET INTERIOR NON-BEARING STUDS (U.N.O.) >);BASE -r- . © .1- - 18 GA "Z" CLIP 0 24" O.C., SPAN (2) SPAN SIZE GAUGE SPACING L��'!^^•� 2j i ' ° ' / \ FLUTES MIN. TACK WELD TO DECKING • vJ II 11I , - PRIOR TO FIREPROOFING, 3 1/2" 24 16" 0.C. N , 1 i 4-0 - 3 1/2" 20 24" O.C. Z c a- I_ I ' '.4"'L.-- 1/2" DEFLECTION SPACE <14'-0" 4" 24 24" O.C. c� a) FINISH FLOOR AS .. HEAD TRACK: 20 GA. W/2" DEEP LEG W/ w o SCHEDULED II ! PARTITION TYPE (2) #8 TEK SCREWS TO "Z" CLIP ® 24" 6" 24 24 0.C. g§, j I I AS SCHEDULED �` O.C. SCREW GWB TO WALL STUDS MIN 3 1/2" 12" 4"I' CO Co a i C. SOUND ATTEN. . . ' ` 1 2" BELOW TRACK LEG. " 18 12 O.C. 0 p :M / 14-0 u) _co Ij i; ilili,ll ` !';I' ;ii'I ll i ►!;I I `'l I BLANKET 4" 20 16" O.C. v�? � c�I}�. �; i� I!! !il 4i!I'. l+!I !j �i i Filll ;iii i t ! CENTERLINE STUD ON PLANNING GRID TO " U Q�0•. MODULE OR AS DIMENSIONED 19'-0" 6 24 16 O.C. o ,° 6" 20 24" O.C. O U C co o -a-5 WOOD BASE @ GYP BD OVERLAY ON (E) WALLS SECTION: TYPE "A" PARTITION HEAD 19'-O" 4" 18 12" O.C. a — a_ '- SECTION DETAIL AT GL-2 PANEL VRP25 14 " 1" NON COMBUSTIBLE PARTITIONS F514-1P TO 22'-8" 6" 20 16" O.C. 19 SCALE: 1 1/2" =1'-0" SCALE: 1= 1 VRP16 SCALE: 3= 1'-O" 6" 20 12" O.C. >22'-8" 6" 18 16" O.C. • v • FIRESAFlNG PER MFR. TO NOTE: DOUBLE STUD WALLS - PROVIDE INTERMEDIATE v °4 ACHIEVE REQ. RATING BRIDGING © 4'-O" MAX. AS SHOWN BELOW: CARPET � ' • 1" STL 'Z"s 0 24"o.c. 2 - #8 SCREWS THROUGH N • . SPAN (2) FLUTES MIN. 2" BENT LEG, TYP, \ _ CD 4 t: TACK WELD TO DECK - - p K LOCATION OF SURFACE ° BRIDGING r - SCORING EDGE METAL STL DEFLECTION TRACK w/1" DEFLECTION SPACE STUDS THINSET STONE TILE ,,_ 5/8" GYP BD. TYPE 'X' ��i;i�ll,��iil�i��ii�iii ��i��i���u!{���� STEEL ROOF/FLOOR k.. !� EXTEND TO DECK BOTH SIDES W EQ EQ EQ EQ _ DECK - SEE SECTIONS I -� DO NOT LOCATE SCREWS to .�' ,� ,► FOR TYPE �. �` CLOSER THAN 1 1/4" FROM HEADER & SILL SCHEDULE Z �'1 FLOAT FLOOR 1's" ® CARPET SEE PLANS FOR (� BOTTOM OF DEFLECTION TRACK OPENING HEADER & SILL JAMB P. ° p ° O �_ PARTITION TYPE c�v ~ o WIDTH CONFIGURAl10N STUD c11 N p O f` l� CONCRETE SUBFLOOR STL STUD 01-0" c9 o r' o ° INSULATION 'S' TO I I STUDS o o O -� TRACK 2 STUDS 0 N 71- t0 F-- -, SECTION: TYPE "F" PARTITION HEAD 41-0" -I I- '� •/ \ / \ 0 STONE TILE TO CARPET VBC-002 0 © FIRESTOPPED PARTITIONS F524-1P I I - I i - - _ I _i \ 4'-0" �-i I 24 GA TRACK a p [] C� O CC \,�`,/ HALF SCALE SCALE: 3= 1'-0" TO (2} STUDS 2 STUDS < < < < < U 6'-a" a 2a GA TRACK Sheet Title W FACE OF STUD 6'-O" f; ;-- 20 GA TRACK INTERIOR DETAILS SEE PLAN FOR CARPET & PAD ! I PARTITION TYPE 8,-0" .. (2) STUDS 3 STUDS ! CONT. 16 GA X 6" MTL. 20 GA TRACK REDUCER STRIP I STUD OR PLATE 3 STUD MIN. SPAN, 2' x 4' TYPICAL A.C.T WELD TO 20 GA. STUDS. I I ACCEPTABLE LOCATIONS RESILIENT FLOOR I I ,_ " I I- ` 20 GA TRACK Drawing No. I � 1 8 0 � 9 (2) #10 X 5/8" PAN HEAD TO (2} STUDS 4 STUDS FOR DETECTORS, SPRINKLERS, scREws ��� EA. STUD MIN 10'-0" 1 q S A9.1 PEAKERS & LIGHT FIXTURES 8 G TRACK CONCRETE SUBFLOOR i I 1111 IHIiIl II H III 111111 -T-- ,a,_a" i 1=--18 GA TRACK CONTRACTOR RESPONSIBLE FOR DETERMINING TO (3} STUDS 4 STUDS AND COORDINATING BACKING PLATE LOCATIONS ,2,_a" 18 GA TRACK Scale AS NOTED !'/ INTERIOR PARTITION SYSTEMS Date 05.30.07 PLAN TYPICAL HEADER, JAMB & SILL SPAN TABLE AND SCHEDULE 20 CEILING MOUNTING LOCATIONS M175-1P 16 CARPET TO RESILIENT FLOORING VBC-OO1 SECTION - TYPICAL BACKING PLATE F5112-1P project No. 88800 1" = 1%-.0" HALF SCALE $ 3" = 1'-0" N.T.S. F50-3P 0 .5" 1„ 2" III , 111 1111111 i kIL CD N • x14 HEAVY TIMBER a) L SCHED. WALL - PROVIDE Ackil.) 3 T W II) » BLOCKING AS REQUIRED » » � ' "4 °, �, EXISTING WINDOW U SYSTEM i L-2 RECESSED INTO / 3-0 CD ih TO ALIGN W/ CREDENZA /2 / :+-1 HEAD & SILL ST-2 ITERED CORNERS, TP. ST-2 L1GN ALIG I ,t, \ . \ 1 I � . .y,.. ..t.}. ,�'k x 4. .N �i r.<k •x�.,�. .,� �.. ..Xaf. •l. ;.>a �d. <�R ............................ ... ..... ...... .. .. .... -. ..........._................__........ .... •> �.fil:' OF §'''C'' jWALL CLEAT � 1 -6 U01 �ho LCD RF-2 +-, WD_2 j .i - , ' I/ FIXED SHELF W/ o 0 0 \ t » SCHED. PLAM ON ALL ir: / / C 0 :; OADJ SHELVES - 3/4" MDF o �� 1'-6" T.O. SHELF -�► VISIBLE SURFACES / CABINET BODY- W PLAM-1 ALL SIDES • ►� EL. 6 O il 3/4" MDF ° , °PROVIDE 4 MTL SUPPORT CLIPS : g WD-3 • / W/ PLAM-1 ;• ° G ; , PER SHELF Sc MOUNTING ° `0° ' 0 .: °HOLES 1 OC IN END PNL� i .1 VP - % �� ° i CUSHION FAB-1/ • ►� PROVIDE BLOCKING Jrrr FULL WIDTH X / % ♦� AS REQUIRED ?i FULL DEPTH % { ° ° ° • » ' /"``1 1/2 WD-1 ! STAINLESS STEEL % "' ° ° ° . 1 -8 CLEAR kremeramsmangsspirmarassawm WATER TIGHT BASIN •"x14" HEAVY TIMBER I o o o o :<:> ° G p A81NET BODY-3/4 MDF " COAT ROD .„,„., 1:" (SIM AT HEAD & SILL) G MDF W PLAM-1 ° iJ ►♦ e FINISHED TO MATCH D 1 ►, WM G o o ►�° ° p p _ AT ALL FACES AND RIB c • 1 ° .o ° RB-1 RECESSED BASE �. EXPOSED EDGES co I o . ., o o . .j ►/ iiii .. -.K. ------------------------------ I: f a ° G PLAM-1 BOTTOM SNE�.F '"""""" "" """""" WD 2 {\ WD-3 BASE �,i .... co c Pi CO 1 (2) CONT 2"W BASE RAILS :NO NOTE: TOUCH-LATCH �a p V)) HARDWARE AT DOORS. FIN. FLR. 0 ,•. WI STRETCHERS 0 OC ,.;;, �- \ % } . .:!::..;:,..::..<" 1 � 1`.,1,..:.:: � 3" FINISH FLOOR - SHIM CAB 3" NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED /��:._ NOTE REFER TO SPECIFICATIONS FOR SCHEDULED :> 1'' ' / / AS NECESSARY TO LEVEL / HARDWARE HARDWARE i ©� do- : -- SPACING FOR SHIMS � c w o U I 0 SECTION DETAIL AT PLANTER VRP19 PLAN SECTION DETAIL AT LCD SCREEN/GL-2 RELITE VRP18 SECTION - ISLAND CABINET Wf DOORS VRP-17 SECTION - CREDENZA VSBOO2 SECTION - BENCH VRP12 SECTION DETAIL - COAT ROD AND SHELF N242-1 CO N 21 1 1/2" = 1'-0" 1 1/2" = 1'-0" '- 1 1/2" = 1'-0" 9 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 0 CABINET BODY - 2 -0 U.N.O. �C N,. � 1'-1" FINISHED CEILING �∎ 8'-6" #' " f OD LL 3/4" MDF W/ PLAM-1 -,�--- 1)-6" BACKSPLASH 0 RETURN 24" © FACE, EDGES, , » FINISHED CEILING / > WALL, WHERE OCCURS 1 -2 UOf © 8 6 U.O.N. �► _ �-- / /AND ALL OTHER f y .; �.-- CABINET BODY-3/4 MDF W/ PLAM -'l (J) �. o EXPOSED SURFACES SCHED. WALL - PROVIDE 0 FACE & EDGES MELAMINE © "r--. 0 1 -1 ALL OTHER EXPOSED SURFACES - N N BLOCKING AS REQUIRED . T.O. CABINET CABINET BODY-3/4" MDF EL. 7 -6" U.O.N. - • .. u ,'' '.. `; as cO W PLAM-1 © FACE & EDGES N ,'.'.':'.:' :•:. , ;,w; :� x SCHED. DRAWER SLIDES, o ...............................•..,.; MELAMINE © OTHER °� : 0 O -CD ° ° •...........••.•..•.......••.•.•. ,. 4 CONT LEDGER ATTACHED c ��..! 2 ► o o X. ••! w EXPOSED SURFACES TO FACE OF WALL ` �, R SCHED. WALL - PROVIDE• ►♦� o o "` 0 0 i c° - 4 BLOCKING AS REQUIRED : -}-•' " 0 PLAM-1 ADJUST. ° 11 1/2 0 o ! .:�' +-� GO ►' SHELF ° TO NFACEDOFRWALLACHED �_---- FACE OF WALL (PROVIDE v 0 ►.'I --r:.:.:>nie:��::::rAr♦.4r24 1::..:!:.:1♦�.�:�:r.�:�:r♦�:�:�:;.."...���♦. o o G O �•4 \ 4. :' } _ •• CONT BACKING TOP & BOTTOM) ,�) a Q >-. ::. 0° 0 AT 1 O.C. W 4 PINS 0 cn ° c (PROVIDE CONT zo f ° p AT 1" O.C. W/ 4 PINS ° :co , o p PER SHELF, TYP. o p ° BACKING TOP & BOTTOM) Q 1/4" PLYWD BACK W/ MELAMINE o PER SHELF, TYP. ►♦i ° 0 H I- ° 0 z a a j♦j ° ° 0 Q o 0 I Li• 0 0 i ;; O 0 a ° W W ° 1/4" PLYWD BACK Cn w o o o co ■4 0 0 0 0 V - n W/ MELAMINE 1/4" PAINTED MASONITE SHELVES 4 ° ° CD Et4 ° ° o ET c ° p ! >:co ■" PULL-1 P ° a 1 ° ° 4" W RAIL (4 TOP & 4" ° ° s cNv 4��.!fit_____...e....A�.......'...._'.?_.z.��.._T_.-_i .-_-.'! _ I_I _ ° �. i� BOTTOM OF CABINET 4 W RAIL © TOP & IL/ ° a �� .— BOTTOM OF CABINET a:5 0) ..._.. ...... ......... ❖ -- 1 o I i: : O . SCHED. FIXTURE. RE: N _ 1 0 0 it - 3 4" SCRIBE PLAM BOTTOM SHELF OD Cr) ■ -- - - ----- ----------- - ----- ----------- / ELECTRICAL DWGS. FOR ;•, ;. CO ,_..s;�-.--.-.-. �• 3/4" ADDITIONAL INFORMATION PLAM-1 © BOTTOM OF SHELF :: ,;,,.•• zis (i) (:).,(...0(`' :� ;. 3/4 MDF W/ - SCRIBE i "d- . PLAM-1 UNDER-CABINET LIGHT 3" ,� ~ c — 3/4 MDF W/ NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED WHERE OCCURS UNDER-CABINET LIGHT NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED c �►.� o o r-- -_ ---� PLAM-1 BEYOND HARDWARE SEE lNT. ELEVS HARDWARE 3 _ co a) 0 r 1- _ `- LG MICROWAVE SECTION - UPPER CABINET W/ STANDARD DOORS N232-5 SECTION - UPPER CABINET W/OUT DOORS VBC-015 SECTION - UPPER CABINET / PAPER SLOTS VBC-o11 SECTION - BASE CABINET W/ DOORS AND DRAWER N232-10 , w (23 7/8"W X 19 3/16""D 14 1 1/2" = 1'-0" 10 1 1/2" = 1'-0" 6 1 1/2" = 1'-0" 1 1/2" = 1'-0" M X 13 9/16"H) 111 FLUSH MOUNTED ! DUPLEX OUTLET " » 2'-O"-0 U.N.O. 2'-0" U.N.O. : , » BACKSPLASH @ RETURN __ , " ' SEE PLAN • 2'-0" U01 _ WALL, WHERE OCCURS 1 -6 BACKSPLASH 0 RETURN / / FACE OF WALL BACKSPLASH 0 RETURN WALL, WHERE OCCURS BACKSPLASH RETURNS WALL, WHERE OCCURS 3/4" MDF W/ if- \ _ � r.-.;;-N..-;•;-5,∎.♦ �•;•;;;- -;er;; PLAM-1 SCHED. SINK, RE: MECH. ': PER ELEVATIONS .� ►'4''7`''F '; '''., ti4 — DWGS FOR ADDITONAL :� - __ �__T- -- - BACKSPLASH & COUNTERTOP- .::3, `� INFORMATION ►'� r;f' DRAWER SLIDES, ST-2 d- \ SCHED. DRA E SL DES . ...... ........y . ? y ;,�, . N �, * •L .■ 4,, . 4,,• SCHED. WALL PROVIDE _ r SCHED. WALL PROVIDE _ CABINET BODY 3/4" MDF W/ ;.� SCHED. WALL PROVIDE .`♦: BLOCKING AS REQUIRED e7-SCHED. AS REQUIRED �- PLAM-1 I a ° BLOCKING AS REQUIRED • II>;• •; "' r- ,= . .. ,- ;! I AND ALL OTHER EXPOSED SURFACES -; ° ° ,:. , ►♦ O •4 af. •tin`' ->r: V.CO 0 ° .4, -, \ I 4 W RAIL ® TOP & BOTTOM ':, °': • ': M ' ALL EXPOSED PIPING TO ° ° c CLR. ! A w OF CABINET ♦�;<..::::.::o.:.:;...::.::.::.:..::..:.. :.::. :.:.........::....;:.::.::.:::.. :.:.:::::::::..::::...:::.:::-:: �. >� BE PROTECTED, TYP. 0 ° :'', ', o o , PROVIDE 5MM DIA. HOLES a o PROVIDE 5MM DIA. HOLES C PULL-1 TYP. AT 1" O.C. W/ 4 PINS Q�• ►� AT 1" O.C. W/ 4 PINS z ° °0° 0 :• N » ,� --- a ° o ; i - - - - - - — — — — a ° PER SHELF TYP. ,,, ►., ,; 8 MIN o PER SHELF, TYP. o ! r ;; o ° `. \ ,� // : o o � W � = .0- .. p o 90,?irk i 1 � r '' N ►: 1 4 \ ,__, - HOT WATER HEATER = ► 0 . w - ■ N a a w I (18 1/4" H X 18" DIA.} c 0 (� ;4 i PLAM-1 ADJUST. i, --" Z ° Z :4 : ; 0 0 — I i 0 0 ° ' SHELF (� ►♦i ° • • 1 a a W o a , +'� • '� : 1 W 1/4" PLYWD BACK p `- ° SEE ELEVATIONS W 0,,4.. �♦���♦♦-.-��'.41.�������•����+•♦•♦��411.,.�+.4, .♦+�-♦w♦+�,�1�♦�♦•♦4.4., .1�♦� •. , CV ° 0 h I FOR FINISH r� , o OPEN FOR -- a 0 ° 0 i o o V,/ WHEELCHAIR 1 �- ►�i o o ; i a o N t ACCESS ■' a a I -- ! , ° ° Z C � � ;� z ! RECESSED -f MELAMINE BOTTOM SHELF _• 1 :� -s"- ;_ / L: .: -.°°:.;:-.::r:.y•. .:r... ,�>::...,...... : RB-1 BASE & CABINET INTERIOR -\ O ° p o• „:„ ., . ,,, .: ;:::*\ -,... . .., .. `- / :` _ s (2) CONT 2"W BASE RAILS :.•. CO 1- cN - `' I: W/ STRETCHERS @ 24" OC ♦ ♦ < -- V? O co 3 6 MAX. 3 3 I o L / / / / , 3" - - � � NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED O > ® � � NOTE. REFER TO SPECIFICATIONS FOR SCHEDULED 3 FINISH FLOOR SHIM CAB o NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED HARDWARE ' / AS NECESSARY TO LEVEL HARDWARE a (.) - co a_ I- Ti) DETAIL HARDWARE 0 TYPICAL PANELING DETAIL SCALE: 1 1/2" -1'-O" VRP2o 19 SECTION - VLRP1 3 ADA BASE CABINET W/DOORS AND SINK SCALE: 1 1/2" = 1'-O" N232-9-ADA- 11-ADA--ALT SECTION - BASE CABINET W/ DOORS AND DRAWER VBC-017 1 1/2" = 1'-a" SECTION - LOWER CABINET W/ HOT WATER HEATER VBC-013 1 1/2" = 1'-0" SECTION - BASE CABINET WZDOORS 1 1/2" = 1'-0" N232-8 © MICROWAVE/REFRIGERATOR CABINET SCALE: 1 1 j2 = 1 -0 COUNTERTOP - 3/4" MDF BACKSPLASH RETURNS FACE OF WALL PROVIDE 2'-0" U.O.N. 2'-1" W/ PLAM-2 © FACE EDGES PER ELEVATIONS CONT BACKING TOP & " /'L AND ALL EXPOSED SURFACES. PENCIL TROUGH 2 1 -6 BACKSPLASH @ RETURN 0 -6 BOTTOM -- WALL, WHERE OCCURS 0 7" ST-2 4'-0" ----- - .,i,• BACKSPLASH - 3/4" MDF _ y;? ST-2 TOP WHERE C� W/ PLAM © FACE & - - `� Y' � OCCURS .:; .........., �, ������•�`�'� •��'• _ '�'�� /' :- � ❖. ALL EXPOSED EDGES �- - - . ., Z. . : Air ........... CABINET BODY 3/4 .:� to PLAM-2 / _ SCHED. WALL PROVIDE �o r MDF W PLAM PANEL BEYOND N ;, a 0 0 --� } •a.' :, COUNTERTOP END PNLS - / BLOCKINCAS o r o ❖ REQUIRED o ,:, It FACE & EDGES MELAMINE ,� i Lb- O0 ::: r___ ____ _ ____ _____ 1 �� .X © ALL OTHER EXPOSED N ° °�- U I a ° ;.; G SURFACES - s cin o 0 0 o CD n co DRAWER SLIDES PER » SCHED. DRAWER SLIDES ° - .�•. 4 W RAIL © TOP & U-> ,'• I ° V ,.� ;i8 J G SPECS ;, BOTTOM OF CABINET TYP. '> 0 0 z 3/4" MDF W/ WD-3 FACE, c: ADJ SHELVES - 3/4" MDF I ��' s 1 I EDGES, AND BACK. ,� -:iii 1 44 ° ° W/ PLAM-1 ALL SIDES ° ,.; DRAWER 3/4 MDF z -._�..n.,. ,._. i, 2 PROVIDE 4 MTL SUPPORT CUPS FRONT 1/2 SIDES & o cam"' ° ° ° PER SHELF & MOUNTING .. �•. ° - 1 '.• o - 4 PULLS, TYP. BACK, 1 4 BOTTOM W _ W t') • I HOLES ' 1" OC IN END PNLS o o .;. p p • 4f ° ;:;; Sheet Title ;�, I PLAM © FACE & EDGES, ■ }'�, :: ,-:., :•; >> , , :� ,,, ;,>: .'a�:;,'.^ ;v r:>.,... '., MELAMINE DRAWER INT 1 c �.� ,A. >:ti-„..^ .:1 • . M ELAM N E © D i INTERIOR DETAILS I:3. n tT i :'` -- - - - - - (WIRE PULLS TYP) 1 RECYCLING CONTAINERS N.I C. n ° ! ,. .•. x MDF W/ PLAM ? @BOTH SIDES Q y RB-1 RECESSED BAS ;,.. �•. _ ,.:.. Drawing No :.;:•. ,•. C p ° �;� ,. r .. RECESSED � --- •�•PLAM 1 {� BOTTOM SHELF BASE, RB-1 1 4” MDF BACK �--- -�--- I„, (2) CONT 2"W BASE RAILS W/ / .•i��! --���% ( J / i .. '>S :i T� .. STRETCHERS 24” OC (... .:_,.'�: . '.. '_.`r •.I..... ... ........ .............................:............ .. '. ', :) :•• .•1' •' , o�.0,.........iif..,.•.ii.1V..W.,iii i.a i i iai i r i❖.i ii a,iii ai•.s i• ••Ai i..i. •0.0 :: :: .r (2) CONT 4"W BASE `' �* 4... , a ,,,,,,:\ ,'') �'.' d- (2) CONT 2"W BASE RAILS _ ,, A A: :::;''- ., `- :: log RAILS W/ STRETCHERS © Y , .. W/ STRETCHERS 0 OC .. .. ...� -i • - 24 OC , 3» Scale AS NOTED 3" 3" INISH FLOOR - SHIM CAB AS / 3" / FINISH FLOOR SHIM CAB ` 3" � 301 FINISH FLOOR - SHIM CAB NOTE: REFER TO SPECIFICATIONS FOR SCHEDULED NECESSARY TO LEVEL AS NECESSARY TO LEVEL AS NECESSARY TO LEVEL HARDWARE Date 05.30.07 SECTION DETAIL AT GL-2 RELITE VRP20 SECTION - GARBAGE RECYCLING © ISLAND veC-018 0 SECTION - LOWER ISLAND CABINET W/OUT DOORS VBC-012 SECTION - BASE CABINET W/ DRAWERS VBC-01 6 SECTION - BASE CABINET W/ DRAWERS N232-12 Project No. 88800 ZO SCALE: 1 1/2" =1'-0" 16 1 1/2" = 1'-0" 1 1/2" - 1'-0" 8 1 1/2" = 1'-O" 1 1/2" = 1'-0" 0 .5" 1" 2" I I I • , III _ milli I A ,,.., •e k ° DOOM & HARDWARE LEGEND N SCHEDULE 1 KEYNOTE ray•a ,. H;),:.L DOOR NUMBER • . "ff GROUP 1 ? Q DOORS: 203,204,205,206,207,208,209, ~ 210,211,212,213,214,215,216,217 DETAIL OR SECTION REFERENCE 218,220,223,225,226,227,229,240,242 a .1 '� DOOR TYPE: FULL HEIGHT, ALL GLASS ENTRY HARDWARE: BY MANUFACTURER INTERIOR ELEVATION REFERENCE PROVIDE STRUCTURAL REINFORCEMENT ABOVE CEILING AS REQ'D. FOR PIVOT -► SPECIAL WALL FINISH PUSH PULL: BY MANUFACTURER o ____ GROUP 2 —--— EXISTING PARTITION OR ITEMS TO I BE REMOVED DOORS: 219A,221,224,231 a DOOR TYPE:FULL HEIGHT FLUSH WOOD DOOR �"' °°°�"'°"°` EXISTING PARTITION TO REMAIN co HARDWARE: BUILDING STANDARD o 1 LATCH SET 4 BUTTS NEW PARTITION 1 FLOOR STOP 1/2" BUTT-GLAZED FULL-HEIGHT GLASS 1 DOOR GASKET = I— RELITE GROUP 3 I PARTIAL-HEIGHT RELITE, SEE 1O/A6.1 DOORS:232,239 DOOR TYPE: FULL HEIGHT FLUSH WOOD DOOR FLUSH FLOOR MONUMENT LOCATION. DEVICE TO BE POWER & VOICE/DATA COMBINATION HARDWARE: BUILDING STANDARD �� UNIT. PROVIDE CUT SHEET TO ARCHITECT FOR APPROVAL el 1 LOCKSET 4 BUTTS DUPLEX ELECTRICAL OUTLET 1 DOOR GASKET 1 CLOSER e DUPLEX ELECTRICAL OUTLET 0 CEILING p 1 ELECTRIC STRIKE U 1 CARD READER, BY TENANTS VENDOR FOURPLEX ELECTRICAL OUTLET GROUP 4 -0 SPECIAL PURPOSE ELECTRICAL OUTLET j �I p �° DOORS:233, 243 (1 PAIR) I , o DOOR TYPE: FULL HEIGHT FLUSH WOOD DOORS HARDWARE: BUILDING STANDARD -d PHONE/DATA OUTLET _I m c0 rn 4 PIVOTS (HEAD & SILL) I 5 c\.! 2 DUMMY TRIM -� PHONE OUTLET cZ 2 OVERHEAD CONCEALED STOPS = Q CD CD �J 0 ED O 2 ROLLER LATCHES DEDICATED MULTI-SERVICE FLOOR BOX WITH COMBINATION al _c to LL 2 DOOR GASKETS �AV TELEPHONE/DATA WITH (2) CAT6- JACKS AND (2) CAT6 CABLES TO IDF AND AUDIOVISUAL CONNECTIONS TO AV RACK LOCATED WITHIN 0 0 gg .2541 THE ROOM a) T- N @ FLUSH MOUNTED CEILING SPEAKER DOOR TYPE: FULL HEIGHT FLUSH WOOD DOOR - HARDWARE. BUILDING STANDARD as c) 0 (71 '-E3-•c.%1 1 LOCK SET TELECONFERENCING SPEAKER PHONE PROVIDED BY OTHERS �"` o 75 1 PRIVACY LOCK W/ "OCCUPIED" INDICATOR �- 4 BUTTS * WALL CONTROL PANEL U -� 1 FLOOR STOP 01 1 DOOR GASKET at CARD READER V GROUP 6 ' [11-3 DOORS:219B CEILING MOUNTED A/V PROJECTOR _-: ;::...:.:Y...: DOOR TYPE:FULL HEIGHT FLUSH WOOD DOOR ( :; AV EQUIPMENT RACK OR CABINET co � ( HARDWARE° BUILDING STANDARD rm U h. . • .. . WS-1 4 BUTTS•• •• co 1- 1 FLOOR STOP D CEILING MOUNTED CAMERA B J i c)• 1 DOOR GASKET D00 SET kaS BOARD � ` RECP ° - . 1 CLOSER �.' T NOTES T . . . , SH EE 202 , 201 °' - - • . I i 1 T 1 GROUP P 7• CPT S �•'.•••'.•° :•�:'' '•' OFFICE , C � R . 43A 243B, 243C D00 S•2 , • •OFFICE ! OFFICE 1. ALL WORK AND MATERIALS TO CONFORM WITH BUILDING STANDARDS UNLESS OTHERWISE 208 OFFICE� � OFFICE {� � .• • � 207 ' 203 - - DOOR TYPE: WOOD DOOR TO MATCH PANELING 20s 204 t � 20 NOTED. CPT-1 , OFFICE , CPT-1 CRT-1 j CPT-1 CPT-1 HARDWARE. � �•205 , — 0 243A 2. PROVIDE A SUBMITTAL OF ALL FINISHES FOR ARCHITECT'S REVIEW PRIOR TO t� N ��j. CPT—1 !f 1 OVERHEAD CONCEALED STOP 00 •f , , PROCUREMENT, �•o ! 1 ROLLER LATCH• as cr) N ••ii "\ _PAINT ALL GYP SURFACES P 1 UNLESS OTHERWISE NOTED, !0 o N 6 2434 HINGES O CONCEALED S S g N N N crJ _ f �.� -V .' - , ° ,},may V U ��'� 1 0 C'... •••. 4. PAINT ALL METAL FRAMES P UNLESS OTHERWISE NOTED. C!) N CPT ST-fi' l 1 FLUSH CONCEALED PULL —� HALL � N 243C -uPT i S� _tS�I 235 C 5, PROVIDE AND INSTALL 4 H SOLID WOOD BASE AT BOARDROOM 202, CONFERENCE 222 GROUP 8 CD co • i AND T 1 LOCATIONS. F"' • • • CONE CPT—1 � - , S • .' DOORS:202A 222A 222B � f C o ccs D 240 ,; �, ,• .'.:•';'• U . . . . . . . ...... a . , • . , . , . , . • DOOR TYPE: FULL HEIGHT FLUSH WOOD DOOR WITH 225 N '. ^ 24 2 i N A O I— o . PROVIDE ELECTRICAL LITE IT (SEE 6 1 0 DE EL L GLASS L E { BREAK • . ':` '°° 'f ' V R • CONNECTIVITY AS REVD. 0 221 Q OFFICE iii.� '°T' �' •' CONF G-2 OFFICE GLASS TYPE. G 2 225 224 p 223 ♦wb• •` HARDWARE: BUILDING STANDARD CPT—1 CPT 1 _ =-� FINISH LEGEND CPT—1 � -. ••* *, ,b�. � s �w. .*, • 4 BUTTS OFFICE t, ,,.....e.. :..:: ,..:r..:w..,.....,.., ': •r• <• 1 FLOOR STOP 04400 (1) 209 •�} ,:: •-- 1 LATCH SET ST 1 STONE FLOORING 08800 CPT-1 . : 209 � _ n 221 1 DOOR GASKET GL-1 GLASS I TM SUPPLIER: OTM , SUP L E . ST-1 LINO 1 ,:.,......_.r........,....w:., ::.. <• a r• .• e . , '47 210 ' . � :,..,...-..,.-.,: ....,,...• ".' CLEAR TEMPERED GLASS O •, °;� >, TYPE 607G NOTES: •':• PATTERN: FLAGSTONE, RANDOM • • • • OFFIC �' .....j -• ft 1f T I OFFICE GL 2 ELECTRONIC GLASS 0 E 226 NF '.• .: CO NF THICKNESS: 3 8 12 210 _ >.: ..: ••.•'•'.<�•.-`- 222 ••. CPT—1 1. OR TO BE WD 3 I ALL WOOD DO S 0 GROUT: MFR: INNOVATIVE GLASS P — — a o CPT • • —1 1 2 B 2 2B , PRODUCT: LC Glass 6 _ I > ° 2. HARDWARE FINISH TO BE SCHLAGE #616 i ., .;.... ST 2: SLAB MATERIAL 3cm CD —1 6 THICKNESS: 5/16" 227 39 ., TENT: TO BE SELECTED SUPPLIER: TM PP R' CLOSET A SU L E OTM r,r 23s PROVIDE CONNECTIVITY U HALL PRODUCT: 474H(3cm) • • i - -•OFFICE 237 IRETO CPT EDGE DETAIL: 227 — i ° •r 's' CPT—1 LINO-1 LINOLEUM CD _rt_, —— - • . °>- GROUT: CPT-1 �� i` ° .'.. _. , . . • . , HALL - �- MFR: FORGO•OFFICE RV-R i TEL SE _ I STYLE: R w•236 • .• S LE• EAL BOLD 11 � •I� .,.'. ST-3: SLAB MATERIAL 2 � � 232 L � • CPT-1 ► _ r--� _ °•• COLOR: 3203 HENNA•OPT-1 SDT 1 HowE- :;•, : •, :: , SUPPLIER: OTM C•(2--.1 11.) _ OPEN DT-1 _ 241 1 •WORK CPT—1 / PRODUCT: 1143 4 228 234 232 � PT-1 I 09651 212 A5.01 .• •y •, EDGE DETAIL,•CPT-1 LINO-1 ••• T. RB-1 RUBBER BASE OFFICE '• ':• GROUT:•212 CPT-'1 LINO-1 ' • . MFR: v HALL . . , COLOR: � � i ° CPT-1 I ► •'I•:•':•.�:': :'•:':•:•'. :•:'•• ST-4: RIVER ROCK 238 w� ' ff Lu ft_ 1 NOTE: 4 STRAIGHT BASE AT N CPT-1 SUPPLIER: OREGON DECORATIVE ROCK .v VJ El OFFICE •:.' '.~'~ C °-~ TYPE MONTANA COBBLES ALL CARPET LOCATIONS. •• -I' �`:• •':• >'• COVE BASE AT LINO LOCATIONS. 231 ) COLOR: HAND-SELECTED FOR COLOR Z 0 0 . •.mow..... • CPT-1 _LINO 1 '•' CPT-1 SIZE: TO MATCH ARCHITECTS SAMPLE >;• 229 W• • ':• ' GROUT: RB-2 RUBBER BASE 220 STORAGE w• :• MFR:• 231 '•' ••, ; et- LINO-1 PT 1: PORCELAIN FLOOR TILE +-+ N• OFFICE CE F ATLAS � � • • 213 OFFICE CCS in MR: ALAS m ff tCS•• . • . •. • . • . • . •. . •.•. • . . •. • • . •. . • . •• . • . . . •• .• • . .. . . •. •. . •. .• . . • . • . . •OPEN - . SUPPLIER: PENTAL GRANITE & MARBLE NOTE: 4 STRAIGHT BASE AT o• ® 220 • • • •• • * * . . 213 , o CPT-1o. • . . •• . . • •230 CPT-1 • • PRODUCT: EXTREMA ALL CARPET LOCATIONS. 0•CPT-1 N N.. •. 214 • • •;_' COVE BASE AT VCT/RF COLOR: TREKKING co••OFFICE : •y ';• SIZE: 12X24 RE I I LOCATIONS. O o• 06410 MFR. KENTWOOD 21 (/�•4 GROUT: 7 • •s• �� VJ t-1 CPT-1 219A '.>�,�•°.�,'�A.�.,�°.. .,, .>•, •; .,, ,�,•�w.�.,'..+, '.>�,- o•. . . . . . . .• 9680 P 45 0 >T-2: PORCELAIN TILE BASE CPT-1 BROADLOOM CARPET t � �J - MFR: ATLAS CONCORDE MFR: MONTEREY TANDUS Arc,i - �- SUPPLIER: PENTAL GRANITE & MARBLE STY E: 52008 LLANO•: OFFICE �' ° '. . ...... . . L 215 N N OPEN OFF CE COLOR: 00226-STONEWASH••...___;) PRODUCT: EXTREMA (i) CPT-1 r 219 • . COLOR: TREKKING INSTALLATION METHOD: DIRECT GLUE OFFICE OFFICE OFFICE OFFICE CPT-1 , - SIZE: 12X24 RL l I, CUT IN HALF-15X60 RE I I 216 L _ _ _ FACTORY FINISH EDGE UP. 09900•CPT-1 CPT-1 f CPT-1 CPT-1 ,•' • • . - ,. - -' -,• .•, P-1 PAINT (GENERAL WALL)•!f • .,... . MFR',� ':• '• ':'•�':•'•'' WD 1 WOOD E EE E G EE Q � COLOR: 1•• : .. • FINISH. LATEX, EGGSHELL•• R PED BIRCH COPPER CITY X'•• ' w PRODUCT:HANDSC A o, . • • : WIDTH: 5-7/8" P-2 PAINT (ACCENT)• • THICKNESS: 5/8" MFR:• • : '=. LENGTH: ASSORTED, UP TO 6' COLOR: K • • • , NOTE: END-TO-END JOINTS WILL NOT BE ACCEPTED FINISH: LATEX, EGGSHELL w K • '': w• .,....:.::............:.........,.-:......,...:: .• D 1 PAINT (ACCENT)• , WD-2: SOLID WOOD: MAPLE TO MATCH W - P-3 WD-3: WOOD VENEER: TO MATCH WD-1 MFR: ® o © o o p COLOR: � - co co c) N N N o O PLAM--1 PLASTIC LAMINATE FINISH: LATEX, EGGSHELL c9 cfl I`. I� U MFR: WILSONART e o 0 0 0 0 FINISH: PREMIUM P-4 PAINT (CEILING) .2 * * * * ' I- COLOR: 7936-78 WILLIAMSBURG CHERRY MFR: •� COLOR: o o o ® O PLAM-2 PLASTIC LAMINATE FINISH: LATEX, EGGSHELL Q Q < < < U MFR: WILSONART COLOR: 4794-60 09510 Sheet Title ACT-1: ACOUSTIC CEILING TILE SDT-1 STATIC DISSAPATIVE TILE TO MATCH BUILDING STANDARD FINISH PLAN MRF: VPI COLOR: 0022 OLIVE ACT-2: ACOUSTIC CEILING TILE GRADE: COMMERCIAL RESILIENT TILE, 2MM MFR: DECOUSTICS 12500 TYPE: CEILENCIO CUSTOM Drawing No. FINISH: CLARO, STANDARD WHITE WS-1 WINDOW COVERING SIZE: 24" X 48" X 1-1/16" MFR: MECHO SHADE EDGE DETAIL: ALUMINUM, CLARO COATED. Al SERIES: ELECTRO/2 DOUBLE SHADE #17 THERMOVEIL, WEAVE T.B.D. FAB-1: BENCH UPHOLSTRY FABRIC 02 BLACKOUT SHADE MFR:CORTINA LEATHERS COLOR: T.B.D. TYPE: RUSTICO 21-11 Scale 1/8" = 1'-0" MOUNT INBOARD OF BLDG STANDARD BLIND. COLOR:SELVA Date 05,30.07 Project No. 88800 0 •5" 1" 2" III III 1 I 1 I 1 1 I ©Yost Grube Hall Architecture 2004 0 0 0- 0 c) c) cr,) o ® o ® • . . • • .. .". :: .. "•• . . ... . .: .. . r-- • . . 1 --:- ..... . . . • „,. 0 • ... „-- , ...!i :::....:: A R-IC- 1 R----N- . TT A .,.,.... i ,eo,\s <). -*1 :, •I N \L / V I \I - L.....I _......._ IN \ , ---\I _ . El r „ r , : El [ [ H .... ... ,---,, l .. I. „ ji_jii.:.......,., ..__, ... ... . .: . : . , 0 .:. „ ,..2.. ___,_ ....,_ f., ... . ... ...:..,,,.....: . : :: .,:::,,... .. ... .. .... ..:::•: , .., .. . - --f m Cl : ..::. ..,... .... ..... " ...::: ?:, ....: . ' .11: ... ... ., .•:. . ... . . • .,..., .... ,,, ...... _ . .,.:.... ..... _..... .... : • r— u) m --i '..---.- •• U LI IIII LA H 1 1.- 1 L--', L-: ,... A : ::. ,.. .. .. . r. -- r-- (-- --- 7 ..._____, ... ,„,•••■••■■•■■••4 .... :,.-, „..................... '.. . k , ...., .". . T3 , .... : ...,... . .- • .. ....... • .... ___i k.............._ 3 ij . ,:: [ tri 1 1 t• 'i . (1-1 rl 7 . .. 0 .. , .. . . . ... . . . . . . . .. . ... ... . ..:. , ,, ,.... .... . ,... :.• . Allp=1 ...6.v .• . \) .. . ...... ;:::: . r-7.1 -•--• 1,-- I .• • ......„....... .... .. . ,....•.,...... . . . ,..•• ,•• .. . • 0 ... . r7r7 1 Emil= . Null!IMI- 4 . .. ... _Di NMI EimI ' 0 ,J. . ..,:•-• •...,.. _ .., ',1].:.•...„.... .., •.. ::::,:• - ) 0 0 \3 7 3 _..____. 7 , . tj .:,,,...:,: :... :„.........., r •.: . . . _ \--) •:-::: ,::...:: • PI • ‘,.. :.• .!,.! ::. :.• .: ;.: . .-. 1=1 [ / 1 LA - ,.: ,: : ,....: ".' - "LIIIIPPlir- .. . . . :: ... ,... , :.....:: • : . , :..." ,..•:. .. . r •••••.:: . ,•••• --i , ••• :,,, ,, • •••• • • .. ..: • . ... „ . .. .... . ,. . . .. .... :..: . Ir. .hv.:1.,..: •i ij * ' . il ... .= ....,:: . . -::: :: • hill."1111ri MI 7 •:::: ... ,.., • -1---L-. 3 ;i'.:;, ::;.: ''..!:: ' :1 ,. iii Emu .m 1 II ii 1 „, :•,.. ,...: .-:..• , .:., . ii, ...... .. .. .- - ' Ell . •• - i .,.• lz 7 i ::' :7„ C:n .. ,--- :1 i..I IlL ].,„. .... . . .1.:1. l':.. .i..!,;,‘.. . ,„, n 71 , tz_ -- ' ' 1 , , . ,-----tH: 1 1 ::• 7 ::.•.: , ., 1- ....... ..• : .. , .. ., . .. :: .. _ ::. ..........., - A r - , L - . : •..: .-- ., . r,---' 1 : 0 • . ,.. .. .. , .,,,,, . .,.: ,...... .• • ,...•... :.••"•, „:................... , II . .......... .......... ,,....:.' 1 \ ... • . „ . .. • .:. ... . .„...,.. 7 .• i:: II: --- 1 , lialliDalli- .::::::. :,:.::, .. . • ...- D> III j •••• - t • I =,----/ i:• i \) /j H. ..i in.__ . .. , . . ..•• :: ...: '•-: • . - ..- , • f/ . 1 II Cjilli . il• / 1 0 rIcion . _ .... " .. . .\:.) (.. _71171: : , : 0 • • , . •: is) : . ... ....ca.... : .. ., , I\T /I Al ...I ,' :... :: :: .,... - C lap DI „.:: ..•: li II Iii) 4 - - .- -. • I \j \ / V I - :,.::: : ....._ _ •• : •-: ::-: //".* of . .. ..... • : . •.: a 111 :: ..' .... .: : :-.., • .;. • . . :: UOLDU - ::. :: _ ..„ ...: •, .. ..... ® ' c1= : i .::: ::.•.:. :: -- :1 1111 lit :: • ...: :: 1 ,,,1 ••::::1 ..• •!.: - . . ---) I 0 0.) ::: ,7 '. ••': ::..::; El rl (1 _, " " . 1 Z_ • • .... • 1 ...:--)■ 1 ... ... . U :.• .. :.• ...• :::.• ,.... -:.:-.. ..... ::-.., •••. ....: .:-.... : .• ...., :.,..:..•. .. i :-.....: :...:•: . .. ..., :...; .--"----... • ,.. . . •... - ... ... .. .. ... .. :: „. .. ... ... .. . I .:•::...:::.4:.... — : . C.) .31— ... • -. . • ii..-Iii :•:.• ' . . ,. .,.... .... " .. cr> - L • ••::, ....1— ::. 0:, :•••:. :..:. . . :...:::.:.:.....::..:„ ' ....:• • ii. .... . . . . ..... •••,...:...‘ ,. ••••••••• .,•:,.. .... .. . .. :: .. . , . .... : :.:., • ,:.,.. :„.. •••.• :•• , .„.•::.•:.: ::„.:. .,. .,... •• ::. • "" "• . . .. :...: :.• :„... ..:„:„:•:::::•„,:: : . : ..: ••••. , 1:!: . • : ••, .:.•.• •. :•„:„ II L' '''. ... ... . .H ../. ........ . .. :: : .... ..••• ,;.,...:. 0 ..... .:,. , • : .., ... _ : ... .:.: „........:„.;. . . . .. ...., ,•..:• .• ... _ .• _ _ I . . .. . •...,•.... ,„ ., .... --r- -t- -t's ' -Ts. .. . .• . -. •. • .• ' . 0 0 ... • • • • • •- • • . . . '"■,,,..j- :• . • . • . • . •. . ....„...•...—.• • . • . • 0 0 .1:- . .. . 0 „„„„, :. . . „........„, „. :. , .... •" "... ..•...... . .„....::: ..:: ..: ....: .:: .. ..:. :.,.: .•... ?...........•....•.-......:, •:•..:•..•,..„..,„„4...,....„,..,„...,,,,,,...:,.p,„:„......................• 1. . :.• ..• ::. ... ".. ....:. :.• .:•• •::......... . •. . •. . . .. . . ,..• :.•• :.• . . . • • . • . • • • . • . • . . . • . .. .,............................. .::::-........„..,...:::„......,......,..:. ........„, - .:::....:„:„....,:. .........,„...:,,,,..„..-....................-.2,,. ......-•............................... :.• ..: • • • ,.,..... • .,..•. .„, , . , .• ..• ..,......,. .... . ... . _ . . •. . . .. .: :.,.„ . . . . ,,, ....•.. •. ..•....„.. .. . •. . .. . ... •. . . .... •.. . ....... ., •• • ••• •• •••••_.,......•• ••• • • •: , •• • •• • • ••• •• • •. . .... .. . .. .. ... . ... . .. .... . .. . .. ..... . . • 0 • • • CD • i ......................:::::•:::::::•::•:::-:......-:.-.:-....- .....•.. ..-:-.T.:.-:::..:•.„..„..,,,,,,........:,..::::. .••••••::::•.•:,...•............:,.....,....!..,...:•....:..:.-.:..,....„..,,,,,,,,,....,,,,-...,...,,,,:.„:„:„:...:,.....„-.:-.....„...„,,,..:::::....:................................................ . .: e • _ 0 Owner - Architect - Consultant •11,,;() A v 1- Project S -a o a) 0 2 D„.0) - Revisions ..... .--- _ ......... m 111114.0 "..6 PacTrust ..,... . ,.. .17) .;--. ,-......, _to CD m z3") rata) ADD #1 06,25,07 ,........... s 0 COMMON SENSE Yost Grube I-!all_____ - ... CI N) ="! ADD #2 06.27,07 Ron Tesch t..4.:Za..... Z imigai Z R13 • ADD #4 06.28,07 L.L.C. Architecture - 0 0 Investment Management, 1211 SW 5th Ave. Suite 2700 ....., • • simialL ' ADD #5 07,06.07 15350 SW Sequoia Parlway, Suite 300 ), ',•:::!:::. \\•,' .... ..... ....„ oi • COi,,,,.' ADD #6 07,09.07 • , ..... • , co 9-1 iii IND z 15350 SW Sequoia Parkway, Suite 250 - - - co co Tel l5 o3,6 204r 6g3o0n0 97224 Tel Portland,503.2210150 Fax F9a7x20540-33.728925.0U8S4A0 - co P -* CONSTRUCTION SET: 07. 10.07 Portland, Oregon 97224 Tel 503.603.2510 _ c) cp ili cp --1 - — INI a i 0 � o o � � e r �� 0 0 m p !:11° V� j iL L �s 8� m M 8 > N WALL MOUNTED 40" LCD MONITOR, BLACK O � � co �SONY FWD-42LX2F/B, 38.9"W X 23.3"N X 4.9"D � � �' al11ga3 1 ADD 2"D FOR WALL MOUNT BRACK, ADD 4"W PER ` F -,--=y, SIDEFORSPEAKERS. APROX. 7OLB.STOTAL, i 120VAC, 200 WATT POWER CONSUMPTION PER MONITOR Vc 0 Pie WIRELESS TOUCHSCREEN DOCKING STATION FLUSH cp 0 0 CO,o r.... ce a. a.MOUNTED IN MILLWORK ABOVE THE BENCH HEIGHT � 1 _ r,,t6 W � �� erg z AMX MVP-WDS, CUT-OUT BY MILLWORK, CUT-OUT i 1 ^^ N Q o „, TEMPLATE TO BE PROVIDED BY AN CONTRACTOR, T{P. 1 ,- .., < z 0 111111 Cg 11 o ` a Z< P 1 1 1 I I I I I I z z= li, •STUB OUT BEHIND DOCKING t o to to o CO o � 0 O— STATION,HEIGHT TBD I I WI �}� �. .. ,.. 4 1 TM .____ 4111111111111 / 41 ) ilraili I - o STUB OUT IN-WALL, ONE 3/4"CONDUIT ABOVE � • � BOARD i ' RECP � � �IN-WALL SPEAKER,AND ONE 3/4'CONDUIT AT » c v o THE VIDEO CAMERA, SEE PRESENTATION 23�4"C ��4�C 2 0 2 � � -�- � � 201 WALL ELEVATION FOR HEIGHTS • STUB OUT ABOVE ACCESSIBLE ° STUB OUT ABOVE � 4 ti---1 �o CEILING IN ROOM 202 � m g ACCESSIBLE CEILING 4 r m= CE IN ROOM 202 1-1"C I t 6S AFF � e 3 3 it-22)WIRE PATHWAY UNDER �� � 8 a U @:404, TABLE TO ALLOW SIGNAL aliit4M , 1 _ a m D GROUPING IN CONDUITS i�� 4 ` r j = o ; AV © PROVIDEPOWERUNDER AV � L Q a TABLE FOR POWERING � 4 ! � _ £ AN LAPTOP INTERFACES ( ; S� 1.9/4"C A A � � 3 c o STUB OUT IN-WALL ABOVE IN-WALL SPEAI�R � i � • 2-1'C 2-1"C { e. `o TO STUB OUT IN TEL/ TO STUB OUT IN TEU p o '�+ $ z 0 m SERVER ROOM 232 SERVER ROOM 232 ` 1 � 0� a. �. o c.0 = a I t , lc moo rt I I m ; m -Lamo c c m PROVIDE A WIREPATH TO THE LOW VOLTAGE = e� a o - CONTROL INTERFACE OF THE SMART GLASS SYSTEM. + 65 " i i � Z 0 Q Ji N god LOWVOLTAGECONTROLTOBEEITHERCONTACT �� 1 STUB OUT ABOVE ACCESSIBLE � w $ i CLOSURE RELAYS, RS-232 SERIAL, OR IP NETWORK CONTROL CEILWGIN ROOM 222 ♦— �i a) 1:3 J. cr > I i aE BREAK E J.-- LECTRICAL SYMBOLS — 0 221 ► - (110) THESE ELECTRICAL SYMBOLS ARE FOR INFORMATIONAL USE ONLY. AM. THE INSTALLATION,BdGiNEERMG,ELECTRICAL CODE REQUIREMENTS AND MINIM ! ii COSTS nssocu►�arnmH,�w. av��wcaL�u��s ARE�E D + A ..' Fla RESPONSIBILITY OF'THE OWNER DUPLEX POWER RECEPTACLE,15 AMP,120 VAC,DEDICATED O Z GND&NEUTRAL,MOUNT AT BASE ELECTRICAL HEIGHT. QUADPLEX PONVER RECEPTACLE,15 AMP,120 VAC,DEDICATED A ILI GND&NEUTRAL,MOUNT AT BASE ELECTRICAL HEIGHT. IE DUPLEX POWER RECEPTACLE,15 AMP,120 VAC,DEDICATED � STUB OUT ABOVE {�G 2 ND 8�NEUTRAL,MOUNTED ON 10'FLDC YYHIP ACCESSIBLE CEILING r�1� �r� 111 � J WITH TILE SPANNER AND OUTLET COVER PROVIDE). � IN ROOM 222 `i A V AN CONTRACTOR WILL INSTALL INTO CEILING TILE. / � �/ jJ iii QUADPLEX POWER RECEPTACLE, 15 AMP,120 VAC,DEDICATED 13/4"C f G tam ND&NEUTRAL,MOUNTED RUSH IN CEILING STUB OUT IN-WALL BEHIND RS-WITH TILE SP/WNERAND OUTLET COVER PROVIDED. � � f ��a�CKiNG STATfa7iv, HEt3iiT AN CONTRACTOR WILL INSTALL INTO CEILING TILE. TBD 2-1"813/MC V) 4.,_ RECESSED CLOCK POWER RECEP'TACLE,15 NNP,120 YAC,DEDICATE TO STUB OUT IN TEU GNDBNEUTRAL,MOUM'EDATHEiGHTSPECIFlED{+7p(� WIRELESS TOUCHSCREEN SERVER �=' �_ � � � W cz 0 W a�� Mou�Hrm iri Roo HBO vac,��ca� � o — . __ 001 DOCK FLUSH MOUNTED SNBOUTIN-WALL,ONE3/4°CONDUITABOVE � � �� ���� QUADPLEX POWER RECEPTACLE, I5AMP,1�VAC,DEDICATED C O N F IN-WALL SPEAKER,AND ONE 3/4 CONDUIT _ I L�� ( [l, GND&NEUTRAL,MOUNTED IN FLOOR BOX THE VIDEO CAMERA,SEE PRESENTA710N I � SINGLE GANG DEEP JUNCTION BOX 1 N M ILLWORK, ABOVE COUNTER 222 WALL ELEVATION FOR HEIGHTS » a J1 � STUB OUT IN-WALL ABOVE � ����� ��s MOUNTED AT HEIGHT SPECIFIED(+7p() � � 40 " IN-WALL SPEAI�R � _4 4 _ _ .� � � — �. C� W .. . DOUBLE GANG DEEP JUNC710N BOX C o 0 o L i (i_p , J2 MOUNTED AT HEIGHT SPECIFIED(OW) , � r lip Q� J3 eg TRIPLE GANG DEEP JUNCTION BOX • 1T � � . — , MOUNTED AT HEIGHT SPECIFIED(+XX') (�''� ■ ■ ■ _ J WI J4 QUADRUPLE GANG DEEP JUNCTION BOX W/ � — — — — — — — — — — --1 tU !1/ 41) MOUNTED AT HEIGHT SPECIFIED(tXX') D + 44�� D D Q-j � CLOSET :ALL Z Ca SINGLE GANG DEEP JUNCTION BOX 3/4C MOUMED RUSH W CEWNG A7 L�ATION SPECIPiED jcrsm6 z.�4"C 233 239 0 Z DOUBLE GANG DEEP JUNCTION BOX i� OUT IN 'fEU _MOUNTED RlJSH IN CElyt�AT LOGITION SPECIFlED SERVER ROOM 232 4 ���,��,BaX CR ( � III a MOUNTED AS SPECIFIED 6 6X6X4 SCREW COVER NEMA BOX �1 � � //1 I-u U) IUIN MOUNTED AS SPECIFlED ' , Q � �4��►��eoX W d z "OU"T�^S�'� � TEL/SERVER � � � � �J•t2 1ax1zxasc�wcOv�►�a�a,sox 1 � \ DI . Mour�rEnass�cI� �� 232 CR � SHOWER �FB AN FLOOR BOX-SEE AN DRAWINGS FOR DETAILS a MoU►����� r 241 � Z owg oZ W • co�nw�ic�ouRS�-�m�r AND s�,�s ►►►t \ � - - � � � �°"�'F�""O''�""�°B�P"`�""�" AUDIO VIDEO EQUIPMENT CABINET ON CASTERS, — `\ i � 4 a W go CONDUIT s'U�°'� �`GE'�'�`"°'�> . M I D D LE ATLANTIC ERK-4025, 22'�WX 25"D X 74"H �� �g AFFl. a IMO CEILING SPACE -(NUMBER OF CONDUITS:/=ONE,//_� � � � fl j � fa � � y �2 3/4"C. (J-BOX TYPE) PROVIDE A 20 AMP DEDICATED CIRCUIT, (CONDUIT 101+42,,,,,e--(J-BOX HEIGHT LOCATION) AP ROX. 7000 BTU'S PER HOUR Z O •CONDUIT IN WALL OR CEILING v_ tin—CONDUIT IN OR UNDER FLOOR at o � 2 � 0 �� ��CABLE ONLY, NO CONDUIT 0 W � � �' . (I) 0 Q �CM PROJECT NUMBER , Z PD01327 ,.._ 0 Q CAD FILE NAME 01 COPY OF ELECTRICAL LEGEND 02 SECOND FLOOR AIV CONSTRUCTION REQUIREMENTS FLOOR PLAN � T-av-D '-01-01 SCALE: NONE T2-01-01 SCALE: 1/4"=f-O" SHEET NUMBER F Us g t T2-01 -01• , . • „.: ,. 111111111■1111111111r , 0 Li ' I 4 M. .,... .. MOTORIZED FRONT PROJECTION SCREEN FLUSH MOUNTED GDv, . ce, 4.1 � _--.----- ------ ------------: INTHECEILING, PROVIDEDBYANCONTRACTOR, INSTALLED �� ° °� m PROJECTIONSCREEN � BYGENERALCONTRACTOR. � � ° `° X " N 57"H X 77"W X 96" DIA. 1 °' ' �' 96.25"W X 7.25"H X 7.75"D a � °' M VIDEO DATA IMAGEAREA � m � • i E u+ mom - n PTZ VIDEO CONFERENCING CAMERA MOUNTED IN THE WALL � ° M o 0 . : . ..� CAMERASYSTEMPROVIDEDANDINSTALLEDBYAN Q � U � `� 3 CONTRACTOR. VADDIO WALLVIEW 50i PTZ HIDEAWAY CID F � � E 8'-10" � � 12"H X 12"WTRIM PLATE ON WALL PAINTED TO MATCH BY OTHERS 4��:� . , 6 5116"WX 9 1/16"N X 3 15/16"D ENCLOSURE, CAMERA PROTRUDES ��` „ . t . OUT 6 5/8" FROM WALL WHEN IN USE 6-6" 6' 1 � VIDEODATAPROJECTORMOUNTEDTOTHECE1LING, o � 41-9–" 4' IN-WALL SPEAKER, TANNOY 1W62 TDC, PROVIDED PROVIDED AND INSTALLED BY THE AN CONTRACTOR � N. z o 4 AND INSTALLED BY AN CONTRACTOR. PRE-INSTALL LOCATE OUTLET 13'-0" FROM PROJECTION SCREEN. a o `" a �u � d' ¢ M H WO � � p RING PROVIDED BY AN CONTRACTOR AND INSTALLED EIKI EIP-3000N PROJECTOR, 4.3"H X 12.4"WX liD, 20 LB.S BY GENERAL CONTRACTOR PRIOR TO SHEET ROCK. I2OVAC 385 WATTS POWER CONSUMPTION, 1314 BTU/ HOUR NZ W ° .:i i v , 185/8"HX815/16"WX37/8"D m >- o °C 4'-5 . 4' 5n ., .. — Q 2 2 —,- m r: AIL CD 0 �� N to V/ = CO CENTERLINE OF SCREEN —���� � � � � e7_, ° w � � 'i ANDCEILING � _3 Z � z m G 01 PRESENTATION WALL ELEVATION ► - -. . • �. �. � � -. T2-01-0. SCALE: 1/26=1'-0" iiH„ ( 4 0 � � � � - .. 0 , ... ., 4 4 0 . - - - - - - „a' cs9 T.' ma _ o 0 0 1 s O w 4 0 :-.. .* .. .- . m '0 .0 O . 4 C 4 1 co ,.-.6 se co E C (t 0 1 4 ) - - - - . - Mb, 111111■11ait. S F o t> ; , zr AN WIRE PATH FROM � � � `��f v III O 0 � N 4 1 1 m iii. - 22"&2-1"C � � I c 'o a3 r .1, -Q- ' -Q-. -Q- - - .. . , .,:, . . , . I , C , ,. o 1!!—, a i I • cc d - e, e e e . . . . -. . -0 . ., mw .c m CE i ' - - - - ED - - - - . ELECTRICAL SYMBOLS I . a CO) a 1 . 0 e e i._._ . - . • . - . - . - . - . Ami THESE ELECTRICAL SYMBOLS ARE FOR INFORMATIONAL USE ONLY. THE INSTALLATION,ENGINEERING,ELECTRICAL CODE REQUIREMENTS AND , � S ��� COSTS ASSOCIATED WITH ALL AN ELECTRICAL REQUIREMENTS ARE THE O D A. I � - . RESPONSIBILITY OF THE OWNER 1111111 � � � � � . DUPLEX POWER RECEPTACLE, 15 AMP, 120 VAC,DEDICATED f DE GND&NEUTRAL,MOUNT AT BASE ELECTRICAL HEIGHT. . - , • . ' , • . • . - ED. QUADPLEX POWER RECEPTACLE,15 AMP,120 VAC,DEDICATED • 2: GND&NEUTRAL,MOUNT AT BASE ELECTRICAL HEIGHT. - 0 � �.. \ �i� . ' _ ' . . � � .. . . ^. . . .GND DUPLEX EUTRALS MOUNTED ON �FLEX WHIP VAC,DEDICATED 1111■'I ,,� � � : . Ul DEDICATED . 2 2 WITH TILE SPANNER AND OUTLET COVER PROVIDED. - — -F(�}i � ��' - - - • - - AN CONTRACTOR WILL INSTALL INTO CEIUNG TILE � . . - .'��. _ . . , . . ��i QUADPLEX POWER RECEPTACLE, AMP, 120 VAC,DEDICATED � � GND&NEUTRAL,MOUNTED FLUSH IN CEILING — - ' I - _ � W�7'ICES.RASlNER AND OI�?7.ETGQ�.R?RQM.��. otint.• '- AN CONTRACTOR WILL INSTALL INTO CEILING TILE - {� - - RECESSED CLOCK POWER RECEPTACLE,15 AMP,120 VAC,DEDICATED 1111. �— n _ ' _ GND&NEUTRAL.MOUNTED AT HEIGHT SPECIFIED(+XX j ��i��—■ • 0 ■tim r _ / � � �Y' ' '°- I - . . - M ICJ DUPLEX POWER RECEPTACLE, 15 AMP,120 VAC,DEDICATED 's 1 i I GND&NEUTRAL,MOUNTED IN FLOOR BOX. / Elf©-I.- GND rfEUTRAL.MOUNTED FLOOR BOX BOX.120 VAC,DEDICATED � \ I1 :- 1►m - - . ia CY J1 SINGLE GANG DEEP JUNCTION BOX ROOM 232 CEILING�TO :1111 � ir-- (I' � . . -• --.. .• Z ROOM?22 CEILING II.. -MOUNTED ATHEiGHTSPECiPiED(+XX') CEILING RECESSED PROJECTION SCREEN, ili J2 DOUBLE GANG DEEP JUNCTION BOX {�c} ,� MOUNTED ATHEiGHTSPECiFlED(+X)C') DA-CITE ADVANTAGE DELUXE ELECTROL y I �. � o�� � �.,�� ���_�� �. �.�� �_ � �u 3-2°& 1-1"C � TRIPLE GANG DEEP JUNCTION BOX to � y � MOUNTED AT HEIGHT SPECIFIED(+? 96" DIAGONAL IMAGE AREA 96 25" CASE LENGTH. �' �_ o '`�,-%'' �- � �. � � . � . n-... . . . WI - • • • J4 QUADRUPLE GANG DEEP JUNCTION BOX � - I i ( I 1111 . MOUNTED AT HEIGHT SPECIFIED(tXX") .–. �- � - - - - -XX' SCREEN PROVIDED BY AN C ONTRACTOR, INSTALLED . - . SINGLE GANG DEEP JUNCTION BOX � Z (1) is MOUNTED FLUSH IN CEILING AT LOCATION SPECIFIED BY GENERAL CONTRACTOR. SCREEN TO BE CENTERED ° o 0 � mDOUBLE GANG DEEP JUNCTION BOX Z , 0 MOUM'EDFLUSH IN CEILING AT LOCATION SPECIFIED ON THE CEILING SOFFIT CENTERLINE. V1/IRE POWER TO l_ �� - ----=1 � ';e * lR�— - • *. - - - � 4 4X4X3 SCREW COVER NEMA BOX . . . \/ . . _ _ ' v - - - a MOUNTED AS SPECIFIED �� • - � • 1• S S �. – - - - 7 'a� THE SCREEN THROUGH THE LOW VOLTAGE CONTROL — � . - � . � - � � •. � . � � � �. � . � . - . � - 3 N 6 �4��►��N�BOX 1 NTERFA – – – – — — — — — — -� - i . . - . . _ . � . _ � . . . . . . � � V N►�N��X �� i � Q . . . _ � . . . . � . � . _ . . _ . _ . . � Zap MOUNTED AS SPECIFIED 12 12X12X4 SCREW COVER NEMA BOX I�� � I 1 ��I I�� 1�� ��I - ' - � - � � � Z � �MOUNTED AS SPECIFIED I > < I � I 1 > I I i 1 1 ) I { � � - - - � � - - � - � - � - - - M E O FB AN AOOR 80X-SEE AN DRAWINGS FOR OE3'AILS !�'-_ —��l _ I � � _ ��!� I��—Ikk.-------1 �I � I� —�� � . - - - -7 ■••■•■ .IMINI■,, MOUNTED AS SPECIFIED • FIELD VERIFICATION�Fica�U�nui�o BEFORE �n�NOTED � 0 • . , . - • '�= ��. CZ g o.,, . . im, Elm a CONDUIT STUB-OUT � GENERAL NOTE) - •- / \ � - - � �� CO 1:1" � � Z INTO CEILING SPRCE `(NUMBER OF CONDUITS:!=ONE,!!=2) � - � � y Q 3/4"C. (J-BOX TYPE) _ f \ � . Ak i- -(CONDUIT SIZE) -/ +42'-#-(J-BOX HEIGHT LOCATION I -•---.. � rtl II > < I rr '� I ) < � 1 I - . .... � � s I � � I J \ z CD z O Q to „la CONDUIT IN WALL OR CEILING � � g i ' � � � " � /"."."'"■„,,.........../---"'"•—CONDUIT IN OR UNDER FLOOR � �- -.- -� �tl ig _ I�— — — —mil � — —,/ — - '� � � 0 � V � l� d• CABLE ONLY, NO CONDUIT � �� _ . \\�I� — � O Z W � 4 0 0 r �CVI PROJECT NUMBER � I I I �,. r � � � � � �. r � z PD01327 • _ (.42 CAD FILE NAME 1 02 COPY OF ELECTRICAL LEGEND 03 SECOND FLOOR A/V CONSTRUCTION REQUIREMENTS CEILING PLAN jJ T-av D � SHEET NUMBER o T2-01 SCALE: NONE 12-01-0 SCALE: 1/4"=1'-0° 0 T2-01 -02 [ 1 ,pN N . , . . .. . . . . . . _. ...._ .,. ...... ._ .. ._.„ .....,...,.., . _ .. .__. .. .._... . _.. . . . .,..,. ...,__ ___ _. ._. ...