Loading...
Report 0//_c}c]// 3 / s^/ vE GeoPettliC ' 1oo10mw Galbreath Drive, Ste, 102 Sherwood, Oregon 97140 Tel (503) 625-4455 • Fax (503) 6254405 July 25. 2011 GeoPacific Project No. 11 Attention: Alan Goffmore ' Pacific Evergreen Homes 7410 SW Oleson Road #133 Portland, OR 97223 Fax 503-208-7127 AlanpPao0cEver,gOeeDfomescgm FOUNDATION EXCAVATION REVIEW LOT 28 — BRITTANY MEADOWS CITY OF TIGARD, OREGON GeoPacific Engineering Inc. visited the site on today to review the single family home foundation layout on Lot 28 We understand that the proposed building is a two home. In our opinion. the observed subgrade is generally adequate for support to an allowable bearing pressure of 1.500 psf. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement) are 1 inch and 3 /4 inrh, roypedive|y, over a span of 20 feet. At the time of our site visit, the excavation was complete and consisted of predominantly very stiff to hard compacted fill soil that could be probed about 1 inch with medium pressure using a steel ^T^ bar probe. These soils are considered adequate to support the planned foundation loads. Footing- to-slope setbacks are not an issue and foundation embedment depths appeared adequate. Due to silty clay soils encountered throughout the site, all foundations should incorporate appropriate drainage measures. Crawlspaces should be provided with a low-point drain and pass through pipes should be installed 1hrough•footingsvvhioh would otherwise restrict water flow to the low-point drain, Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after • excavation. If footing bearing soils become saturated or dioturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. • • ` . Geo Pacifc Engineering, inc. | �� „� ��_ Job No. 11-2373 Lot 28 Brittan Meadows Our work scope pertains hoe geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule i and budged. Geo Pacific attempted to execute these services in accordance with generally accepted . professional principles and practices in the fields of geotechnical engineering and engineering i geology at the time the report was prepared No warranty, express or implied, is made, If you have . any questions, please call i Sincerely, Geo Pacific Engineering, Inc. ArA OREGON 1- 7 . ���;P,:S: CIG ,?› James D. Imbrie, G.E. Geotechnical Engineer . | ! | CA-