Loading...
Report Jul. 11. 2011 2:37PM No. 1974 P. 1 Ebgllieeringlnc:F`? • July 11, 2011 Real -World Geotechnical Solutions • Investigation Project No. 11 -2315 • Design • Construction Support • J,T. Roth Construction 12600 SW 72nd Ave. #200 Portland, OR 97223 j Phone 503- 473 -3497 j� ]� »' 4 4 0/ n vti (,�/ Fax 503- 624 -0239 '71 ' RE: GEOTECHNICAL REVIEW OF FOUNDATION E ATION �/ LOT 7 - MOUNTAINVIEW ESTATES TIGARD, OREGON On July 5'h, 6Th and 8 2011, a representative of GeoPacific Engineering, Inc. (GeoPacific) visited the project site to review the foundation excavation subgrade. On the first visit, the foundation excavation exposed up to 6 feet of loose rocky soil fill. We observed removal and recompaction of the unsuitable fill within the foundation footprint. Based on the observed reworked conditions, the foundation excavation subgrade is now considered adequate for supporting spread footings to a minimum allowable bearing pressure of at least 1,500 psf. We anticipate settlements to be on the order of 1 inch total and one -half inch differential. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. This report was prepared for J.T. Roth Construction only and should not be relied upon by third parties without consulting GeoPacific. Sincerely, GeoPacific Engineering, Inc. �EO PR �� 14 E OREGIIN v 23 . James D. Imbrie, G.E., C.E.G. EXPIRIS:° Geotechnical Engineer •• 13910 SW Galbreath Drive, Suite 102 Tel (503) 626 -4455 Sherwood, Oregon 97140 Fax (503) 626-4405