Loading...
Report Bend Office (541) 330 -9155 Carls ®n Testing, Inc. Salem hnicarOffice (503)601 -8250 Eugene Office Salem Office (541) 345 -0289 (503) 589 -1252 Tigard Office (503) 684-3460 Special Inspection FINAL SUMMARY LETTER July 8, 2011 T1104629 City of Tigard • 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Project Name: Charter Mechanical Project — Stairs (Tenant Improvement) Address: 7940 SW Hunziker Street — Tigard, OR Permit #: BUP2011 -00090 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Expansion Anchors Structural Welding All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there ar- any further questions regarding this matter, please do not hesitate to contact this office. Respec r u submitted, CARLS• r TESTING, INC. 'Hietpas Pr. : t Manager //ks cc: Perlo Construction — Chris Gregg emailed CIDA Incorporated — Dustin Johnson emailed Charter Mechanical Contractors — Richard Smoke emailed