Permit - 'i' CITY OF TIGARD BUILDING PERMIT
1 ' COMMUNITY DEVELOPMENT Permit #: BUP2011 -00127
TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 07!0812011
Parcel: 2S103AB05600
Jurisdiction: Tigard
Site address: 12125 SW SWEENEY PL
Project: Quadri Subdivision: WALNUT GLEN Lot: 14
Project Description: Solar photovoltaic system.
Contractor: SOLARCITY CORPORATION Owner: QUADRI, AMRULLAH
6132 NE 112TH AVE 12125 SW SWEENEY PL
PORTLAND, OR 97220 TIGARD, OR 97223
PHONE: 503 - 964 -0489 PHONE:
FAX: 503 - 926 -9101
FEES
Specifics: Description Date Amount
Type of Use: SF Solar Photovoltaic System 06/17/2011 $180.00
Class of Work: ALT 12% State Surcharge - Building 06/17/2011 $21.60
Dwelling Units: 0 Info Process /Archiving - Sm Sheet (up to 07/08/2011 $4.50
Stories: 0 Height: 0 ft 11x17)
Bedrooms: 0 Bathrooms: 0
Value: $0
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $206.10
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952- 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2
Issued By: / Perm ittee Signature:
lt��._E� g
Call 503.639.4175 by 7:00 a.m. for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
V
Building Permit Application
Residential RECEIVED FOR OFFICE USE ONLY
City
Rece ived /� �
of Tigard Permi No .:
g Date /By: LP'
�� � aOlt- QdloG
13125 SW Hall Blvd., Tigard, OR
1111 M q 9 )N 1- 7 20 11 D an Review I �` 11 G1 ,'
Phone: 503.718.2439 Fax: 503.598.1 i 1 I Date /By: Q ` 4V Other Permit:
T 1 G A R D Inspection Line: 503.639 Date Ready /By: n / Juris: ® See Page 2 for
/ - Notified /Meth �
Internet: www.tigard - or.gov CITY OF TIGARD // 677--
r / Supplemental Information
BUILDING DIVISION ` r -„ C4, 4-( i
TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
® I- and 2- family dwelling ❑ Commercial /industrial Valuation: $
El Accessory building 1=1 Multi-family Number of bedrooms:
I=1 Master builder 1=1 Other:
Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: /2 / 2 6 S sw /7 1 New dwelling area: square feet
City/State /ZIP: Portland , ofz 6123 Garage /carport area: square feet
Suite/bldg. /apt. no.: Project name: a( , ( . Q c( h . Covered porch area: square feet
Cross street /directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL - USE CHECKLIST
Subdivision: Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Roof Mount PV System Valuation: $
Existing building area: square feet
New building area: square feet
El OWNER ❑ TENANT Number of stories:
,
Name: J}-m ru l I Gl h Q (2 c ]I-I Type of construction:
Address: Occupancy groups:
City /State /ZIP: 5/4/1/I Existing:
Phone: ( ) Fax: ( ) New:
❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name: SolarCity Corporation (Please refer to fee schedule)
Structural plan review fee (or deposit):
Contact name: Caitlin Horsley
FLS plan review fee (if applicable):
Address: 6132 NE 112 Ave
Total fees due upon application:
City /State /ZIP: Portland
Phone: (503) 9560610 Fax: : (503) 5366513 Amount received:
E - mail: chorsley @solarcity.com
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
'CONTRACTOR roof -top mounted PhotoVoltaic Solar Panel System.
Business name: SolarCity Corporation Submit two (2) sets of roof plan with connection details
and fire department access, along with the 2010 Oregon
Address: 6132 NE 112 Ave Solar Installation Specialty Code checklist.
City/State /ZIP: Portland, Oregon 97220 Permit Fee (includes p lan review $180.00
and administrative fees):
Phone: (503) 9560610 Fax: (503) 4366513 State surcharge (12% of permit fee): X2,1 60
CCB lie.: 180498
Total fee due upon application: $201.0
Authorized signature: r ` / f This permit application expires if a pe ..'t is not obtained
/ l within 180 days after it has been accepted as
Print name: Caitlin Ho ey
i Date: / n� 7 / �i * Fee methodology set by Tri-County Building Industry
t1� Service Board.
I:\ Building \Permits \ BUP- RESPermitApp.doc 02/24/2011 440- 4613T(1 I /02 /COM /WEB)
Y aJ ?•
CITY OF TIGARD
F . Building Division
i.
• ®b r.
� : ®� �� � 1 3125 SW Hall Blvd.
Tigard, OR 97223
503.639.4171
r-
www.tigard- or.gov
t
9 Specialty 2010 Oregon Solar Installation S ecialt Code E I
Check List for Prescriptive Installation of Roof - Mounted JUN 1 7 2011
PhotoVoltaic Solar Panel System CITY OFT1G
N 01 V1 �1G N
Installation address: a (57 (SGU.P,�,YI
City: P ri ,n-U Zip: q7.2
Owners name: mr U.116. A- riff 0 (14,A-
Contractors name: cO e/
Contractors CCB number: / D//g.(r/
If "Yes ", does not
Flood Hazard Area Is the installation ❑ Yes qualify for the
located in a flood prescriptive path
plain/ flood way follow OSSC or
ORSC for design
rr requirements.
Wind Exposure Is the wind r ' es If "Yes ", qualifies for
exposure "C" or less ❑ No the prescriptive
path.
Installations on Is the Ground Snow If "Yes ", qualifies for
detached single/ Load 70 psf or less. the prescriptive
two - family dwelling/ ' es path.
Ground Snow single/ two - family
Load townhomes and /or ❑ No
their accessory
structures.
Installations on all Is the Ground Snow If "Yes ", qualifies for
structures other Load 50 psf or less. the prescriptive •
than above cAS path.
❑ No
1
Is the construction
material wood and cdYes If "Yes ", qualifies for
does the the prescriptive
Type of constructions qualify ❑ No path.
Construction as "conventional
light frame"
construction?
Is the spacing 24 If "Yes ", qualifies for
Pre - engineered /Yes inches or less. the prescriptive
trusses. (Yes path.
Roof framing ❑ No
members Is the spacing 24 If "Yes ", qualifies for
Nominal lumber
/Yes less. the prescriptive
Yes path.
❑ No
•
Is the combined • Wes If "Yes ", qualifies for
weight of the PV the prescriptive
modules and ❑ No .. path.
racking less than or
Solar installation equal to 4.5 psf.
Is the solar
installation layout in r/Yes If "Yes ", qualifies for
accordance with the prescriptive
Section 305.4(3) of ❑ No path.
the 2010 Oregon
Solar Code.
❑ Metal
Check the type of ❑ Single layer of If roofing material is
roofing material. woo shingle/ shake one of the three
Max. Two layers types checked,
Roofing material qualifies for the
of composition prescriptive path.
shin le.
Is the roof mounted ZYes • If "Yes ", qualifies for
Connections of the solar assembly o No the prescriptive
solar assembly to connected to roof path.
the roof framing or blocking
directly.
Attachment of roof Is the gauge 26 or ❑ Yes If "Yes ", qualifies for
mounted solar less? ❑ No the prescriptive
systems directly to path.
standing seam
metal panels
Page 2 of 4
115 lbs for 60 inch If "Yes ", qualifies for
Minimum Uplift spacing or less the prescriptive
rating of Clamps: ❑ Yes path.
❑ No
75 lbs for 48 inches If "Yes ", qualifies for
spacing or less the prescriptive
❑ Yes path.
❑ No
If the spacing falls
Spacing of clamps? Minimum 24 inches within 24 inches and
60 inches, qualifies
in Maximum 60 inches for the prescriptive
path.
If the width of the
Width of roofing 18 inches or less panel is less than
panels? 18 inches, qualifies
for the prescriptive
in path.
o Yes
Size and spacing of Minimum #10 at 24 ❑ No
fastener? inches o/c If "Yes ", qualifies for
the prescriptive
path.
Is the roof decking ❑ Yes If "Yes ", qualifies for
of WSP min. ' /z" ❑ No the prescriptive
thickness, decking path.
connected to
framing members w/
•
min. 8d nails @
6 "/12" o /c.
Maximum 18 inches Is the height less . If "Yes ", qualifies for
•
Height of the solar from the top of the than or equal to 18 the prescriptive
modules module to the roof inc es path.
surface
Yes
• ❑ No
Page 3 of 4
$ubmitta >l� � ou rtn Y °rfofPecr�,pi�e Inal�aic�n
Show the location of the PV system in relation to buildings, structures,
property lines, and, as applicable, flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5x11 inches.
Attach a simple structural plan showing the roof framing (rafter size, type,
and spacing) and PV module system racking attachment.
Structural System must be shown in sufficient detail and clarity to assess whether it
Plan meets the prescriptive construction requirements as listed earlier above in
the matrix.
Minimum size of the plan is 8.5x11 inches.
* Manufacturer: 9iirt
* Model Number: V L 230 Tom'
* Listing Agency: uL «O3
Page4of4