Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
P • • • • • • • • • • • • • • • • • • • • • . -.. _ • • • - • • a ! - • • v - - • ! • • i *a I • • • : • • • • . • ii • • • • Ma • 7• + L ~ ' • •• I • • • a _ • , • • I - 1 r • • • • • • 4. '- • • • O I p O — M M L i•, T . :,,,, MM i INK • . • L� o ~ o ' 1 M M 1111 1 lir M ,, i . , 11 b km go 1, OP i • „ oc E i ' . I la ill AI 1 k - likIL 1; : W ' r • i ff . edi k S rga bibb, . , •• .....L.6. • 4 i r . Pil IR = la _1 AI 4.111 Wel ' 1151 .14. Ill itili EZrea IM 1 t r + • 1:-.... .0 ROOF FRAMING PL, Ty OF TIGARD PR/ - Conditionally p o r et See Letter to: Follow f I i lu < Attah o +a I ,l W� Permit Number. -.:��,�,��� p ` �� I I t • s not a a z:. he 1+ of at1 OFFICE COPY `�'� r r z z e� ac . �� rs o private easements. The ap N o z o plicant is urged to contact any such parties and ul op m > m secure thier approval before commencing work. ¢3 3 ¢a d x_111 Building Permit for 10112 StoneBridge J1463 Project These plans comply with the State's 2010 Oregon Solar Installation Specialty Code. •••• • • . • • •••• ••• • • • • • • OOOOOO •• • o d "- 1011 StoneBridge J 1463 Project Installation Method MIN 2x4 JOIST OR TRUSS 4 5/3" CHORD ins 2' MAX. ON CENTER' — _ --- PHOTOVOLTAIC MODULE PROVIDE CONNECTION TO ROOF 4141% ca 4' -0" MAX. ON CENTER AT EACH END OF RAIL • / ----------- FLASHING AS REQUIRED TO SEALa f)F •....• • ... . • 3 1/2" x 5, /16" STAINLESS LAG BOLT --------- --` `— ~ ! ` • . • • • • S .. . `- SEAL AT ROOF PENET'N ' • • • ' a- I • • • • June 3, 2011 Copyright © 2011, LiveLight Energy LLC 3 CCB: 187491 • •• •• • •• • • • • • •• • • • •, w • • • • • r • • • • • • • • • • • • • • • • • • • • • • • • • City of Tigard • • 1111 • '' Building Division MAY 31 2011 13125 SW Hall Blvd, Tigard, OR 9722: ; ' • • : • • ' • Phone: 503.718.2439 Fax: 503.598.1960: : • • ' • . «•' -�:. • .•• • • •• ••• T I G A R D Inspection Line: 503.639.4175 www.tigard - or.gov ••• ••• • • •• •• • • • • • • • • ••• ••• •• • • • • • 2010 Oregon Solar Installation S p e cialty Code Check List for Prescriptive Installation of Roof - Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 15368 SW Arlington Terrace City: Tigard Zip: 97224 Owner's Name: Stonebridge Homes Date: 5 -31 -11 Contractor's Name: LiveLight Engergy CCB #: 187491 Design Parameters of the Property /Structure If "Yes ", does not Flood Hazard Is the installatio ❑ Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? ® N OSSC or ORSC for design requirements. Is the wind exposure ® Yes If "Yes ", qualifies for Wind Exposure "C" or less? ❑ N the prescriptive path. Installations on detached Is the Ground Snow single /two - family Load 70 psf or less? dwelling/single /two- If "Yes ", qualifies for family townhomes ® Yes the prescriptive path. and /or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? If "Yes ", qualifies for structures other than El Yes the prescriptive path. above ❑ No 1 1: /Building/ Forms /PhotoVoltaic- Checklist.docx •• • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • •• • ••• • • •• • • • • • • • • • Is the construction • • Yes • • • : • • , • • • material wood. and does "Yes", • • t h e conSti qualify If qualifies for ConstfatiYtti • • • • « • • No the prescriptive path. as n conventional light frame" 9041 ame" construction? 00 00 4 • .. • • • • • • • • • Is the spacing 24 inches . . •• ••• ••• • • • • • • • • • • • •• • or less? Pre - engineered trusses. ® Yes If "Yes ", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. ❑ If "Yes ", qualifies for Yes the prescriptive path. ❑ No Is the combined weight ® Yes of the PV modules and If "Yes ", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance Yes If "Yes ", qualifies for with Section 305.4(3) of ❑ No the prescriptive path. the 2010 Oregon Solar Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle /shake checked, qualifies for Max. two layers the prescriptive path. ® of composition shingle. Is the roof mounted ® Yes Connections of solar assembly the solar assembly connected to roof No If e the p prreesy cri i pa f ptivve e ies path. to the roof framing or blocking ❑ directly? 2 I: /Bull ding / Forms /PhotoV oltaic- Checklist.docx • • . • • • • • • • • • •••. • • • • . .. • • . . ••• • • . . . . • • • •• • • • 0 Yes • • • • • • If "'es"rqualifies for Is the gauge 26 or less? • • • • • • • • N . . the eresc. iptive path. • ••• • . • 115 lbs fpr 6Q incl; . • • • • spacing•or less • •• -I• •• • • • ' •• ff \' ", qualifies for Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If "Yes ", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inche Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum #10 at 24 inches o /c? Size and spacing of If "Yes ", qualifies for fastener? ❑ Yes the prescriptive path. ❑ No Is the roof decking of WSP min. %2" thickness, ❑ Yes decking connected to If "Yes ", qualifies for framing members ❑ No the prescriptive path. w /min. 8d nails @ 6 "/12" o /c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If "Yes ", qualifies for solar modules module to the roof ® Yes the prescriptive path. surface. ❑ No 3 I:/ Building /Forms /Photovoltaic- Checklist.docx • •• .• •• . • • • . • • . • . • • • • • . . . • • • • .• • • • • . . • • • . . . . • •.. .. • • • • •. • Submlttai Qocuments required for Prescriptive Installations • • • •, • • •• • • • Slow the tota on of the PV system in relation to buildings, structures, ••• ••• • ••• propertylines, and, as applicable, flood hazard areas. Site Plan. .. Detailsi u�t De clear and easy to read. • • • • • . • • • . • • • ZVlit s ze of the plan is 8.5 x 11 inches. • Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: SolarWorld Model Number: SW250 Listing Agency: UL 4 11Building/ Foims /PhotoVoltaic- Checklist.docx 14 i