Loading...
Plans y � RECEIVED JUN 7 2011 CITY OF TIGARD BUILDING DIVISION 4Y 12 - ke, 2 � C.� I �' l( Gr Pfd` 1 9 fir- 1 \ r � vi � 9 ©� Q jI �r L OFFICE COPY RECEIVED JUN 7 2011 CITY OF TIGARD BUILDING DIVISION 4x12 header _ 14` 5 -0x3 -0 window 3 ` V • 70' �. t■111••1=11. r- N. t ®!MM tal • r. •i' . GLACIER POINT 17468 NW Blacktail Dr. CONSTRUCTION Portland, OR 97229 General Construction and Remodeling This proposal includes all applicable materials and installation with the following exceptions: a) Due to weather any outside painting portion of the work may be delayed until there is Suitable weather for painting. b) Price is good for 30 days. c) Does not include any necessary relocation or updates to the existing utility's or obstructions that may be in the wall. d) We may need to move the window location a foot or so towards the garage door depending on the wires from the electrical outlet under the window that you see in the picture Time frame: approx 1 working day s / e g 6 2/6/ �� /�sF 3 Payment schedule: 17 2 • Full payment on completion of above mentioned items. Sincerely, Karl Luchsinger Details phone: 503.610.8072 I glacierpointconstruction.com Portland, Oregon I Licensed Bonded Insured CCB#191868