Loading...
ROW2011-00002 • RECEVELJ. • APPLICATION FOR AN 1 LU i i a PUBLIC FACILITY IMPROVEMENT (PFJ), PERMIT = Development Engineering TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 FAX: (503) 624 -0752 FOR STAFF USE ONLY General Information: Engineering Property Address /Location(s): /4- ?PAT 0 SJ DA'in r -- Case No.: Kpc,J Z4I/ ' 0000 Z 5 E 4 31/ a/ (ply Receipt No.: Date: I/ *Applicant's Name: ALg7�J u,1-itl:,y trWEe Ors Application Accepted By: t 1 / Address: (la S ' / 40E Posted 1/4/08 City /State: y 4lEctrai'v o 2 Zip: 7 7006 Primary Contact: 12-7/4/J REQUIRED SUBMITTAL INFORMATION Phone: 3 t.3 ( 2 - -rse/ Fax: 'S 5- 1 Professional Engineered Plans are required for: Contractor's Name: 7C 41477'J d4/1E/ 6 - itr"E42 Oz 3-Ter,:7° • Street Widening CCB# Expiration: • Subdivision Infrastructure Address: • Main utility line extension: 0 Storm Drain, Sanitary - Tigard City /State: Zip: 0 Water - Tigard Water Service Area Phone: Fax: (includes Durham, King City and a portion of unincorporated Washington County) Plans By: " -Ju- * *Note: See Engineer Plan Address: Submittal Checklist attached. City /State: Zip: For all other work: Submit scaled sketch Phone: Fax: of the work to be done. (see attached minimum sketch requirements and p t 5 — vc provided sketch area). Description of work P 1 Rill '- +�� (` `LC' "-r`s !2 ofsra- .' or /E #Lfss 0,47Eg LzwE /k,ed-ss tioj 71 0 Swl O 7r4,1/ Estimated value of work (within the public right -of -way): $ P4 Is work related to a LAND -USE DECISION? YES f I NO X I If so, please specify (MLP, SDR, SUB, etc.) case #: Is the work related to a BUILDING PERMIT? YES n NO rg If so, please specify (BUILDING PERMIT) case #: *NOTE: Person specified as "Applicant" shall be designated "Permitee" and shall provide financial assurance for the work. • CITY OF TIGARD RIGHT OF WAY PERMIT ` COMMUNITY DEVELOPMENT Permit #: ROW2011 -00002 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 01/27/2011 Parcel: SEG3418/624 Jurisdiction: Site address: Subdivision: Lot: Project: TUALATIN VALLEY WATER DISTRICT Project Description: Pot - holing for existing utilities for design of 16" trenchless water line across Pacific Hwy @ SW Dartmouth Owner: FEES Description Date Amount PHONE: FEE 3 fVL� Contractor: PHONE: FAX: Applicant: TUALATIN VALLEY WATER DISTRICT 1850 SW 170TH AVE BEAVERTON, OR 97006 PHONE: 503 - 591 -0986 17 7) Total 0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee /Applicant Signature: J11. )-41 , 4 t -4t Issued By: II Special Conditions (See Attached) Note: THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for ROW2011 -00002 Type: Condition Name: Status: Seven : ROW 01- CUSTOM CONDITION Applied Notice <Custom Condition goes here> ROW 02- PERMIT & PLAN REQ ON SITE Applied Notice A copy of the permit and all attachments, and a copy of the approved construction plan and all amendments shall be available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance. ROW 03 -TRAF CTRL - SPECIF (CITY) Applied Notice The City's standard specification for traffic control is "Manual on Uniform Traffic Control Devices for Streets and Highways ", U.S. Dept. of Transportation, F.H.A., 1988 Ed. ROW 04 -TRAF CTRL -CONTR RESPON FOR Applied Notice Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in accordance with a City (job specific) approved traffic control plan. A copy of the approved traffic control plan shall be available at the work area. ROW 05 -TRAF CTRL -ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without having first obtained written approval from the City Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide Emergency Services (Tigard Police Dept., Tualatin Fire & Rescue) and to Tri -Met and Tigard School District. ROW 06 -TRAF CTRL - ADVANCE WARNING Applied Notice Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance notification sign at each end of the construction area 72 hours (min.) before initiation of construction work. ROW 07 -TRAF CTRL -PRIV PROP ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not, shall be cause for work stoppage until effective access is established. ROW 08 -TRAF CTRL - DEVICES IN PLACE Applied Notice Traffic control devices, flagpersons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. ROW 09 -TRAF /NOISE CTRL -WORK HRS Applied Notice No work will be permitted during the hours of darkness, nor between 9:00 p.m. to 7:00 a.m. Monday through Friday, nor between 9:00 p.m. to 8:00 a.m. Saturday, nor between 9:00 p.m. to 9:00 a.m. Sunday. ROW 10 -TRAF CTRL -MIN LANE WIDTH Applied Notice Minimum travel lane width shall be eleven (11) feet; pedestrian travel shall also be provided for. ROW 11 -TRAF CTRL -CITY CAN MODIFY Applied Notice The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic and to assure public safety. ROW 12 -INSP 24 HR NOTICE REQUIRED Applied Notice The permit holder or his contractor shall notify the City's inspector <Zen Dutson at 503 = 7182472 or email at zen @tigard- or.gov twenty -four (24) hours prior to commencing work, twenty -four (24) hours prior to any staged inspection, and after completing work covered by the permit. ROW 13- HAZARDS -CERT OF INS Applied Notice Maintenance of the work area and approach roads is the responsibility of the permit holder. The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. A copy of the permit holders Certificate of Insurance shall be available at the work area. ROW 14- DEBRIS - MATERIALS Applied Notice The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate cleanup and stoppage of work to accomplish cleanup. ROW 15- EROSION CTRL REQ Applied Notice Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q. requirements. The City may at any time order corrective action and stoppage of work to accomplish effective erosion control. ROW 16- REPAIRS -LIKE MATERIALS REQ Applied Notice Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs, flowers, barkdust, existing signs, pavement markings, mailboxes, etc., shall be reestablished, reinstalled or replaced, with like kind and material. ROW 17- DRAINAGE CONTROL REQ Applied Notice Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent private property, public property and the receiving system is not adversely impacted. The City may, at any time, order corrective action and stoppage of work to accomplish effective drainage control. ROW 18- UTILITIES PRELOCATION REQ Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080. Copies of the rules may be obtained from the Center by calling (503) 232 -1987. If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders expense. ROW 19- UTILITY LOCATIONAL CONFLICT Applied Notice Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall coordinate the work with affected utility agencies. ROW 20- TRENCH - PATCH /SAFETY /LBILITY Applied Notice A temporary hard - surface patch (Cold mix A.C. or Hot mix A.C. base paving) shall be placed on trenches within roadways at the end of each day's work. No trench, on site or off site, shall be left at any time in an unsafe condition. The permit holder is responsible for and is liable for hazards or damage resulting from the work. ROW 21- REPAIRS REQ - INSPTR OPINION Applied Notice Work provided for under the permit shall include repair of existing facilities (roads, ditches, etc.) as may be necessary, in the City Inspectors opinion, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the permit holders expense. ROW 22 -AS- BUILT /ENGR CERTIF REQ Applied Notice At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public right -of -way shall submit complete "as- built" drawings showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance (form attached). ROW 23 -DAILY INSP REPORTS REQ Applied Notice The permit holders Engineer /Inspector shall submit daily inspection reports, on a weekly basis, to the City's Inspector. (see Developer- Engineer Agreement note #5). ROW 24- TESTS /REPTS TO VALIDT CLMS Applied Notice The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's engineer or contractor to validate claims of material or construction adequacy /compliance. Such tests /reports shall be provided at the permit holder's expense. ROW 25- RELEASE - WAIVER REQ Applied Notice The permit holder shall provide a copy of a properly executed Release & Waiver document to the City for each ownership disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction. ROW 26- MONUMENT PROTECTION REQ Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holders expense. ROW 27 -PROB SOLVING - RESPON PARTY Applied Notice The permit holder shall provide to the City Inspector, in writing, the names and 24 -hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of an emergency. The permit holder shall notify the City Inspector, in writing, of any /all assignment changes. ROW 28- CONSTR SAFETY - RESPON PARTY Applied Notice The permit holder shall cause his contractor to provide to the City Inspector, in writing, the name and 24 hr emergency telephone number of a designated "Competent Person" responsible for construction safety as per OR -OSHA, Chap. 437, Div. 3 Construction, Subdivision P - Excavations. The contractor shall notify the City Inspector of any /all assignment changes. ROW 29- ESMT /RT OF ENTRY - RESPON Applied Notice It is the sole responsibility of the permit holder to provide for proper right -of -entry and /or easements prior to starting work. Proof of right -of -entry, or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the permit holder's failure to obtain or provide for proof of right -of -entry or easements. ROAD WORK AHEAD 7 WORK HR: 9PM TO 5 AM N BE PREPARED TO STOP 4 DURATION: 1 NIGHT W E FLAGGER AHEAD 4 EQUIPMENT: VAC TRUCK & RW 4 ; RIGHT LANE CLOSED 2 CREW TRUCK ' ;' ;" S TRANSITION LEFT • 2 IMPA DARTMOUTH & ;' ;' ;' <; ARROW BO SET UP 1 HWY 99W, TVW WILL VAC & RL ; " ;' ;' 3 s NRT &NLT1 EA. 1EA LOCATE 6 LOCATIONS , , , , / ' ' BARRELS & WEIGHT'S 2 . TL ; ; • CON 45 ' ' LIGHT & GEN 1 " BPT ' BIKES MERGE 1 PLACE RWA EAST & WE'ST ' ,/ /1(,) ON SW PFAFFLE ST MERGE TAPER FA Si 245' 8 BARRELS " i87 Type 3 ; -91, I SITE #2 IARROW B arric / r / I / '' /� I • RWA 700, BOARD . s FLAGGER WILL ;' : ;/ ;'' WORK SITE, FLAGGER BPTS 700 .\ , ' 12" WILL ESCORT PEDESTRIANS, ig P 7 7, 111 111 Y � 12' ' , FLAGGER WILL ASSIST c�0,�1l LSR 70 O • } CREW TO & FROM SITE. tizrP) SHIFT•TAP R NLT 12' . .• MERGE TAPER 65' 4 CONES TRAFFIC ' .• _� 245' 8 CON S LIGHTS ■\ ::` FA NOTE: ADJUST TO FIELD ` CONDITIONS & WORK SITE • ;' ;'/ S��� TL • • •O � .RLC • 12! , 11 T 1 ,' F ;12' ( SITE #1 I 0 � 1 �\ • . WA " ,/, V Not to Scale ; ; r s• " / ; % * RROW BOARD • / , % DOUBLE ARROW \\ ,' f ', /^' f i y p e 3 Barricade 9 49 `.,` 2 , / FA EAVE •RT . \\ C) f TURN OPEN - ! n ' B PTS i o MERGE TAPER , 4; -M 245' 8 BARRELS , ' TL z. c. (01,31126c PL4■) ; PLACE RWA ON RLC 1 217 CUFF RAMP . ( l P �-�" L 4 t So / r / ^ / • , / vJ ^M/T (y, / + F � / ; ' RWA , — , C V , . . ....Tr \ \ \\\\ \5\21\ r ' --'- ' -- --s. v_..-----------'-j ''' - .. S \ a c ..-- -----v. \ \ a ‘ °.•,\ 4 ''' /0/ „ , 1 i \ 4 r4 \ \ . \ \ , 0- i. .0 . 1• 01, 7 77 , I \ \ \ i \ , c's ,.' 7 7 \ , \ \ \ ' \p 4 ' 4 \ • \ 7 \\ell\ \ a , \ \ \ 7 \Q) Ab C) '\--- ,,.. \■' \ \ \ \ \ \ \ \ \ \ \ 4 \ ‘ ,,,,,. „. ai • --/—\ \ \ . \ ? . \ * 0 . 4 , \ 7 , v 4' ,,,, ,,,7-9 \ 4p . \.- - •< . \ ...., \ ,c). .,., ,,. , , ,i.. . , . . , , . \ \A \ \ A d .'\ . . \\ /(--) L-0 , , ' \ I q , \\ . 4. \ \\ N. \ \\, , \ i k :S \q \ 6”) \\ \\ . I •'..V ,* ipplooro " /*A111■1111 ,v,,,,,..X' , . ,o 'k . \ N \ \ • ■ \ \ \ \ \ . \ \ \ \ \ 0 \ ,...-"" < .1. 4 \\ q ..- .,... -- _______Z• /.....).„. \ \ \ 41101 4 .. :\\ r . \ \\ --‘ \ ■\ \\ 7 \ \ . \ 4. ..- ...." 01 / \%\\\\ \ \ \\\ Nk ic i i ••• •■■••1117 .••••■ \ \ \ . \ \ S \ ... 3 ROAD WORK AHEAD 7 WORK HR: 9PM TO 5 AM N BE PREPARED TO STOP 4 DURATION; 1 NIGHT • FLAGGER AHEAD 4 EQUIPMENT: VAC TRUCK & RWA w E RIGHT LANE CLOSED 2 CREW TRUCK S TRANSITION LEFT 2 IMPA DARTMOUTH & ;' ; < A RROW BOARD SET UP 1 HWY 99W. TVW WILL VAC & RL ,'' / ' / 3S / / NRT &NLT1 EA. lEA LOCATE 6 LOCATIONS /' BARRELS & WEIGHT'S 2 . TL " ;' CONES 45 ! ' ' ' ' / i LIGHT & GEN 1 BIKES MERGE 1 BPT PLACE RWA EAST & WEST ' 4 . ti ON SW PFAFFLE S MERGE TAPER Fe ' x S/ 245 8 BARRELS i • ' xi Ty, 3 B_ i i i i de ' ` i " � Barrica i i i i RWA SITE #2 ARROW . 70� • - 's � �r. .' BOARD % % ,, !' FLAGGER WILLL �. � / ;' % • ;" / WORK SITE, FLAGGER BPTS 700 ,,` 12/ / WILL ESCORT • PEDESTRIANS, p E 700 V12' � „ f , FLAGGER WILL ASSIST Lrxi4i�) hL/ O i SHIFT -TAP 12' 65' 4 CONES • ' & MERGE TAPER TRAFFIC le, g 245' 8 CON S • LIGHTS . FA NOTE: ADJUST TO FIELD ,,' CONDITIONS & WORK SITE ./ ;' ; % 5 .. ,. TL 0 • \ RLC / , 121 ,'71 'c' - 1 , / ; , �,- SITE #1 T4 �, TI • • WA N ot to Scale ;' �' 1t/ f ,, — `� • ;' ' - A RROW BOARD '1,2 ; ; 4 DOUBLE ARROW V N i, YPe 3 Barricade C... s � \\ i, ; .// t FA - • EAVE RT cr, TURN OPEN ,•;Z o BPTS • . / ; / ``' MERGE TAPER � M 245' 8 BARRELS • ( °►�A�'F�C e.crTg6 c p4410 ' o -g gt % I PLACE RWA ON I RLC. 217 (OFF RAMP h' ,' RWA • \ , I \ \ 4 \ \,,.\ . \ \ - \ \ t \ L' \\ \ Fa\ a �_ m / -k I \ \� �•' NN \S I \ \ Q \\ i I I 2 \ \ \ \.4 , . , , A. 4.. \\ ZZ I . (-4- \ \, i -. \ <6 „5' # * V ''' '''' I \ c, \\ \ V \ \\ mom. a / � ' � #4\ .+ \ \ I s \ \ \ \ \ a / • \ \ \ ��\ X \ \ \q s / , ` _o 6., .7 I ,\, \ \ \ \ \ \ \ \ / ■ \\ \ \ \' Q \ \s \ T \ 40 ' s \ 7 / 7 \C, _CH- . A 4. • „ - ,,,r „c). \,,, v, .3 . \ W A\ \ _ A' \ T - Y • \ u" y � , - - \ \\ \ I Q \\ \ J' /� 0e ��ii \ \T \\ \ \ \ \\ \ ilik 'b ' .1' • ,'• T ''' \ \ /;;;+ '-:; .'''..-.k \‘ \\ \ k \ , ,;,/e/ A ‘'‘. 4 '5' leXt. \ ca \ \ \ \ \ \ \ \ . \ \ • \ \ • .. ,0 / 10* . ■ C-2 . „, 2Z.'. . \ \ \ , A1,4 ..-..,...... 0 0 - 2- \ \ \ ' l_ j N ...., \ \ ,.\\. \ i. • 1..• \ . r<\ \\ '\ T \ \ \ V c' Q.. i'M - ' \'`.1 . \ \ • // �, \ `\ \ . s. \,.. \\\\ o / / \ `� / / - • �_ / a \ �\\• \\ \ \ . \. \ d Finish grade Surfacing -match MULTIPLE INSTALLATIONS E Topsoil or existing material Top of subgrade as directed ° N Base material C ° m 4c m c� - m O c E 0 co... $ DIAMETER MIN. SPACE BETWEEN PIPES m oi2 n -O.. 2 Upto48° 24' �9 N OBE m 4 U 13 p g m < °; r 48" to 72" One half (/) dia. of pipe W t. Di,. )gv 9 rr a • m e o 9 �� Ij F If t. g -`. a) P: m 0. TABLE A s a " " " " a (in) (in) (in) (in) Nom +____,- .e. Pipe diameter 4 10 4 8 °A° 6 10 4 8 r n 8 10 6 10 _ "C' Pipe bedding, f see Table A 10 10 6 10 Trench foundation I . ' II" air" "11 n j E 12 12 6 10 stabilization, as require — 11 i1 — II_z — III , •, 15 12 6 - 10 GENERAL NOTES FOR ALL DETAILS: 18 16 6 12 1. Surfacing of paved areas shall comply with street cut Std. Dr RD302. 21 16 6 12 24' min. g P P Y g• 2. For pipe installation in embankment areas where the trench method will not be 24 18 6 12 used and the pipe Is is 36' diameter, increase dimension "B" to nominal pipe diameter. 30 18 6 12 3. Pipes over 72' diameter are structures, and are not applicable to this drawing. 36 24 6 14 4. See Std. Drg. RD336 for tracer wire details (When required). 42 24 6 14 48 24 6 - 14 CA LC. BOOK NO. N/A BASE NE REPORT DATE 16- DEC-2009 54 24 6 - 14 NOTE: All material and wDna accordance p shall be In ac aence with the current Oregon Standard SpadOo5Ions 60 24 6 14 OREGON STANDARD DRAWINGS The selection and use of this 66 24 6 14 Standard Drawing, while designed In accordance with generally TRENCH IE ZONE AND MULTIPLE Gr 72 24 6 I 14 I d accepted engineering principles 73 For pipes over 72' diameter, INSTALLATIONS 0 see general note 3. and practices, is the sole mean- 0 slblltty of the user and should not 2008 o be used without consulting a DATE REVISION DESCRIPTION Registered Professional Engineer. a� ... ua '" Effective Date: June 1, 2010 - November 30, 2010 RD300