Loading...
Report �{ Main Offur Seder', Office Bend Office Carlson ■ esting, Inc. BaO Sir (03) 5 000 Hudson SL,A'E 630?SOB ell 1 Inc. Tigard, OR 97 ??3 Salem OR 97301 Brnd, OR 9770? Phone: (503) 6b'J -3460 Phone (503) 589 -1 ?5? Phone. (541) 330-9155 Fax /5031684 -0954 Fax S5031589-1309 Fos (5411 330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER September 13, 2010 T0901159 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: National Safety Co — New Office Building 7059 SW Gonzaga Street — Tigard, OR Permit No.: BUP2009 -00077 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. q ,(„ L i Neil S. Shannon Project Manager NSS /rb cc: National Safety Co Inc — John Skourtes Fax: 503 620 -5338 City of Tigard Building Division James G Pierson Inc — Peder Golberg Dibenedetto / Thomson / Livingstone — Michael Madias Carlson Testing, Inc. Incompleted Items List (NCL) Sep 10, 2010 T0901159. Project Name: NATIONAL SAFETY CO - NEW OFFICE BUILDING Project Address: 7059 SW GONZAGA STREET TIGARD OR Permit No: BUP2009 -00077 P.O. No: Project Manager: NEIL S. SHANNON Item # Insp. Date Item Description Compliance CTI Sign -Off Date Corrected 1 YV 09/18/2009 CONCRETE MIX DESIGN 30500ZW WAS NOT APPROVED BY APPROVED AS BUILT BY NEIL S. SHANNON 09/10/2010 EOR. PHONE CONVERSATION WITH EOR PEDER GOLBERG. 9/22/09: PER INSPECTION THIS DATE, NCL IS STILL OUTSTANDING. CC:NATIONAL SAFETY CO INC - JOHN SKOURTES CITY OF TIGARD BUILDING DIVISION JAMES G PIERSON INC - PEDER GOLBERG DIBENEDETTO /THOMSON /LIVINGSTONE - MICHAEL MADIAS NATIONAL SAFETY CO INC - JOHN SKOURTES Page: 1 SEP -13 -2010 MON 12:48 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 02/03 I Inc. Alnin O,Q7u Yalam Ofr.. l Oflly i lima Carlson Testing, 1 1J//SII'/lur, 7221 allpP lHnlrrvi l7., NE 60:501 VA4 GI`J Li■ ■li■ • Tpun /, OR 97 ^'] ,1'rrlem, Wf Y73U/ Aund. (1R v >7nT l Krum. (SW) 681,300 1'hnn.r: (J0317,Y9 -I'J! Nm,'; (.+J /17.In.Yf7t Construct.Ion Materials Testing & Inspection fn "''`u, +lfaa -r01 Prv: /50313Hil -)31W r >n nau. {.(n.u Special Inspection FINAL SUMMARY LETTER September 13, 2010 T0901159 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: National Safety Co — New Office Building 7059 SW Gonzaga Street — Tigard, OR Permit No.: BUP2009 -00077 Dear Sir or Madam: This is to certify that in accordance with Section 1704,1.2 of the international Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Cg . (1 . 4 41tAAA_4.4 Neil S. Shannon Project Manager NSS /rb CC; National Safety Co Inc — John Skourtes r-ax: 503 6ZO -5338 City of Tigard Building Division James G Pierson Inc — Peder Golberg Dibenedetto / Thomson / Livingstone — Michael Medias Carlson Testing, Inc. Incompleted Items List (NCL) m Sep 10,2010 - TO901159. ry Project Name: NATIONAL SAFETY CO - NEW OFFICE BUILDING Project Address: 7059 SW GONEAGA STREET TIGAaRD OR Permit No: BIJP2009 -00077 30 P.O. No: Project Manager: NEIL S. SHANNON Item # Insp. Date Item Description Date °' P Compliance CTI Sign-Off Corrected `d 1 YV 09/18/2009 CONCRETE MIX DESIGN 30500Zw WAS NOT APPROVED BY APPROVED AS BUILT BY NEIL S. SHANNON 05/10/2010 ERR. PHONE CONVERSATION WITH a> a0 FOR PEDER GOLBERG. 9/22/09: PER INSPECTION THIS DATE, NCL IS STILL OUTSTANDING. m Cc) - • C) n 0 cn 0 w CID CO r' 0 CO 01 F' CC: NATIONAL. SAFETY CO INC - JOHN SKOUR T ES CITY OF TIGARD BUILDING DIVISION -o JAMES G PIERSON INC - PEDER GOLBERG DIBEiEDETTO /TDONSON /LIVINGSTONE - MICHAEL MADIAS o w NATIOPJAL SAFETY CO INC - JOHN SKOURTES � 0 w Page: 1 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Salem Office (50)589 -1252 �6. 1 Salem Office (5033) 589 -1252 Tigard Office (503) 684-3460 Report of In -Place Asphaltic Concrete Density Tests Date: 08/12/2010 Job Number: T0901159. Permit #: BUP2009 -00077 Client: NATIONAL SAFETY CO INC - JOHN SKOURTES Project: NATIONAL SAFETY CO - NEW OFFICE BUILDING Address: 7059 SW GONZAGA STREET TIGARD OR Description: HMAC 1/2" MIX C KNIFE RIVER Rice Value: 151.9 Marshall Value: % Required: 92.0 Method of Test: ASTM D2950 Source of Value Dated 08/05/2010 was supplied by Knife River. Standard Count for Gauge Serial #: Trox . 39510 Density: 2748 Calibration Date: _CIE 10 Date of Test Density Lift Thick- In Place Test No. Test Location Mode Count No. mess Density Comp. 6'S OF CURB LINE END OF PLACEMENT AT CAST 1 08 -05 1 BS 1092 2" 140.9 92.8 100'W OF TEST 1 AT DRIVE APPROACH 1 08 -05 2 BS 1078 2" 141.9 93.4 Please see reverse side for additional information. El Distribute attachments. Job Number: T0901159. Date of Test: 08/05/2010 Date of Test Density Lift Thick- In Place % Test No. Test Location Mode Count No. ness Density Comp. Asterisked ( *) percent compaction test results did not meet listed acceptance criteria. Remarks: NATIONAL SAFETY CO INC - JOHN SKOURTES FAX /503- 620 -5338 TO: CITY OF TIGARD BUILDING DIVISION JAMES G PIERSON INC - PEDER GOLBERG DIBENEDETTO /THOMSON /LIVINGSTONE - MICHAEL MADIAS NATIONAL SAFETY CO INC - JOHN SKOURTES Typist: KA Test By: H . TIMZEN Reviewed By: Neil Shannon On 08/11/2010 Test results were discussed and left withKIETH Of KNL INDUSTRIES Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345-0289 Carlson Testing, Inc. Salem Office Tigard Office (503) 589 -1252 (503) 684-3460 Report Of In -Place Density Tests Date: 08/10/2010 Job Number: T0901159. Permit #: BUP2009 -00077 Client: NATIONAL SAFETY CO INC - JOHN SKOURTES Project: NATIONAL SAFETY CO - NEW OFFICE BUILDING Address: 7059 SW GONZAGA STREET TIGARD OR REJECT KNIFE RIVER - COFFEE LAKE Material Description: Maximum Dry Density: 124.3 lbs. /cu. ft. Optimum Moisture: 13 % Required Compaction: 92 Standard Count for Gauge Serial # Troxler 39510 Method of Test: ASTM D2 92 2 , D3 017 / ASTM D698 Source of Value Dated 08/03/2010 is project specific. Standard Counts - Density: 2727 Moisture: 640 Calibration Data: 06/2010 cyo In -Place Density Date Of Test Test Density Moist. Ele. Field (lbs/cu. ft.) % Code v Mode Depth ( ) Test No. Location Count Count Ft. Moist. Wet Dry Comp. 1459 91 DT 2" TSG 5.5 120.1 113.8 08 -03 1 BC 200' PATCH NORTH SIDE GONZAGA 10'W OF DRIVEWAY CL 92 1 1484 1 86 I DT 1 2" I TSG 15.2 1 119 1 113.1 08 -03 2 BC 200' PATCH NORTH SIDE GONZAGA 50'E OF DRIVEWAY CL 91* 1 3549 1 115 1 DT 1 2" 1 TSG 1 7 1 125.6 I 117.4 08 -03 3 BC CENTER OF DRIVEWAY CL 94 I I I I I I I 1 I Please see reverse side for additional information. ❑ Distribute attachments. Job Number: T0901159. Date Of Test: 08/03/2010 In -Place Density �• Date Of Test Code Test Density Moist. Mode Depth Elev. Field (lbs /cu. ft.) Test No. Location Count Count Ft. Moist. Wet Dry Comp. I I I I I I I I 1 I I I I I I I I I I I I I I I 1 I I I 1 Asterisked ( *) percent compaction test results did not meet listed acceptance criteria. Remarks: NATIONAL SAFETY CO INC - JOHN SKOURTES FAX /503- 620 -5338 TO: CITY OF TIGARD BUILDING DIVISION JAMES G PIERSON INC - PEDER GOLBERG DIBENEDETTO /THOMSON /LIVINGSTONE - MICHAEL MADIAS NATIONAL SAFETY CO INC - JOHN SKOURTES Typist: CN Test By: B . SHILHANEK Reviewed By: Neil Shannon On 08/09/2010 Test results were discussed and left with GARY of Code Descriptions NC - No code (general fill areas and backfill /original ground /not fil BC - Base course (Rock Only) ET - Electrical trench SF - Structural fill (Buildings Non- Residential) RW - Retaining wall backfill GT - Gass line trench LF - Residential lot engineered fill WT - Water line trench CT - Cable, phone trenches RF - Roadway engineered fill (Soil Only) ST - Sanitary sewer trench PS - Pavement subgrade DT - Storm drain trench Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. Carlson Testing, inc. NCL of Low Compressive Strength Tests & Compaction Tests Aug 10, 2010 T0901159. Project Name: NATIONAL SAFETY CO - NEW OFFICE BUILDING Project Address: 7059 SW GONZAGA STREET TIGARD OR PerinitNo: BUP2009 -00077 P.O. No: Project Manager: NEIL S. SHANNON Compliance CTI Sign -Off Date Corrected Sample Type Register # Date Molded Date Tested Set # Days PSI Strength Req Concrete 92424 09/22/2009 10/20/2009 28 2860 3000 Average f'c @ 28 days 2860 Concrete 92424 09/22/2009 11/17/2009 56 3510 3000 Location: FOUNDATION WALLS & ELEVATOR FOUNDATION Sample Type Proctor Date Tested Test # o Comp Req % Comp Soils 2 08/03/2010 BC 2 91 92 Location: 200' PATCH NORTH SIDE GONZAGA 50'E OF DRIVEWAY CL NATIONAL SAFETY CO INC - JOHN SKOURTES TO :CITY OF TIGARD BUILDING DIVISION JAMES G PIERSON INC - PEDER GOLBERG DIBENEDETTO /THOMSON /LIVINGSTONE - MICHAEL MADIAS NATIONAL SAFETY CO INC - JOHN SKOURTES Page: 1 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carls ugene Office (541) 345 -0289 tA1 �s ®n Testing, Inc. I Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Moisture - Density Relationship OD 9- 000 7 Client: National Safety Co. Inc. - John Skourtes 8/5/2010 Project: National Safety Co. - New Office Building Job Number: T0901159 Material Type: Reject Sampled from: Grade Source: Knife River - Coffee Lake Test Method: ASTM D -698 C, C -136, D -2216 Date Sampled: 08/03/10 Sample Method: ASTM D -75 Date Tested: 08/03/10 Preparation Method: Moist Oversized Material: Removed Compacting Method: Manual Hammer Type: Circular 130 - 129 128 127 126 125 124 123 122 121 120 119 118 • 117 116 • 115 114 113 6 112 111 110 8 9 10 11 12 13 14 15 16 17 18 Moisture Content ( %) Assumed 100% Saturation Curve: 2.800 Optimum Moisture:I 13.5% Max. Dry Density:I 124.3 I lbs/ft Percent Passing 3/4" Sieve: 96.2% cn CC: National Safety Co Inc. - John Skourtes - Fax: 503 -620 -5338 City of Tigard Building Division James G. Pierson Inc. - Peder Golberg Dibenedetto/Thomson /Livingstone - Michael Madias a , Reviewed By: Neil S. Shannon Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CT1 has distributed this report shall be entitled to use or rely upon the information contained in this document.