Loading...
Report Slain Office Salon Office Bend Office Carlson Testing, Inc. 5130 5N'llun_ 8 4i 4060 Hudson St NE 630250B Polry &7 #11 Tigard OR 97223 Salem OR 97301 Band, OR 97702 Phone. (503) 654 -3460 Phone 15037 SS9 -1252 Phone (541) 330 -9155 Pax 15031684-0954 Far 15031589 13 09 Fax (54/1 3311 -9169 Construction Materials Testing & Inspection Special Inspection ( FINAL SUMMARY LETTER November 5, 2007 T0705190 City of Tigard FILE COPY 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Westgate Baptist Church - Tenant Improvement 10730 SW 130` Street — Tigard, OR Permit No.: BUP2007 -00243 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Structural Steel — Field Erection Only All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, I . Neil Shanno Project Manager NS /Im cc: Duttons Remodeling — Brian Dutton AL BRADFORD CONRAD CROW ENGINEERING CO. CIVIL • STRUCTURAL • MECHANICAL ENGINEERS November 1, 2007 rill COPN Hap Watkins Building Official City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 RE: Permit No. BUP 2007 -00243 Westgate Baptist Church 12930 SW Scholls Ferry Road Tigard, OR Structural Observation visits have been made for the work covered by the above noted permit, in accordance with the State of Oregon 2004 Structural Specialty Code Section 1709. I am aware of no outstanding deficiencies. Respectfully Submitted, Z fi f 103 / John F. Bradford, SE ,, President 0 .0 cc. Brian Dutton, Westgate Baptist Chur ` 3 PI 9925 S.W. Nimbus Avenue • Suite 110 • Beaverton, Oregon 97008 -7387 • Phone (503) 213 -2013 Facsimile (503) 213 -2018 • Email inforequest @bccengineering.com •www.bccengineering.com 00-it CONSTRUCTION OBSERVATION REPORT Project Name: Westgate Baptist Church Project No.: 01371 -4 Project Address: 12930 SW Scholls Ferry Road Tigard, OR Project Engineer: John Bradford Client: Westgate Baptist Church Contact Person: Brian Dutton Phone: 503 - 407 -1627 Building Department: City of Tigard Phone: Building Permit No.: Contractor: Brian Dutton Phone: Project Manager: Phone: Job Superintendent: Brain Dutton Phone: Date of Site Visit: 9 -06 -07 Time: 4:45 pm Status of construction: Framing for ceiling 99% complete. Non - structural soffit panels (sound baffles) being installed. Platform is framed, no finish materials in place. Wall framing complete and sheet rocked. Observations: Purpose of the visit was to obse the installation of the ceiling system overt auditorium. 1. Horizontal ceiling brace to glu -lam beam at front of auditorium at side bays. Field condition not covered by drawings. Minor modification to contractors installation required. See attached sketch. No other exceptions taken. Purpose of Engineer's Site Visit Structural observation does not include nor waive the responsibility for the inspections required by International Building Code Sections 109 (building inspections) and 1704 (special inspections) as defined in the Quality Assurance Plan. The purpose of Engineer's visits to the site is to enable Engineer to provide for the Owner a greater degree of confidence that the completed work of Contractor(s) will conform generally to r • 47 Construction Observation Report 9 -06 -07 Bradford Conrad Crow Engineering Co. Design Documents and that the integrity of the design concept as reflected in the Design Documents has been implemented by Contractor(s). Construction observation means the visual observation of the structural system in accordance with IBC Section 1709, including, but not limited to, the elements and connections at significant construction stages, and the completed structure for general conformance to the approved plans and specifications. Construction observation as defined in this section is not to be relied upon by others as a guarantee of the work and not to be construed to relieve the Contractor(s) of its obligations and responsibilities under the construction contract, approved permit documents, and applicable workmanship provisions of the International Building Code and standards referenced by the approved permit documents. Construction observation does not include responsibility for the inspection or superintendence of construction processes, site conditions, operations, equipment, personnel or the maintenance of a safe place to work, or any safety in, on, or about the work site. Re ctfully Submitted, )61 ,e4,/fi John F. Bradfu d, S.E. President re•.-- _ , i N, cc: Bruce Conachan ,, : . = ' , .. ;:i ....-6 - 1,. , - s Steve Conrad u'� 4,, `' 7 „' Mike Stimson - .4,. ..,,-. , ' - I_ _ 7 Ci l V j y , •-•‘.::-'' C r' < —;: 7 9 -06 -07 CONSTRUCTION OBSERVATION REPORT.doc Page 2 of 2 1.._ mots d. -- 'rnCk el 4 cG; l:n e_ s; 6 . dJ . ,A /6 £ .r!A 1 L oefc-. 5,44-0 w UP I 4-161 y ► ____ i i �" IIIIIII 1 J II ----a-7= ANNINI J..33.4.,At C. . ...A.- P12 G Li:" f 44 ;u ) s0 if 4 .L. , 1 \- a 0-44e, c :, 1 `c✓f " / / 0 ' 1 ' / Cln l ip