Report Bend Office (541) 330 -9155 ® eotechnical Office (503) 601 -8250 Carison Testing, g 9 Inc. I 1 Eugene Office (541) 345 -0289 Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 October 15, 2010 T1003224 Permit No. BUP2010 -00157 %' SL kkitt /NC1 -TGnI S&UARE. IR0 c03 P.O. No. 135340 FIELD INSPECTION REPORT DATES COVERED: October 6, 2010 PROJECT: Express Store #2049 @ Washington Square — Tenant Improvement ADDRESS: 9585 SW Washington Square Rd — Tigard, OR INSPECTOR: L. Warfield — COP#601, WABO #WAR049960, OBOA #361, ICBO #0870272 I 10 -06 -10 - Grouting As requested, CTI representative was on site to observe grout infill of an existing CMU wall on grid 26 at new opening location (refer to detail `B' on sheet S061). Contractor discovered that existing CMU wall is partially grouted at 2' on center, vertically. The detail on sheet 6.1 specifies all cells to be fully grouted above the new opening. Holes were cut into the empty cells at 2 course down from the beam on grid 26 at roof line, for the width of new opening. Cells wee filled with a 3/8" grout from Knife River (mix #60N3R2S0 with intrusion aid added at plant). Height of grout pour was approximately 16'. Slump was approximately 9 ". Grout was placed with a line pump and was not vibrated. There were no samples cast as these were no CMU block to make grout samples per ASTM methods. * ** CHECK ONE BOX ONLY*** YES NO 1. This is a preliminary inspection only. — OR — 2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the work that are non - conforming items are clearly stated above and will be added to the NCL. Remaining portions ❑ ❑ of the work, which are not preliminary in nature, are to be considered as conforming. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON, ESTING, INC. / " Jame-/" . Hietpas Proj: Manager / / L! / / dk c. Horizon Retail Construction — Jimmy Guardalabene City of Tigard Building Division Paul J Ford & Company Shremshock Architects Inc 10 -06 -10 fr 129 doc