Loading...
Correspondence C harter Mechanical 79 yo sw Nutiz -I KE_R 1a - May a 2011 Dan Nelson Senior Plans Examiner City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 Subject: Mechanical Permit # MEC2011- 00150, Plan Review Corrections Dan, Charter Mechanical received the plan review comments letter that you sent us on 4/20/11. We offer the following additional information to address the two action items that required follow -up. Item #1: Please see our "Attachment #1" that includes Uponor product literature for the PEX tubing we plan to use for our radiant slab system. You will note that this product has ASTM F877 approval ratings as required by chapter 12 of the mechanical code. Item #2: We have provided two sets of supporting documents to address the plan review comment. The first set of documents is tagged as "Attachment #2" and it contains 25 -pages engineering drawings and calculations by CIDA Architects that demonstrates that the existing roof structure can support the new roof top air handling units with some additional support members that will be installed. I believe the information in "attachment #2" was previously submitted to the City of Tigard with the Building Permit. The second set of documents is tagged as "Attachment #3" and contains 35 -pages the requested seismic calculations and details for lateral and vertical loads for all HVAC equipment weighing greater than 400 Ibs, prepared by Worth Technical Services. Please feel free to call me at 503 - 783 -2514 if you wish to discuss this information in greater detail or if you need anything additional. Thanks for your assistance throughout this process! Sincerely, CHARTER MECHANICAL /Y John Yeager, LEED® Project Manager cc: Richard Smoke, file 9636 SW Herman Road Tualatin OR 97062- 8080OR CCB 171657503.691.1700 Fax 503.691.1717