Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
„ . , Debbie Adamski From: Debbie Adamski Sent: Thursday, February 24, 201117:24 AM To: R . = e Ier� Wafter Barnet Cc: Mark VanDomelen Subject: FWIStreamborn Final 41940 SW Pacific jjy;,'SIT2010= 00022 Attachments: 20110224092709230.pdf FYI — Attached is a copy of the final erosion control inspection approval by Billy Terry. I believe the property owner is intending to call in for the final inspection on this permit in the near future. I just wanted to make sure that you knew the erosion control had been signed off. From: Billy Terry [ mailto :TerryB @CleanWaterServices.org] Sent: Thursday, February 24, 2011 9:51 AM To: 'jmcdowellle @hotmail.com' Cc: Debbie Adamski; Steve Rivett Subject: Streamborn Final Hello John the only enforcement action issued by Clean Water Services for that project was on 11- 10 -10. The Stop Work order was placed on that site because there was no Erosion Control permit and the site was not in compliance. The permit was later acquired and the site brought into compliance. The Stop Work was removed at that time. When the landscape was completed on or about 1 -26 -10 the final inspection for EC was not called in so I finaled the Erosion Control on the job. Clean Water Services has no holds. I have copied permitting with the city of Tigard on this issue. You will find the PDF of your final attached if there is anything else give me a call at 503 - 681 -3656. Thank you Billy Terry. (C �� dao / 0'u i 0 IJ 12t D/9 j/1 r X0 - /Kilo t / /r /5 ©K d � ,- rao /b oaaa� Pa0/0- 00 /17 . "-- 610k WAG L- do1/4. 6 J -�. §4/,, 1 e- /C/ • 7 - �� PERMIT N0. X a. • CleanWa --‘!';'• Services Our commitment is clear. LOT EROSION CONTROL INSPECTION REPORT DATE /''626- • INSPECTOR , .•fry /e,/ s 4t ; ,l L OWNER/PERMITEE e r�� -x� 4 571" SITE ADDRESS • adi e i 99 "' 2 AppRovED _ • FINAL INSPECTION • THIS SITE MEETS THE POST - CONSTRUCTION EROSION CONTROL REQUIREMENTS SET FORTH IN CLEAN WATER SERVICES RESOLUTION AND ORDER NOTE: IF POST- CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING • • EMPLOYED ON THIS SI'Z'E TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION, • THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE OR PERMANENT GROUND COVER IS ESTABLISHED. A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL. • OTHER • THANK YOU FOR YOUR COOPERATION! .►- t —5�- INSPECTOR ` PHONE