Report ni <.. t. ".a ..s. r. .tl \YA " \. .r..7` q^— r ." y r.7....f' i... v 1 ry .t .,.rin.. -'I.r .n..tn1»....y.r'M1 -`- . .,.^....r^: t i .... J... - .. A4'• . ,r .< ..v,f 2- r '•�c` 4 � 0 ..: :`.v.. - r
PERMIT NO. 3U2020/0- 001
CleanWater Services
Our commitment is clear. LOT 5/F
EROSION CONTROL INSPECTION REPORT
t
DATE 3 - // INSPECTOR ,5,,.Q ( i .; SUBDIVISION �i ; M/
OWNER/PERMITEE e, 0
SITE ADDRESS / L/ 33 5" 5 . I .t ), / c2 - 5 . Ave
APPROVED
•
FINAL \INSPECTION
s,
THIS SITE MEETS THE POST - CONSTRUCTION
EROSION CONTROL REQUIREMENTS SET
FORTH IN CLEAN WATER SERVICES
RESOLUTION AND ORDER
NOTE: IF POST - CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING
EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION,
THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE
OR PERMANENT GROUND COVER IS ESTABLISHED.
A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE
FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES
THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL.
OTHER
THANK YOU FOR YOUR COOPERATION!
INSPECTOR 5. (Z ,, �� %'! PHONE k 3-//d