Loading...
Permit ,r CITY OF TIGARD PERMIT PERMIT #: BUP1999 -00354 u P � l1l D EVELOPMENT SERVICES D ATE ISSUED: 11/10/99 13125 SW Hall Blvd.. Tigard, OR 97223 (503) 639 -4171 SITE ADDRESS: 10751 SW 130TH AVE PARCEL: 1S133AC KNOW SUBDIVISION: KNOWLEDGE BEGINNINGS DAYCA P¼L \f RIGIN ZONING: R -25 BLOCK: LOT: Oi JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: NEW FIRST: 12.368 sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N : sf N: S: E: W: OCCUPANCY GRP: E3 TOTAL AREA: sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: 309 BASEMENT: sf AREA SEP. RATED: STOR: 1 HT: 17 ft GARAGE: sf OCCU SEP. RATED: BSMT ?: N MEZZ ?: N REQD SETBACKS REQUIRED FLOOR LOAD: 60 psf LEFT: ft RGHT: ft FIR SPKL: Y SMOK DET:Y DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : Y HNDICP ACC:Y BEDRMS: BATHS: IMP SURFACE: PRO CORR: N PARKING: VALUE: $ 689,887.00 Remarks: Construction of a new 12,368 square foot daycare facility. Owner: Contractor: HULSEY DEVELOPMENT. CO S D DEACON PO BOX 8600 PO BOX 25392 BEND, OR 97708 PORTLAND, OR 97225 Phone: 541 -385 -9285 Phone: 297 -8791 Reg #: LIC 00038138 FEES REQUIRED INSPECTIONS Type By Date Amount Receipt Mechanical Permit Require Plumb Top Out PLCK DEB 8/16/99 $1,240.20 99- 317438 Electrical Permit Required Framing lnsp Sprinkler Permit Required Roof nailng Insp FIRE DEB 8/16/99 $763.20 99- 317438 Fire Alarm Permit Requirec Insulation Insp PRMT DEB 11/10/99 $1,908.00 99- 319701 Plumbing Permit Required Shear Wall lnsp 5PCT DEB 11/10/99 $133.56 99- 319701 Foot/Found lnsp Gyp Board lnsp Footing Drain Susp Ceilng Insp (additional fees not listed here) Reinf Steel lnsp Sprinkler Underslab Inspec Total $56,415.56 Slab lnsp - Smoke detector insp Plm /undslb Insp Appr /sdwlk Insp This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by calling (503) 246 -1987. , Pe Si, nature: Alb, fl / - • Is . ued By: lk t ; �_ . A 4' JLL d Call 639 -4175 by 7 p.m. for an inspection the next business day . CITY OF TIGARD Commercial Building Permit Application Rec'd By 4 13125 SW HALL BLVD. New Construction and Additions Date Rec'd g • Date to P.E. g' /(p _ 9 TIGARD, OR 97223 Date to DST - ,el - quR) (503) 6394171 Permit# £uf/ a P - 35 / Print or Type Related S Incomplete or illegible applications will not be accepted Called q P t 1 Name of Development/Project I Job I- NskowL.¢"F C3cc.ov.k r-4.1. r•-■.C.,-S Existing Building 0 New Building Address Street Address Suite l On 5k 5.‘-_1. \",eVA Building Bldg # City /State Zip Data Cv,aR U, 0 a x-1'17 j Existing Use of Building or Property: • Name Property Nvtt,;,� eoG.-...t -4.43,p N r Lo. VAL....-1--4 -+- Owner Mailing Address Suite Proposed Use of Building or Property: 9 o. 4 g(.o 00 C,A—CC.��C- City /State Zip Phone Si-ti No. ®f Stories: Po oCt c:110 e) 1 ii .`12/85 4 dH E__ Occupant Name 64. Sq. Ft. ®f Project: K-N Ob•a\.taQc . ?mesa., - p- {c�5 _ \Z - f Name ®ccupancy Class(es) Contractor ,'D — DS i -Ca ti) E• 3 Prior to permit ailing Address Suite Type(s) of Construction issuance, a copy of all licenses 0 69 }( 539 .-N are required if City /State Zip Phone Will this project have a Fire Suppression System? expired in C.O.T. /� 4 q Yes No database Pa D2 ` 7a-g5 / 7- 179 Oregon Con t C ont. Board Lic.# Exp. ate Americans with lsabilities Act (AIWA) 3 c 1 J? - /o 9 9 Valuati ®n X 25% = $ Participation Complete Accessibility Form Name }!• Srlcr Project ' $ Architect ST�i✓c.E.- Ac-rc-aoe..... .c Valuation Mailing Address Suite J;4) �8'�. (F00 5.%,..-1. Gok.A.wv. A -7-- atee Plans Required: See Matrix for number of sets to submit City /State Zip Phone on back Engineer Name I hereby acknowledge that I have read this application, that the information FQ�L.A[� -N (;A`r+cs�.tvTLI Ge - tla, given is correct, that I am the owner or authorized agent of the owner, and Mailing Address Suite that plans submitted are in compliance with Oregon State Laws. \\ 8" 1 ■. - aAct.,t,___ C. Sig tore of Ow er/ a . AL Date C City /State Zip S�; u C. Ti?=.5A-AO , o Q °1,'1'■0\ 383. ■K2-8 on act Pers Nam O Phone ccii Indicate type of work: NewA Addition 0 Demolition 0 I /LL I gUIJ i 3ES -5' Z.B.S Accessory Structure 0 Foundation Only 0 Alteration 0 Repair 0 Other 0 FOR OFFICE USE ONLY Description of work: P - - ;; , � 0 Map/TL# , �.� LandiUse " � A rua� c " i � v \ t - r a - 0 - ∎c-. -- t ' - ` - S re ; SV 3 1 9 e d r o no 7 . 0 0 - 6 b . : 1 5 . ' - ' , 'OUP/WI. D . t pe..0• - .. - re Notes _ 1 .. 1 /l'//0/art - e 3 0 w Parks: Estimated # of Employees Is TIF ¢ Y If the above figure is not supplied at the time of application, the city will , calculate the fee based upon the number of parking spaces.:.... ;; °� „;... .„:.. , -,.. _ / � _r.: _, -.`_ 1:',V;., .. , Q Al Note: Site Work Permit Application must precede or accompany Building ®PG /0? 7 �✓' °2 � Permit Application ' ®! . a° F 5 7 ` 1 '''() �! , CVO I: \COMNEW.DOC (DST) 5198 ` i3 a G � 2 � io � ,b � 'd . . or-. COMMERCIAL REQUIREMENT PLANMSAU MATRIX ib .A1'0. ::::.................,::::*%-t: . ,t:„..:.,..„-........:,—,.......,.....---- " .....- - •••••)-1,:uriortii$4....''''.4t:i.• :•:-....':::::::::-.:•:-: '..-".: titVM0 contain .- • .:::.:.:...v:1 d:P::::::':',',''':::::i'i:, 14140:::.R00pW .. „.. - - :.- .,.::1.-ett40.0000R:..::::.....,......„.....,.........:-.--...).....'t s‹.-).TH:.....:ti.".....*:'....9491.:.:°.:1:.P9::!Ai''irdF:i7rir:?-:.::::::::11:::1::::!..1.1:1-1i' te4000 :....„... F011.„0...„!,..t.,f„i.:00.........:::.....1i.i.:::::000M7.01.:;14°.•::::.°!114 --:.:...:—... '' -:.: : ... lirbe , :::t0:010.0V - . 1 ..... p .... ...: . ! . .P ., :.0 .....6 fO r rli 5 1 ..: ...i.: 1 04 . ...ti.. ::::,:. - ---- f.::::#10:::$,,:,..KF,..„„:,:,......:„:...„,.......,.:.1..:.......,.....t.,, ..... lamin................ '' ..... . , . ... ........... to ii..................:,........... tr:Koitvm: 4-..p. o .. ,t oily Fitd .. aA1.11....:it.f,:iiio:O.....:0:17.11.•;::•or.".,...i.A.v.::dt......i...6...:0..:,:::P:::..0:T:9: *!!e.........::-....•6tit:„.....r4..:;..-...'"°!'"'-:•''''.**-:-... Wa ,:]...qOpptyvTi40040:M0110L,..,..............:- .:p IT - a t ri " s l.:' . .: : #:!!r11 : 1 . 1 KEY: •-•-• - .... - TTAL Z ----••• -- -..... •••••••-••••""'""'""""drSU BM l' '::::: '''.........:::'....--:::::''' W.'"bnittd e- • - .....::.,::„........................ ......„ .. IvF",..!. .: a ••-• ................",",„,-::::•• Ll.......: ---- - - - - S (Private) Work .., iii . :: , .......... , ::::: „ ..1...: . .. , ....... : .,...„.... : ...............„ . :.....:... : ......„..„....„„„„ : „ .:.:............. 1 ....„,...„:„::„„„„......,........,...------ 1 B tection System B (New or Add) 3 S F === Site Fire B u t e i l d n o o g F (New or Add or Alt) 1 M (Newsor Add or Alt) 1 M : Plumbing Mpl e u c m hanical B & M (New or Add) P (New, Add, or Alt) 2 New .:-. New 2 E = Electrical B & M & P (New or Add) Building Add Alt E (New, Add, or Alt) 2 3 -- Addition B & F & M & P & E = Alternation to Existing ..........:....:.:„........:.:::::.::: .........,.....".............,....,...„.„..: (New , Add) Building ...... „„:::,*-:::::-„,:::,:• • •- : :: ' , "'' ; '" .....: n" .. :14 .- -3 . '.:ti: : : : • .. .... ... R_••••:.MIAlt)-:::::-::::::::.:g•:,:::::4:::::.:•-::::-„..„:-„' ,(14ditilai:.....:::.....„...:.•-:..:,.• '...„•••••••••••""".... _ •••• .- -...---.-:..-- ,----.::::--. .....,.................,..,..,..:::..,..::::::.:..:::::::::::.::,.......„..::.......:....... ,••:. :•'•• . .........mitipiAit):::::•........-..::::::-...,..:-.....:.::::::::,:.....:::::::,,,,..:.•••••••• - • - :.:•,...:!........aiik,.,..::.::::::.:.,,,..::::......!iiii:::i.....i*::::••:•-::-•-• • ......: ......- ........:......... ....]:....i.....::::-..i:ili:i.....:•::::::::::::::::,:::::::... .:;:::::: . - . .. . ........ ................................................................. :!:::::::::::::.:.....................::::::.--.....,...-...i ri.....::::::"..5:Alyi.,...........,..::::::::::..,..........,...,...,..,J.::::::..:.,;.„, .. .. '..--- -....,.............................„...,..:......:::::::::4.i::::::::::::::-.:...-....::::::,:::: ...........:••••••:::::::•:::::::,:::: .. ..:::&......p:4,..i.Eiii:4:::P:(.A...-.::::1:1)...-....i..1:::::-.,..."::::::::::::::::::::::i.:-::.:::::::::::.:......----• . :-....iiis*.i.M.:::::::::::..........:.!.....2:::::::.:;!;,:iiiiii . . .. • . - .2 NOTES: ............,-.....,,,:-::::.:::::..---....,.*•:,...,,,:::::::-.:,---: .................:.......................... . . ........... ..----------------,------- --------- „ ----- .. .. .. ................. ...................................................................................................................................... ................................................... ._...,,.. . I: \dsts \forms \matrxcom.doc 10/29/98 ''CITY OF TIGARD BUILDING INSPECTION DIVISION MST 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 i� j/1/ Date Requested • 1 1/z 7/00 AM ( PM 2tob D• 8l FPS Location Cb S ( / Suite MEC (Rqq -m ?ci 3 Contact Person OW V S • Ph s 6 10 — g . PLM Contractor Ph SWR IIUILDIN Tenant/Owner • ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain Crawl Drain Inspection No es: /� SGN Slab B �iYI Vl/i. S : p1 L. p q q q -00o63 0 i S/ 4S SIT l qqq- CO S6I Post & Beam Cu p i99q -e ooZ— _ - �� b l 9G y - 6n �' t� Stu- ',(Z OA to G S ett its rams �? wa On< t Q LrG ' Drywa I Nailin - Firew -1 <Fire Ala usp• eili• Misc: S : - PART FAIL PLUMBING • Post & Beam V � , . Under Slab � Top Out :( Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL CHANT Post & Beam Rough In Gas Line Smoke Dampers trIP *ASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final a s PART FAIL Backfill /Grading Sanitary Sewer Storm Drain [ I Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access Fire Supply Line ADA Approach /Sidewalk Date 14/Z7 G v Inspector v. C.A . Ext� k Other PART FAIL DO NOT REMOVE this inspection record from the job site. • �', /075 Sp,/ /3O DATE: PLANS CHECK NO.: PROJECT TITLE: fb COUNTYWIDE �'`��'�� - �� %' , c �..�,� ,,���:� TRAFFIC IMPACT FEE APPLICANT: . J£GD co • WORKSHEET MAILING Ag000 : (FOR NON- SINGLE FAMILY USES) Cl; Y21P /PHON ,�J7 real 5 7 70 RATE PER TAX MAP NO.: /5/33 -08000 LAND USE CATEGORY TRIP SITUS NO. ADDRESS: • RESIDENTIAL $201.00 / °75, oS1.cl / BUSINESS AND COMMERCIAL $51.00 OFFICE $184.00 .INDUSTRIAL •$193.00 INSTITUTIONAL PAY MENT METHOD: • CASH /CHECK CREDIT • INSTITUTIONAL ONLY: BANCROFT (PROMISSORY NOTE) LAND USE CATEGORY DESCRIPTION OF WEEKDAY AVG. TRIP WEEKEND AVG. TRIP DEFER TO OCCUPANCY 5 '5 USE Y 43 CIR. I RATE Za 7 RATE (, . / 5 BASIS: H e_ APP���9 1,) i /'2O f , 2 2 2 , A ) S72 4.e 67- , i 3 l O g - D4 , / 64-24_ L ' 7 6 - • • C A L C U L A T I O N S : i G : ag5i5 ` D 2 - "MiP/��r£�fr�Ci'', Ji 7 c/,.1Y 406.4 4<-1 " 1A- )Ef. 4 ✓4 S. P Ief TS x uSs • Cal x S)y(( x � 7 PROJECT,T k — G S �4 '� F J C , ^� ?. FEE: y 9 3s— L (ar3. s X 5 83' 6c ' — 5,93. — FOR ACCOUNTING PURPOSES ONLY ADDITIONAL NOTES: ✓C "' i ��. _ 15 ROAD AMT.: / 5 X L, 14 = h C , I /J Mr TRANSIT AMT.: 9. ! O > > O Li t • a 1 \ .Q i� ; r 6/7/99 hscottk\tif\worksheet 99- OO.doc CC: WASHINGTON COUNT/ TIF NOTEB.. 0.% fe>/* A\ August 16, 1999 CITY OF TIGA� Hulsey Development Company OREGON PO Box 86700 Bend OR 97708 TRAFFIC IMPACT FEE FOR Knowledge Beginnings, 10751 SW 130th Ave Enclosed with this letter you will find a calculation sheet showing the computation that has been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid for the project noted above. The amount of the TIF is $50,935. You have three payment options available to you. The first is to pay the TIF at the time you are issued a building permit. The second is to arrange for payment over time by signing a promissory note (if you wish to exercise this second option please contact me for additional details). The third option is to defer payment until occupancy. Traffic impact fees are subject to an annual increase of up to 6% if not paid or financed prior to July 1st of each year. Please note that you may appeal the discretionary decisions made in determining the appropriate category and the amount of the fee based on that category. A notice of appeal must be received by the City Recorder no later than 5:00 p.m. on 8/30/99 and must be accompanied by the $625.00 appeal fee required by Washington County. Although filed with the City .Recorder, an appeal would be heard by the Washington County Hearings Officer. If you have any questions, or if I can be of further service, please contact me at 639- 4171. ebbie Adamski Development Services Technician c: TIF file Building file I: \DSTS\3TIF.DOT 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 RECEIVED AUG 1 1999 �'�mp�a COUNTYWIDE COMMUNITY BEVELp � !'� ~' TRAFFIC IMPACT FEE CITY O TIGAR PAYMENT OPTION FORM OREGON • y I 875'1 5W /3a Date Site Address • ,�,✓a (AJL ZOGC let= g- Project Name Plan Check # I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore, I request the following. (choose whichever option or options are applicable): y l Cash or Check n Credit Voucher n Bancroft or Installment Payments or . n_ . _The. Ordinance. allows.. for deferral of payment of _the TIF until issuance of the occupancy permit if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option. I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand that the TIF will be recalculated based on the prevailing rates at the time of payment. Please be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not subject to appeal. IV ER/ • ' PLICANT OWNER/APPLICANT cc: Building Permit File Payment Option Notebook 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 is \dsts \forms \tifsub.doc 10/29/98 A COUNTYWIDE TRAFFIC IMPACT FEE APPEAL INFORMATION Attached is a copy of the Director's decision on this Traffic Impact Fee assessment or Traffic Impact Fee Credit /Offset request This decision may be appealed and a public hearing held by filing a signed petition for review (appeal) within fourteen (14) calendar days of the date written notice is provided (date mailed) APPEAL PERIOD: Date mailed: g-11.0 -q1 to 5:00PM on Appeal Due Date A motion for reconsideration also may be filed within seven calendar days of the date written notice of the decision is provided (see Section 208 of the Washington County Community Development Code). A motion for reconsideration does not stop the appeal period(s) from running and is available only as an extraordinary remedy for when a mistake of law or fact has occurred. A motion for reconsideration requires a filing fee of $ P.5. c This decision will be final if an appeal is not filed by the due date(s), and a motion for reconsideration is not granted by the Director. The complete file is available at for review. A petition for review (appeal) must contain the following: 1. The name of the applicant and the relevant casefle /building permit /other development permit number, 2. The name and signature of the petitioner filing the petition for review (appeal). If a group consisting of more than one person is filing a single petition for review, one individual shall be designated as the group's representative for all contacts with the Department. All Department communications regarding the petition, including correspondence, shall be with this representative; 3. A statement of the interest of the petitioner, 4. The date the notice of decision was sent as specified In the notice; 5. The petition for review (appeal) shall state the relevant facts, applicable ordinance provisions, and relief sought; and 6. The fee of $625.00 for Director's decisions being appealed to the Washington County Hearings Officer. For further appeal information contact: '..)E b39- /i 7i k 4/ /o formt3 l .w DATE: PLANS NO.: PROJECT TITLE: COUNTYWIDE k'GL: L Et) � � �' � �; ���, ,�� .5 TRAFFIC IMPACT FEE • APPLICANT: /-7 f. ' �� J�«i�r� % e0 WORKSHEET MAILING � d C G )C Ag�c0 : (FOR NON - SINGLE FAMILY USES) C TY21P /PHONE: fiJ770 9977 RATE PER TAX MAP NO.: /si33AC -o8oO0 LAND USE CATEGORY TRIP SITUS NO. ADDRESS: RESIDENTIAL $201.00 , /075/ c i /30 BUSINESS AND COMMERCIAL $51.00 OFFICE $184.00 INDUSTRIAL $193.00 X_ INSTITUTIONAL $83.00 PAYMENT METHOD: CASH /CHECK CREDIT INSTITUTIONAL ONLY: BANCROFT (PROMISSORY NOTE) LAND USE CATEGORY DESCRIPTION OF WEEKDAY AVG. TRIP WEEKEND AVG. TRIP DEFER TO OCCUPANCY 565- +Y e-A C712. I RATE lO 7 RATE (o . /S BASIS: -1 1E- RPk-, ex/J P20 fic-- D,(J S u i /� 3!A g j 9 �/ 9 C'.a//r /L CALCULATIONS: %G s '065/5 `02 - 2 /P /C,/?TE. �frcEt 'E,./F�^h1 ' 4.)fi,k0A-4-/ + WE '/Lib /� ✓L L�t?'� e t9 7t X l-Ft u "S £. � A - T- 6c2 -/ ( (07 x 5)+( x �� b g3• �'`` • 7 I a• 3, X 4c1 ' I (� t 3, / ,g T 1 P. PROJECTUiP Q ENERATION: S 8 ac. r kc— FEE: LS X 5a iJ�S (o/3 - = G,�5. J, r" 0 �� FOR ACCOUNTING PURPOSES ONLY ADDITIONAL NOTES: (),P__ ` �� F _ I ROAD AMT.: ` 7 7,k 4 -, S• °G X L. /'4 _ 5c 1 ) .10 " - F1'r TRANSIT AMT.: 9 fi- / - PREPAI3 9 6/7/99 j:lscottF tif\worksheet 99- OO.doc CC: WASHINGTON COUNTY TIF NOTEBOOK • isp . . _ moo August 25, 1999 - ° -° CITY OF TIGARD O REGON Steele Associates, Architects . 600 SW Columbia, Suite 3000 Bend, OR 97702 RE: Knowledge Beginnings Site Plan Review 10731 SW 130th Avenue PC #: 8 -10c SIT #: 99 -00354 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1998 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: - FIRE .fit ,;: ,.,: ,,4',4, 1. COMMERCIAL BUILDINGS - REQUIRED FIRE FLOW: The required fire flow for the building shall be 3000 gallons per minute (GPM) at 20 psi. Hydrants shall /' be flow tested in accordance with NFPA 291. Results shall be submitted to the Y City of Tigard, Attn: Plans Examiner, 13125 SW Hall Blvd., Tigard, OR 97223, on the form enclosed. a FIRE HYDRANT /FIRE DEPARTMENT CONNECTION: A fire hydrant shall be located within 70 feet of a fire department connection (FDC). Fire hydrants and FDC's shall be located on the same side of the fire apparatus access roadway. (UFC Sec. 903.4.2.5) FDC. locations shall be approved by the building official. (1996 Oregon Structural Specialty Code, Sec. 904.1.1) O / FIRE DEPARTMENT CONNECTIONS ON BUILDINGS: Fire department (� connections shall not be located on the building that is being protected. (UFC Sec 903.4.2.5) 4. UFC (TVFR) Appendix III.F — A building survey and plans shall be provided to the fire department. Forward the attached survey when completed to include a site plan and one set of architectural drawings to: Plans Examiner, City of O \ � Tigard, 13125 SW -Hall Blvd., Tigard, OR 97223. ENERGI C-001 IANCE .... . A .AA ;,... ,. 1. Submit completed Energy Compliance Forms 2a, 3a, 3b, and 5a through 5c from the April 1, 1996 Revised Oregon Energy Code. 2. Submit completed applicable Forms 4a through 4j, and required duct insulation Form 4a through 4c of the Energy Code Compliance Manual (Revised April 1996). 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 R Knowledge Beginnings Site Plan Review PC #: 8 -10c BUP #: 99 -00354 Page #2 ..� , :.:, --< <, y ." ` �4'.y�; f w� ; '.�y,.,� fie ='° . _ .m.- -��`."r'�A.: 0 ,.,, FIRE AND °;LI SAFETY e n - # ` , sue. .� . , � . . E SAM . ° . � � ,,.� a�m,..,� �,_� ��::� z�� ° � � � ._ . °A, y .. 1. Under the provisions of OSSC, Section 305.9 (as amended) an approved fire alarm system shall be provided. The automatic sprinkler system shall automatically activate this system, which shall include an alarm mounted on the exterior of the building. Smoke detectors will also be required throughout the © common atmosphere of the exit access, and shall activate alarms audible in all interior rooms and shall be connected to the fire alarm system, OSSC, Section 1007.3.4. Visual and audible alarms shall be provided in accordance with OSSC, Section 1109.14. Provide details. 2. Addressing your comments on Sheet A2.0 referencing automatic extinguishing systems, neither Exception 1 or 2 apply to this building. Exception #2 applies only to E -1 occupancies. The intent of the Oregon Amendment requires all E -3 occupancies be equipped with automatic fire extinguishing systems where the occupant load is 50 or more. Exception 1 applies to E -3s. Exception 2 applies to E -1 occupancies. 3. Provide panic hardware on the exterior exit door, OSSC, Section 1007.3.10. 4. Plans shall indicate the safe dispersal area required by OSSC, Section 1007.3.11. 5. Provide an attic access door at draft stop installed on the face of the girder drag truss. STRUC° f5 } C� y 1. Based on the total occupant load of your proposal, the provisions of ORS 445.447(1) (e)(B) "Special Occupancy Structure" apply to this building, provide details on compliance with OSSC, Sections 1804.2, 1804.2.1, 1804.2.1.1, 1804.3.1, 1804.3.2, 1804.3.3, 1804.3.3.1, 1804.3.4, and Section 1702. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, R ert Poskin, CBO SENIOR PLANS EXAMINER i lbldg\prmsys\sit99354.d oc , 5/2/00 Activities for Case #: BUP1999 -00354 3:24:02 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC005 Application received 8/5/99 GEO RECD No Hold DEB 8/16/99 BUPC008 Permit created 8/16/99 DEB DONE No Hold DEB 8/16/99 BUPC012 Plans routed to Plans Examiner 8/16/99 DEB DONE No Hold DEB 8/16/99 BUPC015 Plan Review Ltr. to Ofc. Svcs. 8/24/99 RDP NOTE No Hold RDP 8/24/99 Ltr to Ofc Svc BUPC018 Revised Plans Received 9/21/99 RDP DONE No Hold RDP 9/21/99 BUPCO24 Plans Approved by CPE 9/21/99 RDP• DONE No Hold RDP 9/21/99 BUPCO22 Plans Approved /Routed to DSTs 9/21/99 RDP . DONE No Hold RDP 9/21/99 BUPC520 Mechanical Permit Required 9/21/99 9/21/99 No Hold RB 4/14/00 MEC1999 -00343 BUPC530 Electrical Permit Required 9/21/99 9/21/99 No Hold RB 4/14/00 ELC1999 -00698 BUPC540 Sprinkler Permit Required 9/21/99 9/21/99 No Hold RB 4/14/00 BUP2000 -00014 BUPC550 Fire Alarm Permit Required 9/21/99 9/21/99 • No Hold RB 4/14/00 BUP2000 -00081 BUPC565 Plumbing Permit Required 9/21/99 9/21/99 • No Hold RB 4/14/00 PLM1999 -00266 BUPC705 Foot/Found Insp 9/21/99 9/21/99 11/29/99 RB FAIL No Hold RB 11/29/99 1. Maintain all construction vehicles off of 130th. 2. Post address signage. 3. Install spread bearing pads where missed. 4. Provide Geo -Tech special inspection report(s). 5. • Install HD's where applicable 6. Interior footings not installed at this time- install rebar for contineous footings. 7. Wings at front and including the footing at line D, 3 & 4 not ready yet. 8. Electrical conduit needs to be inspected and approved; that part in the footing and later to be in the stem wall. 9. USA Erosion approved 11 -2 -99 CPB- OK • • 10.Ufer not tagged this date. BUPC707 Footing Drain 9/21/99 9/21/99 No Hold RDP 9/21/99 BUPC716 Reinf Steel Insp 9/21/99 9/21/99 No Hold RDP 9/21/99 Page 1 of 5 • 5/2/00 Activities for Case #: BUP1999 -00354 3:24:02 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC725 Slab lnsp 9/21/99 9/21/99 12/14/99 RB PART No Hold RB 12/14/99 Compact rock where lacking. Place wire 6X mesh as per spec's. Submit spec's for additive to concrete disallowing sand and vapor barrier. Contingent to plan review letter applicable issues regarding slab detailing. BUPC730 Pim /undslb lnsp No Hold RDP 9/21/99 BUPC737 Plumb Top Out No Hold RDP 9/21/99 BUPC740 Framing lnsp 9/21/99 9/21/99 2/1/00 RB PASS No Hold AKJ 2/1/00 BUPC742 Roof nailng lnsp 9/21/99 9/21/99 2/1/00 RB PASS No Hold AKJ 2/1/00 1) provide adequate roof ventilation 2) nail sheathing as per specs BUPC750 Insulation lnsp 9/21/99 9/21/99 2/24/00 RB FAIL No Hold AKJ 2/24/00 1) firestop all thru hole • penetrations 2) vapor missed at various locations 3) fireblocking missed at archways, ok to use solid • packed insul or insul 14" each • side of opening, firecaulk as needed 4) vant baffles' missed at various locations, esp at corners 5) issue 3 above, where existing in 1.hour corridor must be maintained with fire rated materials for all thru hole penetrations 6) walls enclosed w/o prior viewing BUPC757 Shear Wall lnsp 9/21/99 9/21/99 1/18/00 RB FAIL No Hold AKJ 1/18/00 outside sheathing and perimeter hd's only 1) hd's missed marked 2) either provide hd's at location marked or provide a revision for changes made 3) tighten anchor bolts 4) add stud where notched studs exist thereafter nail • sheathing BUPC760 Gyp Board lnsp 9/21/99 9/21/99 2/8/00 RB PART No Hold AKJ 2/8/00 fasteners req to be 8" oc in 1 hr rated wall complete prior to the installation of equip Page2of5 5/2/00 Activities for Case #: BUP1999 -00354 3:24:02 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC762 Susp Ceilng Insp 9/21/99 9/21/99 4/14/00 RB FAIL No Hold RB 4/14/00 NOT READY 1. ELECTRICAL LIGHT FIXTURES NEED TO BE SUPPORTED. 2. SEISMIC BRACING MISSED. 3. RIVOTS MISSED. 4. SUPPORT WIRES MISSED AT FIELD INTERMEDIATE AND END WIRE • LOCATIONS. • 5. MECHAICAL DUCT REGISTERS NEED TO BE SECURED TO T -GRID. BUPC782 Sprinkler Underslab Inspection 9/21/99 9/21/99 No Hold RDP 9/21/99 BUPC790 Appr /sdwlk Insp 9/21/99 9/21/99 No Hold RDP 9/21/99 BUPC786 Smoke detector insp 9/21/99 9/21/99 No Hold RDP 9/21/99 BUPC790 Appr /sdwlk Insp 9/21/99 9/21/99 No Hold RDP 9/21/99 • BUPC797 Appr /sdwlk Insp No Hold RDP 9/21/99 BUPC799 Final Inspection 9/21/99 NOTE No Hold RDP 9/21/99 No final until Hydrant Flow Test has been completed and approved by the Plans Examiner BUPCO29 DST Post Review Completed 9/28/99 BON DONE No Hold BON 9/28/99 BUPC070 HOLD FOR (Note in Action Memo) 9/28/99 BON HOLD No Hold BON 11/3/99 On hold for conditions of • approval from planning and engineering (CUP1999- 00002). Also, needs to identify . contractor before issuing permit. BUPC074 Hold Release to Ready Status 11/10/99 DEB DONE No Hold DEB 11/10/99 Received Brian's okay to issue, as long as SOP is issued at • same time. Planning has • already okay'd release. Must identify contractor prior to issuance. BUPC100 (F) Issue permit 11/10/99 DEB DONE No Hold DEB 11/10/99 BUPC705 Foot/Found Insp 12/6/99 12/6/99 12/6/99 RB PART No Hold RB 12/6/99 Foundation- . 1. Ufer Tagged. 2. Maintain seismic restraint requirements. 3. Provide anchor bolts as per • plans. 4. Tie contineous rebar w/ interior bearimng pads. Page3of5 5/2/00 Activities for Case #: BUP1999 -00354 3:24:02 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes BUPC725 Slab Insp 12/15/99 12/15/99 NOTE No Hold RB 12/15/99 RHEOMIX -235 Water Repellent Admixture for slab concrete- OK Issue #3 of report dtd. 12 -14 -99 RB. BUPC705 Foot/Found lnsp 1/2/00 1/2/00 12/30/99 RB PASS No Hold AKJ 1/2/00 trash enclosure BUPC725 Slab Insp 1/2/00 1/2/00 12/30/99 RB PASS No Hold AKJ 1/2/00 trash enclosure BUPC792 Misc. Inspection 1/18/00 1/18/00 1/18/00 RB FAIL No Hold AKJ 1/18/00 ext sheathing insp: see shear 1/18 BUPC740 Framing Insp 2/22/00 2/22/00 2/22/00 RB PART No Hold AKJ 2/22/00 1) detail 13 & 14 need straps 2) vent baffles req at eave vents, will view at insul 3) seal all thru holes in draft stopping 4) firestop at ceiling level ie at corridor 5) h clip missed at dbl girder truss BUPC757 Shear Wall lnsp 2/22/00 2/22/00 2/22/00 RB PART No Hold AKJ 2/22/00 see framing 2/22 BUPC798 Misc. Inspection 2/22/00 RB PART No Hold AKJ 2/22/00 ext sheath see framing 2/22 BUPC750 Insulation Insp 2/27/00 2/27/00 2/25/00 RB PART No Hold AKJ 2/27/00 ext walls approved, all int walls still have issues re: fireblocking, firestopping, etc ok to cover ext walls BUPC760 Gyp Board Insp 2/29/00 RB FAIL No Hold AKJ 2/29/00 drywall and firewall prep work incomplete do not lid any room or space prior to mech rough app and installation of insul BUPC758 Firewall Insp 2/29/00 RB FAIL No Hold AKJ 2/29/00 see gyp 2/29 BUPC760 Gyp Board Insp 3/1/00 RB FAIL No Hold AKJ 3/1/00 not ready 2) int firestopping still incomplet( vertical wall erection needs to be installed for split levels etc then apply insul, draft stop as needed 3) don't cover flat hard ceiling areas without mech above ceiling app BUPC758 Firewall lnsp 3/1/00 RB FAIL No Hold AKJ 3/1/00 see gyp 3/1 BUPC750 Insulation Insp 3/6/00 RB FAIL No Hold AKJ 3/6/00 hard lid areas covered, unable to inspect BUPC760 Gyp Board Insp 3/6/00 RB FAIL No Hold AKJ 3/6/00 incomplete BUPC750 Insulation lnsp 3/7/00 RB PART No Hold AKJ 3/7/00 only areas to receive a hard gyp ceiling BUPC760 Gyp Board Insp 3/7/00 RB PASS No Hold AKJ 3/7/00 complete . Page 4 of 5 • 5/2/00. Activities for. Case #: BUP1999 -00354 3:24:02 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By. Updated Notes BUPC798 Misc. Inspection 3/7/00 RB PASS No Hold AKJ 3/7/00 eave draftstops BUPC750 Insulation Insp 3/14/00 RB PART No Hold AKJ 3/14/00 close up all open areas and bring insul down to the bottom • edge of trusses and wall plate . flamespread all unfaced batt, maintain insul to the warm side of the room BUPC762 Susp Ceilng Insp 4/19/00 RB PART No Hold AKJ 4/19/00 secure lighting fixtures BUPC802 Final Inspection 4/26/00 RB FAIL No Hold AKJ 4/26/00 too many outstanding permits BUPC757 Shear Wall Insp 4/27/00 RB PASS No Hold RB 4/27/00 Completed at prior inspection- OK. BUPC740 Framing lnsp . 4/27/00 RB PASS No Hold RB 4/27/00 Completed at prior inspection - OK. BUPC750 Insulation Insp 4/27/00 RB PASS No Hold RB 4/27/00 Completed at prior inspection - OK. BUPC762 Susp Ceilng Insp 4/27/00 RB PASS No Hold RB 4/27/00 Completed at prior inspection - OK. BUPC802 Final Inspection 4/27/00 RB PASS No Hold RB 4/27/00 Case Final- OK. BUPC757 Shear Wall Insp 4/27/00 RB PASS No Hold AKJ 4/27/00 and ext sheathing BUPC740 Framing Insp 4/27/00 RB PASS No Hold AKJ 4/27/00 BUPC750 Insulation lnsp 4/27/00 RB PASS No Hold AKJ 4/27/00 BUPC762 Susp Ceilng Insp 4/27/00 RB PASS No Hold AKJ 4/27/00 BUPC802 Final Inspection 4/27/00 RB PASS No Hold AKJ 4/27/00 BUPA994 Plans sent to records 4/28/00 JMT DONE No Hold JMT 4/28/00 plans rolled BUPA990 (F) Issue Cert. of Occupancy 4/27/00 . RB DONE No Hold ST 5/2/00 5 /2 /00- mailed to owner /tenant/TVFD /file BUPA995 File sent to records 5/2/00 SLT DONE No Hold ST 5/2/00 • • Page 5 of 5 .