Permit Warner Engineering Fax:253 -858 -8579 Apr 27 '00 1532 P.01
<51 1 l - c
///'" ARNER
ENGINEERING
C/{72 PLANN/NO
FAX TRANSMITTAL
Date: 27 April 2000 File No.: 047002
FAX No..: 1 -503- 624 -3681
To: Hap Watkins
Firm: City of Tigard, Bldg. Dept.
From: Carol M. Modjeski, P.E.
Subject: Knowledge Beginnings, Tigard o� 5 .5w i 3 at``
Total Number of Pages 1 (including this page)
Remarks: I have inspected the completed storm system and biofiltration swale for this project
and find that it was installed per the engineer's design.
a �GtN4 - 4, 4 t i127(b'"
4
18011 PE C'
COAPT
9 a OC 25,
MO 0 , ��
EXPIRES' 12131/ pp I
-C)fri\ COgl)
cc: Joey Shaw, 541- 385 -8816
Please notify us as soon as possible if you do not receive the correct number of pages
indicated above.
BIOSWALE.sAM
5122 OLYMPIC DRIVE NW • SUITE B204 • GIG HARBOR WA 98335 • TEL (2531858-8577 • FAX (253.), 858- 8579.
CITY OF TIGARD BUILDING INSPECTION DIVISION
MST
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
uested � "r Z 7/00 AM PM ® � �`�q �b 3 S Li Date Re q fr
( 240b oma 1 f-Ps
Location (0 S I I ?")1) 4 Suite MEC Cgg9-m3(4 3
Contact Person r» in YNA S Ph 59'0 — (D g LID PLM
Contractor Ph SWR
0_D10 Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN /J q
Slab I Drain Insp h 'on No en t o 2_ P get-0013 0✓I l r Pn,u S SIT Iqt 9q -I S 1
Post & Beam y /� / � �, (� 5 , � i
Int Shtaath /cE ,,;� t► 1 �' � "(q -[�C�CJ b 6h �l It _ - � I S 1 Oh �t I�G !I SAO, ?
rams •. A` k `s 1d& ( `rt S \Q .�-� C Vv \ ti"n )
Nailing g /116 - Qth L.:e...eN
� a I
Firew
'Fire Al 3
sp• ell .•
Misc:
• PART FAIL
PLUMBING ice; •
Post & Beam
. Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS __PART FAIL
mg CHANIC /'
Post & Beam
Rough In
Gas Line
Smoke Dampers
•ASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
a s PART FAIL
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA /
Approach /Sidewalk Date I C
Other Z7 G Inspector Ext7 t 1
di fiiWi PART FAIL DO NOT REMOVE this inspection record from the job site.
CITY OF TIGARD BUILDING INSPECTION DIVISION / MST
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
BUP
Date Requested / ///� AM PM BLD
Location 7 S'"/ 3' 4‘.." /3 c' Suite MEC
Contact Person Ph R 1 /9 - 9 7 yv' PLM
Contractor Ph SWR
BUILDING Tenant/Owner ELC
etaining Wa ELR
° • Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Post & Beam SIT 15 7- c' O
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
I ttilART FAIL
PLUMBING
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk
Other Date // /C `Y7 Inspector Ext
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.
04/28/2000 Activities for Case #: SIT1999 -00059
8:47:10 AM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
SITC005 Application received 08/05/1999 GEO RECD No Hold DEB 08/16/1999
SITC008 Permit Created 08/16/1999 DEB DONE No Hold DEB 08/16/1999
SITC011 DST /mail Land Use Condition Lt 08/16/1999 DEB DONE No Hold DEB 08/16/1999
SITC013 Plans Routed to Plans Examiner 08/16/1999 08/16/1999 08/16/1999 DEB DONE No Hold DEB 08/16/1999
SITC015 Plan Rev. Ltr Sent to Ofc Svcs 08/24/1999 08/24/1999 No Hold RDP 08/24/1999
SITCO27 Plans approved by Water Dept 08/12/1999 SENT No Hold RDP 09/21/1999
SITCO28 Plans approved by Engineering 08/22/1999 SENT No Hold RDP 09/21/1999
SITCO29 Plans approved by Planning 08/12/1999 SENT No Hold RDP 09/21/1999
SITCO26 Plans approved by CPE 09/21/1999 09/21/1999 09/21/1999 RDP DONE No Hold RDP 09/21/1999
SITCO30 Reviewed plans routed to DSTS 09/21/1999 RDP DONE No Hold RDP 09/21/1999
SITC700 Erosion Control Insp 844 -8444 09/21/1999 09/21/1999 11/02/1999 CPB PASS No Hold RB 11/03/1999 USA Erosion approved.
SITC702 Excavation 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC710 Fill 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC720 Grading 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC730 Paving Insp 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC740 Strm Drain Insp 09/21/1999 09/21/1999 12/03/1999 MRS PASS No Hold MRS 12/03/1999 outlet from detention tied into
storm in street
SITC750 San Sewer Insp 09/21/1999 09/21/1999 11/05/1999 MRS PASS No Hold VT 11/05/1999 SWR 1999 00175
$ 36,845.00 fee due
Sanitary Sewer of 30 -34 - okay
SITC754 Manhole /Cleanout - PVT No Hold RDP 09/21/1999
SITC755 Sprinkler supply lines 09/21/1999 09/21/1999 12/29/1999 GS PASS No Hold AKJ 12/29/1999 call for flush and test insp
SITC757 Domestic water line inspect. 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC765 Fire system test 09/21/1999 09/21/1999 No Hold RDP 09/21/1999
SITC770 Misc. Inspection 09/21/1999 09/21/1999 12/10/1999 MRS PASS No Hold MRS 12/10/1999 underground retention from
catch basin
SITC'195 Driveway surfacing No Hold RDP 09/21/1999
SITC799 Final Inspection 09/21/1999 09/21/1999 04/26/2000 RB FAIL No Hold AKJ 04/26/2000 too many open permits, not
ready
SITCO32 DST Post- Review Completed 09/28/1999 BON DONE No Hold BON 09/28/1999
SITCO50 Hold for 09/28/1999 BON HOLD No Hold BON 09/28/1999 On hold for conditions of
approval for planning and
engineering (CUP1999- 00059).
Also, contractor must be
identified before issuing permit.
Page 1 of 2
i
04/28/2000 Activities for Case #: SIT1999 -00059
8:47:10 AM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
SITCO55 Hold Release 10/12/1999 GEO DONE No Hold GEO 10/12/1999 Hold release, okey to issue Site
Permit, per Brian Rager:
Engineering, and Matt
Scheidegger: Planning,
10/12/99.
SITC080 (F) Ready to issue 10/12/1999 GEO DONE No Hold GEO 10/12/1999 Need contractor information
prior to issuance.
SITC092 (F) Issue permit 10/14/1999 GEO DONE No Hold GEO 10/14/1999
SITC724 Retaining Wall /Footing 11/03/1999 RB PASS No Hold RB 11/03/1999 USA Erosion approved.
Detail B5, Page A9.1- OK
SITC724 Retaining Wall/Footing 11/03/1999 RB No Hold RB 11/03/1999
SITCO50 Hold for 11/05/1999 HAP HOLD No Hold DGW 11/05/1999 HOLD all activities &
inspectionsd until the sewer fee
is paid. The connection to the
lateral is not authorized until the
fees are paid.
SITCO58 Return to Issued status 11/10/1999 HAP PASS No Hold DST 11/10/1999 Sewer fees paid.
SITC724 Retaining Wall /Footing 11/10/1999 GS PASS No Hold GES 11/10/1999 wall insp
SITB799 Final Inspection 04/27/2000 RB PASS No Hold RB 04/27/2000 Case Final- OK. That part
done by engineering -
completed 4 -26 -00 (PI).
SITC770 Misc. Inspection 04/27/2000 AKJ RECD No Hold AKJ 04/27/2000 rec'd fax from Warner Eng.
stating storm system and
biofiltration swale was installed
per eng design
SITC799 Final Inspection 04/27/2000 RB PASS No Hold AKJ 04/27/2000
SITC800 Case Finaled 04/27/2000 AKJ DONE No Hold AKJ 04/27/2000
•
,
Page 2 of 2