Loading...
Permit A CITY TI GARD SEWER CONNECTION PERMIT 1 DEVELOPMENT SERVICES DATE ISSUED: S 1R 0134 2000 13 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 SITE ADDRESS; 13333 SW 128TH PL PARCEL: 2S104DA -02600 SUBDIVISION: QUAIL HOLLOW - WEST ZONING: R -4.5 BLOCK: LOT: 012 JURISDICTION: TIG TENANT NAME: USA NO: FIXTURE UNITS: CLASS OF WORK: NEW DWELLING UNITS: 1 TYPE OF USE: SF NO. OF BUILDINGS: 1 INSTALL TYPE: LTPSWR IMPERV SURFACE: Remarks: SF New Owner: FEES JESS ALWAY, INC. Type By Date Amount Receipt 24300 SW STAFFORD RD TUALATIN, OR 97062 PRMT DLH 07/11/200C $2,300.00 0003629 INSP DLH 07/11/200C $35.00 0003629 Phone: 638 -0718 Total $2,335.00 Contractor: Phone: Reg #: Required Inspections Sewer Inspection This Applicant agrees to comply with all the rules and regulations of the Unified Sewage Agency. The permit expires 180 days from the date issued. The total amount paid will be forfeited if the permit expires. The Agency does not guarantee the accuracy of the side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect 3 feet in all directions from the distance given. If not so located, the in. t- : • i purch : - - "Tap and Side Sewer" Permit and the Agency will install a lateral. ATTENTION: Oregon law r:f . .0 t, f• ow rule adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -c�, ■ S I r • ; i �aA �• 52 -011 -0080. You may obtain copies of these rules or direct questions to OUNC by calling (50 1.: • ; r��o- .. r /��c Issued by: Permittee Signatu e: 1 . G L W i v Call (503) 639 -4175 by 7:00 P.M. for an inspection needed the next ! . usines digir CITY OF TIGARD BUILDING INSPECTION DIVISION ,w :, ' y4 1 44-Flour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested VI le /O) AM PM BLD Location 1 3333 ■ Suite MEC Contact Person Ph PLM Contractor Ph 42460 — 06131- BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear qq Framing J t ,, . - l U 4'S - ,"c Insulation 1 , Drywall Nailing V 6 v � Fire wall '� �C� ��fiv% Fire Sprinkler Fire Alarm Susp'd Ceiling Roof \ 1 1 Misc: F P a SS ART FAIL 4 6`--A 5 / \ S LUMB vu. \ s 2 Post & Beam Under Slab Top Out Water Service Final ( SS ) PART FAIL MECHANICAL 0.1 \ Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA �11 Other � Approach/Sidewalk Date �f 1 ,a Inspector Ext 1 Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site. • Pr dand'Pipe and Precast .�' ':" + � - 19585 S.W. 118th Ave.,-P.O. Box 363 C Tuala tin,.OR 97062 '- r. , . Telephone (503) 692 -3885. VI DEO INSPECTION Facsimile (503) 692 -3173. SERVICE AGENCY: DA C l PAGE U: 9v 3 KS A . ,- j °fir t`-zs Wr SECTION: INSPECTOR: PROJECT U: SN i SN i . . CA . *0 rr Air, Ca _ PROJECT CONTRACTOR: 1 ECT � NAME. �� • � LOCATION: • VIDEO REF. I: 'S` ) /_ tAxac TI C'., "1 ‘c., e.� Ref Footage Ref ' Footage N0. Mark Code SN N Clock Ref REMARKS N0. Mark Code SN # Clock Ref REMARKS 1 C,C. 36 2 50• N 37 ` 4 PIN A l 39 S 40 6 41 4 7 42 8 43 ! � 9 �n -+��� 10 'M ✓� 4B - � � Q 7 J--- • 11 \ 46 -2w- 12 47 13 48 14 49 ,/ 15 50 r 16 ; 51 1. 17 J ' 52, i 18 .r 53 : ( ° } 1 - CV 4 c 19 54 4 20 55 21 56 , 22 57 23 58 , 24 59 , ■ 25 60 26 LINE LENGTH: f 27 SIZE OF PIPE: HP P V L 28 TYPE OF PIPE: PV,l✓ . • . 29 With Flow Against Flow 30 _ DIRECTION OF FLOW -oil-- 39 • . InRCtEONO • 1 . 32 REMARKS / NOTES: 33 34 OPERATOR / NAME: 35 . F • TU-52 p • .CITYr,OF TIGARD•B&ILDING INSPECTION DIVISION �7 ai�v i' 24 -Hour Inspection Line: 639 -4175 Business Line: 639-41 1 P Date Requested 3-- /9 AM PM BLD Location /5 3,3 3 - --' % - A Dom Suite MEC Contact Person Ph PLM Contractor Ph _6 O c) f 2 (7 BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ft D - S�N • ' .T Inspection Notes: itw �' � Z /4 r Post & Beam / If Ext Sheath /Shear (� Int Sheath /Shear , ' /t, c � _ / k r' ` , _ 1'. �/\ I S 0 Framing / V Q'h'� \ ` T VL-� \ /1 V Insulation Drywall Nailing ` ' p ' ' Y Arm AMit � w Firewall 1 A � ,,,^ � ( .� Fire Sprinkler V v ` € -111 (Q- - - "7/1 Ni SAM ) Fire Alarm / �� �r Susp'd Ceiling L ��/� - ' e -r �( L ?�G O D5�. Roof Misc: 6 . AL - - ■$ / -2-,v\ 4 J c r \ - e -Q5 Final G i l 't & PASS PART FAIL S r �- .r• =.MI p a OA/ Post & Beam 4 am Drains ∎ - ' C1 Y\AJ.- S" PASS PART AIL R� `r & Q S IL) MECHANICAL i v \._ � Post & Beam ) Rough In G3—��� i �Q 9 .� VIA_A,� N 't` \c ---\----\j) ci. Gas Line � Smoke Dampers _ t4-0---1. `�� S A � 6-- "_ � Final `� PASS PART FAIL \_J�W , k' `` S `�� s j ...,.... ;: ___ • ELECTRICAL _ 441, Service V� �� .• ..�•r�_.������f- `����L't� «r►1i ' \ Rough I g: 1 L a a oo/ ooiy 4.-i pt ' q' /0 0 • ., Low Voltage (:)? Fire Alarm . • 5 r /�� w S Q Final % �, / � PASS PART FAIL( � � -^ ►',! v i �''�^' SITE l Backfill /Grading l Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Date 3\ Y 0 l t Other Inspector (� E Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site. L 8 /22 /00 Activities for Case #: SWR2000 -00134 1:19:22 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes SWRA003 Application received 6/2/00 GEO No Hold BT2 6/14/00 SWRA008 Permit Created 6/14/00 BT2 DONE No Hold BT2 6/14/00 } SWRA705 Sewer Inspection No Hold BT2 6/14/00 SWRA070 Ready to issue 7/3/00 JMT DONE No Hold JMT 7/3/00 A SWRA080 (F) Issue permit 7/11/00 DLH DONE No Hold DLH 7/11/00 SWRA085 (F) Reprint Permit 8/15/00 ZZZ DONE No Hold ZZZ 8/15/00 Page 1 of 1 f • .L BUP - Building Permit ELC - Electrical Permit Inspection Description Date Passed By Inspection Description Date Passed By Footing /Setback Underground cover Foundation walls Wall cover Footing drain Ceiling cover Waterproof bsmt walls Electrical rough -in Slab Electrical service Crawl drain Electrical final Underfloor insulation Post/beam structural Shear walls /anchors ELR - Restricted Energy Permit Roof nailing Inspection Description Date Passed By Firewall Low voltage Tilt -up panel Electrical final Masonry /Reinforcement Framing MFG- Structure set -up MEC - Mechanical Permit Insulation 1/ Inspection Description Date Passed By Drywall nailing Post/beam mechanical Suspended ceiling Gas line • Engineered soils Mechanical rough -in Welding Lab Final Fire damper Concrete Lab Final Duct work Bolting Lab Final Smoke detector Fireproofing Lab Final Mechanical final Structural observation Final inspection PLM - Plumbing Permit Inspection Description Date Passed By BUP — Fire Protection System Permit Plumbing underslab I Inspection Description Date Passed By Crawl drain Sprinkler underfloor /slab _ Post/beam plumbing Sprinkler rough -in Plumbing top -out Sprinkler final RP /backflow preventer Fire alarm final Rain drain Storm drain Water service SIT - Site Permit Sanitary sewer mai Inspection Description Date Passed By Culvert/catch basin Footings Pum /fill seItic tank Foundation walls Plumbin: final ► / �o ®W , Sprinkler supply lines r_ i-- Sprinkler underfloor /slab Catch basin /Manhole SWR - Sewer Permit Engineered soils - 4 Inspection Description Date Passed By Engineering acceptance Sanitary sewer Final inspection Final inspection INSPECTION RECORD - BUP, PLM SWR, ELC, ELR, MEC, SIT PERMITS