MSTA007 Application received 9/22/94 JF PASS BLT 9/28/94
MSTA010 Plan check deposit paid 9/22/94 JF PASS BLT 9/28/94
MSTA020 Plan check by 9/28/94 9/28/94 RT PASS BLT 9/28/94
MSTA705 Foot/found Insp 10/20/94 KS DIS KBS 10/21/94 #-1 -Ftgs depth and width not as
shown on plans
MSTA710 Post/Beam Structural 11/14/94 KS DIS KBS 11/15/94 #- 1- gussets both sides of beam
splices - #-2- min' of three
inches of bearing at beam
pockets #-3- locate low point
drain #-4- support under pony
adjacent to masonry fireplace
#-5-positive connection at at
north corner pony wall rim
beam.
MSTA711 Post/Beam Mechanical 11/14/94 KS APP KBS 11/15/94
MSTA717 PLM /Underfloor 11/14/94 MS PASS MRS 11/15/94
MSTA720 Mechanical Insp 1/17/95 RB FAIL RB 1/17/95 ELECTRICAL COVER; SOFFIT
DUCTWORK IN GARAGE;
VEHICLE BARRIER;
EXHAUST VENTING
INCOMPLETE- UTILITY;
SOFFIT DUCTWORK IN
UTILITY; SECURE B -VENT AT
EXT. GREATER THAN 5;
UNABLE TO PERFORM
FRAMING DUE TO NO
ELECTRICAL COVER.
MSTA722 Plumb Top Out 1/6/95 MS PASS RB 1/19/95
MSTA725 Framing Insp 1/18/95 KS DIS KBS 1/19/95 #-1- see inspection notes
MSTA730 Fireplace Insp 1/18/95 KS A/N KBS 1/19/95 #-1- ok to smoke shelf
MSTA735 Gas Line Insp 1/17/95 RB PASS RB 1/17/95
MSTA740 Insulation Insp 1/19/95 KS APP KBS 1/19/95
MSTA745 Gyp Board Insp 1/30/95 KS DIS KBS 1/31/95 #-1-nail shear wall ( gypsum) at
common wall garage and
interior
MSTA755 Rain drain Insp 12/23/94 GS PART GES 12/23/94 HOUSE TO SEWER CONN
MSTA760 Water Line Insp 1/26/96 GS APP GES 1/26/96
MSTA795 Mechanical Final 4/28/95 GS DIS GES 4/28/95 SEE BUILD FINAL
MSTA797 Plumb Final 4/28/95 GS DIS GES 4/28/95 SEE BUILD FINAL
MSTA799 Building Final 4/28/95 GS DIS GES 4/28/95 USE LAG BOLTS TO STRAP
WH SEAL HOLE IN WALL
ABOVE WH LID FOR GAR
ACCESS NEED LADDER FOR
CRAWL ACCESS INSP
TERMINATED
Page 1 of 3
.5/30/00 Activities for Case #: MST94 -00371
2:22:55 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTB706 Erosion Control Insp 844 -8444 BLT 9/28/94
MSTB713 Crawl Drain 1/26/96 GS DIS GES 1/26/96 LOCKED
MSTA097 Issue plumbing signature form 10/19/94 JF JF 10/19/94
MSTA092 (F) Issue combination permit 10/19/94 JF JF 10/19/94
MSTA705 Foot/found lnsp 10/21/94 KS A/N KBS 10/21/94 # excavate step footings
width of footings #- 2- electrical
ground painted #-3- provide
positive keyway
MSTA705 Foot/found lnsp 10/26/94 KS APP KBS 10/26/94 #- 1- erosion control barrier
approved washington county
#-2- expended footings and
isloated piers not included this
inspection
MSTA710 Post/Beam Structural 11/18/94 KS DIS KBS 11/21/94 #-1- corrections not made
MSTA710 Post/Beam Structural 11/21/94 KS A/N KBS 11/21/94 #-1- provide positive connection
between pony wall and mud sill
behind furnace plenum, also
pony wall to mud sill north sside
of structure. #-2- will extend
stem wall both sides of
masonry fireplace
MSTA770 Misc. Inspection 1/5/95 KS DIS KBS 1/5/95 shear wall inspection #-1- min'
of three studs or 4/4/ post as
indicated on plans #-2 -nail
brace panels size of nails and
fallow nailing schedule
MSTA770 Misc. Inspection 1/6/95 GS APP GES 1/6/95 PREV CORR APP
MSTA720 Mechanical Insp 1/19/95 KS A/N KBS 1/19/95 #-1- connect exhaust duct at
utility rm #-2- support B vent at
exterior ( strap to r after tail not
gutter #-3- protective barrier
vehicle ) sleeve installed in floor
slab
MSTA726 Framing <REINSP> 1/19/95 KS A/N KBS 1/30/95 #-1- anchor chimney straps first
fl / attic
MSTA745 Gyp Board Insp 1/31/95 KS APP KBS 1/31/95 #-1- corrections made
MSTA765 Appr /Sdwlk Insp 3/1/95 LT PEND NL 3/9/95 1. Trim curb to a clean edge. 2.
Place expansion felt at cold
joint. 3. Place 2 -1/2" - 3" board
MAX for lip of approach. 4. Be
prepared to protect finish.
MSTA795 Mechanical Final 9/11/95 RB FAIL RB 9/11/95 SEE BUILDING FINAL THIS
DATE
MSTA797 Plumb Final 9/11/95 RB FAIL RB 9/11/95 SEE BUILDING FINAL THIS
DATE
Page 2 of 3
. • .
5/30/00 Activities for Case #: MST94 -00371
2:22:55 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA799 Building Final 9/11/95 RB FAIL RB 9/11/95 SEAL CABLE HOLE AT SIDE
WALL OF GARAGE; AT BASE
OF DECK STAIRS- SEAL
THRU PENETRATION LF
SIDE OF FIREPLACE- WATER
& CRITTERS; DOWN SPOUT
DISCONNECT UNDER DECK -
CAP OR CONNECT; CAULK
/SEAL WATER CLOSET &
LAV- MAIN FLOOR;
FIRESTOP THRU
PENETRATIONS AT
FURNACE; REMOVE WOOD
DEBRIS; LAP VAPOR
BARRIER; INSULATE FLOOR
CAVITY W/O INSULATION.
MSTA795 Mechanical Final 1/26/96 GS DIS GES 1/26/96 LOCKED
MSTA797 Plumb Final 1/26/96 GS DIS GES 1/26/96 LOCKED
MSTA799 Building Final 1/26/96 GS DIS GES 1/26/96 LOCKED
MSTA765 Appr /Sdwlk Insp 2/23/96 1/26/96 PI PASS C *H 2/23/96
MSTA945 Request inspection research 3/28/00 JMT DONE No Hold JMT 3/28/00
MSTA153 Expired by limitation 4/18/00 HAP DONE No Hold AKJ 4/26/00 card sent to contractor