Loading...
Permit . ' I' l y C 9 5 vt/ 1 21 /4 V€ 5/30/00 Activities for Case #: MST94 -00371 2:22:55 PM trp / . / A ssigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA007 Application received 9/22/94 JF PASS BLT 9/28/94 MSTA010 Plan check deposit paid 9/22/94 JF PASS BLT 9/28/94 MSTA020 Plan check by 9/28/94 9/28/94 RT PASS BLT 9/28/94 MSTA705 Foot/found Insp 10/20/94 KS DIS KBS 10/21/94 #-1 -Ftgs depth and width not as shown on plans MSTA710 Post/Beam Structural 11/14/94 KS DIS KBS 11/15/94 #- 1- gussets both sides of beam splices - #-2- min' of three inches of bearing at beam pockets #-3- locate low point drain #-4- support under pony adjacent to masonry fireplace #-5-positive connection at at north corner pony wall rim beam. MSTA711 Post/Beam Mechanical 11/14/94 KS APP KBS 11/15/94 MSTA717 PLM /Underfloor 11/14/94 MS PASS MRS 11/15/94 MSTA720 Mechanical Insp 1/17/95 RB FAIL RB 1/17/95 ELECTRICAL COVER; SOFFIT DUCTWORK IN GARAGE; VEHICLE BARRIER; EXHAUST VENTING INCOMPLETE- UTILITY; SOFFIT DUCTWORK IN UTILITY; SECURE B -VENT AT EXT. GREATER THAN 5; UNABLE TO PERFORM FRAMING DUE TO NO ELECTRICAL COVER. MSTA722 Plumb Top Out 1/6/95 MS PASS RB 1/19/95 MSTA725 Framing Insp 1/18/95 KS DIS KBS 1/19/95 #-1- see inspection notes MSTA730 Fireplace Insp 1/18/95 KS A/N KBS 1/19/95 #-1- ok to smoke shelf MSTA735 Gas Line Insp 1/17/95 RB PASS RB 1/17/95 MSTA740 Insulation Insp 1/19/95 KS APP KBS 1/19/95 MSTA745 Gyp Board Insp 1/30/95 KS DIS KBS 1/31/95 #-1-nail shear wall ( gypsum) at common wall garage and interior MSTA755 Rain drain Insp 12/23/94 GS PART GES 12/23/94 HOUSE TO SEWER CONN MSTA760 Water Line Insp 1/26/96 GS APP GES 1/26/96 MSTA795 Mechanical Final 4/28/95 GS DIS GES 4/28/95 SEE BUILD FINAL MSTA797 Plumb Final 4/28/95 GS DIS GES 4/28/95 SEE BUILD FINAL MSTA799 Building Final 4/28/95 GS DIS GES 4/28/95 USE LAG BOLTS TO STRAP WH SEAL HOLE IN WALL ABOVE WH LID FOR GAR ACCESS NEED LADDER FOR CRAWL ACCESS INSP TERMINATED Page 1 of 3 .5/30/00 Activities for Case #: MST94 -00371 2:22:55 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTB706 Erosion Control Insp 844 -8444 BLT 9/28/94 MSTB713 Crawl Drain 1/26/96 GS DIS GES 1/26/96 LOCKED MSTA097 Issue plumbing signature form 10/19/94 JF JF 10/19/94 MSTA092 (F) Issue combination permit 10/19/94 JF JF 10/19/94 MSTA705 Foot/found lnsp 10/21/94 KS A/N KBS 10/21/94 # excavate step footings width of footings #- 2- electrical ground painted #-3- provide positive keyway MSTA705 Foot/found lnsp 10/26/94 KS APP KBS 10/26/94 #- 1- erosion control barrier approved washington county #-2- expended footings and isloated piers not included this inspection MSTA710 Post/Beam Structural 11/18/94 KS DIS KBS 11/21/94 #-1- corrections not made MSTA710 Post/Beam Structural 11/21/94 KS A/N KBS 11/21/94 #-1- provide positive connection between pony wall and mud sill behind furnace plenum, also pony wall to mud sill north sside of structure. #-2- will extend stem wall both sides of masonry fireplace MSTA770 Misc. Inspection 1/5/95 KS DIS KBS 1/5/95 shear wall inspection #-1- min' of three studs or 4/4/ post as indicated on plans #-2 -nail brace panels size of nails and fallow nailing schedule MSTA770 Misc. Inspection 1/6/95 GS APP GES 1/6/95 PREV CORR APP MSTA720 Mechanical Insp 1/19/95 KS A/N KBS 1/19/95 #-1- connect exhaust duct at utility rm #-2- support B vent at exterior ( strap to r after tail not gutter #-3- protective barrier vehicle ) sleeve installed in floor slab MSTA726 Framing <REINSP> 1/19/95 KS A/N KBS 1/30/95 #-1- anchor chimney straps first fl / attic MSTA745 Gyp Board Insp 1/31/95 KS APP KBS 1/31/95 #-1- corrections made MSTA765 Appr /Sdwlk Insp 3/1/95 LT PEND NL 3/9/95 1. Trim curb to a clean edge. 2. Place expansion felt at cold joint. 3. Place 2 -1/2" - 3" board MAX for lip of approach. 4. Be prepared to protect finish. MSTA795 Mechanical Final 9/11/95 RB FAIL RB 9/11/95 SEE BUILDING FINAL THIS DATE MSTA797 Plumb Final 9/11/95 RB FAIL RB 9/11/95 SEE BUILDING FINAL THIS DATE Page 2 of 3 . • . 5/30/00 Activities for Case #: MST94 -00371 2:22:55 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA799 Building Final 9/11/95 RB FAIL RB 9/11/95 SEAL CABLE HOLE AT SIDE WALL OF GARAGE; AT BASE OF DECK STAIRS- SEAL THRU PENETRATION LF SIDE OF FIREPLACE- WATER & CRITTERS; DOWN SPOUT DISCONNECT UNDER DECK - CAP OR CONNECT; CAULK /SEAL WATER CLOSET & LAV- MAIN FLOOR; FIRESTOP THRU PENETRATIONS AT FURNACE; REMOVE WOOD DEBRIS; LAP VAPOR BARRIER; INSULATE FLOOR CAVITY W/O INSULATION. MSTA795 Mechanical Final 1/26/96 GS DIS GES 1/26/96 LOCKED MSTA797 Plumb Final 1/26/96 GS DIS GES 1/26/96 LOCKED MSTA799 Building Final 1/26/96 GS DIS GES 1/26/96 LOCKED MSTA765 Appr /Sdwlk Insp 2/23/96 1/26/96 PI PASS C *H 2/23/96 MSTA945 Request inspection research 3/28/00 JMT DONE No Hold JMT 3/28/00 MSTA153 Expired by limitation 4/18/00 HAP DONE No Hold AKJ 4/26/00 card sent to contractor Page 3 of 3