Loading...
Plans 05/17/00 WED 1 1 : 5 9 FAX 503 b 9147 CAKLSUiv 1r L LL' CITY OF TIGARD ' A 4s' Approved .1 k Conditionally Approved ( I For only the work as described in: PERMIT NO. "i 2 -env - "° 74) See Letter to: Follow .1 I t Attach PROJECT MEMOR,� d : _�5A - sv Ii 'I k By: ge Date: el w /0 TO: Robert Westlund General Contractor, Inc_ FROM: Timothy Blackwood, P.E. 11515 SW Durham Road Dennis Elton, El. Tigard, Oregon 97224 -3476 DATE: May 17, 2000 '\ - PRpF S i ��5��GIN& PAGES: 2 52838 -37 • w RE: Kaady Car Wash A OREGON 4 15450 SW 116"+ (Next Door) - -p " �g O King City, Oregon �y 12 ' . 00001575 Y W B�p,G CC: City of Tigard Building Department 1 EXPIRES t2 / 3 t/ a This memorandum presents our recommendations for structural fill placement and compaction to backfill the existing basement at the above site. An approximate plan map of the site is shown in Figure A_ We understand the basement is located in a future parking area and the area is to be paved after backfilling. Our recommendations are outlined below. Demolition and Backfill Recommendations 1. The existing concrete basement walls should be removed and hauled off site. Care should be taken to prevent damage to existing sewer and /or gas lines observed at the south side of the basement. The basement floor should be demolished to provide adequate drainage. Concrete debris does not need to be removed, provided large voids are not left after demolishing �.nd the rubble is tracked to a well -keyed state by heavy equipment. 2. Complete exploratory test pits in the bottom of the excavation under the direction of the geotechnical engineer. Two shallow test pits are anticipated, but this may vary depending on actual findings of the test pits. 3. Plug existing drains or other abandoned piping with grout or concrete. 4. Place baekfill material on the well- keyed, prepared surface of the excavation. The walls of the excavation. shculd be benched if sloughing occurs. Sloughed material may be used as backfill only if it meets the following requirements_ Backfill should consist of dean, well- graded granular material (crushed rock and sand) free of organics and deleterious material, with less than 5% by weight passing the No. 200 sieve. Three - inch -minus material should be placed at the first lift and subsequent lifts should be up to a maximum of 3 -inch material. The material shall be approved by the geotechnical engineer prior to placing. Place in lifts no more than 1 foot thick (loose) when compacted with large, riding, compaction equipment, or 8 inches thick (loose) when compacted with hand compaction equipment (e.g., jumping jack, plate compactor). A 0 1 4 cr LLI U 0 C1 E ' co - CO • •••• • M = ti m • a c • •••• `l { yf c? t. • • • I- :.,1 ., • g.,) a • w. J 6 • a ii, 11) C. I 73 N IA • • • • • • � .� �} '" 0 %; C 13 ! a rfl • • • I, j,l A C) + A. �` r R: r'• 4 X a • • ' A C U ' C �� m w ;s, • • C 0.1 ry .∎ ii 4 0. (i 0 C • • • A X:1 G) ea ;.5 : ( J a 'i7 w u • • • J g tJ 0 a C r e! e ta I �� Li C1 p (7 o C. G v • 4; �1 . . ca w U f • • V w at s, !II rs ; i.7) q T t1 Iv C 1 l J . ) y c ) 5 e co v 0 c, Q. • a'6 0 u . 0► a 16 u .c a E 1: y b m U) C 5 x 5 tL 1.:. 4') 0. V) cn V) r NI v. o a ❑ a o C I 0 0 0 0 0 0 0 C 1 VN May 17, 2000 Kaady Car Wash, King City CGT Job No G0001575 Page 1 of 2 5_ Compact the backfill to 90% of the maximum dry density as determined by the Modified Proctor Method (ASTM 0-1557) below 3 feet below final subgrade elevation and to 95% of Modified Proctor Method (ASTM D -1557) for the final 3 feet of fill placed_ Testing Program 1. Prior to placing the initial backfill lift, a geotechnical engineer should be present to observe the recommended test pit explorations and the bottom of the basement to determine that conditions are suitable to begin the backfill operation. 2. Field density tests shall be performed every 2 vertical feet of placed fill and at finished grade. Density testing should conform to the nuclear density method ASTM 0-2922. Attachment: Figure A US /1t /UU IV.1) IC: UU CAA .U4 U/V 7114/ icaii ' vs Cjik`\si vJ Asphalt Concrete Pad Curb Asphalt Sewer Line 35 Basement Gas Line Approximately SITE PLAN 120' Kaady Car Wash - ling City FIGURE A „ L $ 0 Concrete Pad iuur ; w *." 1 Concrete 05/12/00 Pad Gutzon Geotsc nke! CGTJobNo. P.O. Box 23814 G0001575 Tiparca &egos 97281 Asphalt see,rait • LEGEND 7S NOT TO SCALE • M.:aRamav «,e •devbd We sloths Boni. EJmnC & , doeQSal • �;..��' .. ..,. •��j..r• ,�xr. »;.3N" �:z:Krw. h� :..,.rwit...z.1tt. asi- a= scw.v�xs!r+�� iw ..,....,�... '' .�-< , . N - .•.�:,•• K k MARTIN S. BURCK ASSOCIATES, INC. 2880 May Street, Hood River, OR 97031 Phone: (541) 387 -4422, Pt Id: (503) 977 -2401 e -mail: msbail@aol.com MBA Geologic and Environmental Consulting Services Rosie Day May 4, 2000 City of King City 15300 SW 116th Avenue King City, Oregon 97224 Subject: Former Q Lube Structure 15450 SW 116th King City, OR • Dear Rosie: On May 3, 2000, 1 inspected the basement portion of the partially demolished structure referenced above with respect to the reported presence of water and petroleum hydrocarbons, I observed approximately 0 inch of water on the concrete basement floor with a light iridescent sheen in several places. I did not observed any distinguishable petroleum hydrocarbons as staining on the surface of the concrete floor or on the surface of the water. Therefore, in consultation with the DEQ (Andree Pollock, Manager of the UST Cleanup and Compliance Section)(personal communication, 5/4/2000), we intend to pressure wash the concrete floor with hot water and remove the accumulated and resulting liquid with a vacuum truck immediately prior to backfllling. I am confident that this action will mitigate any future concerns regarding the potential contact of water with the concrete basement floor. Please call me if you have any questions or require any additional information, Sincerely, Martin S. Burck Associates, Inc_ CkAS &/`CAZ,_ a y Burck, RPG Registered Professional Geologist cc: Chuck Kaady, Kaady Car Washes y n f14 • fa ;, dr y y + i' ��3c`r j P ffi May 31, 2000 CITY OF TIGARD Timothy Blackwood OREGON PO Box 23814 Tigard, Oregon 97223 PERMIT NO: Site #2000 -00020 OWNER: Kaddy Car Wash PROJECT ADDRESS: 15450 SW 116th PROJECT DESCRIPTION: Fill and Compaction of existing foundation TYPES OF SPECIAL INSPECTION: As setout on the enclosed form The owner has notified us that he /she will retain your services to perform Special Inspections in accordance with the provisions of the State Building Code, permit documents and special inspection requirements. The owner or the owner's agent must also confirm with you that they have authorized you to do the special inspection work. As the regulatory agency, the City requires that you do the following: 1. Submit copies of all inspection reports promptly to the building division, Architect, engineer, and the contractor. 2. Maintain one copy of each field report at the job site. 3. Submit a final report at the completion of each category of work that you Inspect. (See UBC Appendix Chapter 13 for soils special inspection final report requirements.) If you fail to comply with the above requirements, there may be cause for the City to revoke your authority as special inspector for this job. Should you have any questions, please call me at (503) 639 -4171 X 392. Sincerely, Ro ert D. Poskin, C.B.O. Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 CITY OF TIGARD A Program for Inspection Services and/or Material Testing • City of Tigard: Plan Ck. No. 5 -56C Project Title: Kaddy Car Wash Address: 15450 SW 116 Architect of Record: Sconzo/Hallstrom Phone: 425- 455 -3203 Address: 919 — 124 Avenue, NE — Bellevue, WA. 98005 Structural Engineer of Record: Phone: Address: Geo- Technical Engineer of Record: Timothy Blackwood Phone: 684 -3460 Address: PO Box 23814 - Tigard, Oregon , 97224 Provide the following information for the testing agency chosen to provide inspection services and/or testing. * Testing Agency: Timothy Blackwood Phone: 684 -3460 Address: PO Box 23814, Tigard OR. 97281 Geo- Technical Agency: Phone: Address: The owner certifies that the above noted Agency has been employed to conduct the special inspections or observations required herein. * "Notice" Special Inspection reports shall not preclude the need to have City of Tigard inspection approval on all re -bar placement. Signature of Owner /� Phone No. Date /�// C 4 Z U ci,41 5 -51-1 /We Pn t name Company name The following is a list of special inspection and/or services required by the 1998 Oregon Structural Specialty Code and Tigard Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo - Technical Engineer of Record are as follows: 1. Fill 2. Compaction •Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. •Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official.