Permit CITY OF TIGARD
! ! MASTER PERMIT
^^ i ��,f � l ;� DEVELOPMENT SERVICE i �ATE ISSUED: °�i`MS�77 -144
� PARCEL: 2S103BD —HG017
SITE ADDRESS...:12712 SW 116TH AVE
SUBDIVISION ° HUNTER'S GLEN ZONING: R-4.5 PD
BLOCK LOT 0117 JURISDICTION: TIG
Remarks: Path 1
- -------- - - - - -- --- -- - - -- - -- — BUILDING — - -- ------------ - -------- --- - --
REISSUE: STORIES • 2 FLOOR AREAS -- BASEMENT...: 0 sf REQUIRED SETBACKS - -- REQUIRED - --
CLASS OF WORK.:NEW HEIGHT • 19 FIRST • 1208 sf GARAGE • 785 sf LEFT • 5 SMOKE DETECTRS: Y
TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 1378 sf FRONT : 20 PARKING SPACES: 0
TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT • 5
OCCUPANCY 6RP.:R3 BDRN: 3 BATH: 3 TOTAL - - - -: 2586 sf VALUE..$: 186882 REAR : 54
- -- -- --------------------------- — PLUMBING -- -- - - - - --
SINKS : 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 100 TRAPS : 0
LAVATORIES • 4 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 1Y SF RAIN DRAINS: 1 CATCH BASINS..: 0
TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 1 BCKFLW PREVNTR: 1 GREASE TRAPS..: 0
OTHER FIXTURES: 0
- - -- - -- - - - - -- MECHANICAL — -- — - - --
FUEL TYPES - - - -- FURN (100K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: I
GAS FURN ) =100K ..: 1 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1
MAX IMP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 WOODSTOVES • 0 GAS OUTLETS...: 1
- ----- — - — _ —_____ — --------------- ELECTRICAL — — - --
- - RESIDENTIAL UNIT— -- SERVICE /FEEDER -- - -TEMP SRVC /FEEDERS— —BRANCH CIRCUITS -- -- MISCELLANEOUS— — ADD'L INSPECTIONS -
1000 SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0
EA ADD'L 500SF.: 5 201 - amp..: 0 201 - 400 amp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0
LIMITED ENERGY.: 0 401 - 600 amp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PALL...: 0 IN PLANT • 0
MANF HM /SVC /FDR: 0 601 - 1Y amp.: 0 601 +amps -1000 v: 0 MINOR LABEL -10: 0
1000+ amp /volt.: 0 - - - --- - -- PLAN REVIEW SECTION - - -- -
Reconnect only.: 0 )=4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC:
---- - - -- — ELECTRICAL - RESTRICTED ENERGY — -- -- - - --
A. SF RESIDENTIAL------ --- - -- B. COMMERCIAL------ --- — _— _— ____— _ —__ —__ ____— ____ —_ --
AUDIO I STEREO.: VACUUM SYSTEM..: AUDIO i STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT:
BURGLAR ALARM..: 0TH: :: X BOILER HVAC LANDSCAPE /IRRIG: PROTECTIVE SIGNL:
GARAGE OPENER..: CLOCK • INSTRUMENTATION: MEDICAL OTHR: ..
HVAC DATA /TELE COMM.: NURSE CALLS TOTAL # SYSTEMS: 0
Owner: - - ----- - -- Contractor: -------------- - - - - -- TOTAL FEES:$ 2984.96
LEGEND HOMES LEGEND HOMES CORPORATION
6900 SW HAINES 7160 SW HAZELFERN RD.
TIGARD OR 97223 STE 1.v!
TIGARD OR 97224
Phone #: 620 -8080 Phone #: 620 -8080
Reg #..: 000605
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other
applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180
days of issuance, or if work is suspended for more than 180 days.
- - -- — - - -- - REQUIRED INSPECTIONS --------------------- - - - - - -- --
Erosion Contol Post /Beam Meehan Electrical Servi Gas Line Insp Water Line Insp Building Final
Grading Inspecti Crawl Drain Electrical Rough Gas Fireplace Appr /Sdwlk Insp
Footing Insp PLM /Underfloor Framing Insp Insulation Insp Electrical Final
Foundation Insp Mechanical Insp Shear Wall Insp Gyp Board Insp Mechanical Final
Post /Beam Struct Plumb Top Out Low Vol ge Rain drain Insp Plumb Final
Permittee Signature: Issued By: 4 LIA. . 4 r
Call for inspection — 639 -4175
: !,'• ` 6K
:ITY OF TIGARD Residential Building Permit Application Rec'd ByO
3125 SW HALL BLVD. New Construction Additions or Alterations Date Rec'd S`S
IGARD, OR 97223 Single Family Detached or Attached Date to P.E.
503) 639 -4171 Date to DST .S°- / 3 -
Permit # ' - ,0 I5u1 g17
Print or Type Called 5 0143
Incomplete or illegible applications will not be accepted �•
I Z -- 1)Z £Lt. ) ) / p '
Name of Subdivision Lot # Name
Job HUNTER'S GLEN 17 LEGEND HOMES
Architect Mailing Address
Address � SAddress _ 6900 SW Haines St.
gW 116th Avenue
Name City /State Zip Phone
LEGEND HOMES Tigard, OR 97223 620 -8080
Owner Mailing Address Name
6900 SW Haines St. FROELICH
City /State
Zip phone Engineer Mailing Address
Tigard, OR 97223 620 -8080 6969 SW Hampton St.,
City /State Zip Phone
Name Tigard, OR 97223 624 -7005
General LEGEND HOMES
Describe work ne r'1 addition 0 alteration 0 repair 0
Contractor Mailing Address to be done:
6900 S W Haines St. Additional Description of Work:
City/State Zip Phone
Tigard, OR 97223 620 -8080
Oregon Const. Cont. Board Lic.# Exp. Date
Attach Copy of 060563 6/19/97 Project
Current COT Business Tax or Metro # Exp. Date Valuation $ /8 8 g..2
Licenses _4-r1 97 - 2 G. 3 6/1/97 s
Name / Z /s / / q �, NEW CONSTRUCTION
Mechanical S U N G L O W INC. Sq. Ft. House: 1730030 Sq.Ft.Garage:
Sub- I Mailing Address . 6 7S S /f, ,q. g C
Contractor ; 2428 S E 105th Corner Lot . .Yes No Flag Lot Yes No
City /State Zip Phone (check one) (check one)
I Portland, OR 97216 253 -7789 Restricted , Audio /Stereo // Burglar
Oregon. Const. Cont. Board Lic.# Ex Date Energy ,ef System rv w e uAlarm
Attach Copy of 148131 3" s° /Y7 Installation Garage Door HVAC
Current ' COT Business Tax or Metro # xp. Date
Licenses --1-2--7 97 y23/ / -/ 9B 4 / ,,, Opener Systems
Name (check all that Other:
Plumbing i WOLCOTT PLUMBING app'•y)
Sub- '.'ailing Address Will the electrical subcontractor wire for all Yes No
Contractor PO Box 2007 restricted energy installations? X
City/State Zip Phone Has the Subdivision Plat recorded? N/A Y,es No
Gresham, OR 97030 667 -9891 �
Oregon Const. Cont. Board Lic.# Exp. Date Reissue of MST# Solar Compliance
Attach Copy of 7 3A 4 7 10/19/97 fi (Calculation Attached) y 3
Current Plumbing Lic. # . Exo. Date I hereby acknowledge that I have read this application, that t e
Licenses 26 - 2 0 8 P B ' _.81-31/ 97 information given is correct, that I am the owner or authorized agent of
COT Business Tax or Metro #' Exp. Date the owner, and that plans submitted are in compliance with Oregon
96 -4281 12/9;1 State laws,
Name Signature of /Agent ' 7 /
Electrical GARNER ELECTRIC
Con ct Pe on Narne Phone
Sub- Mailing Address
Contractor 21785 SW TV Highwa FOR OFFICE U'S,E ONLY:
City/State Zip Phone Plat # \ Map/TL #: •
Aloha, OR 97006 591 -1320 11'' d \ �7 /_
Oregon Const. Cont. Board Lic.# Exp. Date )05-- q7, L j ,O, SD v > *$ -H90 0
Attach Copy of ,,7,444.9.6 //67 a - /q- t 7 Setbacks Zone: ,
Current Electrical Lic. # Exp. Date Vg J� //'-'‘ -----
Licenses 34 -305C /0 -1 -97 �i� ��r" � � � ' �
COT Business Tax or Metro # Exp. Date Engineering Approval: Planning Approval: TIF:
WA) 1. - / -9 7 9 +#e- fkrA.V \ *o - ,( A- -
istslmstapp.doc f "
Va s-)17
K
V
Permit # Account Description Amount Amt. Pd, Bal. Due
MST. Permit � (BUILD) 6 s - , �/
jl i/f�i7c� �� — 650,
Plumb. Permit (PLUMB) 225, _ Z25, ✓
-G
Mech. Permit (MECH) 45. Gp 45 .
ELC /ELR Permit (ELPRMT) 2 75. w 275, u
78
State Tax (TAX) 5g, 5, IL
Bldg: 3,2-.
2. ) 3
z,
Plumb: //.
Mech: �- - i/
ELC /ELR: v /.3 7) ✓
Plan Check
MST: (BUPPLN) 422. 2-5 17Z,
Plumb: (PLMPLN)
Mech: (MECPLN) 1/. z '
DC: CDC Review (LANDUS) �O, 6° r . � Z ,�
5(447 o / 3 Sewer Connection (SWUSA) 2200 ZZ
w
/ /
Sewer Inspection (SWINSP) 3s, i 3.,
�' J V Parks Dev Charge (PKSDC) /0,5o. GU /6-5o,
Residential TIF (TIF -R) - , _4# . __4_/ —
Mass Transit TIF (TIF-MT) - / 0, \\ /,724-
Water Quality (WQUAL)
Water Quantity (WQUANT) /%, ` /a Gi- /
Erosion Control Permit (ERPRMT) ‘44 w 1 ‘-11 ✓
Erosion Planck/USA (ERPL�`N) �Q i z�? /
Erosion Planck/COT (EROSN) 2. °D ,2 4, ° U I/
Fire Life Safety (FLS)
TOTALS: ',L1--9--4-7Z-9) s:.- ,
Q_
is \dsts■mstapp.doc �j Z' I � (� 41l(J 1 4 9 ,%
Rev. 7/96 m
V-
Solar Balance Point Standard Worksheet
Address /L //2 Sell // f .ii,c-- 4 194 /7 1,,,-X.e -r ,i---t-
Box A calculations: North -South dimension for the lot. Box A:
This dimension is determined by finding the midpoint of the North lot line and drawing
an intersecting line perpendicular to that point.
First, determine which property line is the North lot line. The North lot line is the line
with the smallest angle from a line drawn east -west and intersecting the northern most
point of the lot.
��. 45
t
t \
LOT L LONOTMNN E
N North -South
Dimension for Lot:
Measure the distance from the midpoint of the North lot line to the South lot line along
the described line. ��
feet
t
=NOR1H -SOU41 CIMENSION. --... .,,
I I
Box B calculations: Shade point height for your residence. Box B:
1. Determine whether measurements will be based on the peak or eave of your Which describes
structure. The orientation of the ridge is also important. your residence?
1 a: If the roof line runs North - South, measurements will (circle one)
`
be based on the peak of the roof. 0 0 0 0
FONT
M -..
ey 1B 1C
1 b: If the roof line runs East -West and the roof pitch is
less than 5/12, measurements will be based on the
eave.
SHADE POINT EA'.£
■
1c: If the roof line runs East -West and the roof pitch is
5,12 or steeper, measurements will be based on the 5 n 12 Roof T»m
❑ ar Qoo
peak. SHADE FONT RIDGE
Box B. continued Box B:
2. Measure change in elevation from front property line to finished floor elevation. If
the lot slopes up from the front lot line to the foundation, the figure is positive. If / ft
the lot slopes down from the front lot line to the foundation, the figure is negative.
3. Measure distance from finished floor elevation to the affected peak/eave. + 2 7 ft
4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - ft
deduct nothing.
S. Subtract one foot for each foot of difference in elevation from the front property
line to the rear property line, if the lot slopes up from the front to the rear. If the
lot has no slope or slopes up from the rear to the front, deduct nothing. - ft
6. Total figure for box B: 2 ft
Box C. Distance to the shade reduction line. Box C:
1. Measure the distance from the North property line to the foundation near the ft
affected peak/eave.
2. Measure the distance from the foundation to the affected peak or eave. + 2— ft
•
3. Total figure for box C: 7 ft
It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the
appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value
in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then
the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the
Community Development Counter.
MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) r
Distance to North -south lot dimension (in feet
shade 100+ 95 90 85 80 75 70 65 0 55 50 45 40
reduction line
from northern
Jot line (in feet)
70 40 40 40 41 42 43 44
65 38 38 38 39 40 41 42 43
60 36 36 36 37 38 39 40 41 2
55 34 34 34 35 36 37 38 39 40 41
50 32 32 32 33 34 35 36 37 38 39 40
45 30 30 30 31 32 33 34 35 36 37 38 39
40 28 28 28 29 30 31 32 33 34 35 36 37 38
35 26 26 26 27 28 29 30 31 32 33 34 35 36
30 24 24 24 25 26 27 28 29 30 31 32 33 34
25 22 22 22 23 24 25 26 27 28 29 30 31 32
20 20 20 20 21 22 23 24 25 26 27 28 29 30
15 18 18 18 19 20 21 22 23 24 25 26 27 28
10 16 16 16 17 18 19 20 21 22 23 24 25 26
5 14 14 14 15 16 17 18 19 20 21 22 23 24
Box D. Maximum allowed shade point height: ,Ev -e j +T`ros.._ feet
h: \d ocs \n a n cy\ve n to ra\so l a r. c h p
Revised 2/26/96
.,` is CITY OF TIGARD X1002/011 10/15/96 11:49 '503 684 7297
is primarily intended to allow a substantial building height up to or at the
height limit allowed by the zoning district where a row of narrower lots'
widths are side by side. See Figure 8 on Page 7.
2) When calculating the Solar Balance Point height restrictions, a north to
south ridgeline orientation that causes shading can be considered to be
three feet lower in height than the actual height. This was allowed
because a ridgeline roof feature was not found to significantly shade
another structure.
3) A variance is allowed to reduce the sideyard dimension to the minimum
allowed by The Uniform Building Code, usually three feet, in order to
comply with the Solar Access requirements.
4) If the site has an average slope that exceeds 20% in a direction greater
than 45 degrees east or west of true south the lot would be exempt from
compliance.
5) If the proposed structure would shade an undevelopable area or an area
constructed with an unheated space such as a garage the structure would
be exempt. (If the proposed exemption relates to a structure on an
adjoining lot, the structure would at a minimum have to be under review
for Building Permits)
6) If the proposed structure would shade a portion of a structure that does
not contain a solar feature the structure would be exempt. The most
common solar feature are windows_ The Solar Access requirements
specifically exempt a windowless south facing wall as being a solar
feature.
7) A topographic feature creates the shading issue (for example: a prominent
hill that limits other development options).
8) Existing trees that are to be preserved cause the shade. A duly executed
covenant protecting the trees is required to use this exemption.
9) Lots of less than 3,000 square feet are exempt.
i:aurpin/markdsolarex.doc
�1$ d
n p� If
CITY OF TIGARD BUILDING INS ' ("CTION DIVISION A/,4
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: /0 .- — 97 A.M. /\ P.M. MST: �F
Location: 127 ID- S-60 11 61-1\._ LOT 17 BUP: /
Tenant: Suite: Bldg: MEC:
Contractor: Phone: 59-cG> 5 PLM:
Owner: Phone: ELC:
ELR:
SIT:_
BUILDING ; LDG : I't) PLUMBING MECHANI�IJ ELECTRICAL SITE
Site ' os I : ear Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm _Eurna _ ,� _ Temp Service MISC.
Masonry Ceiling Rain Dr. ' 1 _ - 5 UG Slab
Shear /Sheath Fire Spklr /Alm :. 'I o1 d Dr s FarPtunp Low Volt S ( 0 0
4.1:21dwlk r�i A• •roved Approved u •prov' Approved Approved
of Approve Not Approv • ?> ■ • • y. ved Not Approved Not Approved
,� AI,..
l ° INa:1_ FINAL FINAL FINAL
r — r--- -_ _ __ 0/1^-12,47 . d -te 1 ca r l� �i�rt w ,A G���
•
J
all for reins ction O Reinspection fee of $ required before next inspection O Unable to
pe pec q pec inspect
Inspector: _ r Date: / - 2,--1 7 Page of
•
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: ` 6._.3 (c:?-7 A.M. L. „---•-- P.M. MST: G 6 ( T
Location: ! c -7 I oZ / /6 A-0c - BUP:
Tenant: Suite: Bldg: MEC:
i
Contractor: � ,/- ke a,�� Phone: 3--.:_q_____5--( P' () PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING t/ MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C . UG Slab
Shear /Sheath Fire Spklr /Alm C awl/Found Dr Heat Pump Low Volt
Approved A ID Droved_ Approved Approved Approved
Appr/Sdwlk Not Approved `"4� _ Not Approved Not Approved Not Approved
PP PP ,s �: PP PP PP
FINAL ` •LI t) FINAL FINAL FINAL
® r __ r L _ ■1" 0 . E. _ _ �- ��►_ ........
IIA_WIWAIMIIIAIWA 1 i wi,7 --- ... 0 417SWAMFBIWIMPYIN
_WARIPM -.,. .-44-1
--/-
4.41 Allf,..1_,MATE_AE5"-. •
v
0 Call for reinspection O Reinspection fee of $ required before next inspection O Unable to inspect
Inspector: Dat /Q Z -Q Page of
______,ZZL___
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 •
Date Requested: /6 (02 3 f q A.M. "' P.M. MST: d ( 4 1S .
Location: / `7 / c)— //6 c/'4 )4-f L BUP:
Tenant: Suite: Bldg: MEC:
Contractor: i / _ ,,k_. / LJ L. Phone: ....5 q-s 1 (. PLM:
Owner: ' Phone: . ELC:
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL ELECTRICAL__ SITE
•
Site PostBeam Post/Beam Post/Beam Cover /Service • Sewer /Storm
- Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation • Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved Approved Approved
Appr /Sdwlk Not Approved Not Approved. Not Approved o , 'roved Not Approved
FINAL • FINAL FINAL r 1 • FINAL
2- /A/ L — 1,)3
ii/FD ' /1,4- rye) IV
D IO /l6 T No 7 1_0 c4- T/ DA/ DF // 'v Ii0x4= s
f-7 AD '6-N - / N, p4.EA -S CoN A/.1, 777 ARD.dEA
A D i . S /A/S7.9- 4 & E'D-
. 4
l .
El Call for reinspection 0 Reinspection fee of $ required before next inspection O Unable to inspect
Inspector: Ai Date: 6 — 3 —9 7 Page of
x 5/30/00 Activities for Case #: MST97 -00144 eAep „ft
3:05:14 PM
Assigned Hold Updated
Activity Description Date 1 • Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA005 Application received 5/5/97 B RECD BON 5/8/97
MSTA008 Permit Created 5/8/97 B PASS BON 5/8/97
MSTA010 Check for prcl. restrict. 5/8/97 B PASS BON 5/8/97
MSTA012 Plans routed to Plans Examiner 5/8/97 B PASS BON 5/8/97
MSTA026 Plans approved by Pln Examiner 5/13/97 RT PASS BT2 5/20/97
MSTA030 Reviewed plans routed to DSTS 5/13/97 RT PASS BT2 5/20/97
MSTA032 DST Post - Review Completed 5/14/97 B PASS BON 5/21/97
MSTA700 Erosion Control Insp 844 -8444 BON 5/8/97
MSTA705 Footing Insp 6/18/97 KS FAIL J *H 6/20/97 EXCAVATE FORMS AT REAR
OF LOT TO STABLE SOIL.
MSTA706 Foundation Insp 6/24/97 KS PASS J *H 6/24/97
MSTA710 Post/Beam Structural 7/7/97 TLP PASS J *H 7/7/97
MSTA711 Post/Beam Mechanical 7/7/97 TLP PASS J *H 7/7/97
MSTA713 Crawl Drain 10/24/97 GS PASS J *H 11/7/97 sump
MSTA717 PLM /Underfloor 6/20/97 MS PASS J *H 6/22/97 missing a few nail plates -
correct.
MSTA720 Mechanical Insp 8/22/97 KS PASS J *H 8/25/97 Heat ducts at garage and
above furnace at attic not
insulated, will check at
insulation inspection.
MSTA722 Plumb Top Out 8/14/97 MS PAID DST 8/15/97 25 dollar reinspection fee
accessed (8/15/97 paid
re- inspection fee of $25.00: see
receipt #97- 298342)
MSTA723 Electrical Service 8/19/97 BRP PASS B *P 8/19/97
MSTA724 Electrical Rough In 8/19/97 BRP PASS B *P 8/19/97 Check number of wires under
wirenut at entry door 3 -gang
switch box.
MSTA725 Framing lnsp 8/22/97 KS PASS J *H 8/25/97 Approved pending correction:
Replace bottom plate (notched
for plumbing at bottom of
stairs).
MSTA726 Shear Wall Insp 8/8/97 KS DIS KBS 8/8/97 #-1- nail panels per schedule
interior exterior #-2- mst straps
missed at front second story
#-3- renail panels where nails
have fractured outer layer of
panel
MSTA727 Low Voltage 10/23/97 BRP PASS J *H 10/23/97
MSTA735 Gas Line Insp 8/22/97 KS PASS J *H 8/25/97 17psi approved
MSTA736 Gas Fireplace BON 5/8/97
MSTA740 Insulation lnsp 8/26/97 KS PASS J *H 8/27/97
Page 1 of 3
•
=v
5/30/00 Activities for Case #: MST97 -00144
3:05:14 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA745 Gyp Board Insp 9/8/97 KS FAIL J *H 9/14/97 not ready
MSTA755 Rain drain Insp 6/25/97 MS PASS J *H 6/27/97
MSTA760 Water Line Insp 6/25/97 MS PASS J *H 6/27/97
MSTA765 Appr /Sdwlk Insp 10/24/97 MW PASS S *W 12/1/97 OK. NOTE: only one weep hole
at RPC. Rain drains drain
where?
MSTA790 Electrical Final 10/23/97 BRP PASS J *H 10/23/97 NOTE: For information: I did
not note location of fain boxes
at roughin. Please confirm that
proper box is installed.
MSTA795 Mechanical Final 10/30/97 KS FAIL J *H 10/31/97 1. Seal void above furnace. 2.
Gas fireplace not functional. 3.
Seal around door jamb and
upper storage.
MSTA797 Plumb Final 10/23/97 GS PASS J *H 10/29/97 TERRY OF LEGAND IS
FAXING TO MIKE SHEEHAN
THE APPROVED PLUMBING
FINAL INSPECTION. HE
CALLED IN FOR BLDG FINAL
FOR TODAY AND WAS TOLD
NO BECAUSE OF NO
• PLUMBING FINAL. 10/29 call
. from Terry with receipt # of $25
paid. see above. was not ms
who did plm final, but geo on
10/23/97 terry brought in his
approved inspection slip.
approved by george on
10/23/97. 102997: Entry of
approved plumbing final from
original form. - JH
MSTA799 Building Final • 10/24/97 GS FAIL J *H 11/7/97 1. Landing needed at bottom of
. deck stairs (14 -inch drop). 2.
Deck tread 9 -inch minimum
with 3/8 -inch max. variation. 3.
Extend handrail to bottom riser
min.
MSTA080 (F) Ready to issue 5/14/97 B PASS BON 5/21/97
MSTA092 (F) Issue combination permit 5/23/97 JMH PASS TAT 5/23/97
MSTA095 Issue plumbing signature form 6/18/97 SW RECD MRS 6/18/97
MSTA097 Issue electric signature form 6/9/97 SW RECD MRS 6/9/97
MSTA705 Footing lnsp 6/22/97 KS PASS J *H 6/22/97
MSTA717 PLM /Underfloor 7/3/97 RAB PASS J *H 7/7/97 noted that previously approved
on 062097 by Mike Sheehan.
MSTA780 «REINSPECTION» 8/14/97 MS PAID J *H 11/7/97 no test 2nd time paid $25 on
8/15/97 receipt 97- 298342
MSTA722 Plumb Top Out 8/12/97 RAB FAIL J *H 8/15/97 No test on DWV above first
floor.
MSTA726 Shear Wall lnsp 8/12/97 KS PASS J *H 8/15/97 Okay to apply siding - shear
wall nailing approved
MSTA722 Plumb Top Out 8/18/97 MS FAIL MRS 8/18/97 no test
Page 2 of 3
5/30/00 Activities for Case #: MST97 -00144
3:05:14 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA722 Plumb Top Out 8/21/97 RAB PASS RAB 8/21/97
MSTA795 Mechanical Final 10/24/97 GS PASS J *H 11/7/97
MSTA765 Appr /Sdwlk lnsp 10/28/97 PI PASS S *W 12/1/97 Done yesterday; OK for C.O.
MSTA799 Building Final 3/10/99 VLN NOTE VLN 3/10/99 Inspection request for research
to George S. 3/10/99.
MSTA945 Request inspection research 3/27/00 JMT DONE No Hold JMT 3/27/00 SECOND REQUEST
MSTA153 Expired by limitation 4/18/00 HAP DONE No Hold AKJ 4/26/00 card sent to contractor
•
•