Permit CITY OF TIGARD
l � i f- ' � I �
DEVELOPMENT SERVICES PERMIT
639-4171 CES MERTIR PP MST97 -0130
DATE ISSUED: 05/05/97
24 7.4 PARCEL: 2S 1 03BD-HG020
SITE ADDRESS... ;-.1.'-a6 SW 116TH AVE
SUBDIVISION • HUNTER' S GLEN ZONING: R -4.5 PD
BLOCK LOT •020 JURISDICTION: TIG
Remarks: Path 1
--- BUILDING
REISSUE: STORIES : 2 FLOOR AREAS BASEMENT...: 0 sf REQUIRED SETBACKS --- REQUIRED
CLASS OF WORK.:NEW HEIGHT : 24 FIRST • 1844 sf GARAGE • 787 sf LEFT • 15 SMOKE DETECTR5: Y
TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 1026 sf FRONT • 28 PARKING SPACES: 1
TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT : 5
OCCIPANCY GRP.:R3 BDRM: 4 BATH: 3 TOTAL------: 2078 sf VALUE..$: 152397 REAR : 21
PLUMBING
5INKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 8 RAIN DRAIN ft: 0 TRAPS • 0
LAVATORIES • 4 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 8 SF RAIN DRAIN: 1 CATCH BASINS..: 0
TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 100 BCKFLW PREVNTR: 1 GREASE TRAPS..: 8
OTHER FIXTURES: 8
— MECHANICAL - -
FUEL TYPES— FURN (108K ..: 0 BOIL /C P ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1
GAS FURN ) =100K ..: 1 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1
MAX INP.: 0 BTU FLOOR FURNACES: 8 VENTS • 0 WOODSTOVES • 0 GAS OUTLETS...: 1
ELECTRICAL -
- RESIDENTIAL UNIT— — SERVICE /FEEDER ---- —TEMP SRVC /FEEDERS— — BRANCH CIRCUITS — -- MISCELLANEOUS— - -ADD'L INSPECTIONS -
1808 SF OR LESS: 1 8 - 200 alp..: 8 8 - 208 alp..: 0 W /SVC OR FDR..: 8 PUMP /IRRIGATION: 8 PER INSPECTION: 0
EA ADD'L 508SF.: 4 281 - 480 alp..: 0 201 - 400 alp..: 0 1st W/O SVC/FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 8
LIMITED ENERGY.: 8 401 - 680 alp..: 8 481 - 600 alp..: 0 EA ADDI BR CIR: 8 SIGNAL /PANEL...: 0 IN PLANT • 0
MANF HM /SVC /FDR: 0 681 - 1080 amp.: 0 601 +asps -1000 v: 0 MINOR LABEL -10: 0
1000+ amp /volt.: 0 --- PLAN REVIEW SECTION
Reconnect only.: 0 )=4 RES UNITS..: SVC /FDR)=225 A.: ) 680 V NOMINAL: CLS AREA /SPC OCC:
ELECTRICAL - RESTRICTED ENERGY --
A. SF RESIDENTIAL ---- ---- B. COMMERCIAL --
AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO N STEREO.: FIRE ALARM • INTERCOM /PAGING: OUTDOOR LNDSC LT:
BURGLAR ALARM..: 0TH: :: X BOILER • HVAC • LANDSCAPE /IRRI6: PROTECTIVE SI6NL:
GARAGE OPENER..: CLOCK • INSTRUMENTATION: IEDICAL • OTHR: ..
HVAC • DATA /TELE COMM.: NURSE CALLS TOTAL $ SYSTEMS: 0
Owner: Contractor: ---- TOTAL FEES:$ 2814.21
LEGEND HOMES LEGEND HOMES CORPORATION
6908 SW HAINES 7160 SW HAZELFERN RD.
TIGARD OR 97223 STE 108
TISARD OR 97224
Phone 0: 620 -8080 Phone 8: 628 -8088
Reg t..: 080685
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other
applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180
days of issuance, or if work is suspended for more than 188 days.
REQUIRED INSPECTIONS --
Erosion Contol Post/Beau Meehan Electrical Servi Gas Line Insp Water Service In Building Final
Grading Inspecti Crawl Drain Electrical Rough Gas Fireplace Appr /Sdwlk Insp
Footing Insp PLM/Underfloor Framing Insp Insulation Insp Electrical Final
Foundation Insp Mechanical Insp Shear Wall Insp Gyp Board Insp Mechanical Final
Post /Beam Struct Plumb Top Out L stage Rain drain Insp Plumb Final
Permittee Signature: Issued By: u
Call for inspection - 639 -4175
Plan Check # �� 1_
:ITY OF TIGARD Residential Building Permit Application Rec'dBy bo
3125 SW HALL BLVD. New Construction Additions or Alterations Date Recd 4-2;2- - 1i
IGARD, OR 97223 Single Family Detached or Attached Date to P.E. q z - 11
03) 639 -4171 Date to DST . lq - S 1
Print or Type Permit# S' - 0( _ . _..l' 7-
. �7
-.2 Incomplete or illegible applications will not be accepted canedN . or
Z
Name of Subdivision Lot # Name
Job HUNTER'S GLEN 20 LEGEND HOMES Architect Mailing Address
Address Site ress 6900 SW Haines St.
-E S W 1 l,� t h Avenue City /State Zip Phone
Name Tigard, OR 97223 620 -8080
LEGEND HOMES
Owner Mailing Address Name
FROELICH
6900 S W Haines St. Engineer Mailing Address
City/State zip p Weer hone g 6969 S W Hampton ton St.
Tigard, OR 9 223 620 -8080 City/State Zip Phone
Name Tigard, OR 97223 624 -7005
General LEGEND HOMES Describe work new O addition O alteration O repair O
Contractor Mailing Address to be done:
6900 S W Haines St. Additional Description of Work:
City/State Zip Phone
Tigard, OR 97223 620 -8080
Oregon Const. Cont. Board Lic.# Exp. Date _
Attach Copy of 060563 6/ 19 / 9 7 Project
Current COT Business Tax or Metro # Exp. Date Valuation $ S-1 ,i9 s
Licenses -7-1 97 24.33 6/1/97
Name i2 f��� 7 NEW CONSTRUCTION ONLY:
Mechanical SUNGLOW INC. Sq.Ft. House: Sq.Ft.Garage:
Sub- Mailing Address LC l G 7
Contractor ; 2428 S E 105th Corner Lot Yes I.1 Flag Lot Yes No
City/State Zip Phone (check one) (check one)
I P o r t l a n d , OR 97216 2 5 3 - 7 7 8 9 Restricted Audio /Stereo n w ,�Burglar
Oregon Const. Coat. Board Lic.# Ex . Date Energy �� System p e Alarm
Attach Copy of 148131 U/7 Installation /r Garage Door HVAC
Current ' COT Business Tax or Metro # xp. a n id /Cu
Licenses 97 - f S/ / 8 !r` O Systems
Name (check all that Other:
Plumbing ; WOLCOTT PLUMBING apply)
Sub '.'ailing Address VWII the electrical subcontractor wire for all Yes No
restricted energy installations?
Contractor PO Box 2007
Has the Subdivision Plat recorded? N/A Yes No
City/State Zip Phone
De--
Gresham, OR 97030 667 -9891
Oregon Const. Cont. Board Lic.# Exp. Date Reissue of MST# Solar Compliance
Attach Copy of 23a.47 10 / 19 / 9 7 (Calculation Attached)
Current Plumbing Lic. # Exo. Date I hereby acknowledge that I have read this application, that the
Licenses 26- 2 0 8 P B 8/31/97 information given is correct, that I am the owner or authorized agent of
COT Business Tax or Metro # Exp. Date the owner. and that plans submitted are in compliance with Oregon
96-4281 .124L State laws. _ ,
Name /4/f7 Signature __ner /Agent Date ,.�" ;
Electrical GARNER ELECTRIC ��� '` r° c -,.
Co cName Phone
S U b- Mailing Address
Contractor 21785 SW TV Highwa FOR OFFICE USE ONLY:
City/State Zip Phone Plat # Map/TL #:
Aloha, OR 97006 591 -1320 f LL . � /
Oregon Const. Cont. Board Lic.# Exp. Dat I 06 - 141 q% 1-6 7 � 2 J� 1+
Attach Copy of 6 //6721 8 /97 Setbacks ' ) ) Z ne: Solar:
Current Electrical Lic. # D ��// �\\
Licenses 34 -305C / 1) t 7 _ Of -fltw -q 3 QD
COT Business Tax or Metro # E . D to Engineering Approval: Planning Approval: TIF:
1 yv ;'i y � > . . �e b," J ems. ti k Jv> o-r
sts\mstapp.doc
Lf/ilan
Permit # Account Description Amount Amt. Pd. Bal. Due
nlsk701 3v MST. Permit (BUILD) 565, a ,56 5,
Plumb. Permit (PLUMB) 225. -- 1- 225, G
Mech. Permit (MECH) 445.. - " 45,=
ELC/ELR Permit (ELPRMT) Z$c -'` 250, ''
2
State Tax (TAX) 54. .54,-
Bldg: Z8. .i
Plumb: - �
/1.
2( ¢ '
Mech: 2.
ELC /ELR: /Z.-.
v
Plan Check
MST: (BUPPLN) 36 7 ✓ 7:5D 117, *
Plumb: (PLMPLN)
Mech: (MECPLN) //, ." / , 2.;
�' c w
CDC Review (LANDUS) 40. eo w.
v
stvRgi -di 7 Sewer Connection (SWUSA) 2200, ZZQO.
e.
Sewer Inspection (SWINSP) 35. 3S,
f I
Parks Dev Charge (PKSDC) /0.50, //0.50, s-
Residential TIF (TIF -R) \l ': Jvviv
Mass Transit TIF (TIF -MT)
Water Quality (WQUAL)
Water Quantity (WQUANT) /00 /U 0
Erosion Control Permit (ERPRMT) 64.
Erosion Planck/USA (ERPLAN) 20. # 20. 0 t
Erosion Planck/COT (EROSN) 20, ° o ` o .? 0, v
Fire Life Safety (FLS)
TOTALS: 51)49 •-- 7,0 7 /`J, "
c dstslmstapp.doc
Rev. 7/96
Solar Balance Point Standard Worksheet
Address /f7 i �j / � / 1-11 '‘ c
Box A calculations: North -South dimension for the lot. Box A:
This dimension is determined by finding the midpoint of the North lot line and drawing
an intersecting line perpendicular to that point.
First, determine which property line is the North lot line. The North lot line is the line
with the smallest angle from a line drawn east -west and intersecting the northern most
point of the lot.
■
45° —►
NOMERN
LOT T UK LOT UNE North -South
N
Dimension for Lot:
Measure the distance from the midpoint of the North lot line to the South lot line along
the described line. F `-/
feet
NORTH-SOUTH DtMENE7ON
Box B calculations: Shade point height for your residence. Box B:
1. Determine whether measurements will be based on the peak or eave of your Which describes
structure. The orientation of the ridge is also important. your residence?
1 a: If the roof line runs North - South, measurements will f (circle one)
be based on the peak of the roof. o 0 a 0
lull 1.11111
NMI 1A 1B 1C
1 b: If the roof line runs East -West and the roof pitch is
less than 5/12, measurements will be based on the
in 12ZerriMeh
eave.
SFNOE pc INT EA£
1 c: If the roof line runs East -West and the roof pitch is
5/12 or steeper, measurements will be based on the .. a 96 ,
peak. ,�„
•
Box'B. continued Box B:
2. Measure change in elevation from front property line to finished floor elevation. If
the lot slopes up from the front lot line to the foundation, the figure is positive. If ;, ft
the lot slopes down from the front lot line to the foundation, the figure is negative.
3. Measure distance from finished floor elevation to the affected peak/eave. + Z Z ft
4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - - ft
deduct nothing.
5. Subtract one foot for each foot of difference in elevation from the front property
line to the rear property line, if the lot slopes up from the front to the rear. If the
lot has no slope or slopes up from the rear to the front, deduct nothing. - .5 ft
6. Total figure for box 8: /7- ft
Box C. Distance to the shade reduction line. Box C:
1. Measure the distance from the North property line to the foundation near the i ft
affected peak/eave.
2. Measure the distance from the foundation to the affected peak or eave. ft
3. Total figure for box C: 3 / ft
It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the
appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value
in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then
the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the
Community Development Counter.
MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet)
Distance to North -south lot dimension (in feet)
shade 100- 95 90 85 80 75 70 65 60 55 50 45 40
reduction line
from northern
jot line (in feet)
70 40 40 40 4' 42 43 44
65 38 38 38 39 40 41 42 43
60 36 36 36 3' 38 39 40 41 42
55 34 34 34 3 36 37 38 39 40 41
50 32 32 32 31 34 35 36 37 38 39 40
45 30 30 30 3 32 33 34 35 36 37 38 39
40 28 28 28 2) 30 31 32 33 34 35 36 37 38
35 26 26 26 2' 28 29 30 31 32 33 34 35 36
30 2w L4 24 1) 2b 11 28 29 30 31 32 33 34
25 22 22 22 23 24 25 26 27 28 29 30 31 32
20 20 20 20 2 22 23 24 25 26 27 28 29 30
15 18 18 18 1) 20 21 22 23 24 25 26 27 28
10 16 16 16 1 18 19 20 21 22 23 24 25 26
5 14 14 14 1i 16 17 18 19 20 21 22 23 24
Box D. Maximum allowed shade point height: L S feet
h:\docs\nancy\ventu ra\solar.chp
Revised 2/26/96
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: q — / 7 -'7 7 ip_.4t_ P.M. MST: 77-4 / 30
Location: 124.24 Se-0 //6 A/'�' ( .Dr2) BUP:
Tenant Suite: Bldg: MEC:
Contractor: _' A A _ _ /C L/ I Phone: 524i-5/8o PLM:
Owner: Phone: ELC:
r77- 07/742. L/12 _NI A. ELR:
SIT:
BUILDING : LDG on't) PLUMBING MECHANICAL ELECTRICAL SITE
Site • : . earn Post/Beam •o t : • : Cover /Service Sewer /Storm
Footing Roof UndFl/Slab A Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation 4v4- Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath - - Fire Spldr /Alm Crawl/Found Dr Heat Pump Low Volt / 9 // / 524-691
7 17 Ap Approved Approved Approved pproved
I,
Appr /Sd lk No ved Not Approved Not Approved Not Approved Not Approved
��ZZ AL FINAL �1 6 I FINAL/9,-17/6 FINAL
a f c. - - - G- f, el 0 - ' /OO - -- - Zr 1F-
mr—#i 7 —/� — 5 a as,--/,'�` 1 Rie, 61,•Q ,, f',4L Cx,pp' 5 — 97 4 14 t,
w_ 41 //VLGf7 1/G.`' '< 0. t 0 A a r.. ..I ! Il ■ —
gv ‘ v 4P/7
O Call for reinspecti O Reinspection fee of $ required before next inspection O Unable to inspect
Inspector: 1. Date: 9.--./ 7- ! re Page of
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: q -" / / 7 • X P.M. MST: g 7- 0 Lao
Location: • _ i --1 / ■ // '_ r • — BUP:
Tenant: Suite: Bldg: MEC:
Contractor: A /ti , , 4 Phone: Sc - 5 PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con / PLUMBING MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spldr /Ahn Crawl/Found Dr Heat Pump Low Volt
Approved `+, •: •ved Approved Approved Approved
Appr /Sdwlk Not Approved - , .i. oved Not Approved Not Approved Not Approved
FINAL FIN P FINAL FINAL FINAL
driN — Alleglil l :IIMIW / ,
O Call for reins ction O Reinspection fee of $ ' / q1' before n ' spection O Unable to inspect
Inspector: Date: [ > Page / of s /
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
IP
Date Requested: --- • 0 x P.M. MST: q 7-0/3()
Location: . / 1 , _g . . / / %1 /�� �] ( BUP:
Tenant: Suite: Bldg: MEC: I
Contractor: J-elIA-'((f Phone: 5024 -,50) PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL (ELECTRICA SITE
Site Post/Beam Post/Beam Post/Beam over /service ` - Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved • pprov -. Approved
Appr /Sdwlk Not Approved Not Approved Not Approved , . - pproved Not Approved
FINAL FINAL FINAL IN 1 FINAL
- /A//4 L i4-i A a v.-
r
-'---- s'-' (
0 Call for reinspection einspection fee of $ uired Clef e next inspection 0 Unable to inspect
Inspector: Date: Page of
4/26/00 Activities for Case #: MST97 -00130
2:03:59 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA005 Application received 4/22/97 B RECD BON 4/24/97
MSTA008 Permit Created 4/24/97 B PASS BON 4/24/97
MSTA010 Check for prcl. restrict. 4/24/97 B PASS BON 4/24/97
MSTA012 Plans routed to Plans Examiner 4/24/97 B PASS BON 4/24/97
MSTA026 Plans approved by RPE 4/29/97 RT PASS BT2 4/29/97
MSTA030 Reviewed plans routed to DSTS 4/29/97 RT PASS BT2 4/29/97
MSTA032 DST Post - Review Completed 4/20/97 B PASS BON 4/30/97
MSTA700 Erosion Control Insp 844 -8444 BON 4/24/97
MSTA703 Grading Inspection BON 4/24/97
MSTA705 Footing lnsp 5/6/97 KS APP KBS 5/6/97
MSTA706 Foundation Insp 5/7/97 GL APP JT 5/8/97 all stab bolts for holdowns in
MSTA710 Post/Beam Structural 5/15/97 GL APP J *H 5/21/97 PLUMBING APPROVAL
REQUIRED BEFORE
COVERING.
MSTA711 Post/Beam Mechanical 5/16/97 GL APP J *H 9/17/97
MSTA713 Crawl Drain 9/18/97 MS PASS MRS 9/18/97
MSTA717 PLM /Underfloor 5/19/97 MS PASS MRS 5/20/97
MSTA720 Mechanical Insp 7/10/97 GS PASS J *H 7/11/97 Pending connection of bath
fans downstairs.
MSTA722 Plumb Top Out 6/27/97 MS PASS J *H 6/29/97
MSTA723 Electrical Service 7/8/97 BRP PASS J *H 7/14/97
MSTA724 Electrical Rough In 7/8/97 BRP PASS J *H 7/14/97 Check strapping of conduit at
. furnace on final. Fanbox -entry,
. master bdrm, living rm
MSTA725 Framing lnsp 7/10/97 GS PASS J *H 7/11/97 Fireblock soffet in garage,
laundry and bath downstairs.
MSTA726 Shear Wall Insp 6/27/97 KS PASS J *H 7/8/97 1. Renal! #4 panels at 3/12%
nailing. 2. Nail #5 -7- panels
adjacent of entry per schedule
install MST#48 straps at each
side of door. 3. This inspection
does not include generic .
panels.
MSTA727 Low Voltage 9/16/97 BRP PASS J *H 9/17/97
MSTA735 Gas Line Insp 7/10/97 GS FAIL J *H 7/11/97 NO PRESSURE
MSTA736 Gas Fireplace BON 4/24/97
MSTA740 Insulation lnsp 7/15/97 GS PASS J *H 9/17/97
Page 1 of 2
4/26/00 Activities for Case #: MST97 -00130
2:03:59 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By U pdated Notes
MSTA745 Gyp Board Insp 7/24/97 TLP PASS J *H 8/1/97
MSTA755 Rain drain Insp 9/18/97 MS PASS MRS 9/18/97
MSTA761 Water Service Insp BON 4/24/97
MSTA765 Appr /Sdwlk Insp 6/11/97 PI PASS S *W 7/1/97
MSTA790 Electrical Final 9/16/97 BRP PASS J *H 9/17/97
MSTA795 Mechanical Final 9/17/97 KS PASS J *H 9/17/97 see bldg final this date
MSTA797 Plumb Final 9/16/97 MS PASS MRS 9/16/97
MSTA799 Building Final 9/17/97 KS PASS J *H 9/17/97 Approved as noted: 1. Erosion
final approved. 2. Insulation
approved by GS on 071597. 3.
P &B Mech approved by GL on
051697. 3. Provide verification
that rain drain & water line have
been approved.
MSTA080 (F) Ready to issue 4/30/97 B PASS BON 4/30/97
MSTA097 Issue electric signature form 5/5/97 B PASS DST 5/5/97
MSTA095 Issue plumbing signature form 5/20/97 SW RECD SMW 5/20/97
MSTA092 (F) Issue combination permit 5/5/97 B PASS DST 5/5/97
MSTA726 Shear Wall Insp 7/2/97 KS PASS J *H 7/2/97 okay to apply siding
MSTA735 Gas Line Insp 7/16/97 MS PASS J *H 8/1/97
MSTA765 Appr /Sdwlk Insp 8/27/97 8/26/97 MH FAIL S *W 8/27/97 1. Maintain 3' driveway wing. 2.
Re -cut curb at driveway. 3. 6"
depth at back of approach. 4.
4" depth at sidewalk property
line. Do not pour. Call for
reinspection.
MSTA765 APPr /Sdwlk Insp 8/27/97 MH PASS S *W 8/29/97 Okay to pour.
MSTA050 Hold for 9/19/97 JT JT 9/19/97 see ken's building inspection
note. hold for verification from
builder that water line was
inspected & approved
MSTA945 Request inspection research 3/27/00 JMT DONE No Hold JMT 3/27/00 HOLD ON C/O
MSTA055 Hold Release to Issued 4/24/00 JMT DONE No Hold JMT 4/24/00 per Hap W., process C/O
MSTA960 (F) Issue Cert. of Occupancy 9/17/97 KS DONE No Hold ST 4/26/00 4/26/00 -did not mail to owner
(too old) /file
Page 2 of 2