Loading...
Permit CITY OF TIGARD MASTER PERMIT ` .M ` , Vi.1i � DEVELOPMENT SERVICES DATE ISSUED: 06/0 -0167 ��/ PARCEL: 2S103BD —HG013 SITE ADDRESS...:12703 SW 116TH AVE SUBDIVISION • HUNTER' GLEN (J I NG : R-4.5 PD BLOCK LOT •013 JURISDICTION: TIG Remarks: PAN I SF BUILDING - REISSUE: STORIES • 2 FLOOR AREAS BASEMENT...: 0 sf REQUIRED SETBACKS --- REQUIRED CLASS OF WORK.:NEW HEIGHT • 23 FIRST • 1198 sf GARAGE • 651 sf LEFT : 5 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD : 48 SECOND...: 961 sf FRONT : 28 PARKIN SPACES: 2 TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT • 19 OCCUPANCY GRP.:R3 BDRM: 3 BATH: 3 TOTAL------: 2159 sf VALUE..$: 155947 REAR : 39 PLUMBING -- -- ---- -- - - SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN MAIN ft: 180 TRAPS • 8 LAVATORIES • 4 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 180 SF RAIN DRAINS: 1 CATCH BASING..: 0 TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LIME ft: 180 BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 OTHER FIXTURES: 0 MECHANICAL FURL TYPES FURN ( 108K ..: 8 BOIL /CMP ( 3HP: 8 VENT FANS • 4 CLOTHES DRYERS: 1 GAS FURN ) =100K ..: 1 UNIT HEATERS..: 8 HOODS • 1 OTHER UNITS...: 1 MAX INP.: 8 BTU FLOOR FURNACES: 8 VENTS • 0 WOODSTOVES • 8 GAS OUTLETS...: 1 ELECTRICAL -- RESIDENTIAL UNIT— --- SERVICE /FEEDER -- —TEMP SRVC /FEEDERS— — BRANCH CIRCUITS— -- MISCELLANEOUS— — ADD'L INSPECTIONS - 1880 SF OR LESS: 1 0 - 208 amp..: 8 8 - 288 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 588SF.: 4 201 - 408 alp..: 0 281 - 408 alp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 8 PER HOUR : 0 LIMITED ENERGY.: 0 481 - 600 alp..: 0 401 - 600 alp..: 8 EA ADDL BR CIR: 8 SIGNAL /PANEL...: 0 IN PLANT • 0 MANF HM /SVC /FDR: 8 681 - 1880 amp.: 8 681 +asps -1800 v: 8 MINOR LABEL -18: 8 1800+ amp /volt.: 0 - - PLAN REVIEW SECTION -- Reconnect only.: 8 )=4 RES UNITS..: SVC /FDR) =225 A.: f 680 V NOMINAL: CLS AREA /SPC OCC: ELECTRICAL - RESTRICTED ENERGY A. SF RESIDENTIAL— — B. COMMERCIAL - AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM. • INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: OTH: :: X BOILER HVAC LANDSCAPE /IRRIS: PROTECTIVE SIGNL: GARAGE OPENER..: CLOCK • INGTRUMENTATIDNM: MEDICAL • OTHR: •• HVAC • DATA /TELE COMM.: NURSE CALLS • TOTAL 0 SYSTEMS: 0 Owner: Contractor: — TOTAL FEES:$ 4516.95 LEGEND HOMES LEGEND HOMES CORPORATION 6900 SW HAINES ST 7168 SW HAZELFERN RD. TIGARD OR 97223 STE 100 TIGARD OR 97224 Phone 0: 620 -8088 Phone 0: 628 -8080 Reg 0..: 080086 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 1 : days. REQUIRED INSPECTIONS Erosion Contol Post /Beam Meehan Electrical Servi Gas Line Insp Water Line Insp Building Final Grading Inspecti Crawl Drain Electrical Rough Gas Fireplace Appr /Sdwlk Insp Footing Insp PLM /Underfloor Framing Insp Insulation Insp Electrical Final Foundation Insp Mechanical Insp Shear Wall Insp Gyp Board Insp Mechanical Final Post /Beam Struct Plumb Top Out ow Viltage in drain Insp u Final Permittee Signature: W/71e/ ,,,,,V,-,,,/ i sued By 1,i /Call .,s' inspection — 639 -4175 Plan Check #5 `c I :ITY OF TIGARD Residential Building Permit Application Rec'd By 3125 -SVN HALL BLVD. New Construction Additions or Alterations Date Recd ` I3 'IGARD, OR 97223 Single Family Detached or Attached Date to P.E. 5-15' 13 503) 639 -4171 Date to DST-S' 4 Print or Type Permit # 0 ' - D( - I,UR!T7 Called O5e79 g" A— p I 1&' Incomplete or illegible applications will not be accepted (jet r.t ,,.._.,,�_ / ;773 Name of Subdivision Lot # Name Job LEGEND HOMES HUNTER'S GLEN 13 Architect Mailing Address Address Site Address 6900 S W Haines St. '- 14 -7-r2 SW 116th Avenue Name City /State Zip Phone LEGEND HOMES Tigard, OR 97223 620 -8080 Owner Mailing Address Name 6900 SW Haines St. FROELICH City /State Zi phone Engineer Mailing Address Tigard, OR 9223 620 -8080 6969 SW Hampton St. Name City /State Zip Phone LEGEND HOMES Tigard, OR 97223 624 -7005 General Describe work newel addition 0 alteration 0 repair 0 Contractor Mailing Address to be done: 6900 S W Haines St. Additional Description of Work: City/State Zip Phone Tigard, OR 97223 620 -8080 Oregon Const. Cont. Board Lic.# Exp. Date Attach Copy of 060563 6/ 19 / 9 7 Project Current COT Business Tax or Metro # Exp. Date Valuation Licenses .4371 cc) /7- -2033 6/1/97 Name /a - 3/ - 91 NEW CONSTRUCTION ONLY: Mechanical SUNGLOW INC. Sq.Ft. House: Sq.Ft.Garage: Sub I Mailing Address Contractor ; 2428 S E 105th Corner Lot Yes No Flag Lot Yes No City/State Zip Phone (check one) - ?c, (check one) A I P o r t l a n d , OR 97216 2 5 3 - 7 7 8 9 Restricted ft „,,,, Audio/Stereo , ,, 2)- Burglar Oregon Const. C.nt. Board Lic.# Exp. Date Energy f System Alarm Attach Copy of ; 48131 5 -97 Current COT Business Tax or Metro ]2 Exp. Date Installation , � ,.L' ' N 1 Garage Door HVAC Licenses 7.£ -c of : / 7- 9/ / / -/ -6 7 i +- Opener f. Systems Name (check all that Other: Plumbing , WOLCOTT PLUMBING appiy) Sub . Address Will the electrical subcontractor wire for all Yes No P O Box 2 0 0 7 restricted energy installations? X Contractor Has the Subdivision Plat recorded? N/A Yes No City/State Zip Phone Gresham, OR 97030 667 -9891 /c _ Oregon Const. Cont. Board Lic.# Exp. Date Reissue of MST# Solar Compliance Attach Copy of 9 3947 10/19/97 (Calculation Attached) Current Plumbing Lic. # Exo. Date I hereby acknowledge that I have read this application, that the Licenses 26 - 2 0 8 P B 8/31/97 information given is correct, that I am the owner or authorized agent of COT Business Tax or Metro # Exp. Date the owner, and that plans submitted are in compliance with Oregon 96 -4281 12/9' State laws. Name Signa re of Ow /Agent Date Electrical GARNER ELECTRIC co P erso Na a i7Ln Phone Sub- Mailing Address ?4 10..10 Votdc/ Contractor 21785 SW TV Highwa FOR / OFFICE USE ONLY: City/State Zip Phone Plat # Map/TL #: • Aloha, OR 97006 591 -1320 ,/. Oregon Const. Cont. Board Lic.# Exp. Date I (9c - 1 1 4 %1YI 50 C 2- 361)- q - 7 ,0 () Attach Copy of 7.48_9{ 1/ ( 7,. / , / - 7 Setbacks ' ' Zone: Solar: Current Electrical Lic. # Exp. Date 1 2 Licenses 34 -305C /O--1 --97 ON 1 tX, 9 "r 1 1.J Tv COT n Business orMet�� # Exp. Date Engineering Appro al: Planning Approval: TIF: Ists\mstapp.doc y - / / 1 )%k{ A K �1 S -4 97 Permit # Account Description Amount Amt. Pd. Bal. Due rosf q7 0I17 MST . Permit (BUILD) 573 573, Plumb. Permit (PLUMB) ZZS V 225 Mech. Permit (MECH) 45 2S a/ v 45 ELC /ELR Permit ( ERPRMT) 25 o Gs State Tax (TAX) 54. (= V 54, Bldg: a8. Plumb: //. 2, V Mech: z, zs ELC /ELR: I Z .' ° V Plan Check L/J V as" MST: (BUPPLN) 372. 'z ed /21 Plumb: (PLMPLN) --- / Mech: (MECPLN) /1. Z' Ill Z ' / F CDC Review (L,ANDUS) 41 g ✓ ,,4-e- SG,Rg7 o1G y Sewer Connection (SWUSA) 226 Z2oo Sewer Inspection (SWINSP) 5 v 3 S p (S ) 3 Parks Dev Charge 00 (PKSDC) /650 V /os o 99- Residential TIF , I 9 --- (TIF -R) /576 I — -- ll /31 , A Mass Transit TIF Q 1 I l> (TIF -MT) / 20 120 Water Quality (WQUAL) Water Quantity (WQUANT) /00 V /00 Erosion Control Permit (ERPRMT) 6.4 / GI Erosion Planck/USA (ERPLAN) �, go v ate - Erosion Planck/COT (EROSN) 20, I .90 �v Fire Life Safety (FLS) TOTALS: 67.5/..i. 9 _ is \dsts\mstapp.doc �. Rev. 7/96 (p0 • Solar Balance Point Standard Worksheet Add /Z 7 Sev / /01 /# Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. ■ 45° — LOT we LOT UNE N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. feet j <7= 1 NORIKSOUDI 00.4ENSION Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? 1 a: If the roof line runs North - South, measurements will (circle one) fib be based on the peak of the roof. 00130 uwI: NOTM ) 1B 1C 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, measurements will be based on the 12 ace. eave. SVVOE FONT EA%E 1c: If the roof line runs East -West and the roof pitch is 5/12 or steeper, measurements will be based on the od' peak. • Box B. continued Box B: ` ' _ 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If 2 - < ft the lot slopes down from the front lot line to the foundation, the figure is negative. 3. Measure distance from finished floor elevation to the affected peak/eave. + l' ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - 3 ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. - / ft 6. Total figure for box B: ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation near the / � ft affected peak/eave. 2. Measure the distance from the foundation to the affected peak or eave. + ft 3. Total figure for box C: 3/- ft It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) 1 Distance to North -south lot dimension (in feet) shade 100+ 95 90 85 80 75 70 65 60 55 50 45 40 reduction line from northern Jot line (in feet) 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 33 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 36 36 37 38 39 40 45 30 30 30 31 32 33 34 35 36 37 38 39 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32 33 34 35 36 30 s 25 22 22 22 23 24 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27 28 29 30 15 18 18 18 19 20 ;1 22 23 24 25 26 27 28 10 16 16 16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 77 18 19 20 21 22 23 24 I Box D. Maximum allowed shade point height: Z 7 feet h:\docs\nancy\venturalsolar.chp Revised 2/26/96 �a CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 D a t e Requested: LP-703 /0 -- / ,l / N - a 7 dr X P.M. MST: — ! 0 Location: 5 I / 1 6 (i_oT 133) BUP: Tenant: Suite: Bldg: MEC: Contractor: <=70)A■tj. Phone: 5,a cJ - 5) SO PLM: Owner: Phone: ELC: ELR: SIT: BUILDING BLDG (con't) CPLUMBING� MECHANICAL ELECTRICAL SITE Site Post/Beam / PostBBeam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt Approved Approv -• Approved Approved Approved Appr /Sdwlk Not Approved Not A • • oved Not Approved Not Approved Not Approved FINAL FINAL -) FINAL FINAL FINAL CI Call for rein G aectj CI Reinspection fee of $ r aired before next inspection CI Unable to inspect Inspector: 77 ((((( / /K 6 Date: Page / of / 1 % L i CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 q Date Requested: — -‘1 P.M. MST: C I 7 1 Location: fa 3 S,u) I I Ill (L0 7 7 3) Tenant: Suite: Bldg: MEC: r Contractor: Phone: �� S PLM: Owner: Phone: ELC: ELR: SIT: BUILDING BLDG (con't) PLUMBING MECHANICAL ELECTRI ' SITE Site Post/Beam Post/Beam Post/Beam Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt Approved Approved Approved Approved Approved Appr /Sdwlk Not Approved Not Approved Not Approved . , • • . ved Not Approved FINAL FINAL FINAL " FINAL FINAL 4,o (,1 V a ' T AS S Fait /NFoA/+14T/O / 4o x SE-7 4A-ck DA El/ Al r ricpci Al. in N cE Lv /Th/ 13,4 T- Z//D N56(e) /3i1//) 3 - - `J A T . . '' D Jf c 4 •L1-. .1 0 S 40 A: _ v F C -" / FD ' 7,-. ..5 S�7,,4 o ck 1 „,__________ O Call for reinspection O Reinspection fee of $ required before next inspection O Unable to inspect Inspector: Date: /C — 97 Page of 5/30/00 Activities for Case #: MST97 -00167 3:00:52 PM 1 A Assigned Hold Updated 'R� Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 5/13/97 BON PASS JD 5/27/97 MSTA008 Permit Created 5/15/97 BON PASS JD 5/27/97 MSTA010 Check for prcl. restrict. 5/15/97 BON PASS JD 5/27/97 MSTA012 Plans routed to Plans Examiner 5/15/97 BON PASS JD 5/27/97 MSTA026 Plans approved by Pln Examiner 9/16/97 RT PASS BT2 5/20/97 MSTA030 Reviewed plans routed to DSTS 9/16/97 RT PASS BT2 5/20/97 MSTA032 DST Post - Review Completed 5/27/97 JSD PASS JD 5/27/97 MSTA700 Erosion Control lnsp 844 -8444 BT2 5/20/97 MSTA703 Grading Inspection BT2 5/20/97 MSTA705 Footing Insp 6/10/97 RB PART J *H 6/12/97 1. Are we going by lot numbers or is this the correctg address? 2. Erosion OK 061097 3. Maintain ancholr bolt detailing at foundation wall, provide rebar, all hold -down locations. 4. Provide an adequate keyway. 5. UFER tagged. MSTA706 Foundation lnsp 6/12/97 RB PASS J *H 9/16/97 Approved pending: Provisionof anchor bolts as per plans and engineering. MSTA710 Post/Beam Structural 6/23/97 KS PASS J *H 6/25/97 MSTA711 Post/Beam Mechanical 6/23/97 KS PASS J *H 6/25/97 MSTA713 Crawl Drain 6/16/97 MS PASS J *H 6/18/97 MSTA717 PLM /Underfloor 6/19/97 MS PASS J *H 6/22/97 MSTA720 Mechanical lnsp BT2 5/20/97 MSTA722 Plumb Top Out 7/22/97 MS PASS J *H 7/22/97 MSTA723 Electrical Service BT2 5/20/97 MSTA724 Electrical Rough In BT2 5/20/97 MSTA725 Framing Insp 7/15/97 RB FAIL KBS 8/5/97 1. Electrrical cover required. 2. Ventilate living room rafters. 3. Strap glulam at main entry wall. 4. Nail arc 45 degrees structural members at exterior sheathing. OK to insulate once electrical is approved. MSTA726 Shear Wall Insp 7/23/97 KS PASS J *H 7/23/97 MSTA727 Low Voltage BT2 5/20/97 MSTA735 Gas Line lnsp 8/5/97 KS DIS KBS 8/5/97 #-1- gas piping won't hold pressure MSTA736 Gas Fireplace BT2 5/20/97 Page 1 of 3 5/30/00 Activities for Case #: MST97 -00167 3:00:52 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA740 Insulation Insp 8/12/97 KS APP J *H 8/15/97 Approved as noted: Eave baffles missed at vent, install prior to applying gypsum. MSTA745 Gyp Board Insp 8/22/97 KS PASS J *H 8/25/97 Approved pending correction: 1. Trim water proof gypsum at soaking tub to adjacent stud for attachment of wonder board at stall shower. MSTA755 Rain drain lnsp 6/16/97 MS PASS J *H 6/18/97 MSTA760 Water Line Insp 6/16/97 MS PASS J *H 6/18/97 MSTA765 Appr /Sdwlk lnsp 9/22/97 MW PASS S *W 9/24/97 Install rain drains both sides of drive; okay to pour after rain drains installed. MSTA790 Electrical Final 10/14/97 BRP FAIL J *H 10/15/97 1. Sheetrock gap around panel. 2. Panel not flush with wall. 3. Wall plate not seated - kitchen counter. 4. Boxes not projected to surface - ART380 -20. 5. Recpt. not seated to wall or box - 410 -56 (e). This is in numerous locations. 6. Dryer recpt. not rigidly mounted to wall or box. Sheetrock screws not approved to install outlet. MSTA795 Mechanical Final BT2 5/20/97 MSTA797 Plumb Final 10/14/97 MS PASS MRS 10/14/97 MSTA080 (F) Ready to issue 5/27/97 JSD PASS JD 5/27/97 MSTA092 (F) Issue combination permit 6/9/97 DRA PASS DRA 6/9/97 MSTA095 Issue plumbing signature form 6/18/97 SW RECD MRS 6/18/97 MSTA097 Issue electric signature form 6/18/97 SW RECD MRS 6/18/97 MSTA725 Framing Insp 8/5/97 KS DIS KBS 8/5/97 #-1- positive connection trimmers to header garage #-2- king stud each side of glu /lam garage #-3- block under sole notched for plumbing #-4- provide full bearing under beam at nook #-5- support under hips and nil hip jacks as needed #-6- provide full bearing under double rim joist at hallway #-7- positive connection ridge to support studs at liv /rm #-8- truss clips missed at hip #-9- connect exhaust fan vent to roof jack #-10 -strap heat duct above B vent #-11- support B vent at horizontal #-12- firestop mechanical chase upper level #-13- add stud at splice adjacent to gas piping #-14- provide rubber grommet at thermostatwire fireplace Page 2 of 3 4 5/30/00 Activities for Case #: MST97 -00167 3:00:52 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA723 Electrical Service 8/8/97 BRP OK MJR 8/12/97 MSTA724 Electrical Rough In 8/8/97 BRP OK MJR 8/12/97 MSTA735 Gas Line lnsp 8/13/97 KS APP KBS 8/13/97 #-1- gas piping pt test = 29 psi for 15 minutes MSTA790 Electrical Final 10/15/97 10/15/97 BRP PASS J *H 10/15/97 1. Many boxes are set back, not allowing compliance with ART410 -56(e) and 380 -9. Future rough -ins boxes must project to wall surface, 1/2 -inch for 1/2 -inch sheetrock. MSTA728 Low Voltage 10/15/97 BRP PASS J *H 10/15/97 MSTA795 Mechanical Final 10/16/97 KS FAIL J *H 10/16/97 see bldg final this date MSTA799 Building Final 10/16/97 KS FAIL J *H 10/16/97 1. Support flex gas piping at water heater. 2. Post insulation certificate. 3. Sealweld spots at return air supply. 4. Attach insulation at furance plenum at crawl and support from framing members /beams. 5. Remove loose wood and debris at crawl. 6. Need to locate low point drain. 7. Slope finish grade away from structure. 8. Louvars appear to be painted shut at kitchen exhaust. Final USA erosion control approved. MSTA799 Building Final 3/10/99 VLN NOTE VLN 3/10/99 Inspection request for research to George S. 3/10/99. MSTA945 Request inspection research 3/27/00 JMT DONE No Hold JMT 3/27/00 SECOND REQUEST MSTA153 Expired by limitation 4/18/00 HAP DONE No Hold AKJ 4/26/00 card sent to contractor Page 3 of 3