Loading...
Permit ~ . • A CITY OF TIGARD DEVELOPMENT SERVICES MPST�R PERMIT "�""�o� v ~~�~"»�"��°�~� oERM 0 ' ^ , YST�7-W�76 13125 SN/Ma0Bhui Tigard, ' ' ` ^ Blvd., �~- '—-- ' DAT:: ISSUED: 03/28/97 4t ilt ) PARCEL: 2S103BD-HG031 STTE ADDRSS...:126 SW 115TH AVE SUBDTYISION....:HUNT�R'S GLEN e4) ZONING: R-4.5 PD s{/RISDiCTIoH, Rooarko: pATli � --------------------------------------------------------- BUILDING___ FPISSUE: STORIES....—: 2 FLOOR AREAS --- BASEMENT...; 0 of REQUIRED SE78QCKS---- REQUIRED- CLASS Oe NORK t\EW 9ElSHT ..., 24 FIRST ' 1187 of GARAGE ....; 755 sf LEFT..........: 16 ST1KE DETECTRS: Y TYPE OF USE ..:Sc F^OOR LOAD--; 40 SECOND...: 1283 sf FRONT ..... 24 PARKINS SPACES: 1 TYPE CF CONS7.:5N DUELLING UNITS: 1 F0BSMENT: D of RIGHT ' 10 OCCUPANCY SRP ;RZ BORN: 3 BATH: 3 TOTAL-----; 2390 sf VALUE -$: 173239 REAR ' 19 -------- __-______-_________RINBING__ S}KKS.......,.: 1 WATER CLOSETS,: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: \ RAIN DRAIN ft: N TRAPS........., C LAVATORIES--; 4 DISHKASHERS...1 1 FLOOR DRAINS..; 0 SEVER LIME ft: 0 Sr RAIN DRAINS: 1 CATCH BASINS..: S TUB/SHOWERS...: 3 G0R3P2EDlSP..; 1 HATER HEATERS.: 1 WATER LINE ft: 1QW ECK8LWPREVNTR: 1 . GREASE - RAPS-: 0 OTHER FIXTURES: G --- ----- MECHANICAL --------- --- ------ 9�L -YPES--------- rURN / 105K ..; 5 BOlL/CVA < 2;P: 5 VENT FANS.....; 4 CLOTHES DRYERS: 1 GAS FDRN >=180K ..: 1 UNIT HEATERS..: 0 FOODS.........: i OTHER UNITS...: 1 ! [NA.: 08TD FLOOR FURNACES: 2 VENTS........: 0 XOODST]VES....: 8 GAS OUTLETS...: 1 ELECTRICAL '--- --RESIDENTIAL :Ali-- —SERVICE/FEEDER-- --TEMP S@VC/FEEDERS-- --BRANCH CIRCUITS-- ---Ml --ADD 'L l%SPECTI[%S— 1N00 SF OR LESS: 1 0 - 200 app..: 0 0 - 200 app..: 0 H/SVC OR FUR.,: 0 PUMP/IRRIGATION: 0 PER lNSPECTI3Y: 5 BP AUD`L 58WSF.: 5 201 - 450 amp..: 0 201 - 405 amp..: 8 ld H/O SVC/FDK; 0 SIGN/OUT LIN LT: W PER H]UR......, N �IM:T[D ENERGY.: 0 401 - 600 app..: 0 401 - 600 anp..: 2 EA ADDL BR CIR: W SIGNAL/PANEL...: @ IN PLANT......: VANF HM/SVC/FDR: 0 601 - 1500 arfp., 0 6$1+amps-1020 vl 0 MINOR LABEL -10; 0 1220+ app/volt.: 0 --'---'---- -------- ALXY REVIB| SECTION Reconnect only.: 0 >=4 RED UNITS-: SVC/FDR)=225 A.: ) 600 V NOMINAL: CU AREA/SP: OCC: --- ---- ELECTRICAL - RESTRICTED ENERGY -- Q. SF RESIDENTIAL-------------- ---- D. COMMERCIAL --------------------'-- ------------ AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & S`ERED.f F:YE ALARM.....: INTERCDN/PAGING: OUTDOOR LMDSC LT: IIRGLAR ALARN,.: 51 :; X BOILER HVPC .,........: Lu0DSCAP[/lRRIG: PROTECTIF SICN'': GARAGE OPENER-: CLOO{..., ..... : INSTRUMENTATION: HEDlCQL........: OTHR: .` HVAC,..........: DAT4/TELE COIN.: NURSE CALLS.--: TOTAL 4 SYSTEMS: 5 Owner: Contractor: - TOTAL FEES: 2929,70 LeGEND LEGEND HOMES CORPORATION 6922 SW HAlNES Sr 71E2 SW HA7EBERN RD. TIGARD OR 97223 SUITE iQN TISPRD OR 97224 Phone 4: 620-8065 Phone 4: 62T-80B Re ..; � 68563 • � ThiB per~it is issued subject to the regulations contained in the `iga'd Municipal Code, State of Ore. Specialty Codes and 311 0 apTlicsble laws, All work will be done in accordance with approved plans. This per9d pill expire if work is not started within 180 :ays tf i5s:N1c2, ur i` vork is mpended for rore than 180 days.. -- ---'------'------ REQUIRED INSPECTIONS ---- --------------'--------- e~osioc Ccrtol l':st/3eap Xe:hao electrical Servi Sas Line Ins? Water Line insp Duil Fioul Srod"o !rspecti Craw ?rein Electrical Roxgh Gas Fireplace Appr/Sdxlk Inso ron�ing :ns? PiM'Uodc^;lar Fraoing Insp Insolation 7nsp Electrical Final c^o,dito' Ios; yechani~�' lr,s` Shear Hall 'nsp Sy,: Board Imp oc\a,icsl cine Top Cit lain 1-air Irsp P!mb Final • �ssuod By- - -l tnsoection - 639-4175 �� :ITY OF TIG Plan Check # ' a ARD Residential Building Permit Application Reed By • - ii,f/w 3125 SW HALL BLVD. New Construction Additions or Alterations Date Recd ".. - 30 - 11 IGARD, OR 97223 Single Family Detached or Attached Date to P.E. 3-21 - S 7 503) 639 -4171 Date to DST 3 Z. r.0 7 Print or Type Permit 4 ; t 7_4 c' 7 Called3 /0.,2_0 Incomplete or illegible applications will not be accepted 1 Name of Subdivision Lot 4 Name Job HUNTER'S GLEN 31 LEGEND HOMES Address • Site Address Architect Mailing Address • 1260 SW 115th Avenue 6900 SW Haines St. Name City /State Zip Phone LEGEND HOMES • Tigard, OR 97223 620 -8080 Owner Mailing Address Name FROELICH 6900 S W Haines St. Engineer En f Mailing Address City /State Zi Phone g 6969 S W Hampton ton St. Tigard, OR 9223 620 -8080 City /State zip Phone Name T igard, OR 97223 624 -7005 General LEGEND HOMES ` Describe work newA-- 0 alteration 0 repair 0 Contractor Mailing Address to be done: 6900 S W Haines St. Additional Description of Work: City/State Zip Phone Tigard, OR 9.7223 620 -8080 Oregon Const. Cont. Board Lic.# Exp. Date Attach Copy of 060563 6/19/97 Project ��� 3 �� Current 'COT Business Tax or Metro # Ex . Date Valuation J Licenses 9 7 -„?3 3 NEW CONSTRUCTION ONLY: Name / y2 _ 3 -c7 Mechanical SUNGLOW INC . Sq.Ft. House: Sq.Ft.Garage:_ Sub- Mailing Address a _ 37 �s ..s Contractor ; 2428 S E 105th Corner Lot . . Yes No Flag Lot Yes No City/State Zip Phone (check one) > (check one) K ( P o r t l a n d, _OR 97216 2 5 3 - 7 7 8 9 Restricted Audio /Stereo Burglar Oregon Const. Cant. Board Lic.# Exp. Date Energy System Alarm Attach Copy of ; 48131 3- _d Installation Garage Door HVAC Current . COT Business Tax of M o # Exp. Date ate Licenses X7 77— 4 /.L / 1 —% � Opener Systems I Name (check all that Other: Plumbing i WOLCOTT PLUMBING apply) Sub- .'ailing Address Will the electrical subcontractor wire for all Yes No Contractor P O Box 2007 restricted energy installations? X City/State Zip l Phone Has the Subdivision Plat recorded? N/A Ys No t. Gresham, OR 97030!667 -9891 Oregon Const. Cont. Board Lic.# Exp. Date Reissue of MST# Solar Compliance .• • Attach Copy of 7 33 4 10/19/97 (Calculation Attached) Current Plumbing Lic. 4 Exo. Date I hereby acknowledge that I have read this application, that the Licenses 2 6 - 2 0 8 P B 8/31/97 information given is correct, that I am the owner or authorized agent of COT Business Tax or Metro 4 Exp. Date the owner, and that plans submitted are in compliance with Oregon 96 -4281 12/96 State laws. . Name Sigma ure of • erlA ent Date Electrical GARNER ELECTRIC �, � � 3i xlf 7 Con : t Person Nam / Pho e Sub- Mailing Address C3 v �i�tdjo10 21785 SW TV Highway Contractor g y FOR OFFICE USE ONLY: City/State Zip Phone Plat # Map/TL #: Aloha, OR 97006 591 -1320 Oregon Const „Cont. Board Lic.# Ex -p. Date Attach Copy of -�-, / / �'c z/ 6 - /? 7 Setbacks Zone: Solar: Current Electrical Lic. 4 Exp. Date Licenses 34 -305C / - / - q 7 COT Business Tax _or Metro # E,xp . Date Engineering Approval: Planning Approval: TIF: sts\rnstapp.doc Permit # Account Description Amount Amt. Pd. Bal. Due tnA7 -au 74 MST. Permit (BUILD) 6/e, `� � , ✓✓ Plumb. Permit (PLUMB) ZZ. , C41 0 �• Mech. Permit (MECH) ELC /ELR Permit (ELPRMT) 2/5'; u �� State Tax (TAX) .S� Se, A Bldg: Jo, 5v Plumb: Mech: .2. ELC /ELR: / 3, 7' Plan Check MST: ( BUPPLN) 10/ 711 C2 S / S%, Plumb: (PLMPLN) Mech: (MECPLN) /J. L) c.a ,fl �v CDC Review ( LANDUS) 0, U� �- Z4 7 -6u 7gSewer Connection (SWUSA) ,Z,20 0, Inspection �� Sewer Ins p (SWINSP) �.� � ...�.5 LL Parks Dev Charge (PKSDC) /GS.SU, /050 Residential TIF (TIF -R) Mass Transit TIF (TIF -MT) I' Water Quality (WQUAL) Water Quantity (WQUANT) /00 , /CV, W ua Erosion Control Permit (ERPRMT)�f, 6 � Erosion Planck/USA (ERPLAN) 4 Erosion Planck/COT (EROSN) -. 0-6 • Fire Life Safety (FLS) TOTALS: 57( ? � 7 5) J /c/T i :\dsts\mstapp.doc Rev. 7/96 Solar Balance Point Standard Worksheet Address Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. 11.1 45° '" ■ . NO KERN NORTHERN UNE N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. �l feet CT= NOR1HSOU1H DIMENSION Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? 1 a: If the roof line runs North - South, measurements will (circle one) be based on the peak of the roof. 0000 uw lmu NOETH Al1 B 1C 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, measurements will be based on the S n II 5ee■ .YCn eave. SHADE POINT EA'.£ 1 c: If the roof line runs East -West and the roof pitch is 5/12 or steeper, measurements will be based on the °xti ❑ peak. RCGE • Box B. continued Box B: 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If 3 t ft he lot slopes down from the front lot line to the foundation, the figure is negative. 3. Measure distance from finished Floor elevation to the affected peak/eave. + Z ft 4. If the roof line runs North- South, deduct three feet. If the roof line runs East -West, - - ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. - ft 6. Total figure for box B: z „) ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation near the / 7 ft affected peak/eave. 2. Measure the distance from the foundation to the affected peak or eave. + . v ft 3. Total figure for box C: 5 z- ft it is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) 1 Distance to North -south lot dimension (in feet) shade 100+ 95 91 85 80 75 70 65 60 55 50 45 40 reduction line from northern Jot line (in feet) 70 40 40 41 41 42 43 44 65 38 38 3: 39 40 41 42 43 60 36 36 3. 37 38 39 40 41 42 55 34 34 3' 35 36 37 38 39 40 41 50 32 32 3' 33 34 35 36 37 38 39 40 45 30 30 31 31 32 33 34 35 36 37 38 39 40 28 28 2: 29 30 31 32 33 34 35 36 37 38 35 26 26 2. 27 28 29 30 31 32 33 34 35 36 3D 30 31 32 33 34 25 22 22 ' 23 24 25 26 27 28 29 30 31 32 20 20 20 1 21 22 23 24 25 26 27 28 29 30 15 18 18 11 19 20 21 22 23 24 25 26 27 28 10 16 16 1. 17 18 19 20 21 22 23 24 25 26 5 14 14 1• 15 16 17 18 19 20 21 22 23 24 I Box D. Maximum allowed shade point height: 2 feet h: \dots \nancy \ventura\solar.chp Revised 2/26/96 CITY OF TIGARD BUILDING INSPECTION DIVISION 1 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 5 511,4,__.-7 1. o Date Requested: I A.M. P.M. MST: I �� r Location: I 0 ( BUP: Tenant: Suite: Bldg: MEC: " 4 — Contractor: Phone: �j -- 37e6 PLM: Owner: Phone: ELC: • ELR: SIT: BUILDING BLDG (con't) MECHANICAL ELECTRICAL SITE Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt Approved .t . igat IP Approved Approved Approved Appr /Sdwlk Not Approved o . • rov Not Approved Not Approved Not Approved FINAL (1131. (AZ-) FINAL FINAL FINAL D Call for r ' n O Reinspection fee of $ required before next inspection 0 Unable to inspect Inspector: • Date: /f/-5,7 Page of . V CITY OF TIGARD BUILDING INSPECTION DIVISION V 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 Date Requested: •C 5 A.M. P.M. MST `— �74 l' Location: C� 7 5,) f / j BUP: Tenant: Suite: Bldg: MEC: Contractor: 7 Phone: .y"Lj L c PLM: Owner:: Phone: ELC: ELR: SIT: BUILDING BLDG (con't) PLUMBING MECHANICAL ECIRIC SITE Site Post/Beam Post/Beam Post/Beam ' e Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp • Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr/Alm Crawl/Found Dr Heat Pump vs r'o Approved Approved Approved Approv• • Approved Appr /Sdwlk Not Approved Not Approved Not Approved • o • 'i• • oved Not Approved FINAL FINAL FINAL I AL FINAL ,D NT 7 - 3/ - 97 a /q/ O Call for reinspection einspection fee of $ required before next inspection O Unable to inspect Inspector: Date: — ° v 7 Page of CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection.Line: 639 -4175 Business Phone: 639 -4171 Date Requested: '7 r 3 ) "q 7 A.M. V P.M. MST: q 7 -- OD 76 Location: 1 26 0 I S(A ) f /5-1-1,1 ( L-0 r 3 / / BUP: Tenant: Suite: Bldg: MEC: Contractor: -...___. J ♦ �. �� a'�g / _ c..I Phone: i —V__.5 70 PLM: Owner: I Phone: ELC: ELR: SIT: BUILDING BLDG (con't) PLUMBING MECHANICAL C CECE T RICA L SITE Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt Approved Approved Approved Approve Approved Appr /Sdwlk Not Approved Not Approved Not Approved roved Not Approved FINAL FINAL FINAL INAL FINAL C --_____ 1 ... O Call for reinspection ,/A Reinspection fee of $ required before next inspection O Unable to inspect Inspector: 1/ t� Date: 7-3 / - 9 Page of • 0 ✓ g 5/30/00 Activities for Case #: MST97 -00076 1:56:12 PM • trith . . Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 3/20/97 BON PASS BT2 3/25/97 MSTA008 Permit Created 3/25/97 RT PASS BT2 3/25/97 MSTA010 Check for prcl. restrict. 3/25/97 RT PASS BT2 3/25/97 MSTA012 Plans routed to Plans Examiner 3/25/97 RT PASS BT2 3/25/97 MSTA026 Plans approved by RPE • 3/25/97 RT PASS BT2 3/25/97 MSTA030 Reviewed plans routed to DSTS 3/25/97 RT PASS BT2 3/25/97 MSTA032 DST Post - Review Completed 3/26/97 JDA PASS JDA 3/26/97 MSTA700 Erosion Control Insp 844 -8444 BT2 3/25/97 MSTA703 Grading Inspection BT2 3/25/97 MSTA705 Footing lnsp 3/31/97 KS A/N KBS 4/1/97 #-1 need initial erosion control app prior to plac ement of concrete. MSTA706 Foundation Insp 4/2/97 KS APP KBS . 4/2/97 MSTA710 Post/Beam Structural 4/11/97 KS APP KBS 4/11/97 MSTA711 Post/Beam Mechanical 4/11/97 KS APP KBS 4/11/97 MSTA713 Crawl Drain BT2 3/25/97 MSTA717 PLM /Underfloor 4/9/97 MS OPAS - MRS 4/10/97 • MSTA720 Mechanical Insp BT2 3/25/97 MSTA722 Plumb Top Out 5/20/97 MS PASS MRS 5/21/97 MSTA723 Electrical Service 5/30/97 TLP PASS J *H 5/30/97 MSTA724 Electrical Rough In BT2 3/25/97 MSTA725 Framing Insp 6/3/97 GL FAIL J *H 6/4/97 1. Connect exhaust fan to duct - utility room. 2. Lateral brace and hip trusses per truss detail. 3. Nail all walls to floor 16" o.c. • 4. Install attic vent baffles. 5. Gas pressure test ok, tag 133032 MSTA726 Shear Wall lnsp 5/9/97 KS DIS KBS • 5/9/97 #-1- shear panel at front of garage needs additional nailing 3/12 o/c nail interior panel #-6- interior garage interior • panel #-4 nail 3/12 o/c #-1- mst straps at corners missed MSTA735 Gas Line Insp 6/3/97 GL PASS J *H 6/4/97 gas pressure test okay, tag 133032 MSTA740 Insulation lnsp 6/6/97 RC AP J *H 6/6/97 • . Page 1 of 3 • 5/30/00 Activities for Case #: MST97 -00076 1:56:12 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA745 Gyp Board Insp 6/13/97 KS FAIL J *H 6/13/97 1. Seal void above gas piping • at garage. 2. Provide clearance at B -vent (garage). 3. Provide approved plans on site to verify • if shear nailing is applicable. MSTA755 Rain drain Insp 4/4/97 MS PASS MRS 4/7/97 MSTA760 Water Line Insp 4/4/97 MS PASS • MRS 4/7/97 MSTA765 Appr /Sdwlk Insp 6/20/97 PI PASS S *W 6/27/97 MSTA795 Mechanical Final 8/5/97 KS DIS KBS 8/6/97 #-1- see bldg final this date MSTA797 Plumb Final 7/31/97 RAB FAIL J *H 8/1/97 1. Down spouts not installed. 2. Laundry tray in utility room not installed. 3. Strainer cover missing in shower MBR bath. 4. • Very little water coming out of shower in MBR bath. . MSTA799 Building Final 8/5/97 KS DIS VLN 3/9/99 -1- smoke detectors at master and front bedroom not functional #-2 gas fireplace not • functional #-3- insulate exposed • wye's at heat ducts crawl #-4- provide handrail at garage #-5- records show shear wall not app ? please provide hardcard MSTA080 (F) Ready_to issue 3/26/97 JDA PASS JDA 3/26/97 MSTA092 (F) Issue combination permit 3/28/97 JSD PASS JD 3/28/97 MSTA095 Issue plumbing signature form 7/10/97 JT • RECD JT 7/10/97 MSTA097 Issue electric signature form 4/4/97 JTD RECD JT 7/10/97 MSTA725 Framing Insp 6/6/97 6/6/97 RC AP • J *H 6/6/97 CORRECTION 1 -4 APPROVED MSTA745 Gyp Board Insp 6/18/97 KS REJ J *H 6/18/97 1. Seal void at gas piping garage ceiling with gyp. 2. This . inspection does include backer board at stall shower. 3. Shear • nailing not applicable. MSTA726 Shear Wall Insp 7/8/97 KS FAIL J *H 7/8/97 1. Shear panel #1 @ front of garage needs additional nailing • (3/12" o /c). 2. Nail panel #6 interior /garage 3. Interior panel #4 3/12" o/c 4. MST #24 strap @ kitchen corner. MSTA723 Electrical Service 5/29/97 TLP PASS J *H 7/11/97 MSTA790 Electrical Final 7/31/97 BRP . PASS J *H 7/31/97 MSTA797 Plumb Final 8/5/97 MS PASS MRS 8/5/97 MSTA722 Plumb Top Out 7/29/96 MS • FAIL J *H 8/20/97 no test on waste Page 2 of 3 • . • 5/30/00 Activities for Case #: MST97 -00076 . 1:56:12 PM Assigned Hold Updated . Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA745 Gyp Board Insp 6/16/97 KS PASS J *H 11/12/97 1. Seal void at gas piping garage ceiling with gypsum. 2. This inspection does include backer board at stall shower. 3. Shear nailing not applicable. MSTA745 Gyp Board Insp 6/13/97 KS FAIL J *H 11/12/97 1. Seal void above gas piping at garage. 2. Provide clearance at b -vent garage. 3. Provide approved plans on site to verify if shear nailing is applicable. MSTA745 Gyp Board Insp 6/13/97 KS FAIL J *H 12/9/97 1. Seal void above gas piping at garage. 2. Provide clearance • at b -vent garage. 3. Provide . approved plans on site to verify if shear nailing is applicable. MSTA745 Gyp Board Insp 6/16/97 KS FAIL J *H 12/9/97 Seal void at gas piping garage ceiling with gypsum. This inspection does include backer board at stall shower. Shear nailing not applicable. MSTA799 Building Final VLN NOTE VLN 3/9/99 Inspection request for research to George S. 3/9/99. MSTA945 Request inspection research 3/27/00 JMT DONE • No Hold JMT 3/27/00 SECOND REQUEST MSTA153 Expired by limitation 4/18/00 • HAP DONE No Hold AKJ 4/26/00 card sent to contractor • Page 3 of 3