Loading...
Permit CITY TIGARD SEWER CONNECTION PERMIT „. I +� DEVELOPMENT SERVICE / PERMIT #: SWR2000 A. c �' II 13125 SW Hall Blvd., Tigard, OR 97223 (50 6 1� I / DATE ISSUED: 4/5/00 SITE ADDRESS; 12254 SW 114TH TERR ! / ' l ` PARCEL: 2S103AB - 05100 SUBDIVISION: WALNUT GLEN ZONING: R - 4.5 BLOCK: LOT: 009 JURISDICTION: TIG TENANT NAME: RIVERSIDE HOMES, INC USA NO: FIXTURE UNITS: 0 CLASS OF WORK: NEW DWELLING UNITS: 1 TYPE OF USE: SF NO. OF BUILDINGS: 1 INSTALL TYPE: LTPSWR IMPERV SURFACE: Remarks: Sewer connection for a new detached single family dwelling. Owner: FEES RIVERSIDE HOMES Type By Date Amount Receipt 15455 NW GREENBRIER PKWY #140 BEAVERTON, OR 97006 PRMT DEB 4/5/00 $2,300.00 0001180 INSP DEB 4/5/00 $35.00 0001180 Phone: 645 - 0986 Total $2,335.00 Contractor: Phone: Reg #: Required Inspections Sewer Inspection This Applicant agrees to comply with all the rules and regulations of the Unified Sewage Agency. The permit expires 180 days from the date issued. The total amount paid will be forfeited if the permit expires. The Agency does not guarantee the accuracy of the side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect 3 feet in all directions from the distance given. If not so located, the installer shall purchase a "Tap and Side Sewer" Permit and the Agency will install a lateral. ATTENTION: Oregon law requires you to follow rules adopted by the Ore on Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080. You obtain co is of theses or • irect questions to OUNC by calling (503) 246 -1987. Iss ed by: A �� � / /�,� Permittee Signature: ' � i �� Call (503) 6 9 -4175 by 7:00 P.M. for an inspection needed the next busines day CITY OF TIGARD BUILDING INSPECTION DIVISION MST et - -zaoe /7 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP b S .- / % Date Requested / Z 6 d AM PM BLD Location. /2 51-4 ' u ) l r 7 Suite MEC Contact Person ,19, ,piii" Ph VI" 'i PLM Contractor Ph SWR BUILDING : Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Misc: Final PAS RT FAIL a Aro Um-BI Post & Beam Under Slab Top Out Water Service r Sanitary Sewer Rain Drains 01E10 PART F L G MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL • SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Date ` 1 (9i Inspector Ext Other Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site CITY OF TIGARD BUILDING INSPECTION DIVISION MST 'L-COI 7 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 • BUP Date Requested / 1,4 i AM PM BLD Location 1 2-2 (-� ) 1 "I /� ,,, TeXY Suite �i MEC CCJ'� '� Contact Person ``!I Ph l it/ ' PLM Contractor Ph SWR BALDING -) Tenant/Owner ELC Retaining Wall ELR .1011,.5.- Access: FPS nd- .• Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing {6/ //l-/,77A - /. ��ac'n &A/7 Gsel ,') Insulation Drywall Nailing 7 ci�� --;r .ThS Firewall Fire Sprinkler iit, s - LC - 4 o.L - a1 - z 5, SO/<C ....e r- Fire Alarm Susp'd Ceiling /4-3 S. c4,.L/ Roof Misc: d Fin - PART FAIL ' - 11 B ING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL - -- Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin / Fire Supply Line [ ] Please call for reinspection RE: / [ / Unable to inspect - no access ADA Approach /Sidewalk Date �� �t Z In Ext Other Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION MST VZO'CXDO l 7 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested i_/ // 7 OD AM PM BLD Location / Zi I J / ( 1 Suite MEC Contact Person Ph y i-G - 393/ PLM Contractor Ph SWR (UILDINr Tenant/Owner ELC Retaining Wall ELR Access: H aio FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing r , O Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling • Roof Misc: Final PASS PART PLUMBING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains - Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hail, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Other Date G / ' — / 7- O Inspector d Ext Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION MST 06' - V6 7 6' /7 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP ' 7 4 ' / � Date Requested 7 1 / - 0 d AM X PM BLD Location / - - 2r //'' 721/L Suite MEC Contact Person Ph 313/ PLM Contractor Ph SWR Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN MIMMP Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm ' Susp'd Ceiling Roof Misc: Fin- " 2.41 -1 , PART FAIL um: Post & Beam Under Slab Top Out Water Service Sanitary Sewer rai Fina ( ar PART FAIL • MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL. _ _ — Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hail Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Other oach /Sidewalk Date �G. l Inspector //7) Ext ' Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION MST c 000 24 - Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested (v t/o AM PM BLD Location I 1 -I / 1 ` . ��e_4 J' Suite MEC Contact Personn( Ph 1414 1 2i? PLM Contractor Ph SWR BUILDING • ° Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm �`/ Susp'd Ceiling %� ! // Roof Misc: Q� Final PAS§ PART FAIL Z LUMBII Post & Beam Un Slab /x),a2( p.0 ater Service Sanitary Sewer Rain Drains Final 3 dr PASS PART MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading • Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk 7/� Other Date • / / Inspector /7 / /7 Ext Final PASS PART FAIL DO OT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION 32- 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 MST �'�� /� BUP Date Requested r/ /0V AM PM BLD Location 122.9' ) P ) P./ Suite G MEC Contact Person ,0I0ik Ph l �-I ?°" 1 7 PLM Contractor Ph SWR BUILDING : • ; Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing - Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Misc: Final PASS PART FAIL Lot Post & Beam Under Slab -'' T.. Out Ina PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL — - Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE • Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach/Sidewalk Other Date 2r! Inspector Ext Final • PASS PART FAIL DO NOT REMOVE this inspection record from the job site. CITY OF TIGARD BUILDING INSPECTION DIVISION . MST 2000 - 000 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 (' BUP k Date Requested ( q AM PM BLD Location I< '2-2S(-1 J 1 e4"Y Suite • MEC ) Contact Person Vbe' I Ph I / - I g -3 q 3 7 PLM Contractor Ph SWR Z — O �1 BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof MAW P a . Misc: Final PASS PART FAIL [UMBIN) Post & Beam Under Slab Top Out Water Service S ain Dr Final PASS PART • MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final _ PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA - Otheiach /Sidewalk Date Inspector /�� �' Ext )/ � Final PASS PART FAIL ID 0 N ST REMOVE this inspection record from the job site.