Loading...
Permit CITY OF TIGARD BUILDING PERMIT PERMIT #: BUP2004 -00151 5 DEVELOPMENT SERVICES DATE ISSUED: 4/5/04 13125 SW Hall Blvd., Tigard. OR 97223 (503) 639 -4171 SITE ADDRESS: 15432 SW 114TH CT 81 PARCEL: 2S110D6 90811 SUBDIVISION: FOUNTAINS AT SUMMERFIELD CONDO ZONING: R -25 BLOCK: LOT: 081 JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: OTR FIRST: sf N: S: E: W: TYPE OF USE: MF SECOND: sf PROJECT OPENINGS? TYPE OF CONST: sf N: S: E: W: OCCUPANCY GRP: R3 TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 1,377.00 Remarks: Reroof (roof over) 4 unit garage Owner: Contractor: SUMMERFIELD CONDOMINIUMS JBC ROOFING XP'® 15435 SW 114TH CT 12155 SW GRANT AVE STE R TIGARD, OR 97224 TIGARD, OR 97223 Phone: 503 - 639 -3721 Phone: 503 - 968 -1235 Reg #: LIC 98255 FEES REQUIRED INSPECTIONS ■ Description Date Amount Final Inspection [BUILD] Perrnit Fee 4/5/04 $62.50 ei c [TAX] 8% State Surchar4 4/5/04 $5.00 Total $67.50 g I till This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes 0 LD and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these rules or direct questions to OUNC by calling (503) 246 -6699 or 1- 800 - 332 -2344. Issued :y: I t IP �� d Pe rm ittee A Signature: !,, ■ yLn. • l ei --- ---' Call 639 -4175 by 7 p.m. for an inspection the next business day BUP - Building Permit ELC - Electrical Permit I Inspection Description Date Passed By -4 Inspection Description Date Passed By Footing /Setback — Underground cover Foundation walls Wall cover Footing drain Ceiling cover Waterproof bsmt walls - Electrical rough -in _ Slab Electrical service ___ _ _ Crawl drain Electrical final Underfloor insulation Post/beam structural Shear walls /anchors _ ELR - Restricted Ener Permit Roof nailing 4 Inspection Description Date Passed By Firewall Low voltage Tilt -up panel Electrical final Masonry/Reinforcement — — Framing MFG - Structure set -up MEC - Mechanical Permit Insulation Drywall nailing 4 Inspection Description Date Passed By Suspended ceiling Post/beam mechanical -I _ I _ _ _ Gas line _ Engineered soils Mechanical rou h in Welding Lab Final g — - - -- Concrete Lab Final _Fire damper Duct work Bolting Lab Final Smoke detector Structural observation — — Fireproofing Lab Final Mechanical final Final inspection _ ^� -- PLM - Plumbing Permit • BUP — Fire Protection System Permit Inspection Description Date Passed By _ J Inspection Description Date Passed By Plumbing underslab Sprinkler underfloor /slab Crawl drain - , Post/beam plumbing Sprinkler rough -in Plumbing top -out • Sprinkler final RP /backflow preventer • Fire alarm fmal Rain drain 4 0 Storm drain Water service ____I or SIT - Site Permit _ Sanitary sewer _ r I Inspection Description Date Passed By Culvert/catch basin _ • Footings _ _ , Pump /fill septic tank _ _ Foundation walls _ _ _ Plumbing final * Sprinkler supply lines Sprinkler underfloor /slab _ _I Catch basin /Manhole __ SWR - Sewer Permit Engineered soils q Inspection Description Date Passed . By Engineering acceptance Sanitary sewer Final insp Final inspection Inspection Record - BUP, PLM, SWR, ELC, ELR, MEC, SIT Permits i.\dsts \forms\InspRecordBUP.doc 04/17/01