Permit CITY OF TIGARD . BUILDING PERMIT
PERMIT #: BUP2004 -00148
, ,41 DEVELOPMENT SERVICES DATE ISSUED: 4/5/04
1
- �' i 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 - 4171
SITE ADDRESS: 15478 SW 114TH CT 75 PARCEL: 2S110DB 90751
SUBDIVISION: FOUNTAINS AT SUMMERFIELD CONDO ZONING: R -25
BLOCK: LOT: 075 JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: OTR FIRST: sf N: S: E: W:
TYPE OF USE: MF SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: : sf N: S: E: W:
OCCUPANCY GRP: TOTAL AREA: 0 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 8,162.00
Remarks: Reroof (roof over) 6 plex.
Owner: Contractor:
SUMMERFIELD CONDOMINIUMS JBC ROOFING
15435 SW 114TH CT 12155 SW GRANT AVE STE C
TIGARD, OR 97224 TIGARD, OR 97223
Phone: 503 - 639 -3721
Phone: 503 - 968 -1235
Reg #: LIC 98255
FEES REQUIRED INSPECTIONS
Description Date Amount Final Inspection
[BUILD] Permit Fee 4/5/04 $129.70
[TAX] 8% State Surchart 4/5/04 $10.38
Total $140.08 EXPIRED
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0100. You may obtain a copy of these rules or direct questions to OUNC by S
calling (503) 246 -6699 or 1- 800 - 332 -2344.
Issued : y: 1 il .
41. _4/.....
Permittee
Signature: _ ( ed-t_,---
Call 639 -4175 by 7 p.m. for an inspection the next business day
BUP - Building Permit ELC - Electrical Permit _
Inspection Description Date Passed By
Footing /Setback 4 Inspection Description Date Passed By
_ — _ _ Underground cover _ _
Foundation walls Wall cover
Footing drain Ceiling cover
Waterproof bsmt walls _ Electrical rough -in _
Slab Electrical service _
Crawl drain Electrical final
Underfloor insulation — —
Post /beam structural _ — —
— Shear walls /anchors _ ELR - Restricted Ener • y Permit
Roof nailing
4 Inspection Description Date Passed By
F —
Firewall Tilt up panel Low voltage
Electrical final
Masonry /Reinforcement
Framing MFG-Structure set-up _ MEC - Mechanical Permit
Insulation —
Drywall nailing - 4 Inspection Description Date Passed By
Suspended ceiling - Post/beam mechanical
Gas line
Engineered soils — --
Welding Lab Final Mechanical rough -in
Concrete Lab Final - Fire damper
I Bolting Lab Final _ Duct work _
Structural observation Smoke detector
Fireproofing Lab Final Mechanical final
Final inspection - PLM - Plumbing Permit
BUP — Fire Protection System Permit Inspection Description Date Passed _ By
Plumbing underslab
1 V Inspection Description Date Passed By Crawl drain
Sprinkler underfloor /slab — —t-
Sprinkler rough -in Post/beam plumbing -
Plumbing top -out
Sprinkler final RP /backflow preventer
Fire alarm final -
Rain drain
t
Storm drain _
—
Water service
SIT - Site Permit Sanitary sewer _
I Inspection Description Date Passed By Culvert/catch basin _
Footings _ Pump /fill septic tank _
Foundation walls Plumbing final
Sprinkler supply lines _ _
Sprinkler underfloor /slab
Catch basin /Manhole SWR - Sewer Permit
Engineered soils
- - - q Inspection Description Date Passed By
Engineering acceptance _
Final inspection Sanitary sewer
_- Final inspection
Inspection Record - BUP, PLM, SWR, ELC, ELR, MEC, SIT Permits