Loading...
Report Sep. 22. 2006 9:49AM No. 6846 P. 2 • oeoP ifs EbilloCCIing. Inc Real -World Geotechnical Solutions Investigation • Design • Construction Support 1 September 22, 2006 M5 l 200(° — 00 2.71 Project No. 05 -9263 ) 3 2 Co 5W 1 0 714 �' L Attention- Andy Thomas Venture Properties 4230 Galewood Street, Ste, 100 Lake Oswego, Oregon 97035 Fax No, (503) 387 -7617 RE: FOUNDATION EXCAVATION LOT 14 DAKOTA GLEN TIGARD, OREGON On September 21, 2006, GeoPacific engineer, Jim Imbrie, was on site to observe foundation excavation for lot 14. Subgrade predominantly consists of a thin layer of compact fill soils on the north and east corners and stiff native soil exposed elsewhere. The observed subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. No deck footing, patio, or other appurtenant structure subgrades were observed. The northwest corner has a localized area of deep topsoil and needs to be deepened one foot by hand 2 feet on either side of the corner. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No warranty Is herein expressed or implied. This report was prepared for Venture Properties only and should not be relied upon by third parties without consulting GeoPacific. If you have any questions. please call. Please call if you have any questions. Sincerely, GeoPacific Engineering, Inc. „ PROF£ �q‘G1NE£ / is 1 t James D. Imbrie, P.E., OREGON Geotechnical Engineer C.E.G. / 4/ _OREGON 230 ��jc§ ' •' ~ • so 7 7312 SW Durham Road Tel (503) 598-8445 Portland, Oregon 97224 Fax (503) 5984706