Permit CITY OF TIGARD BUILDING PERMIT
* COMMUNITY DEVELOPMENT Permit #: BUP2010 -00238
TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 04/15/2011
Parcel: 2S112DB00700
Jurisdiction: Tigard
Site address: 15245 SW 74TH AVE
Project: Comcast Subdivision: Lot: 11
Project Description: Construct equipment building for new service hub.
Contractor: LEGACY WIRELESS SERVICES INC Owner: HUEWE, ERIC J & JENNIFER E
15580 SE FOR MOR CT 1199 FAIRWAY RD
CLACKAMAS, OR 97015 LAKE OSWEGO, OR 97034
PHONE: 503 - 656 -5300 PHONE: 503 - 968 -5450
FAX: 503 - 656 -5305
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee - COM - New Construction 04/15/2011 $1,550.27
Class of Work: NEW Plan Review 11/03/2010 $1,007.68
Dwelling Units: 0 12% State Surcharge - Building 04/15/2011 $186.03
Stories: 1 Height: 16 ft Erosion Control 04/15/2011 $88.00
Bedrooms: 0 Bathrooms: 0 Erosion Plan Review CWS 04/15/2011 $28.60
Value: $265,000 Erosion Plan Review COT 04/15/2011 $28.60
Metro Const. Excise Tax - Commercial 04/15/2011 $318.00
Use
Floor Areas:
Total Area: 896
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $3,207.18
Required: Required Items and Reports (Conditions)
Fire Sprinkler: No Parapet: 1 Ersn Cntrl 681 -4444
Fire Alarm: No Protected Corridors:
Smoke Detectors: No Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuan - or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification r: ter. Those rules are set f h in OAR
952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 987 or .800.332.2344. /
Issued By: / Permittee Signature:
`■ .l /r �L� �.�i . I .IV.� A L/ Lt
Cali 503.639.4175 by 7 :00 a.m. for the next available inspection date
This permit card shall be kept in a conspicuous place on the job site until completio of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application ete_,o/0.--e.0.0D/
Commercial D ��t 1, I I: , , 1 . I I , , , \ I ,
R
1,1 ECEIVED
of Tigard CEIV D ff _ Pe No.: _ . ^ Pe „0 3
13125 SW Hall Blvd. Tigard, OR 97223 Plan Review �i Other Permit Phone: 503.639.4171 Fax: 503.598.1960 ' NOV 3 2010 t eIB �� -,0
c , t I, Inspection Line: 503.639.4175 Date Readyaty: 1ms B See Page 2 kw
Internet www.tigard- or.gov Notified/Method: N t ' r°' Supplemental W
Iaferwae
CITY OF TIGAR>3 � i _ V w • L
TYPE OF •l� � p V 0 , REQ I ' t DATA: 1- AND 2- FAMILY DWELLING
® New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Other
Indicate the value (rounded to the nearest dollar) of all
❑ Addition/alteration/replacement ❑ O
equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ I- and 2- family dwelling ® Commercial/industrial Valuation: S
❑ Accessory building ❑ Multi- family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors: l
Job site address: 15245 SW 74 Avenue New dwelling area: square feet
City/State/ZIP: Tigard, OR Garage/carport area: square feet
Suite/bldg /apt. no.: I Project name: Comcast Tigard Hub Covered porch area: square feet
Cross street/directions to job site: SW 74 Avenue N. & SW Durham Road Deck area: square fat
- A ,t/�'U't , I �7 1 Other structure area: square feet
D __ b REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: Lot no.: ✓ l Permit fees* are based on the value of the work performed.
Tax map/parcel no.: Wash Co 2S1 12DB 700 �`/ Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
/ DESCRIPTION OF WORK work indicated on this application.
1 Construction of a +1- 896 SF unoccupied CMU block and metal roof equipment Valuation: A e
building with HVAC units, in a gravel and fenced compound also containing Existing building area: square feet
backup power generator and fuel tank for Comcast service to area. New building area: 896 square feet
® PROPERTY OWNER 0 TENANT Number of stories: 1
Name: Ric Huewe Type of construction: CMU Block
ad Address: PO Box 2026 Occupancy groups:
City /State/ZIP: Lake Oswego, OR 97035 Existing: N/A
I Phone: (503)968 -5450 Fax:
New: B
`
® APPLICANT ❑ CONTACT PERSON NOTICE
Business name: Legacy Wireless Services, Inc. All contractors and subcontractors are required to be
Contact name: James Kramer licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be licensed in the
J\ Address: 15580 SE For Mor Court jurisdiction in which work is being performed. If the
___ City /State/ZIP: Clackamas, OR 97015 applicant is exempt from licensing, the following reasons
l apply.
Phone: (503) 804-9202 (Fax:: (503) 656 -530.5
E -mail: jkramei (e)legacy- wireless.com
CONTRACTOR
Business name: Legacy Wireless Services, Inc. BUILDING PERMIT FEES*
Address: 15580 SE For Mor Court (Plo ie
City/State/ZIP: Clackamas, OR 97015 Structural plan review fee (or deposit):
Phone: (503) 656 -5300 l Fax: (503) 656 -5305 FLS plan review fee (if applicable):
Total fees due upon application: 4/ 007.
CCB lic.: 150432 /
Amount received: (/ oc 7 • $
Authorized si This trop expires if permit is out obtained
Permit appiiea puYS � pe
within lbb days after it has been accepted as complete.
Print name: James Kramer , Date: 10/28/10 , * Foe methodology set by Tri- County Building Industry
Service Board.
JOB: •
AKS ENGINEERING & FORESTRY, LLC LETTER OF TRANSMITTAL
AK 13910 SW Galbreath Drive, Suite 100 ID = 9533
Sherwood, OR 97140 Offices Located In:
.com Sherwood, OR
www.aks-eng.com Vancouver, WA
Phone: 503- 925 -8799 Fax: 503- 925 -8969
To:City of Tigard DATE: 11/2/2010 JOB NO.: 1881
Attn: Building Department RE: Huewe Industrial Site
13125 SW Hall Blvd. Comcast Tigard Hub
Tigard, OR 97223
Billing # 1881, 21083, 30232
From:Chris Goodell
WE ARE SENDING YOU THE FOLLOWING:
COPIES DATE NO. DESCRIPTION
2 10/29/2010 7 AKS Engineering Construction Plans
1 10/28/2010 10 Commercial Application Checklist
1 10/28/2010 4 Commercial Building Permit Application
1 9/29/2010 1 Copy of email from Albert Shields, City of Tigard
1 10/28/2010 2 Electrical Permit Application
2 10/29/2010 6 Interior /Exterior Lighting Compliance Certificates
1 11/2/2010 1 Legacy Wireless Check in the amount of $1,036.38, Application Fee
2 10/29/2010 5 Mechanical Compliance Certificate
1 10/28/2010 2 Mechanical Permit Application
1 10/28/2010 4 Site Work Permit Application
2 10/25/2010 17 Twenty -Ten Engineering Construction Plans
2 10/28/2010 13 Twenty -Ten Structural Calculations
For Approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
As requested Returned for corrections Return corrected prints
For review and comment Delivered by Chris Goodell 11/3/10
FOR BIDS DUE n PRINTS RETURNED AFTER LOAN TO US
Remarks: If you have any questions, please call.
Copy To:File SIGNED: Toni Ruehl for Chris Goodell
Vet 1.0 - 4,21200b
Commercial Application Checklist
City of Tigard
I N • 13125 SW Hall Blvd., Tigard, OR 97223
Phone: 503.639.4171, Fax: 503.598.1960
"'\ K D Internet address: www.tigard - or.gov
PROJECT INFORMATION
Project name: Comcast Tigard Hub Date: 10/28/10
Address: 15245 SW 74 Avenue City: Tigard State: OR ZIP:
Scope of work: New commercial equipment building and ancillary equipment for Comcast
Reference no.: Map and tax -lot no.: Wash Co 2S1 12DB 700
Contact person name: James Kramer Company: Legacy Wireless Services, Inc.
Phone: (503) 656 -5300 Fax: (503) 656 -5305
Cellular phone: (503) 804 -9202 E -mail: jkramer @legacy - wireless.com
NOTES AND INSTRUCTIONS
• The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan
review will not take place until a complete package is submitted.
• This checklist can be used for all commercial construction projects, including new construction, additions,
alterations and tenant improvements.
• For complex projects, applicants should use the "location" space to note the item's location and page
number from the plans or the specification book.
• It is not necessary to duplicate submittal information, even if it is asked for in multiple sections.
• In the checklist, "Required" means that the applicant must provide this information for plan review.
• In the checklist, "P" means —
• if checked by the applicant — the information is provided for the plan review.
• if checked by the plans reviewer — this information is required for the plan review.
• In the checklist, "NA" means that the information does not apply.
• Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project
Data," must be included with each pro'ect submitted.
PRE - SUBMITTAL PROCESS
An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project
will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the
applicant has completed plans.
INDEX OF CHECKLIST SECTIONS
1.0 General project data Page 2 7.0 Mechanical data (Types I and II
2.0 Civil data Page 2 kitchen -hood permits) Page 6
3.0 Architectural data Page 3 8.0 Plumbing data Page 7
4.0 Structural data Page 4 9.0 Electrical data Page 8
5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9
improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9
6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10
rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10
This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties.
440 -2734 (8 /01/WEB /COM)
I:\ Building \Forms \COM- Checklist.doc 11/02/10
SECTION 1.0 - GENERAL PROJECT DATA
Construction documents Location (sheet number or spec section)
1.1 ® Required No. of sets of plans: New: 1 TI: 2
1.2 ® Required Cover sheet title block A0.1
1.3 ® Required Cover sheet vicinity map A0.1
1.4 ® Required Cover sheet plan index A0.1
1.5 ® P ❑ NA Code summary A0.1
1.6 ❑ P ® NA Deferred submittal summary
1.7 ® P ❑ NA Professional stamp and signature All Sheets
1.8 ® P ❑ NA Fire and life- safety plan A1.1
1.9 ❑ P ❑ NA Landscape plan
1.10 ❑ P ❑ NA Landscape specifications
Supporting documents Notes
1.20 ❑ P ❑ NA Land -use or planning actions
1.21 ❑ P ❑ NA Required fire -flow calculations
1.22 ❑ P ❑ NA Fire - hydrant flow -test report
1.23 ❑ P ❑ NA Fire department or fire district building survey report
1.24 ❑ P ❑ NA Material safety data sheets (MSDS)
SECTION 2.0 - CIVIL DATA
Construction documents Location (sheet number or spec section)
2.1 ® Required Site plan
2.2 ® Required Site utility plan
2.3 ® Required Grading plan
2.4 ® Required Erosion - control plan
2.5 ❑ P ❑ NA Utility -vault location and details
Supporting documents Notes
2.20 ❑ P ❑ NA Geotechnical /soil engineer report
2.21 ❑ P ❑ NA Storm -water calculations
2.22 ❑ P ❑ NA Site retaining -wall structural calculations
2.23 ❑ P ❑ NA "Assurance of Compliance" with environmental rules ....
440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I :\Building\Forms \COM- Checklist. doc
SECTION 3.0 — ARCHITECTURAL DATA
Construction documents Location (sheet number or spec section)
3.1 ® Required Floor plan(s) A1.1
3.2 ® Required Transverse and longitudinal cross sections A3.1 & A3.2
3.3 ® Required OSSC Chapter 11 accessibility requirements A0.1
3.4 ❑ P ® NA Interior elevations
3.5 ® P ❑ NA Exterior elevations A2.1
3.6 ® P ❑ NA Roof plans A1.1
3.7 ❑ P ❑ NA Exterior wall sections and details A3.1, A3.2, S3.0
3.8 ❑ P ® NA Reflected ceiling plan(s)
3.9 ❑ P ® NA Fire -rated construction details
3.10 ❑ P El NA Energy code compliant construction details and
specifications A3.1, A3.2. A4.1, A4.2, A4.3
3.11 ❑ P ® NA Door schedule
3.12 ❑ P ® NA Glazing schedule
3.13 ❑ P ® NA Furniture plan
Supporting documents Notes
3.20 ❑ P El NA Energy code compliance forms /calculations
3.21 ❑ P ® NA Material safety data sheets (MSDS)
3.22 ❑ P ® NA Hazardous materials inventory statement (HMIS)
3.23 ❑ P ® NA Hazardous materials management plan (HMMP)
3.24 ❑ P ® NA Written fire and life - safety evacuation plan for area
of rescue assistance
3.25 ❑ P ❑ NA Active and passive smoke - control information
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 3
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\ Building \Forms \COM- Checklist.doc
•
SECTION 4.0 — STRUCTURAL DATA
Construction documents Location (sheet number or spec section)
4.1 ® Required Structural cover sheet S1.0
4.2 ❑ P ❑ NA Foundation plan S1.0
4.3 ❑ P ® NA Under -slab mechanical plan
4.4 ❑ P ❑ NA Under -slab electrical plan
4.5 ❑ P ® NA Under -slab plumbing plan
4.6 ❑ P ® NA Floor framing plan
4.7 ® P ❑ NA Roof framing plan S2.0
4.8 ® P ❑ NA Structural elevations S3.0
4.9 ❑ P ❑ NA Structural details and cross sections S2.0
4.10 ❑ P ® NA Standpipe information
4.11 ® P ❑ NA Special inspector /structural observation matrix S1.0
Supporting documents Notes
4.20 ❑ P ❑ NA Geotechnical /soil engineer report
4.21 ❑ P ❑ NA Site - specific seismic hazard report
4.22 ❑ P ❑ NA Design narrative
4.23 ® P ❑ NA Structural calculations Provided Separately
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 4
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I:\Building \Forms \COM- Checklist.doc
SECTION 5.0 - MECHANICAL DATA (New construction, tenant improvement, gas piping permits)
Construction documents Location (sheet number or spec section)
5.1 ® Required Floor plan
5.2 ® Required Equipment schedule
5.3 ❑ P ❑ NA Site plan
5.4 ❑ P ❑ NA Under -slab mechanical plan
5.5 ❑ P ❑ NA Roof plan
5.6 ❑ P ❑ NA Fuel gas piping plan
5.7 ❑ P ❑ NA HVAC equipment and duct plan(s)
5.8 ❑ P ❑ NA Roof access details
5.9 ❑ P ❑ NA Duct smoke detector plans
5.10 ❑ P ❑ NA Fire /smoke damper locations
5.11 ❑ P ❑ NA Smoke control plan
5.12 ❑ P ❑ NA Outside air (OSA) table
5.13 ❑ P ® NA Refrigeration equipment and piping plan
5.14 ❑ P ® NA Kitchen equipment plan
5.15 ❑ P ® NA Type I and/or Type II kitchen hood plan
(see Section 7.0 Mechanical Data)
5.16 ❑ P ® NA Fume /vapor hood plan
5.17 ❑ P ® NA Process piping/product and/or exhaust - conveying
duct plan
5.18 ❑ P ® NA Fire -rated construction details
5.19 ❑ P ❑ NA Equipment hanger /fastener details A3.2
Supporting documents Notes
5.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
5.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
5.22 ❑ P ❑ NA Outside air (OSA) calculations
5.23 ❑ P ❑ NA Smoke - control calculations
5.24 ❑ P ❑ NA Combustion air calculations
5.25 ❑ P ❑ NA Fuel gas piping sizing calculations
5.26 ❑ P ❑ NA Make -up air calculations
5.27 ❑ P ❑ NA Energy code compliance forms
5.28 ❑ P ❑ NA Boiler information
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i :\Building\Forms \COM- Checklist. doc
SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits)
Construction documents Location (sheet number or spec section)
6.1 (Z1 Required Roof plan
6.2 ❑ P ❑ NA Roof framing plan
6.3 ❑ P ❑ NA Fuel gas piping plan
6.4 ❑ P ❑ NA Roof access details
Supporting documents Notes
6.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
6.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
6.22 ❑ P ❑ NA Fuel gas piping sizing calculations
6.23 ❑ P ❑ NA Energy code compliance forms
SECTION 7.0 — MECHANICAL DATA (Tv )e I and Ty )e II kitchen hood )ermits)
Construction documents Location (sheet number or spec section)
7.1 ® Required Site plan
7.2 ® Required Floor plan(s)
7.3 ® Required Kitchen equipment plan
7.4 ® Required Kitchen equipment and hood elevations
7.5 ❑ P ❑ NA Roof plan
7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts
7.7 ❑ P ❑ NA Fire -rated construction details
7.8 ❑ P ❑ NA Fire suppression details
Supporting documents Notes
7.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
7.21 ® Required Make -up air calculations
7.22 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
7.23 ❑ P ❑ NA Hood /grease extractor listing documentation
7.24 ❑ P ❑ NA Hood /grease duct sizing calculations
7.25 ❑ P ❑ NA Fire suppression information
440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 6
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
1:\Building\Forms \COM- Checkl ist. doc
SECTION 8.0 — PLUMBING DATA
Construction documents Location (sheet number or spec section)
8.1 ® Required Floor plan(s)
8.2 ® Required Piping and material schedule
8.3 ® Required Equipment layout plan
8.4 ® Required Fixture schedule
8.5 ❑ P ❑ NA Site utility plan
8.6 ❑ P ❑ NA Building cross section
8.7 ❑ P ❑ NA Rise diagram
8.8 ❑ P ❑ NA Roof plan
8.9 ❑ P ❑ NA Back flow prevention location
8.10 ❑ P ❑ NA Irrigation plan
8.11 ❑ P ❑ NA Fire -rated construction details
8.12 ❑ P ❑ NA Under -slab plumbing plan
Supporting documents Notes
8.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets"
or specifications
8.22 ❑ P ❑ NA Utility maintenance agreements
8.23 ❑ P ❑ NA Water supply calculations
8.24 ❑ P ❑ NA Sanitary system calculations
8.25 ❑ P ❑ NA Irrigation demand calculations
8.26 ❑ P ❑ NA Roof drain and storm water calculations
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 7
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\Building \Forms \COM- Checklist.doc
SECTION 9.0 — ELECTRICAL DATA
Construction documents Location (sheet number or spec section)
9.1 ® Required No. of sets of plans: 2
9.2 ® Required Floor plan(s)
9.3 ® Required Electrical load calculations
9.4 ® Required One line diagram
9.5 ® Required Feeder riser diagram
9.6 ® Required Available fault current information
9.7 ® Required Panel schedule(s)
9.8 ❑ P ❑ NA Site electrical plan
9.9 ❑ P ❑ NA Fire -rated construction details
9.10 ❑ P ❑ NA Lighting plan
9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan
9.12 ❑ P ❑ NA Under -slab electrical plan
Supporting documents Notes
9.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
9.21 ❑ P ❑ NA Energy code compliance forms and calculations
for lighting
9.22 ❑ P ❑ NA Emergency power system specifications
9.23 ❑ P ❑ NA Feeder riser information
9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog
"cut sheets" or specifications
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 8
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
L\Building\Forms \COM- Checkl ist. doc
SECTION 10.0 - FIRE SUPPRESSION DATA
Construction documents Location (sheet number or spec section)
10.1 ® Required Floor plan(s)
10.2 ® Required Sprinkler piping plan(s)
10.3 ❑ P ® NA Site plan
10.4 ❑ P ® NA Standpipe information
10.5 ❑ P ® NA Back flow prevention information
10.6 ❑ P ® NA Reflected ceiling plan(s)
10.7 ❑ P ® NA Transverse and longitudinal cross sections
10.8 ❑ P ® NA Fire -rated construction details
10.9 ❑ P ® NA Specialty fire suppression system plans
and list of systems
Supporting documents Notes
10.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
10.21 ® Required Equipment manufacturers' catalog "cut sheets"
10.22 ❑ P ® NA Hydraulic calculations
10.23 ❑ P ® NA Specialty fire suppression system information
SECTION 11.0 - FIRE DETECTION AND ALARM DATA
Construction documents Location (sheet number or spec section)
11.1 ZRequired Floor plan(s)
11.2 ❑ P ❑ NA Site plan
11.3 ❑ P ❑ NA Reflected ceiling plan(s)
11.4 ❑ P ❑ NA Transverse and longitudinal cross sections
11.5 ❑ P ❑ NA Wiring schematic
11.6 El P ❑ NA Elevator recall information
11.7 ❑ P ❑ NA Operational matrix
11.8 ❑ P ❑ NA Fire -rated construction details
11.9 ❑ P ❑ NA Standard electrical notes
Supporting documents Notes
11.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
11.21 ® Required Equipment manufacturers' catalog "cut sheets"
11.22 ® Required Installer certification information
11.23 ❑ P ❑ NA Battery calculations
11.24 ❑ P ❑ NA Sample fire alarm log book
11.25 ❑ P ❑ NA Emergency power system specifications
11.26 ❑ P ❑ NA Monitoring station information
11.27 ❑ P ❑ NA Voltage drop calculations
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 9
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\Building\Forms\COM-Checklist.doc
SECTION 12.0 — RE -ROOF INSTALLATION DATA
Construction documents Location (sheet number or spec section)
12.1 ® Required Site plan or building location map
12.2 ® Required Occupancy classification
12.3 ® Required Type of construction
12.4 Z Required Minimum roof class required
12.5 ® Required Class of roofing to be installed
12.6 ® Required Roof plan
12.7 ❑ P ® NA Parapet and scupper cross section(s)
Supporting documents Notes
12.20 ® Required Pre -re -roof inspection report
12.21 ® Required Roofing system listing information
12.22 ® Required Roofing manufacturer's catalog "cut sheets"
12.23 ❑ P ® NA Structural calculations
12.25 ❑ P ® NA Structural engineer's report
SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS
Construction documents Item Location (sheet number or spec section)
13.1 ❑ P ❑ NA ❑ Required
13.2 ❑ P ❑ NA ❑ Required
13.3 ❑ P ❑ NA ❑ Required
13.4 ❑ P ❑ NA ❑ Required
13.5 ❑ P ❑ NA ❑ Required
13.6 ❑ P ❑ NA ❑ Required
13.7 ❑ P ❑ NA ❑ Required
13.8 ❑ P ❑ NA ❑ Required
13.9 ❑ P ❑ NA ❑ Required
13.10 ❑ P ❑ NA ❑ Required
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 10
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I: \Building \Forms \COM- Checklist.doc