Loading...
Specifications •vPoil -0.0070 1'2532. Sin/ Iiy .7" T lZ , • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • materials approved for exterior locations and protected 304.9 Fire Fighter Access and Escape. To provide access from corrosion or deterioration. and escape for Fire Fighters the location of roof - mounted • PV modules shall comply • wfh.he rigt�irerngnts of this SECTION 304 section. • • • • • • • • • • • • • ••• ••• LOCATION 304.9.1 General Pathway Requirements. All PV 304.1 General. The location of Photovoltaic (PV) installations shall inclu4 a igph wjde .(,914m) components, racking, support structures and attachments pathway maintained along three sides oCthe solar t shall be in accordance with the provisions of this chapter. The bottom edge of a roof wither slopathst ixaee4s1:141 shall not be used as a athwa All athwa s shall be 304.2 Zoning Requirements. The installation of PV p y p y g q located over a structurally supported area and measured systems shall comply with the requirements of the zoning from edge of the roof and horizontal ridge to the solar requirements of the Authority Having Jurisdiction (AHJ). array or any portion thereof. 304.3 Flood Hazard Areas. installation of PV systems Exception: within flood hazard areas, as defined by the AHJ, shall 1. On structures with a PV array area of 1,000 square comply with the Building Code or Residential Code, feet (92.90 m or less installed on a roof with a slope Section R322 as applicable. that exceeds 2:12 and with an intersecting adjacent roof and where no section is larger than 150 feet 304.4 Building Egress. PV systems shall not be installed (45720 mm) measured in length or width: in locations that would restrict, or otherwise prevent the 1.1. Where the PV array does not exceed 25% as use of, the required means of egress and emergency escape measured in plan view of total roof area of the and rescue. The means of egress shall comply with structure, a minimum 12 inch (305mm) unobstructed Chapter 10 of the Building Code or Residential Code, pathway, shall be maintained along each side of any horizontal ridge. Section R310 and R311 as applicable. 1.2. Where the solar array area, exceeds 25% as 304.5 Light and Ventilation. PV systems shall not be measured in plan view of total roof area of the installed in locations that would restrict the required light structure, a minimum of one 36 inch (914 mm) and ventilation. Light and ventilation shall comply with unobstructed pathway from ridge to eave, over a Building Code, Chapter 12 or Residential Code, Section structurally supported area, must be provided in R303 as applicable. addition to a minimum 12 inch (305 mm) • unobstructed pathway along each side of any 304.6 Rooftop Vent and Drain Clearances. PV systems horizontal ridge. shall not be installed in locations that would restrict the 2. Pathways are not required on non - occupied function of plumbing or mechanical vents, skylights, accessory structures provided they are separated from drains or other rooftop features. occupied structures by a 6 feet (3048 mm) minimum Exception: Non - operable skylights in one- and two- separation distance or by a minimum two -hour fire family dwellings. rated assembly. 3. Townhouses providing fire separation as required by 304.7 Mechanical Equipment Clearances. PV systems the applicable code at the time of construction may be shall be installed with not less than a 30 inch (762 mm) considered one structure and comply with the clearance around mechanical equipment requiring service provisions of Section 304.9.1(1.1). or maintenance. The specific provisions of the Mechanical Where townhouses are separated by real property Code and Electrical Code apply to installations of PV lines and pathways cross real property lines, the systems. building official shall review, approve and maintain a record of all easements for access related to the 304.8 Roof Drainage. PV systems shall not be installed in PV system installation. Easements may be general a manner that would obstruct roof drainage. No vertical in nature or they may describe specific locations. $ supports or roof penetrations shall be allowed within 12 The applicant shall provide a copy of the recorded inches (305 mm) of each side of the low point of the easement to the building official prior to issuance of valley. The PV modules or racking may extend into the the building permit. Easements shall be recorded for • valley no more than 6 inches (152 mm) from the valley each affected dwelling unit and the book and page low point provided that a minimum 3 inch (76 mm) number provided to the jurisdiction having clearance above the surface of the roof is maintained. authority. • • •• •• •• • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • Sample Residence - Portland, Oregon • • • • • • • 1 ridge pathway. • • • • • • • • • • • • • • • ••• • • • • • • • • • a • • a • • • • • • ••• ••• PV rray ess n • ` of ota roo , • • • • • • 4 , I „4 .., . .. • • • • • • • • 1 /410" . k . sss✓✓✓""" .. • ' 1 ----,,.. . . /4002'''' ti "01,11,-;- ' 1 Sample Residence • Portland. Oregon T ridge pathway 3' egress pathway ', v nay circa er an � of total roof area , 1 a. A. f , .,„, ..,.:., : /:::,,,-.... r ..:,- , ' '..1.`1, 7 , , ' , ,7 00"; i 1 "*# v Y A FIGURE 309.1 PANEL PATHWAY LOCATIONS NOTE: See Section 304.10 for alternate installations. 304.9.2.1. Where a system is required to have intermediate pathways, all pathways shall have 304.9.2 Intermediate Pathway Locations. one or more cutouts located adjacent to the Systems that include a solar array section that is pathway. No point on the pathway shall be more larger than 150 feet (45 720 mm) measured in than 25 feet (7620) from a cutout. length or width shall have additional intermediate 304.9.3 Prohibited Locations. Pathways shall not pathways. An intermediate pathway not less than be located within 12 inches of the low point of a 36 inches (914 mm) wide separating the array shall valley. be provided for every 150 feet (45 720 mm) of 304.9.4 Smoke and Heat Vents. In structures array including offset modules or angled where smoke and heat vents have been installed to installations. The maximum square footage of an array shall not exceed 22,500 ft (2090 m without comply with the requirements of the Fire Code, the installation of an intermediate pathway. Chapter 9 Smoke and Heat Vents and Chapter 23 High Piled Storage, a 36 inch (914 mm) wide pathway to and around each vent shall be provided • ., • •• •• •• • • • • .. • • • • • • • • • •• . • • • . . • • ••. • • •• • • • • • • • • • • • • • • • • • • • • • • •• for fire department access, maintenance and testing Racking and racking supports shall be mounted to of these vents. structural component, an shall nqt be 4 ;ttachecl, to . 304.9.5 Electrical Component Location, wall or roof coverin$s,.tr:n.or st=uc ui%hsathjng • . 304.9.5.1 Disconnects, j- boxes, combiner boxes as a means of structtIal:support. • • • • ••• ••• or gutters shall not be located in any required 4. Attached to standing seam metal roofs with pathway or cutout. connectors in accordance with manufacturer's 304.9.5.2 Raceways on flat roofs that cross a installation instruction `s' • • • • • • • • • • required pathway shall be bridged to avoid •• •• • ••• •• • • q p y g 5. Certified non- p$ j tripping hazards. Raceways shall not be permitted penetrating systems installed in accordance with the in required pathways on roofs with a slope that manufacturer's installation instructions. exceeds 2:12 (17- percent slope). 305.3.3 Roof Mounted Racking. Roof - mounted 304.10 Alternate Installations. In accordance with supporting structures shall be certified in Section 103.11, an alternative material, design, accordance with Section 303.4, and shall be location, method of construction, or means of safe designed in accordance with accepted engineering fire fighter access and egress may be approved by the practice, constructed and installed to safely support building official. all loads, including dead loads, snow loads, wind loads and seismic loads as prescribed by the SECTION 305 Building Code or in accordance with Section 305,4. STRUCTURAL 305.1 General. Photovoltaic 305.3.4 Ground Mounted Racking. Ground - (PV) components, mounted supporting structures, and all parts racking, support structures and attachments shall be thereof, shall be designed, constructed and installed in accordance with the provisions of this section. to safely support all loads, including dead loads, 305.2 Module Attachment. PV modules shall be flood loads, snow loads, wind loads and seismic attached in accordance with the manufacturer's loads as prescribed by the Building Code. installation instructions and to account for all loads, The bottom of modules shall be at least 18 inches including dead loads, snow loads, wind loads and (457 mm) clear from ground level. seismic loads, as prescribed by the Building Code. 305.4 Prescriptive Installations. Roof installations 305.3 Racking. Racking shall comply with this on conventional light -frame construction which section. complies with this section shall qualify as prescriptive and shall not require an engineered 305.3.1 Building Penetrations. All penetrations design if all of the following criteria are met: shall be flashed or sealed in a manner that prevents 1. Roof Structure: The supporting roof framing moisture from entering the wall and roof. shall be conventional light framed wood construction with pre - engineered trusses or roof 305.3.2 Structural Support and Attachment. framing members at a spacing of 24 inch (610 mm) Racking and racking supports shall be positively on center maximum that comply with the applicable attached to the structural components or blocking in allowable span in Table 305.4.1 (See Appendix B) accordance with this section. Racking and racking for the specific loads including ground snow loads supports installed in accordance with manufacturer's not exceeding 50 psf and wind loads that do not specifications or be designed in accordance with the exceed 95 MPH in exposure C or 105 MPH in Building Code and shall be mounted in accordance exposures A or B as defined in 1609 of the Building with one of the following: Code. Where the grade cannot be verified it is 1. Installed in accordance with manufacturer's assumed to be #2 Douglas -Fir Larch. specifications and be designed in accordance with Exception: Roof framing in compliance with the Building Code. the applicable allowable span in Table 305.4.2 (See Appendix B) for the specific loads 2. Installed in accordance with Section 305.4. including ground snow loads not exceeding 70 3. Positively attached to the structural components psf and wind exposure is limited to exposure A, or blocking in accordance through the use of B or C shall satisfy the requirements of this screws, bolts, j- bolts, or other approved means. section when the PV system is installed on; Such attachment shall not be accomplished by the use of toenails or nails subject to withdrawal. • • • • • • • • • • • et 114 y : : Buil&ng I)�visiot. • : • • • ® 13125 SW Hall Blvd. . Tigard, QR 91223 • 3 5 • • • 1;03.639.4171 • • • • f 1 ; • • ••• • }} • • • F � k, • • • WWW.U !v • • • • L r -' • • • 9 ••• ••• + ••• ••• • • •• •• 2010 Oregon Solar Installation Specialty Cf de; :•• ••• •• • • Check List for Prescriptive Installation of Roof - Mounted PhotoVoltaic Solar Panel System Installation address: 12532 sW 114 7 race... City: part /and; Zip 87.22 3 Owners name: Mdroki Contractors name: dvktre Oorp rattar2 Contractors CCB number: /i 49 a 0 e14 6 Pa1'4It1'.; * O ` :- 0- 40r@ If "Yes ", does not Flood Hazard Area Is the installation ❑ Yes qualify for the located in a flood prescriptive path plain/ flood way /No follow OSSC or ORSC for design requirements. Wind Exposure Is the wind riYes If "Yes ", qualifies for exposure "C" or less ❑ No the prescriptive path. Installations on Is the Ground Snow If "Yes ", qualifies for detached single/ Load 70 psf or less. the prescriptive two - family dwelling / ,='Yes path. Ground Snow single/ two - family Load townhomes and /or ❑ No their accessory structures. Installations on all Is the Ground Snow If "Yes ", qualifies for structures other Load 50 psf or less. the prescriptive than above /Yes path. I ❑ No S. • • • • •• •• •• • • • • • • • • • • • • • • • • • ` :On construction ▪ • material wood and o If "Yes ", qualifies for does the :. T}gSe of. ccir�structions qualify ❑ No the prescriptive • • • • . • • path. ;Con /tr}igtitn :• gs ;conventional • •• • • Tight frame" construction? •• •• • • •• • • • Is the spacing 24 If "Yes ", qualifies for • • "' • Pre- engineered inches or less. the prescriptive trusses. ❑ Yes path. Roof framing o No members Is the spacing 24 If "Yes ", qualifies for Nominal lumber inches or less. the prescriptive /Yes path. ❑ No Is the combined Dikes If "Yes ", qualifies for weight of the PV the prescriptive modules and ° No path. racking less than or Solar installation equal to 4.5 psf. Is the solar installation layout in dYes If "Yes ", qualifies for accordance with the prescriptive Section 305.4(3) of ❑ No path. the 2010 Oregon Solar Code. ❑ Metal Check the type of ❑ Single layer of If roofing material is roofing material. wood shingle/ shake one of the three 'M Two layers types checked, ax. Roofing material qualifies for the of composition prescriptive path. shingle. Is the roof mounted /Yes If "Yes ", qualifies for Connections of the solar assembl ° No the prescriptive solar assembly to connected to roof path. the roof framing or blocking directly. Attachment of roof Is the gauge 26 or ❑ Yes If "Yes ", qualifies for mounted solar less? ° No the prescriptive systems directly to path. - standing seam t1 metal panels Page 2 of 4 • •• •• •• • • • • •• • • • • • • • • • • • • • • • • •• •• • • • • • • • • -,• • • • 115 lbs for 60 inch ; It `des" : quaaifits for, • :.• Minimum Uplift spacing or less the prescriptive rating of Clamps: ❑ Yes p • ... •••• •• • • • • • • No ••••• • • • • • .• • •••• • • • • • ••• • • 75 lbs for 48 inches If "Yes ", qualifies for spacing or less tltlpr2Stryltive'• • ❑ Yes pa• • : : • • • \ • ••• • • • • •• ❑ No • If the spacing falls Spacing of clamps? Minimum 24 inches within 24 inches and 60 inches, qualifies in Maximum 60 inches for the prescriptive path. If the width of the Width of roofing 18 inches or less panel is less than panels? 18 inches, qualifies for the prescriptive in path. o Yes Size and spacing of Minimum #10 at 24 o No fastener? inches o/c If "Yes ", qualifies for the prescriptive path. Is the roof decking ❑ Yes If "Yes ", qualifies for of WSP min. '/" ❑ No the prescriptive thickness, decking path. connected to framing members w/ min. 8d nails @ 6 "/12" o /c. Maximum 18 inches Is the height less . If "Yes ", qualifies for Height of the solar from the top of the than or equal to 18 the prescriptive modules module to the roof inches path. surface 9/Yes ❑ No Page 3 of 4 •• • • • • • • • •• •• •• • • • • • • • • ; S.4i0:0i It 09?G **iiikr ., 4 f , Prescriptive Enstaf la;tion Show the location of the PV system in relation to buildings, structures, • : • • • ' e roper4 k s, and, as applicable, flood hazard areas. •: • Ste Plan beta>ls m'i.gt be clear and easy to read. • • • • • Minimum size of the plan is 8.5x11 inches. • • • • • ••• Lltach a Limple structural plan showing the roof framing (rafter size, type, • en&spaang) and PV module system racking attachment. Structural System must be shown in sufficient detail and clarity to assess whether it Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5x11 inches. * Manufacturer: ., , 'i * Model Number: / S , . * Listing Agency: UL /703 Page 4 of 4